BOLDEN STADIUM RENOVATIONS & BUILDING ADDITIONS – PHASE 2 ADDENDUM NUMBER TWO Page 1 ADDENDUM NUMBER TWO for BOLDEN STADIUM RENOVATIONS & BUILDING ADDITIONS – PHASE 2 RICHLAND COUNTY SCHOOL DISTRICT ONE COLUMBIA, SOUTH CAROLINA PREPARED BY: Clayton Design, Inc. 2549 Forest Drive, Suite 3 Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street Columbia, South Carolina 29201 DATE OF ISSUE: November 19, 2018 TO: ALL BIDDERS OF RECORD This addendum modifies the Contract Documents only in the manner and to the extent stated herein and shown on any accompanying drawings and will become a part of the Contract Documents. Except as specified or otherwise indicated by this addendum, all work shall be in accordance with the basic requirements of the Contract Documents. BIDDER SHALL ACKNOWLEDGE RECEIPT OF ADDENDUM IN THE SPACE PROVIDED ON THE BID FORM. FAILURE TO DO SO MAY CONSTITUTE AN INFORMALITY IN THE BID. This addendum consists of 4 pages and the following attachments: Specification Section – 101426.15 Post and Panel / Pylon Signage Specification Section – 101433.10 Illuminated Panel Signage Specification Section – 101435-1 Exterior Signs Civil Drawings AD.2-C1.1, AD.2-C1.2, AD.2-C1.3, AD.2-C1-4, and AD.2-C2.1.1. Civil Drawings AD.2-L1.1, AD.2-L1.2, and AD.2-L1.3. Structural Drawing S2 Architectural Sheets ADD#2.1, ADD#2.2, ADD#2.3, ADD#2.4, ADD#2.5, ADD#2.6 and ADD#2.7. I. CHANGES TO BIDDING REQUIREMENTS Item No. Description 1. None at this time.

ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

BOLDEN STADIUM RENOVATIONS & BUILDING ADDITIONS – PHASE 2 ADDENDUM NUMBER TWO

Page 1

ADDENDUM NUMBER TWO

for

BOLDEN STADIUM RENOVATIONS & BUILDING ADDITIONS – PHASE 2 RICHLAND COUNTY SCHOOL DISTRICT ONE

COLUMBIA, SOUTH CAROLINA

PREPARED BY:

Clayton Design, Inc. 2549 Forest Drive, Suite 3

Columbia, South Carolina 29204

And

Cumming Construction Management, Inc. 720 Lady Street

Columbia, South Carolina 29201

DATE OF ISSUE: November 19, 2018 TO: ALL BIDDERS OF RECORD This addendum modifies the Contract Documents only in the manner and to the extent stated herein and shown on any accompanying drawings and will become a part of the Contract Documents. Except as specified or otherwise indicated by this addendum, all work shall be in accordance with the basic requirements of the Contract Documents. BIDDER SHALL ACKNOWLEDGE RECEIPT OF ADDENDUM IN THE SPACE PROVIDED ON THE BID FORM. FAILURE TO DO SO MAY CONSTITUTE AN INFORMALITY IN THE BID. This addendum consists of 4 pages and the following attachments:

Specification Section – 101426.15 Post and Panel / Pylon Signage Specification Section – 101433.10 Illuminated Panel Signage Specification Section – 101435-1 Exterior Signs Civil Drawings AD.2-C1.1, AD.2-C1.2, AD.2-C1.3, AD.2-C1-4, and AD.2-C2.1.1. Civil Drawings AD.2-L1.1, AD.2-L1.2, and AD.2-L1.3. Structural Drawing S2 Architectural Sheets ADD#2.1, ADD#2.2, ADD#2.3, ADD#2.4, ADD#2.5, ADD#2.6 and ADD#2.7.

I. CHANGES TO BIDDING REQUIREMENTS Item No. Description 1. None at this time.

Page 2: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

BOLDEN STADIUM RENOVATIONS & BUILDING ADDITIONS – PHASE 2 ADDENDUM NUMBER TWO

Page 2

II. CHANGES TO DIVISION ONE SPECIFICATIONS: 1. Section 01 10 00 Summary: ADD the following sentence to paragraph 1.3.C.1.a:

“Should the contractor require equipment to access the track area for any reason, the contractor will provide adequate protection to prevent damage to asphalt or rubberized surfacing. No equipment shall be allowed on the turf field at all.”

