December 5, 2016 ADDENDUM #1 TO CONTRACT DOCUMENTS FOR: Project #CP161171 – Clydesdale CPET/ Rad Isolation ADVERTISEMENT DATE: November 22, 2016 PREPARED FOR: The Curators of the University of Missouri CONSULTANT: Planning, Design & Construction University of Missouri 130 General Services Building (573) 882-6800 The contract documents for the above noted project and the work covered thereby and herein modified. GENERAL INFORMATION:
1) CLARIFICATION: The construction estimate amount is being adjusted $200,050 - $221,175.
2) CLARIFICATION: The work area is within a working veterinary hospital. All care shall be made to ensure surrounding areas functioning without outage, or undue disturbance. Planned outages shall be scheduled for early mornings, evenings, or weekend hours with a minimum of 72 hours’ notice provided to the Owner’s Representative.
3) CLARIFICATION: Owner provided Phase 1 work will include the installation of exhaust
ducts through Phase 2 project areas which will exit out the east building façade. This work will require coordination and scheduling efforts by both parties. Individuals representing Construction Services will be present at the pre-construction meeting to initiate this coordination effort.
4) CLARIFICATION: Following substantial completion all contractor access in and out of
the project area for punchlist work shall be coordinated and access granted through the Owner’s Representative.
5) CLARIFICATION: Block cleaning and painting mock-up approvals on each type of sub-straight shall be required to proceed with finish coatings. Work which is not in conformance with specifications and owner approvals will require addition prep prior to finishes installations at the direction of the Owner’s Representative and Design Consultant.
Page 2 of 4
CHANGES TO PROJECT MANUAL: 1) Architectural Seal Page: DELETE sheet in its entirety and REPLACE with the attached
revised sheet. 2) Specification Section 1.A, Bid for Lump Sum Contract: A REVISED “Bid for Lump Sum
Contract” is attached. Revisions have been made to paragraph 3.b.: Bid Pricing. BIDS MUST BE SUBMITTED ON THE ATTACHED REVISED FORM.
3) CLARIFICATION: Alternate #2 provides for the installation of an epoxy floor finish. Base
bid requirements shall be a waterproofing concrete admixture. 4) Specification Section 1.E, Special Conditions, Paragraph 2.c.2: DELETE paragraph in its
entirety and REPLACE with the following:
(2) Demolition shall consist of CMU and concrete slab removal, pit cap cutting & M/E alterations as shown on drawings.
5) Specification Section 1.E, Special Conditions, Paragraph 2.c.3: DELETE paragraph in its
entirety and REPLACE with the following:
(3) Architectural work shall consist of a new slab, trench, CMU walls, doors and casework. 6) Specification Section 1.E, Special Conditions, Paragraph 2.c.4: DELETE paragraph in its
entirety and REPLACE with the following: (4) Structural work shall consist of plumbing tank support rack. 7) Specification Section 1.E, Special Conditions, Paragraph 7.h: ADD the following in its
entirety:
h. Provide temporary dust partitions for work adjacent to public and service corridors. 8) Specification Section 1.H, Alternates: DELETE page in its entirety and REPLACE with the
attached. 9) Specification Section 03 3006, Waterproofing Admixture for Cast in Place concrete: ADD the
attached section in its entirety: 10) Specification Section 09 6700, Fluid Applied Flooring: DELETE paragraph 2.02 in its
entirety and REPLACE with the following:
2.02 MATERIALS A. Fluid- Applied Flooring: Trowel Applied Resin (flooring and base)
1. Thickness: 3/16 inch, nominal, when dry 2. Texture: Slip Resistant, with translucent aggregates. 3. Sheen: Matte. (confirm with samples)
Page 3 of 4
4: Color: As selected by Architect from standard colors 5. Products:
a. Desco Quartz Cremona OR Series :800-373-8128 b. Or approved equal.
B. Fluid- Applied Flooring: Trowel Applied Resin (trench walls and floor) 1. Thickness: 15 mils, nominal, when dry 2. Texture: Slip Resistant. 3. Sheen: Matte. (confirm with samples)
4: Color: As selected by Architect from standard colors 5. Products:
a. Sherwin Williams Armorseal 100% solids epoxy: www.protective.sherwinwilliams.com b. Or approved equal.
CHANGES TO DRAWINGS: 1) Drawing Sheet G002, Equipment Schedule: CLARIFICATION: Item 27 shall be provided
and installed by Owner. 2) Drawing Sheet A101, Demolition Floor Plan: DELETE sheet in its entirety and REPLACE
with the attached. 3) Drawing Sheet A101, Demolition Floor Plan: CLARIFICATION the reference to saw cutting
in Phase 1C does not eliminate the need for Phase 2 demolition saw cuts as needed to the demolition of CMU walls and concrete floor slab noted for removal.
4) Drawing Sheet A102, Renovation Plan: DELETE sheet in its entirety and REPLACE with the
attached. 5) Drawing Sheet A501, Details: DELETE sheet in its entirety and REPLACE with the attached. 6) Drawing Sheet A601, Schedules: DELETE sheet in its entirety and REPLACE with the
attached. 7) Drawing Sheet P1.1, Plumbing Plan, General Plumbing Notes, Note 7: ADD the following in
its entirety:
7. The ¾” water line run to the Rad Waste Storage B143 shall transition from copper to PVC once it enters the Rad Waste Storage Rm. All water lines turn to the tanks shall be PVC and terminate in the tank with a bulkhead fitting. All tank penetrations (water & sanitary) shall be made with an appropriately sized Hayward BFAS series Bulkhead fitting or equivalent. These tanks should have no openings that would allow for evaporation.
