14
                                                                                                                                            BID DOCUMENTS COVER SHEET  CONTRACT DOCUMENTS  FOR  L527 MECHANICAL SYSTEMS UPGRADE   AT  LOS MEDANOS COLLEGE  2700 East Leland Road, Pittsburg, California 94565  CONTRA COSTA COMMUNITY COLLEGE DISTRICT    Consist of the following: ADDENDUM # 1 DSA File # 7-C1, DSA Application #01114479  Engineer:   Salas O’Brien  305 South 11 th  Street San Jose, CA 951122218  

ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT

                                                               

                                                                              

 

 

BID DOCUMENTS COVER SHEET 

 

CONTRACT DOCUMENTS  

FOR  

L‐527 MECHANICAL SYSTEMS UPGRADE   

AT  

LOS MEDANOS COLLEGE  

2700 East Leland Road, Pittsburg, California 94565 

 

CONTRA COSTA COMMUNITY COLLEGE DISTRICT 

   

Consist of the following:

ADDENDUM # 1

DSA File # 7-C1,

DSA Application #01‐114479 

 Engineer:  

  Salas O’Brien   305 South 11th Street 

San Jose, CA 95112‐2218 

 

Page 2: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT
Page 3: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT
Page 4: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT

     DSA Appl. #01‐114479 

   

Contra Costa Community College District  Section 00100 ‐ Page 1 of 2 Los Medanos College  Notice Inviting Bids L‐527 Mechanical Systems Upgrade  Addendum 1 

Section 00100 NOTICE INVITING BIDS 

 L‐527 Mechanical Systems Upgrade  

Los Medanos College 2700 East Leland Drive, Pittsburg, CA 94565 

 NOTICE IS HEREBY GIVEN that the Governing Board of the Contra Costa Community College District (District), 

Martinez, California, will  receive  sealed bid proposals  for  the  furnishing of all  labor, materials, equipment, 

transportation and services for the construction of the project entitled L‐527 Mechanical Systems Upgrade 

Construction  Cost  Estimate  (Range):  $750,000  to  $850,000;  License  Required:  C20‐  warm‐air  heating, ventilating and air‐conditioning contractor (Mechanical Contractor)  In general, the Work consists of removal and replacement of three (3) rooftop air handling units, demolition of existing air handling equipment, curbs, screens, piping, ductwork, controls & pumps; and supplying and installing all new air handling units, curbs, screens, associated piping, hydronics, pumps, ductwork, flashings, electrical, controls and equipment  required  for a  fully operational system. Other Work  includes, but  is not limited to temporary heating/cooling. Roofing membrane work, excluding flashings, to be by others.  Hard copies of plans and specifications shall be available for purchase at ARC located at 5753 Pacheco Blvd., Pacheco, California, Phone: (925) 682‐6930.  To purchase plans at ARC’s Public Planroom website use the link: https://order.e‐arc.com/arcEOC/PWELL_Main.asp?mem=23.  Go to the Public Planroom for access to the documents without a login required.  Payment for hardcopies shall be the responsibility of the bidder, and shall be made directly to ARC.  The District does not provide hardcopies of bid documents or reimburse cost of printing, delivery, or any expenses related to the bidding process.  For information directly from the District, you may also log in to the District Website: http://www.4cd.edu/webapps/PurchasingViewBids/default.aspx. Project documents available include but are not limited to plans, specifications, addenda, bidders lists, bid results, etc., and can be viewed on this District webpage.  All questions related to this project must be in writing and are directed to: 

Jovan Esprit, Contracts Manager Contra Costa Community College District 500 Court St., Martinez, CA 94553  Email: [email protected]  Facsimile: 925‐370‐7512   

Each bid shall be made on the bid form, which is included in the Bid Documents and when submitted, shall be accompanied by a Bid Bond or Certified Cashier’s Check  in the amount of 10% of bid (made payable to the Contra Costa Community College District).   The District reserves the right to forfeit Bid Bond submitted for failure of the successful bidder to secure Payment & Performance Bonds.      