2. ADD the following sentence to paragraph 1.3.C.1.a:

“It is anticipated that the Bleacher Erector will be on site for erection beginning the 2nd week of January. Their work should be complete by the end of January. A section of planking and seating in front of the press box will be left out to facilitate press box construction. Framing will be in place and the planking and seating will be installed late July to early August.”

III. CHANGES TO TECHNICAL SPECIFICATIONS AND DRAWINGS

SPECIFICATIONS Item No. Description

1. Addition: New spec section – 101426.15 Post and Panel / Pylon Signage for sign S1

curved face sign. 2. Addition: New spec section – 101433.10 Illuminated Panel Signage for wall mounted

signs on Buildings 1 & 2. 3. Addition: New spec section – 101435-1 Exterior Signs for signs S2 through S7 for 12’ tall

directional post signs. 4. Change: Section 05510 Metal Stairs, 2.04 Components. Delete 2.04 A and 2.04 B. Stairs

are not to be concrete pan style. Provide McNichols perf-o-grip plank grating galvanized 1 ½” channels. Include matching stair treads with safety yellow edge on treads nosing horizontal and vertical edge. Submit engineered shop drawings for all stair components.

DRAWINGS:

Changes to Civil Plans: 1. Change: Change the new 8’ chain-link fencing at the back sides of the bleachers as

shown on the attached drawings AD.2-C1.1, AD.2-C1.2, AD.2-C1.3, and AD.2-C1-4. 2. Change: Change the dumpster enclosure to masonry wall type per attached arch.

addendum drawing ADD2.6 and called out on the attached drawing AD.2-C1.1. Delete the dumpster enclosure detail on sheet C4.

Page 3: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

BOLDEN STADIUM RENOVATIONS & BUILDING ADDITIONS – PHASE 2 ADDENDUM NUMBER TWO

Page 3

3. Addition: Add a new masonry wall with gate near buildings 4 & 5 as shown on the attached drawing AD.2-C1.3. Wall detail is on attached drawing S2.

4. Addition: Add a new 4’ wide gate on the walkway near building 5 as shown on the

attached drawing AD.2-C1.3. 5. Change: Change the new gravel drive adjacent to buildings 4 & 5 as shown on the

attached drawing AD.2-C1.3. 6. Addition: Widen the new walkway adjacent to the new block wall near building 5 as

shown on the attached drawing AD.2-C1.3. 7. Addition: Remove the existing gravel near buildings 4 & 5 as shown on the attached

drawing AD.2-C2.1.1. 8. Addition: Add 4” PVC sleeves for irrigation as shown on the attached drawing AD.2-L1.1. 9. Change: Change the note about the irrigation system allowance on sheet L1 to the note

shown on the attached drawing AD.2-L1.2. 10. Addition: Add the pavement repair detail shown on the attached drawing AD.2-L1.2. 11. Addition: Add 4” PVC sleeves for irrigation as shown on the attached drawing AD.2-L1.3. 12. Addition: Add sod where shown on the attached drawing AD.2-L1.3.

Changes to Structural Plans: 1. See Addendum Sheet S2 for Typical 8” CMU with Brick Veneer Screen Wall Section for

dumpster pad and screen wall around Bldgs. 4 & 5. Coordinate with civil.

Changes to Architectural Plans:

1. Addition: See Sheet ADD#2.1 for plan changes to Building 6. Electrical door has changed location and added fencing at plumbing chase and chase access door. Coordinate and adjust as required with structural and electrical requirements.

2. Addition: See Sheet ADD#2.2 for changes to door schedule at Buildings 4 & 5. 3. Addition: See Sheet ADD#2.3 for plan changes to Building 5. Deleted one overhead door

and relocated doors to stadium side. 4. Addition: See Sheet ADD#2.4 for plan changes to Building 4. Relocated doors to stadium

side.