8) Drawing Sheet P6.1, Plumbing Details and Schedules, Valve Schedule, Valve V2:
CLAIRIFICATION: Valve V-2 is a TW series 3-way valve and shall be supplied with an EPM3-120 actuator or equivalent.
http://www.protective.sherwinwilliams.com/
Page 4 of 4
9) Drawing Sheet P6.1, Plumbing Details and Schedules, Valve Schedule, Valve’s V-11-14: CLAIRIFICATION: These are solenoid operated valves, not ball valves as described in the remarks of this table. Thus contractor shall add a WHA-1 (Sioux Chief 652-AS) water hammer arrester on the supply line just upstream of these valves
10) Drawing sheet M1.2 Mechanical Plan, General Plumbing Notes, Note 13: ADD the following
in its entirety:
13. Phase 1 Scope: Provide tee fitting and elbow on branch take off for VAV1088 that will be installed in Phase 2. Install 1/4 turn ball valves for branch shut off. Phase 2: route new pipes from ball valves installed in phase 1 to new VAV1088.
11) Drawing sheet M1.2 Mechanical Plan, Phasing Note #26: DELETE note in its entirety and
REPLACE with the attached:
26. Phase 2 shall be installed by the contractor. Phase 2 shall consist of installing all equipment, pipe, and duct associated with the Vestibule, Canine Isolation, Feline Isolation, Pet Kennel and Rad Waste Storage. See Alternates. Refer to specification section 23-0900 Control Systems 1.01 Summary for Scope of Contractor Related Controls Work.
12) Drawing sheet M6.1 Mechanical Details and Schedules, Variable Air Volume Unit Schedule,
Line item #3: DELETE Tag VAV1087 and REPLACE with Tag VAV1088.
Air Device Schedule line item 4 should be S4 13) Drawing sheet M6.1 Mechanical Details and Schedules, Air Device Schedule, Line 4:
DELETE Tag S3 and REPLACE with Tag S4. 14) Drawing sheet E101 Electrical and Lighting Demolition Plan: DELETE note 1H and
REPLACE with the following: H. Remove existing hoist. Remove controls, disconnect, accessible conduit, and
associated conductors back to panel. Mark empty circuit breaker(s) as spare.” 15) Drawing Sheet E102, Electrical and Lighting Renovation Plans, Electrical Renovation Notes,
Note 4.JJ: DELETE in its entirety. 16) Drawing Sheet E102 (Alt 1), Electrical and Lighting Renovation Plans: ADD sheet in its
entirety.
END OF ADDENDUM #1
MU Project #CP161171 1.A - 1 Addendum #1
SECTION 1.A
BID FOR LUMP SUM CONTRACT
Date:____________________________ BID OF (hereinafter called "Bidder") a corporation* organized and existing under laws of the State of , a partnership* consisting of , an individual* trading as , a joint venture* consisting of . *Insert Corporation(s), partnership or individual, as applicable. TO: Curators of the University of Missouri
c/o Associate Vice Chancellor – Facilities Room L100, General Services Building University of Missouri Columbia, Missouri 65211
1. Bidder, in compliance with invitation for bids for construction work in accordance
with Drawings and Specifications prepared by Planning, Design, and Construction, entitled "Clydesdale Hall – CPET/RAD Isolation", project number CP161171, dated November 22, 2015 having examined Contract Documents and site of proposed work, and being familiar with all conditions pertaining to construction of proposed project, including availability of materials and labor, hereby proposes to furnish all labor, materials and supplies to construct project in accordance with Contract Documents, within time set forth herein at prices stated below. Prices shall cover all expenses, including taxes not covered by the University of Missouri’s tax exemption status, incurred in performing work required under Contract documents, of which this Bid is a part.
Bidder acknowledges receipt of following addenda:
Addendum No. Dated Addendum No. Dated Addendum No. Dated Addendum No. Dated
2. In following Bid(s), amount(s) shall be written in both words and figures. In case of discrepancy between words and figures, words shall govern.
MU Project #CP161171 1.A - 2 Addendum #1
3. BID PRICING a. Base Bid:
The Bidder agrees to furnish all labor, materials, tools, and equipment required renovate 865 sq. ft. and exterior yard modifications; all as indicated on the Drawings and described in these Specifications for sum of:
DOLLARS ($ ). b. Additive Alternate Bids:
Above Base Bid may be changed in accordance with following Alternate Bids as Owner may elect. Alternates are as described in Section 1.H of Project Manual. Alternates are written in a priority order, but Owner is not required to accept or reject in order listed. This is a one (1) contract project, therefore, Alternates shall be studied by each Bidder to determine effect on Bids of Contractor and each Subcontractor and/or Material supplier.
(1) Additive Alternate No. 1:
Provide metal fabrications, mechanical, plumbing and control panel installations as drawn & specified to activate the functioning RAD waste containment system within room B143. Suspended ceiling grid and vinyl faced lay in acoustical ceiling in Rooms B142A and B142C. Provide lighting layout as shown on E102(Alt #1); All for sum of:
DOLLARS ($ ).
(2) Additive Alternate No. 2:
In lieu of waterproofing concrete floor additive provide epoxy floor coatings in rooms B142, B142A, B142B, B142C, B143 with 4” roll up base and to include walls and floors of plumbing trench and pits. Provide 6” CMU walls in lieu of wall type 5,6,7 in room B142A, B142B, B142C; All for sum of:
DOLLARS ($ ).
(3) Additive Alternate No. 3:
Provide 8” thick poured in place concrete knee wall to 36” above grade in lieu of three (3) bollards, with chain-link above to 8’; All for sum of:
DOLLARS ($ ).
MU Project #CP161171 1.A - 3 Addendum #1
4. PROJECT COMPLETION
a. Contract Period - Contract period begins on the day the Contractor receives unsigned Contract, Performance Bond, Payment Bond, and "Instructions for Execution of Contract, Bonds, and Insurance Certificates." Bidder agrees to complete project within one hundred fifty (150) calendar days from receipt of
aforementioned documents. Fifteen (15) calendar days have been allocated in construction schedule for receiving aforementioned documents from Bidder.
b. Commencement - Contractor agrees to commence work on this project after
the "Notice to Proceed" is issued by the Owner. "Notice to Proceed" will be issued within seven (7) calendar days after Owner receives properly prepared and executed Contract documents listed in paragraph 4.a. above.