Page 5: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT

     DSA Appl. #01‐114479 

   

Contra Costa Community College District  Section 00100 ‐ Page 2 of 2 Los Medanos College  Notice Inviting Bids L‐527 Mechanical Systems Upgrade  Addendum 1 

Important Information: Pre‐Bid Meeting and Job Walk, Date / Time:  Thursday, February 18, 2016 at 10:00 AM (MANDATORY) Pre‐Bid Meeting and Job Walk, Location:   Los Medanos College 

2700 East Leland Drive Pittsburg, CA 94565 Meet in Room PS 20 (see Campus Map) 

Last Date / Time for Bidder’s Requests for Information:  Thursday, February 25, 2016 Last Day to Issue Addendum:      Monday, March 7, 2016  Bids Due No Later Than, Date / Time:    Thursday, March 10, 2016 PRIOR to 2:00 PM   Bids Must Be Received at:       Contra Costa Community College District (Lobby) 

    500 Court St, Martinez, CA 94553     Attn: Jovan Esprit – Contracts Manager (CCCCD) 

 Bids must be received by the District prior to the time and by the date noted above.  Bids that are not received by the District prior to the time and by the date noted above will not be accepted, and will be returned to the Bidder unopened.

The  successful  bidder will  be  required  to  furnish  a  labor  and material  bond  in  an  amount  equal  to  one hundred percent  (100%) of the contract price and a  faithful performance bond  in an amount equal to one hundred percent (100%) of the contract price, said bonds to be secured from a surety company acceptable to the Contra Costa Community College District and authorized to execute such surety in the State of California.   This project is a public works project and is subject to prevailing wage rate laws.  A copy of the prevailing rates of wages  is on  file with  the Contracts & Purchasing Office of  the Contra Costa Community College District.  Said rates of wages shall be included in the contract for the work by this reference.  Attention is directed to Section 4100 through 4113 of the Public Contract Code concerning Subcontractors, with emphasis on Section 4104, known as the “Subletting and Subcontracting Fair Practices Act, effective July 1, 2014.  Attention  is directed  to Agreement Form, Article 5, and GENERAL CONDITIONS, Article 8, paragraphs 8.4.1 and 8.4.2, regarding liquidated damages.  Liquidated Damages shall be set for $1000 Dollars for each calendar day the work is delayed beyond the substantial completion date and $250 for each calendar day beyond final completion. The Governing Board of the Contra Costa Community College District reserves the right to reject any and all bids and/or waive any informality or irregularity in any bid received.  No bidder may withdraw their Bid for a period of ninety (90) days after the date set for opening thereof.  

 END OF SECTION 00100 

 

Page 6: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT

Page 1

 Contra Costa Community College District 

       

  

MINUTES PRE‐BID MEETING & SITE WALK (MANDATORY) 

 ===================================================================================================================== 

 PROJECT NUMBER/NAME:   L‐527 Mechanical Systems Upgrade   

CAMPUS:   Los Medanos College at 2700 E Leland Rd, Pittsburg, CA 94565       

Important Note:  An on‐site job walk follows the meeting.   Attendance at the job walk for this project is mandatory.   At  completion of  the  job walk, be  sure  to obtain a Certification of Site Visit  (Section 00450), signed by the District.  This signed form must be submitted with your bid.  

 1. Opening Remarks – Rob Mohr, Construction Manager 

Introductions 

DIR Registration requirement  

2. Project Team Members  

Kelly Johnson  Project Manager ‐ Critical Solutions, Inc. (CSI) 

Rob Mohr  Construction Manager ‐ Critical Solutions, Inc. (CSI) 

Joseph Gonzalez  Senior Project Architect ‐ Salas O’Brien 

Kenneth Pilgrim  Hazardous Materials Testing, RGA Environmental 

Russell Holt  Buildings and Grounds (B&G) Manager, LMC 

  Inspector of Record (TBD) 

 3. Brief Project Description 

 In general, the Work consists of removal and replacement of three (3) rooftop air handling units, demolition of existing air handling equipment, curbs, screens, piping, ductwork, controls & pumps; and supplying and installing all new air handling units, curbs, screens, associated piping, hydronics, pumps, ductwork, flashings, electrical, controls and equipment required for a fully operational system. Other Work includes, but is not limited to temporary heating/cooling. Roofing membrane work, excluding flashings, to be by others. 