Page 4: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

BOLDEN STADIUM RENOVATIONS & BUILDING ADDITIONS – PHASE 2 ADDENDUM NUMBER TWO

Page 4

5. Addition: See Sheet ADD#2.5 for plan changes to Building 3. Electrical door has changed location and added fencing at plumbing chase and chase access door. Coordinate and adjust as required with structural and electrical requirements.

6. Addition: See Sheet ADD#2.6 for new dumpster and vehicle gates detail. Coordinate with

civil. 7. Addition: See Sheet ADD#2.7 for plan changes to GR1/A2 Brick Post & Metal Fence

Detail, spec items added for aluminum fence.

8. Addition: See Sheet S2 for Typical 8” CMU with Brick Veneer Screen Wall Section for dumpster pad and screen wall around Bldgs. 4 & 5. Coordinate with civil.

Clarifications to Architectural Plans: 1. Clarification: Sheet A9 – Typical new building wall height is 10’-0” from slab to roof

bearing. Existing canteen building where the ticket booth rooms are to be added are 9’-4” from slab to roof bearing. Field verify and match existing as required.

2. Clarification: Sheet CS1 – Sign S1, Curved Face Sign, by Apco Signs. Curved face sign

system. 5220.2 Series Double Post (Circular Embedded) as per manufactures requirements. See added specification section.

Sheet CS1 – Signs S2 through S7, by Apco Signs. Multi-Directional Sign System. See

added specification section.

Clarifications to Electrical Plans: 1. Clarification: Refer to the Architectural floor plan revisions this addendum and to the

electrical equipment spaces. Since the entrance doors have been moved, rearrange the electrical equipment to suit the new floor plan.

2. Clarification: Refer to sheet E5 and to the provisions for signage shown on Architectural. Wire all signs, both high and low, on circuit C1 from Panel "LC".

END OF ADDENDUM NUMBER TWO

Page 5: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

SECTION 10 14 26.15

POST AND PANEL / PYLON SIGNAGE

Date: 12/18/08 (SignBar – SignPanel – Curved Face SignPanel)

PART 1 - GENERAL

1.01 SUMMARY

A. Section includes: 1. Non-illuminated post mounted signs complete with components by single

manufacturer at locations indicated.2. Provide exterior signs from same manufacturer.

1.02 REFERENCES

A. Standards of the following as referenced:1. Aluminum Association (AA).2. American National Standards Institute (ANSI).3. American Society for Testing and Materials (ASTM).

1.03 SUBMITTALS

A. Product data:1. Manufacturer's signed statement regarding compliance with QUALITY

ASSURANCE Article.2. Manufacturer's product literature indicating units and designs selected.3. Maintenance data and cleaning requirements for exterior surfaces.

B. Shop drawings:1. Indicate materials, sizes, configurations, applicable substrate mountings,

and required location of connections provided in other sections. Specifically indicate tolerances required from other sections for base mounted modules.

2. Typography sample for copy.3. Artwork for ** special graphics. **4. Furnish templates required for anchor locations installed by others.

1.04 QUALITY ASSURANCE

A. Manufacturer qualifications: Work required under this section from manufacturers regularly engaged in work of this magnitude and scope for minimum of five years.

Page 6: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

1.05 DELIVERY, STORAGE, AND HANDLING

A. Acceptance at site: Coordinate delivery of work to Project site under this section for immediate installation.

B. Handling materials and equipment: Handle signage in careful manner in order not to damage or mar surfaces of signs or adjacent finish surfaces as applicable.

1.06 SEQUENCING AND SCHEDULING

A. Coordinate:1. installation with adjacent finish materials not destroying adjacent

surfaces.2. with other sections for cast-in or built-in anchors and mounting hardware

required in work specified in other sections.

PART 2 - PRODUCTS

2.01 MANUFACTURED UNITS

A. Acceptable product: APCO; Curved Face SignPanel; 388 Grant Street SE, Atlanta, Georgia, 30312, USA. Phone; (404) 688-9000. Telex: 752098. Fax; (404) 577-3847.