5. SUPPLIER DIVERSITY GOALS
a. The Contractor shall have as a goal, subcontracting with Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), and/or Veteran Owned Business of a combined ten percent (10%) and with Service Disabled Veteran Owned Business (SDVE) of three percent (3%) of awarded contract price for work to be performed.
b. Requests for waiver of this goal shall be submitted on the attached
Application For Waiver form. A determination by the Director of Facilities Planning & Development, UM, that a good faith effort has not been made by Contractor to achieve above stated goal may result in rejection of bid.
c. The Undersigned proposes to perform work with following Supplier Diversity
participation level: MBE, WBE, DBE, AND VETERAN SUPPLIER DIVERSITY PERCENTAGE PARTICIPATION: percent ( %) SDVE PERCENTAGE PARTICIPATION: percent ( %)
d. A Supplier Diversity Compliance Evaluation form shall be submitted with this bid for each diverse subcontractor to be used on this project.
6. BIDDER'S ACKNOWLEDGMENTS
a. Bidder declares that he has had an opportunity to examine the site of the work and he has examined Contract Documents therefore; that he has carefully prepared his bid upon the basis thereof; that he has carefully
MU Project #CP161171 1.A - 4 Addendum #1
examined and checked bid, materials, equipment and labor required thereunder, cost thereof, and his figures therefore. Bidder hereby states that amount, or amounts, set forth in bid is, or are, correct and that no mistake or error has occurred in bid or in Bidder's computations upon which this bid is based. Bidder agrees that he will make no claim for reformation, modifica-tions, revisions or correction of bid after scheduled closing time for receipt of bids.
b. Bidder agrees that bid shall not be withdrawn for a period of sixty (60) days
after scheduled closing time for receipt of bids.
c. Bidder understands that Owner reserves right to reject any or all bids and to waive any informalities in bidding.
d. Accompanying the bid is a bid bond, or a certified check, or an irrevocable
letter of credit, or a cashier's check payable without condition to "The Curators of the University of Missouri" which is an amount at least equal to five percent (5%) of amount of largest possible total bid herein submitted, including consideration of Alternates.
e. Accompanying the bid is a Bidder's Statement of Qualifications. Failure of
Bidder to submit the Bidder's Statement of Qualifications with the bid may cause the bid to be rejected. Owner does not maintain Bidder's Statements of Qualifications on file.
f. It is understood and agreed that bid security of two (2) lowest and responsive
Bidders will be retained until Contract has been executed and an acceptable Performance Bond and Payment Bond has been furnished. It is understood and agreed that if the bid is accepted and the undersigned fails to execute the Contract and furnish acceptable Performance/Payment Bond as required by Contract Documents, accompanying bid security will be realized upon or retained by Owner. Otherwise, the bid security will be returned to the undersigned.
7. BIDDER'S CERTIFICATE
Bidder hereby certifies:
a. His bid is genuine and is not made in interest of or on behalf of any undisclosed person, firm or corporation, and is not submitted in conformity with any agreement or rules of any group, association or corporation.
b. He has not directly or indirectly induced or solicited any other bidder to put in
a false or sham bid.
MU Project #CP161171 1.A - 5 Addendum #1
c. He has not solicited or induced any person, firm or corporation to refrain from bidding.
d. He has not sought by collusion or otherwise to obtain for himself any
advantage over any other Bidder or over Owner.
e. He will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin in connection with performance of work.
f. By virtue of policy of the Board of Curators, and by virtue of statutory authority,
a preference will be given to materials, products, supplies, provisions and all other articles produced, manufactured, mined or grown within the State of Missouri. By virtue of policy of the Board of Curators, preference will also be given to all Missouri firms, corporations, or individuals, all as more fully set forth in "Information For Bidders."
END OF BIDDER’S CERTIFICATE
MU Project #CP161171 1.A - 6 Addendum #1
8. BIDDER'S SIGNATURE
Note: All signatures shall be original; not copies, photocopies, stamped, etc.
Authorized Signature
Date
Printed Name
Title
Company Name Mailing Address City, State, Zip Phone No. Federal Employer ID No.
Fax No.
E-Mail Address
Circle one: Individual Partnership Corporation Joint Venture If a corporation, incorporated under the laws of the State of__________ Licensed to do business in the State of Missouri? ____yes _____no
(Each Bidder shall complete bid form by manually signing on the proper signature line above and supplying required information called for in connection with the signature. Information is necessary for proper preparation of the Contract, Performance Bond and Payment Bond. Each Bidder shall supply information called for in accompanying "Bidder's Statement of Qualifications.")
END OF SECTION
MU Project #CP161171 ALT - 1
SECTION 1.H
ALTERNATES Base Bid may be increased in accordance with following Additive Alternate proposal(s) as Owner may elect: 1. Additive Alternate No. 1:
Provide metal fabrications, mechanical, plumbing and control panel installations as drawn & specified to activate the functioning RAD waste containment system within room B143. Suspended ceiling grid and vinyl faced lay in acoustical ceiling in Rooms B142A and B142C. Provide lighting layout as shown on E102(Alt #1).
2. Additive Alternate No. 2:
In lieu of waterproofing concrete floor additive provide epoxy floor coatings in rooms B142, B142A, B142B, B142C, B143 with 4” roll up base and to include walls and floors of plumbing trench and pits. Provide 6” CMU walls in lieu of wall type 5,6,7 in room B142A, B142B, B142C.
3. Additive Alternate No. 3: Provide 8” thick poured in place concrete knee wall to 36” above grade in lieu of three (3) bollards, with chain-link above to 8’.