 

DATE:  February 18, 2016 

TIME:  10:00 AM 

LOCATION:  Los Medanos College ‐  PS2 20 

Page 7: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT

Page 2

 

Timeline (calendar days): REVISED WITH ADDENDUM 1 o Estimated NTP – Monday, April 11th – THURSDAY APRIL 7 o Demolition and temporary cooling – May 28‐June 4th. o AHUs functional by August 12th. o Duration to Substantial Completion – 130 Calendar Days 

 4. Project Work Restrictions  

AHUs must be operational by August 12th. 

Temporary cooling required 

Access to roof will be from rear of building near the service road termination at cafeteria 

Work to be coordinated with other contractor who will be performing roofing work during the contract period. 

Refer to General Conditions Section 00700  

5. Bid Phase Communications & Correspondence  

All questions related to this Project must be in writing and directed to:  Jovan Esprit, Contracts Manager Contra Costa Community College District 500 Court St., Martinez, CA 94553 Email: [email protected]   Facsimile: 925‐370‐6517 

 6. Addenda Update 

No addenda issued  

7. Bid Phase Schedule Milestones – SEE ADDENDUM 1 FOR REVISED DATES 

Last day for RFI:  February 25, 2016, 2:00 PM NO CHANGE 

Last Addendum Issued:  March 1, 2016, 2:00 PM MARCH 7 

Bid Opening:    March 8, 2016, prior to 2:00 PM MARCH 10 

Award of Contract:  March 24, 2016 NO CHANGE 

Notice to Proceed:  April 11, 2016 APRIL 7  8. Bid Opening 

Bids must be received at the Contra Costa Community College District Office at 500 Court St, Martinez, CA by March 8, prior to 2:00 PM. – SEE ADDENDUM 1 FOR REVISED OPENING DATE OF MARCH 10 

All bids will be time stamped at the reception counter in the building lobby.   

Any bid received after the bid opening time will be rejected.   

An announcement will be made at the 2‐minute mark prior to the bid opening deadline. 

Page 8: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT

Page 3

Bid Package 

Review your bid package carefully before submitting it.  Be sure to include all required documentation. 

 9. Contract Duration Discussion 

Section 00600, Construction Agreement 

130 Calendar Days to Substantial Completion (SC) – LDs $1000/Calendar day beyond SC 

30 Calendar Days between SC and Final Completion – LDs $250/Calendar day beyond FC  

10. Substitution requests MUST comply with Contract Documents 

Within three (3) work days of bid opening on District form; acceptance at District’s sole discretion – form is provided on page 4 of section 01340 Administrative Forms & Logs.  

11.  Site Job Walk  

Review Construction Site 

Distribute signed Certificate of Site Visit forms 

Aerial view of access staging areas – access point for Sector 10 added   

  

Page 9: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT

9/10/2015 Los Medanos College ­ Google Maps

https://www.google.com/maps/place/Los+Medanos+College/@38.0050799,­121.8619981,149m/data=!3m1!1e3!4m2!3m1!1s0x80855976b8fdfb5f:0xc70ed9e305459803?hl=en 1/1

Imagery ©2015 Google, Map data ©2015 Google 50 ft

Los Medanos College

RobM
Line
RobM
Line
RobM
Line
RobM
Callout
Option 2a & b
RobM
Line
RobM
Callout
Option 1
RobM
Callout
Off hours access
RobM
Line
RobM
Callout
Staging area and roof access
RobM
Line
RobM
Polygon
RobM
Callout
Approximately 10'x20' staging area/access to sector 10
Page 10: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT
Page 11: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT
Page 12: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT
Page 13: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT
Page 14: ADDENDUM # 1 · 2016. 3. 1. · L‐527 MECHANICAL SYSTEMS UPGRADE AT LOS MEDANOS COLLEGE 2700 East Leland Road, Pittsburg, California 94565 CONTRA COSTA COMMUNITY COLLEGE DISTRICT