B. Type: Post, Double post and bars. Wall Channels.

C. Sizes: Indicated in on drawings.

D. Design units with selected components below.

2.02 COMPONENTS

A. Changeable bars and headers1. Material: ASTM B221-90, 6063-T6 structural extruded aluminum alloy.2. Type: Manufacturer's standard 1-3/32" thick tubing with provisions for

interlocking spacers at top and bottom.3. Height: See drawings.4. Finish and color: AA M10C22A31 Natural satin anodized aluminum.

B. Curved Face SignPanel ** 5210.1 Single Post – 5220.1 & 2 Double Post Configuration

1. Material: ASTM B221-90, 6063-T6 structural extruded aluminum alloy.2. Post Lengths: see drawings.3. SignPanel material: 1/16” -1/8” Fiberglass Embedded Graphics **4. Panel Sizes Heights: See drawings.5. Panel Widths: See drawings.

Page 7: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

C 1. Material: ASTM B221-90, 6063-T6 structural extruded aluminum alloy.2. Type: Manufacturer's standard "+" shaped bar creating 3/16" reveal

between changeable bars. 3. Finish: AA M10C22A31 Natural satin anodized aluminum.

D. Graphics panel header and crown module:1. Custom engineered one piece seamless fiber-reinforced polyester (FRP)

consisting of initial gelcoat sealing layer with multilayers of translucent thermoset polyester resin and translucent glass fiber strands in flat sheet maintaining configuration to 0.125" minimum thickness.

2. Internal reinforcing: Encapsulated impact resistant polyurethane core to eliminate oil-canning, surface deflection, and warping and threaded metal inserts for hardware components.

3. Frame: Seamless welded extruded aluminum frame with extruded top hinge and resin hook surface for facer bond.

4. Bond faces to extruded aluminum; using exposed fasteners is prohibited.5. Color: Selected by Architect from manufacturer's standard 44 non-glare

colors per unit.

E. Posts:1. Material: ASTM B221-90, 6063-T6 structural extruded aluminum alloy, 0.093"

thickness minimum.2. Post profile: Circular 3. Finish and color: AA M10C22A31 Natural satin anodized aluminum.4. Design post for panel size; individual lengths required by manufacturer for

in ground mount. Post sizes 50mm and 100mm.5. Manufacturer's standard continuous pocket extrusion and removable

security post cap for each post.

F. Graphics for changeable bars:1. Pressure sensitive vinyl (PSV) colors: Selected by Architect from

manufacturer's standard 14 non-reflective.

Fonts and colors to be determined with shop drawing submittal.

G. Graphics on panel header and crown module:1. Special note: Use of clear overcoat on completed graphics regardless of

colors or types selected is STRICTLY PROHIBITED.2. Intaglio, integral to finish graphics colors: Selected by Architect from

manufacturer's standard 40 non-glare colors indicated in SCHEDULES Article.

2.03 ACCESSORIES

A. Miscellaneous hardware and items required for installation of in-ground mounted sign modules.

2.04 FABRICATION

Page 8: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

A. Shop assembly:1. Fabricate units to configurations indicated on reviewed shop drawings. 2. Fabricate posts to lengths required for in-ground mounting.3. Furnish copy required on reviewed shop drawings in accord with

manufacturer's standard procedures.

PART 3 - EXECUTION

3.01 EXAMINATION

A. Examine areas to receive sign modules; verify for correct location of cast-in anchors installed under other sections.

B. Notify Architect in writing of unacceptable substrate or improper location of anchors. Beginning work indicates acceptance of substrate. Subsequent modifications to substrate or modules become this section's complete responsibility.

3.02 INSTALLATION

A. Install sign modules in locations indicated in accord with reviewed shop drawings. Square, plumb, and level units.

B. Bore required holes for post mounted sign modules; set and align posts; fill and compact space around post with concrete.

3.03 CLEANING

A. Clean exposed surfaces not more than 48 hours prior to Date of Substantial Completion in accord with manufacturer's written cleaning instructions.

3.04 SCHEDULES

A. See attached Schedule.

END OF SECTION 10 14 26.15

Page 9: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

SECTION 10 14 33.10

ILLUMINATED PANEL SIGNAGE

PART 1 - GENERAL

1.01 SUMMARY

A. Section includes:1. Illuminated wall mounted signs complete with components by single

manufacturer at locations indicated.2. Provide exterior signs from same manufacturer.