END OF SECTION
sf
STOR
A11870
sf
SURGPREP
A119129
sf
SCRUB
A12073
sf
SURGERY
PREPA121147
sf
W TO
ILA122B78
sf
W LK
RA122
83sf
M LK
RA123
113
sf
BO
VINE
EXAM
A125
339
sf
LAR
GE
BO
VINE STA
LLSA113B
145
sf
LAR
GE
BO
VINE STA
LLSA113O
145
sf
SWINE
STLS.A10
6A42
sf
BO
VINE
SPEC C
AR
EA10
3169
sf
RESEA
RCH
LAB
A10
5185
sf
CO
RR
CA10
110
5
sf
BO
VINE
SPEC C
AR
EA10
4128
sf
SWINE
STALL A
LLEYA10
6140
sf
LAR
GE
BO
VINE STA
LLSA113A
139
sf
SWINE
STLS.A10
6D42
sf
SWINE
STLS.A10
6C42
sf
SWINE
STLS.A10
6B42
sf
STOR
A10
295 sf
BO
VINE
REC
EIVING
A10
0472
sf
SWINE
STLS.A10
6E42sf
SWINE
STLS.A10
6F41
sf
TELEEQ
UIPA10
9A79
sf
BO
VINE
TREA
TMENT
A126
2,998
sf
LAR
GE
BO
VINE STA
LLSA113P139
sf
MEC
HANIC
AL
RO
OM
A10
97,213
MECHANIC
AL
PIT
TO
LAD
DER
MECHANIC
AL
PIT
sf
SMALL B
OV
INESTA
LLA111E86
sf
LAR
GE
BO
VINE STA
LLSA113D
145
sf
LAR
GE
BO
VINE STA
LLSA113E 139
sf
LARGE
BOVINE STALLSA113F 133
sf
MED
ICAL
REC
OR
DS
A10
8241
sf
LAB
A10
7117
sf
SMALL B
OV
INESTA
LLA111H86
sf
SMALL B
OV
INESTA
LLA111G85
sf
SMALL B
OV
INESTA
LLA111F85
sf
LAR
GE
BO
VINE STA
LLSA113M
145
sf
LAR
GE
BO
VINE STA
LLSA113N139
sf
AV
STOR
A131A35
sf
LAR
GE
BO
VINE STA
LLSA113L 139
sf
LARGE
BOVINE STALLSA113K
133
sf
M TO
ILA123B76
F
sf
LARGEBOVINE STALLS
A113G
138
sf
SMALL B
OV
INESTA
LLA111D85
sf
SMALL B
OV
INESTA
LLA111C85
sf
BO
VINE
STALL
A111B86
sf
CORRCA115
31
sf
LAUND
RY
RO
OM
A112
128
sf
CORR
CA11632
sf
BO
VINE
STALL
A111A85
sf
CORR
CA1101518
sf
LARGEBOVINE STALLS
A113J 138 sf
CORRCA1172224
sf
CORRCA115A
31
sf
CORR
CA116A32
sf
CORRCA117
2158
sf
DIAGX-RAYB124379
sf
RADIOLOGY WORKB120278
sf
SATELLITEPHARMACY
B105193sf
CO
RR
CB
102A
461
sf
VESTIBULEVB100
129
sf
W A
MB
ULLK
R R
MA12796
sf
LG. A
NIMAL
CLINIC
A126A10
8
sf
TACK
RO
OM
A126C118
F
sf
W TO
ILA127B98
F
sf
M TO
ILA 128B115
sf
SHOW
A128A22
sf
TOMOGRAPHYSCANNING
B121545
sf
INTERVIEWB103101sf
OFFIC
EB
104
98
LA
sf
TOMOGRAPHYCONTROL
B120C132
sf
RADIATIONTHERAPY
B122A520
sf
W TOILB109107
sf
MEDRECORDS
B106410
sf
LAWAITING
B102592
sf
CLIENT/WAITING RM
B111104
sf
LG ANIMALRECEPTION
B101184
sf
JANB11037
sf
CORRCB1271100
sf
CORRCB102B
335
sf
NUC MEDISO PREP
B125A59
F
sf
RADIOLCONSULT
B107111
sf
CORRCB1123496
LA
sf
DK RMB120A
51
sf
M TOILB108105
sf
NUC MEDIMAGING
B125286
sf
CNTRLB123A
86
sf
GEN RMB120B
94
sf
SPECIALPROCB123287
F
sf
GENERAL SUPPLY
B137941
sf
ETOSTER RM
B13392
sf
STERPICK UP
B131113
sf
STUDENT
RO
UNDS
A131
295
sf
M A
MB
ULLK
R R
MA12847
sf
CO
RR
CA117
2224
sf
STOR
A13029
sf
CO
RR
CB
1123492
sf
W TO
ILB
135122
sf
CLASSROOMA133373
sf
CLASSROOMA132 315
sf
M SHOWA123A
9
sf
W SHOWA122A
9
sf
ELEV.E000
76
sf
M TO
ILB
13687
sf
STAIRS003
175
sf
STER ROOMB132189sf
STER ENCLOB134126
sf
CO
NTRO
LB
12222
F
sf
ELEV EQUIP
B137A44
sf
ETO STERENCLOB134A
127
sf
BOVINESURGERY
A135444
sf
BOVINESURGERY
A134457
sf
STORA121A
34
sf
CORRCA117A
404
UP
UP
sf
WASTEB15181
sf
CORRCB1271,099
sf
INST WASHB130291
sf
ELEV.E00116 sf
WASTEB150
55
sf
LAUNDRYB130A
333
sf
STAIRS002
61
sf
LAMENESS
EXAMINATION
CC1571362
sf SURG
PREPC117
203
sf
INSTRROOMC110229
sf M LKRROOM
C111A147
sf EQ MED
TREATMENTC156
674
sf EQUINESTALLSC06
126
sf EQUINE
STALLSC03
126
sf
ARENAC153
2021
sf EQUINEEXAM
C149
312
sf EQ SURG
TREATMENT
C154649
sf
STORAGE
C152
181
sf
HYDROTHERAPY
WOUNDSC155
400
sf EQUINESTALLS
C04
126
sf EQUINESTALLSC05
126
sf
PUMPROOMC109157
sfSPE
CPR
OCC1
0448
1
sfSPEC
PRO
C
LAB
& STO
R
C103
296
sfCORR
CC10
115
4
sf EQUINEEXAM
C147327
sf EQUINE
RECEIVING
C100
1625
sf
TACKROOM
C151170
sf EQUINEEXAM
C148
356
DN
sfJAN
C102
53
sf EQUINE
STALLS
C07126
sf EQUINE
STALLS
C02126
sf EQUINE
STALLS
C01126
sf EQUINESTALLS
C08
126
sf EQUINE
SURG
C121
579
sfRECO
RDS
EQUIP
STO
RC1
0623
6
sfLOUN
GE/
VEND
INGC1
0577
6
sf W LKR
ROOMC113A
148
sf
WOMENC113
106
sf
CORR
CC107824
sf EQUINE
RCVRY
C120
274
sf
CORR
C11956
sf
ELECC10882
sfMEN
C111
106
sf
VESTB15261
sf VESTVC18386
sf EQUINESTALLSC23
126
sf EQUINESTALLSC26
126
sf EQUINE
STALLSC14
126
sf EQUINE
STALLS
C11
126
sf EQUINE
STALLSC24
127
sf EQUINESTALLSC161117
sf EQUINESTALLC159
249
sf EQUINESTALLSC12
127
sf EQUINE
STALLSC13
127
sf EQUINESTALLC160118
sf EQUINESTALL
C163172
sf NURSESTATIONC138
514
LADD
ER TO
sf
OFFICE
C165
135
sf CORR
CC163B126
DN
sf
ICUSTALL
C162173
sf
CARPENTER
SHOPC164
215
sf EQUINE
STALLS
C25
127
sf TOILC182
29
sf
STOR
C163A110
sf
ISOL FEEDROOM190A86
sf VESTVC18172
sf ISOL
STALLC190158
sf ISOL
STALL
C189
148
sf
ISOL FEED
ROOM
C189A
95
sf EQUINESTALLSC22
127
sf EQUINE
STALLSC21
126
sf
BEDDING
C127
356
sf MAINT/
STOR
C125319
sf NURSESTATIONC116A
253
sf EQUINESTALLSC10
127
sf EQUINESTALLSC09
126
sf EQUINE
STALLS
C15
127
sf EQUINESTALLS
C16
126
sf EQUINE
INDUCTION
C122
231
sf EQUINE
SURGERY
C123
583
sf EQ NEO STALLSC20
126
sf SUPPLYROOMC19
126
sf EQ NEO STALLSC18
126
sf EQ NEO STALLSC17
126
sf EQUINE
RCVRY
C124
273
sf TOILC12628
sf CLO
C118B
15
sf
ANESTHESIA
MACH
C115
261
sf SCRUBC118
157
sf
CORR
CC116102
sf SUPPLYROOMC114
202sf
CORR
CC118A
160 sf JANC112
62
sf
CORR.CC130
6857sf EQUINE
STALLS
C27
127
sf EQUINESTALLSC28
126
sf
CORR
CC180
339
sf
STORC18529sf
FEED
C128
394
sf
STORC131
90
sf WASTEC129
554
sf ISOL
STALL
C187
150
sf
VESTVC18477
sf ISOL
STALL
C188
158
sf
ISOL FEED
ROOM
C188A82
sf
ISOL FEEDROOM
C187A96
sf VEST
VC186
89
sf
CORR.CC130
6857
sf
CORR.CC1306857
sf
CORR.CC1306601
sf
CORR.
CC130
6857
sf
CORR.CC1306857
sf CORR.CC1306857
UP
UP
sf
TREADMILLC132
368
2ND FLO
OR
PENTHOUSE
sf
VEST
VA10
4A41
sf
CORRCB121
32
RAMP
RAMP
sf
LAR
GE
BO
VINE STA
LLSA113C145
CO
RR
CA11
4
CORRIDORCB142
CORRIDORCB142
CORRIDORCB145
CORRIDORCB145
CANINE
ISOLATIONB142AWASTEB144
BEDDING STOR.B143
FEED STORAGEB140
CORRIDORCB138
CORRIDORCB138
CORRIDORCB112
CORRIDORCB112
STORAGE/ MAINB142
CPET
CONTROL RM B141A
CPETSCANNER
B141
RAD.LAB.
B141B
22'-83
4 "
13'-0
"
FELINE
ISOLATION B142B
RAD. WASTESTORAGE B143
VESTIBULE
B142
PETKENNELB142C
TOP OF NEWSLAB @746'-0"TOP OF NEW SLAB @746'-0"
TOP
OF
NEW
SLAB
@74
6'-0
"
TOP OF EXISTINGSLAB @745'-0"
TOP
OF
EXIS
TING
SL
AB
@74
6'
FEED STORAGEB140
FEED STORAGEB141
TOP
OF
NEW
SLAB
@74
6'-0
"
TOP OF NEWSLAB @746'-0"
sf
HOLDINGB112C201
sf
THERIOEXAMB113144
sf
MRI EXAMB112E614
sf
MRI EQUIP.B112F
211
sf
CONTROLB112D
125sf
VEST. VB112
62
sf
CORRIDORB112340
sf
VALVEROOMB112B
17
TOP OF NEWSLAB @746'-0"
TOP
OF
EXIS
TING
SLAB
@74
6'-0
"
EXTEROPRDOG RUN
CORRIDORCB142
CORRIDORCB145
WASTEB144
BEDDING STOR.B143
FEED STORAGEB140
CORRIDORCB138
CORRIDORCB112
STORAGE/ MAINB142
FEED STORAGEB141
WASTEB144
BEDDING STOR.B143
STORAGE/ MAINB142
SCALE:
KEY PLANNOT TO SCALE
PROJECT AREA
1/8"
1/4"
3/8"
3/4"
0
0
4'
4'
2'
6'
8'
8'
12'
16'
20'
24'
10'
12'
0
0
2'
2'
1'
4'
6'
8'
4'
3'
3'
6'
5'
4'
3'
2'
2'
1'
1'
0
0
1"
1/2"
1-1/2"
3"
0
0
1'
2'
1'
0
0
1:50
1:10
10'
20'
30'
50'
150'
100'
of
PROJECT NUMBER
SHEET
DR
AW
N B
Y:
CH
EC
KE
D B
Y:
CA
MP
US
FAC
ILIT
IES
UN
IV
ER
SIT
Y O
F M
IS
SO
UR
I
Pla
nn
in
g, D
es
ig
n,
& C
on
stru
ctio
n
Design S
ervices
ARCHITECT -
The P
rofessional A
rchitects seal and
signature affixed to this sheet applies only to
the m
aterial and inform
ation show
n on this
sheet. A
ll draw
ings, instrum
ents, or other
docum
ents not exhibiting this seal shall not
be considered prepared by this architect, and
this architect expressly disclaim
s any and all
responsibility for such plans, draw
ings, or
docum
ents not exhibiting this seal.