1.02 REFERENCES

A. Standards of the following as referenced:1. Aluminum Association (AA).2. American National Standards Institute (ANSI).3. American Society for Testing and Materials (ASTM).4. Underwriters' Laboratories, Inc. (UL).

1.03 SYSTEM DESCRIPTION

A. Design criteria: Design to resist wind loads to 125 MPH when installed in accord with reviewed shop drawings and installation instructions.

1.04 SUBMITTALS

A. Product data:1. Manufacturer's signed statement regarding compliance with QUALITY

ASSURANCE Article.2. Manufacturer's product literature indicating units and designs selected.3. Maintenance data and cleaning requirements for exterior surfaces.

B. Shop drawings:1. Indicate materials, sizes, configurations, applicable substrate mountings,

and location of connections provided in other sections; specifically indicate tolerances required from other sections for base mounted modules.

2. Typography sample for copy.3. Artwork for graphics.4. Furnish templates for anchor locations, installed by others.5. Calculations indicating compliance with wind load design criteria

indicated below; seal drawings with stamp of professional engineer licensed to practice in the state where Project is located.

1.05 QUALITY ASSURANCE

Page 10: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

A. Manufacturer qualifications: Work under this section from manufacturers regularly engaged in work of this magnitude and scope for five years, minimum.

B. Pre-installation conference: Closely coordinate tolerances in this section for installation to substrates provided in other sections.

1.06 DELIVERY, STORAGE, AND HANDLING

A. Indicated in Delivery, Storage, and Handling Section.

1.07 SEQUENCING AND SCHEDULING

A. Coordinate:1. installation with adjacent finish materials not destroying adjacent

surfaces.2. with other sections for cast-in or built-in anchors and mounting hardware

required in work accomplished in other sections.

1.08 WARRANTY

A. Special warranty: Manufacturer's standard seven-year limited warranty covering coating degradation, chalking, fading, and fiberglass delaminating.

PART 2 - PRODUCTS

2.01 MANUFACTURED UNITS

A. Acceptable product:1. APCO; Illuminated PolySign; 388 Grant Street SE, Atlanta, Georgia, 30312,

USA. Phone; (404) 688-9000. Telex: 752098. Fax; (404) 577-3847.2. Other manufacturer's products are acceptable if submitted in accord

with Product Options and Substitutions section and are in strictcompliance with these specified requirements. **

B. Types: 1. Surface wall mounted panel: APCO; Model #4240.1; 6" thickness.

C. Design units with selected components below.

D. Locations: Indicated on drawings.

Page 11: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

2.02 COMPONENTS

A. Graphics panel module:1. Sign panel faces and frame:

a. Custom engineered one-piece seamless fiber-reinforced polyester (FRP) consisting of initial gelcoat sealing layer with multilayers of translucent thermoset polyester resin and translucent glass fiber strands in flat sheet maintaining configuration to 0.125" minimum thickness.

b. Internal reinforcing: Encapsulated impact resistant polyurethane core to eliminate oil-canning, surface deflection, and warping and threaded metal inserts for hardware components.

c. Frame: Seamless welded extruded aluminum frame with extruded top hinge and resin hook surface for facer bond.

d. Maximum illuminated graphics area: Complete sign face minus 3" border.

e. Bond faces to extruded aluminum; using exposed fasteners is prohibited.

2. Cabinet:a. Extruded aluminum containing electrical components and top

receiving hinge for panel.b. Electrical: UL listed fluorescent lamps and ballasts contained in

internal raceways; 3. Finish and color: AA M10C22A42 Duranodic Dark Bronze 313. 4. Opaque background color: Selected by Architect from manufacturer's

standard 40 non-glare colors per unit.5. Furnish UL Label for entire sign module.6. Sizes: See drawings.

B. End shapes:1. Material: Molded fiberglass; same type construction as sign panel faces

except use of translucent resins is not required.2. Profile: Radius 3. Finish and color: Match sign module.