This D
ocum
ent is intended to be signed
digitally. If no digital signature is attached to
this file, this m
edia should not be considered
a certified docum
ent.
CP161171
CL
YD
ES
DA
LE
H
AL
L
CO
LU
MB
IA
, B
OO
NE
C
OU
NT
Y, M
IS
SO
UR
I 6
52
11
CL
YD
ES
DA
LE
C
PE
T / R
AD
IS
OL
AT
IO
N
DE
MO
LIT
ION
FL
OO
R P
LA
N (
PH
AS
E 2
ON
LY
)
A101
5
JASON ANDREW GOLDEN
Mo. # A-2007030507
LLL
JAG
11/2
2/16
ISSU
ED F
OR
BID
AND
CO
NSTR
UCTI
ON
112
/05/
16AD
DEN
DUM
#1
SCALE:
DEMOLITION FLOOR PLAN -PHASE 1A, 1B (BY OWNER - N.I.C.) FOR REFERENCE ONLY3/8" = 1'-0"
11'-4
"
5'-105 8" 1'-10"
6A
6C
3A
5B
6A
3C
3D3E
13A501
INDICATES NOTES LOCATED ON PLAN
ARCHITECTURAL DEMOLITION NOTESINDICATES NOTES LOCATED ON PLAN
ARCHITECTURAL DEMOLITION NOTES
1. GENERAL:
A. NOT USED
2. STRUCTURAL:
A. NOT USED
3. WALLS, DOORS AND WINDOWS:
A. REMOVE DOOR AND H.M. FRAME. DELIVER DOOR TO OWNER IDENTIFIED LOCATION WITHIN BUILDING.
B. NOT USED.
C. REMOVE CONCRETE BLOCK WALL IN ENTIRETY. CONTRACTOR IS RESPONSIBLE TO PROTECT ANY PIPING ORCONDUIT THROUGH WALLS TO BE REMOVED. DEMO WALLS IN SUCH A WAY AS TO PROTECT WALLS TO REMAININ THE PHASE 1 PROJECT SPACE. REPAIR TO ITEMS TO REMAIN IS THE RESPONSIBILITY OF THE CONTRACTOR.
D. REMOVE AND SALVAGE ROLL UP DOOR, DELIVER TO OWNER IDENTIFIED LOCATION WITHIN BUILDING.
E. REMOVE EXISTING CONCRETE BLOCKS AS REQUIRED FOR INSTALLATION OF NEW DOOR LOCATIONS. NEWHEADER TO BE BOND BEAM WITH 2)#4 REBARS, KEYED INTO EXISTING CMU WALL. BOTTOM OF NEW HEADERAT +7'-4" ABOVE CONCRETE FLOOR.
F. PHASE 1 PARTITION WALL
G. PROVIDE A TEMPORARY ENCLOSURE WALL UNTIL NEW BLOCK WALL IS COMPLETE.
H. REMOVE TEMPORARY PARTITION ONCE ENCLOSURE WALL IS COMPLETE.
5. FURNITURE AND EQUIPMENT:
A. NOT USED.
B. REMOVE REMAINING HAY/STRAW AND FIXED RAISED FRAMING PLATFORMS.
C. REMOVE HOIST AND LIFT BUCKET (SEE ELECTRICAL FOR ADDITIONAL INFOMATION). EXISTING HOIST RAIL TOREMAIN.
6. MISCELLANEOUS:
A. REMOVE CONCRETE FLOOR SLAB (GRAYED AREA).
B. OWNER TO REMOVE CEDAR CHIPS.
C, REMOVE EXISTING METAL SKID PLATES AND FASTENERS
D. EXIST PIT TO REMAIN
E. SAW CUT ALL PIT WALLS. REFER TO DETAIL 13/A501
F. CUT FLOOR AS INDICATED ON PLAN FOR NEW ELECTRICAL TRENCH. COORDINATE WITH ELECTRICAL PLANS.
G. REMOVE WASTE CARRIER AT/IN EXISTING PIT.
H. CUT FLOOR TO PROVIDE STRAIGHT TRANSITION FOR FLOOR INFILL. COORDINATE WITH ELECTRICAL PLANS.
I. CUT PIT WALL FOR PIPING TRENCH. SEE ELEVATION 11/A501.
J. REMOVE CONCRETE SLAB AND EXCAVATE FOR FOOTING. (BID -ALTERNATE #3)
K. POWER - WASH CMU WALLS TO REMAIN.
L. FOLLOWING SLAB DEMOLITION, EXCAVATE AND REMOVE EXISTING FOOTINGS AND REBAR AS NEEDED FORNEW CONCRETE INSTALLATIONS.
SAW CUT WALL
6A
6E
6B
6A
3C
6A
6C
6C
6C
6A
3D
SCALE:
DEMOLITION FLOOR PLAN - PHASE 2 -BID SCOPE3/8" = 1'-0"
6A
6A
6F
6D13
A501
1'-0"
6G
5C
5C5C
EXISTING SLAB ATELV.745'-0'
6A501
4'-8" 3'-4" 7'-0" 24'-0"
SAW
CUT
WALL
SAW
CUT
WALL
3C
6H
3C
6D
5C
3D
[RENO ROOM #B140]
6A
6C
6C
EXISTING SLAB ATELV.746'-0'
6H
3C
PHASE 1A DEMO - BY OWNER N.I.C.
DUST CONTROLBARRIER
BOTTOM OF BOND BEAM WITH2)#4 REBARS TO BE AT +7'-4"ABOVE CONCRETE FLOOR. KEYBOND BEAM INTO EXISTING WALL.
6I
PHASE 1B DEMO - BY OWNER N.I.C. PHASE 2 DEMO - BID SCOPE
3C
6A
SAW CUT FLOOR FORFLOOR DEMOLITIONIN PHASE 1C
SAW CUT FLOORFOR FLOORDEMOLITIONIN PHASE 1C
SAW CUT WALL FLUSH TO DOOROPENING TO STRUCTURAL CEILING-DEMOLISH ONLY THE PORTION OFWALL WITHIN PHASE 1B
3F
3F
6K
6K
6K
3D
3G
10"
±10'-2"10"
6L
6L
13A501
3H
1
1
1
1
1
REMOVED SLAB DEMOLITION SCOPE WITHIN BUBBLE.
SHORTENED AREA OF SLABDEMOLITION.
1
SCALE:
DEMOLITION FLOOR PLAN - PHASE 2 -BID SCOPE3/8" = 1'-0"
1
1
1 REPLACED VIEW TITLE
goldenjJAG Seal
CANINEISOLATION
B142A
CPETCONTROL RM
B141A
CPETSCANNER
B141
RAD.LAB.B141B
FELINEISOLATION
B142B
RAD. WASTESTORAGE
B143
VESTIBULE B142
PETKENNELB142C
FEED STORAGEB140
WL
WL
WL
CANINEISOLATION
B142A
CPETCONTROL RM
B141A
CPETSCANNER
B141
RAD.LAB.B141B
FELINEISOLATION
B142B
RAD. WASTESTORAGE
B143
VESTIBULE B142
PETKENNELB142C
TOP OF NEWSLAB @746'-0"TOP OF NEW SLAB @746'-0"
TOP
OF
NEW
SLAB
@74
6'-0
"
TOP OF EXISTINGSLAB @745'-0"
TOP
OF
EXIS
TING
SL
AB
@74
6'
FEED STORAGEB140
1'-4"
2'-1
0"
1'-25
8"
1'-4"
11'-4
"
6'-3"
TOP
OF
NEW
SLAB
@74
6'-0
"
TOP OF NEWSLAB @746'-0"
4'-0"11'-3"35 8"
4'-103 8" 8'-8" 6'-85 8"1'-25 8"
35 8"
3'-0"
47 8"
3'-83 4" 75 8"
13'-67 8"
75 8"
11'-4
"
3'-4"8'-0"4'-83 4" 7'-0"
24'-0"24'-0"
6'-4" 1'-4" 4'-0" 10'-412"
7'-6
34"
5'-5
1 2"
8"
1'-81
2"5'
-37
8"
7'-3"
614"
714"
9'-6
58"
4'-13 8" 1'-23 4"12'-105 8"
111 8
"
1114" 1'-0"
7'-2
7 8"
358"
1'-4"
47 8"
812"
358"
7'-11 4
"
TOP OF NEWSLAB @746'-0"
2'-1
34"
3'-6
"
4'-0
"
8"2'
-95
8"
1'-83
8"3'
-4"
4'-0
"
2'-1
07
8"
2'-8
"4'
-0"
1'-5"
3'-4
"
714"
TOP
OF
EXIS
TING
SLAB
@74
6'-0
"
2'-27 8"
6'-113 4"
6'-105 8"1'-
8"5'
-93
4"
EXTEROPRDOG RUN
2'-5
"1'-
8"
8" 3'-0"
SLIP TRACK3 5 8"x2 12"
SUSPENDED CEILINGAS SCHEDULED
R11 BATTINSULATION
5/8" TYPE "x"GYPSUM BOARD
3 5 8" x 20G.A.METAL STUD
VINYL 4" BASE
20 G.A METALBASE TRACK
THREADEDFASTENER TRACKTO STUD ONLY
TOP OF WALL TOFOLLOW LINE OFJOIST AND BEAMS
FLOORING ASSCHEDULED
±9'-4"
2) #4 REBARS
STANDARDHORIZONTALREINFORCING AT 24"O.C. PULL HEIGHTOFF WALL
4" CMU WALL
EPOXY 4" ROLL UPBASE
FLOORING ASSCHEDULED
BRACE TOP OFWALL TO STRUCTUREABOVE AT 4'-0"CENTERS
SUSPENDED CEILINGAS SCHEDULED
#4 REBAR x1'-0" AT2'-8" CENTERS,EPOXY SET INTOEXISTING SLAB
4"
GROUT SOLID ATREBARS
±9'-4"
SEE WALL TYPE#2
58" TYPE "x" GYPSUM
BOARD BOTH SIDES
212" STUDS @ 16"CTRS
BATT INSULATION
SUSPENDED CEILINGAS SCHEDULED
BRACE TOP OFWALL TO STRUCTUREAT 4'-0" CENTERS
SLIP TRACK212"x2 12"
THREADEDFASTENER TRACKTO STUD ONLY
TOP OF WALL TOFOLLOW LINE OFJOIST AND BEAMS
ROOM B141SIDE
FLUS
H G
YP B
OAR
D T
O C
MU
SUSPENDED CEILINGAS SCHEDULED
5/8" TYPE "x"MOISTURE RESISTANTGYPSUM BOARDROOM SIDE ONLY
358"x20 GA.METAL STUD
20 G.A METAL BASETRACK
±9'-4"
EPOXY 4" ROLL UPBASE
FLOORING ASSCHEDULED
BRACE TOP OFWALL TO STRUCTUREAT 4'-0" CENTERS
SLIP TRACK 35
8"x2 12"
SUSPENDED CEILINGAS SCHEDULED
R11 BATTINSULATION
5/8" TYPE "x"MOISTURE RESISTANTGYPSUM BOARD
3 5 8" x 20G.A.METAL STUD
EPOXY 4" ROLLUP BASE
20 G.A METALBASE TRACK
THREADEDFASTENER TRACKTO STUD ONLY
TOP OF WALL TOFOLLOW LINE OFJOIST AND BEAMS
FLOORING ASSCHEDULED
FIBER REINFORCEPANEL BOTH FACESOF WALL TO 8'-0"A.F.F.
SLIP TRACK 35
8"x2 12"
5/8" TYPE "x"MOISTURE RESISTANTGYPSUM BOARD
3 58" x 20G.A.METAL STUD
EPOXY 4" ROLLUP BASE
20 G.A METALBASE TRACK
THREADEDFASTENER TRACKTO STUD ONLY
TOP OF WALL TOFOLLOW LINE OFJOIST AND BEAMS
FLOORING ASSCHEDULED
FIBER REINFORCEPANEL ON ONE SIDEONLY TO 8'-0" A.F.F.