C. Graphics:1. Special note: Using clear overcoat on completed graphics regardless of

colors or types selected is STRICTLY PROHIBITED.2. Illuminated intaglio integral to finish graphics colors: Selected by

Architect from manufacturer's standard five translucent colors indicated in Schedule.

3. Non-illuminated intaglio, integral to finish graphics colors: Selected by Architect from manufacturer's standard 40 non-glare colors indicated in Schedule.

4. Type:a. Size: See drawings.b. Style: Select from shop drawing submittal.

Page 12: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

c. Type code: Uppercase.

2.03 ACCESSORIES

A. Furnish mounting brackets, miscellaneous hardware, and items for installation of sign modules.

B. Sealant for base mounted modules: 1. Acceptable products:

a. ChemRex Inc.; Sonneborn NP-I.b. Pecora Corp.; Dynatrol I.c. Sika Corp.; Sikaflex 1A.

2. ASTM C290-79, Type S, Grade NS, Class 25.3. Colors: Selected by Architect from manufacturer's standard selection.

2.04 FABRICATION

A. Shop assembly:1. Fabricate units to configurations indicated on reviewed shop drawings.

Internally reinforce units in accord with reviewed shop drawings.2. Furnish copy indicated on reviewed shop drawings in accord with

manufacturer's standard procedures.

B. Shop finishing: Finish in accord with color selections indicated on reviewed shop drawings; cover graphics area with removable clear protective film.

PART 3 - EXECUTION

3.01 EXAMINATION

A. Verification of conditions: ** Indicated in Coordination Section. ** OR **1. Examine areas to receive sign modules; verify for correct location of cast-

in anchors installed under other sections.2. Notify Architect in writing of unacceptable substrate or improper anchor

location.3. Beginning work indicates acceptance of substrate. Subsequent

modifications to substrate or modules become this section's complete responsibility.

3.02 INSTALLATION

A. Install sign modules in locations indicated in accord with reviewed shop drawings and printed installation instructions; square, plumb, and level units.

Page 13: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

3.03 CLEANING

A. Clean exposed surfaces not more than 48 hours prior to Date of Substantial Completion in accord with manufacturer's written cleaning instructions.

B. Remove clear protective film from graphics area.3.04 SCHEDULES

A. See attached Schedule.

END OF SECTION 10 14 33.10

Page 14: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

SECTION 10435-1

EXTERIOR SIGNS

PART 1 - GENERAL

1.01 SUMMARY

A. Section includes: 1. Non-illuminated post mounted signs complete with components by single

manufacturer at locations indicated.2. Provide exterior signs from same manufacturer.

1.02 REFERENCES

A. Standards of the following as referenced:1. Aluminum Association (AA).2. American National Standards Institute (ANSI).3. American Society for Testing and Materials (ASTM).

1.03 SUBMITTALS

A. Product data:1. Manufacturer's signed statement regarding compliance with QUALITY

ASSURANCE Article.2. Manufacturer's product literature indicating units and designs selected.3. Maintenance data and cleaning requirements for exterior surfaces.

B. Shop drawings:1. Indicate materials, sizes, configurations, applicable substrate mountings,

and required location of connections provided in other sections. Specifically indicate tolerances required from other sections for base mounted modules.

2. Typography sample for copy.3. Artwork for special graphics. 4. Furnish templates required for anchor locations installed by others.

1.04 QUALITY ASSURANCE

A. Manufacturer qualifications: Work required under this section from manufacturers regularly engaged in work of this magnitude and scope for minimum of five years.

Page 15: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

1.05 DELIVERY, STORAGE, AND HANDLING

A. Indicated in Delivery, Storage, and Handling Section.

1.06 SEQUENCING AND SCHEDULING

A. Coordinate:1. installation with adjacent finish materials not destroying adjacent

surfaces.2. with other sections for cast-in or built-in anchors and mounting hardware

required in work specified in other sections.

PART 2 - PRODUCTS

2.01 MANUFACTURED UNITS

A. Acceptable product: APCO; SignPoint TM ; 388 Grant Street SE, Atlanta, Georgia, 30312, USA. Phone; (404) 688-9000. Telex: 752098. Fax; (404) 577-3847 e-mail: [email protected]

B. Type: Post, Blade Directionals.

C. Sizes: 12’ tall, gauges as required by manufacturer.

D. Design units with selected components below.

2.02 COMPONENTS

A. Post shape: Circular & Octagonal1. Material: ASTM B221-90,6063-T5 structural extruded aluminum alloy2. Type: Manufacturer's standard

Normal: 3/32" thick extruded aluminum wall for Circular and Octagonal

3. Height: 12’ post length.4. Finish and color:

AA M10C22A31 Natural satin anodized for extruded aluminum Circular posts only.

B. Mounting Feet and Cover Plate:1. Material: Mounting Feet: Structural Steel welded 2. Type: Circular 3. Finish and color: Cover Plate: Molded FRP Finish and color:

Select from manufacturer’s standard 40 non-glare polyurethane colors.

C. Multi-Directional Blades: Solid Plate aluminum, see drawings for sizes1. Material: ASTM B221-90, 6063-T5 structural extruded aluminum alloy.

3003 Aluminum Plate 1/4” .

Page 16: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

2. Type: Manufacturer's standard Normal: Lengths available: see drawingsShape: Bevel End

3. Finish and color: Select from manufacturer’s standard 40 non-glare polyurethane colors.

D. Graphic Panels:1. Material: ASTM B221-90, 6063-T5 aluminum alloy plate2. Type: Manufacturer's standard

Normal: Thickness (1/4”) Double Sided viewing.3. Height: See drawings.4. Width: See drawings.5. Finish and color: Select from manufacturer’s standard 40 non-glare

polyurethane colors.

E. Clamps: Circular 1. Material: ASTM B221-90, 6063-T5 structural extruded aluminum alloy.2. Sizes: Manufacturer's standard: as recommended by manufacturer3. Type: Select degree angle for blades: 180 3. Finish and Color: Select from manufacturer’s standard 40 non-glare

polyurethane colors.

F. Decorative Rings: Circular 1. Material: Cast Aluminum alloy #319. 2. Size: 1/2” thick3. Finish and Color: Select from manufacturer’s standard 40 non-glare

polyurethane colors.

G. Graphics panel crown module:1. Crown Panels are provided for graphic accents:

Material: 6mm FRP flat sheet Type: Square

2. Color: Selected by Architect from manufacturer's standard 40 non-glare colors per unit.

3. Logo: Match color and style of school district’s logo.

2.03 ACCESSORIES

A. Miscellaneous hardware and items required for installation of in-ground mounted sign modules.

2.04 FABRICATION

A. Shop assembly:1. Fabricate units to configurations indicated on reviewed shop drawings. 2. Fabricate posts to lengths required for in-ground mounting.

Page 17: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement

Bolden Stadium Renovations & Building Additions 2014-0183Richland County School District One 11/17/18PHASE TWO

3. Furnish copy required on reviewed shop drawings in accord with manufacturer's standard procedures.

PART 3 - EXECUTION

3.01 EXAMINATION

A. Examine areas to receive sign modules; verify for correct location of cast-in anchors installed under other sections.

B. Notify Architect in writing of unacceptable substrate or improper location of anchors. Beginning work indicates acceptance of substrate. Subsequent modifications to substrate or modules become this section's complete responsibility.

3.02 INSTALLATION

A. Install sign modules in locations indicated in accord with reviewed shop drawings. Square, plumb, and level units.

B. Bore required holes for post mounted sign modules; set and align posts; fill and compact space around post with concrete.

3.03 CLEANING

A. Clean exposed surfaces not more than 48 hours prior to Date of Substantial Completion in accord with manufacturer's written cleaning instructions.

3.04 SCHEDULES

A. See attached Schedule.

END OF SECTION 10435-1

Page 18: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 19: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 20: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 21: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 22: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 23: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 24: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 25: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 26: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 27: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 28: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 29: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 30: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 31: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 32: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement
Page 33: ADDENDUM NUMBER TWO BOLDEN STADIUM RENOVATIONS & …€¦ · Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720 Lady Street ... Addition: Add the pavement