SLIP TRACK 6" x 212"
5/8" TYPE "x"MOISTURE RESISTANTGYPSUM BOARD
6" x 20G.A.METAL STUD
EPOXY 4" ROLLUP BASE
20 G.A METALBASE TRACK
THREADEDFASTENER TRACKTO STUD ONLY
TOP OF WALL TOFOLLOW LINE OFJOIST AND BEAMS
FLOORING ASSCHEDULED
FIBER REINFORCEPANEL BOTH FACESOF WALL TO 8'-0"A.F.F.
±10'-6"
ABOVE 10'-6" THISSIDE ONLY TAPEAND MUD SEAMSONLY
3 58" x 20G.A.METAL STUD
FLOORING ASSCHEDULED
5/8" TYPE "x"GYPSUM BOARD
SLIP TRACK 3 5 8"x2 12"
THREADEDFASTENER TRACKTO STUD ONLY
TOP OF WALL TOFOLLOW LINE OFJOIST AND BEAMS
FEED
STO
RAG
ER
OO
M B
140
VINYL BASE
CO
NTR
OL
RO
OM
B14
1A
2
1/8"
1/4"
3/8"
3/4"
0
0
4'
4'
2'
6'
8'
8'
12'
16'
20'
24'
10'
12'
0
0
2'
2'
1'
4'
6'
8'
4'
3'
3'
6'
5'
4'
3'
2'
2'
1'
1'
0
0
1"
1/2"
1-1/2"
3"
0
0
1'
2'
1'
0
0
1:50
1:10
10'
20'
30'
50'
150'
100'
of
PROJECT NUMBER
SHEET
DR
AW
N B
Y:
CH
EC
KE
D B
Y:
CA
MP
US
FAC
ILIT
IES
UN
IV
ER
SIT
Y O
F M
IS
SO
UR
I
Pla
nn
in
g, D
es
ig
n,
& C
on
stru
ctio
n
Design S
ervices
ARCHITECT -
The P
rofessional A
rchitects seal and
signature affixed to this sheet applies only to
the m
aterial and inform
ation show
n on this
sheet. A
ll draw
ings, instrum
ents, or other
docum
ents not exhibiting this seal shall not
be considered prepared by this architect, and
this architect expressly disclaim
s any and all
responsibility for such plans, draw
ings, or
docum
ents not exhibiting this seal.
This D
ocum
ent is intended to be signed
digitally. If no digital signature is attached to
this file, this m
edia should not be considered
a certified docum
ent.
CP161171
CL
YD
ES
DA
LE
H
AL
L
CO
LU
MB
IA
, B
OO
NE
C
OU
NT
Y, M
IS
SO
UR
I 6
52
11
CL
YD
ES
DA
LE
C
PE
T / R
AD
IS
OL
AT
IO
N
RE
NO
VA
TIO
N P
LA
N
A102
5
JASON ANDREW GOLDEN
Mo. # A-2007030507
LLL
JAG
12/0
5/16
ISSU
ED F
OR
BID
AND
CO
NSTR
UCTI
ON
112
/05/
16AD
DEN
DUM
#1
6E
SCALE:
RENOVATION PLAN - PHASE 1 - CPET SUITE (MU CONSTRUCTION SERVICES)3/8" = 1'-0"
INDICATES NOTES LOCATED ON PLAN
ARCHITECTURAL RENOVATION NOTES (PHASE 2- BID)
3A
3M
3L
5E
30
12A501
3F
3D
+ 9'-0"
7E
EXISTING ROLL-UPDOOR TO REMAIN
2'-0
"
SCALE:
RENOVATION PLAN - PHASE 2 - RAD. ISOLATION SUITE (BID)3/8" = 1'-0"
3H
3F
3B
3E
4D
4D
4C
6E
3A
3C
1. GENERAL:
A. NOT USED
2. STRUCTURAL:
A. PROVIDE BOND BEAMS OVER OPENINGS IN NEW AND EXISTING C.M.U. WALLS. SEE DETAILS 2/A501.
B. PROVIDE STEEL HEADER WITH 4" BEARING AT CMU BLOCK WALL, AND 4" BEARING ON CUSTOM FABRICATEDSTEEL CLIP ANGLE AND 3) 12" DIA. EPOXY SET STUDS INTO EXISTING ROUND CONCRETE COLUMN, WELDED TOHEADER. SEE DETAILS ON SHEET A502 FOR HEADER SIZING. (2/A502).
C. EXTERNALLY MOUNTED STEEL BUCKS FOR LEAD LINED DOOR SUPPORT. SEE DETAIL 2/A502.
3. WALLS, DOORS AND WINDOWS:
A. INSTALL NEW LEAD LINED DOOR AND LEAD LINED HOLLOW METAL FRAME. SEE SHIELDING PLAN AND DOORSCHEDULE FOR ADDITIONAL INFORMATION.
B. INSTALL 414" MTL. FRAME WALL -58" TYPE 'X' GYPSUM BARD, OVER 37 8" x 20 GA. STUDS. TOP AT 9'-4" A.F.F.
C. INSTALL 4" CMU WALL -TOP AT +9"-4" A.F.F. WITH BOND BEAM AND 2-#4 REBARS. BRACED TO STRUCTUREABOVE. APPLY EPOXY PAINT OVER BLOCK FILLER PRIMER. (BOTH SIDES). PROVIDE 3 8" EPOXIED ANCHORSAT EXISTING WALLS/COLUMNS @ 24" O.C.
D. INSTALL 4-7 8" METAL FRAMED WALL. -3 5 8"x20 GA. METAL STUDS -R11 BATT INSULATION. FINISH WITH 5 8"TYPE "X" GYPSUM BOARD BOTH SIDES. TOP OF WALL AT STRUCTURE ABOVE.
E. FURRED OUT GYPSUM BOARD WALL. -58" TYPE "X" GYPSUM BOARD, OVER 20 GA.x7 8" HAT CHANNEL-TOP AT 9-4" A.F.F.
F. INSTALL 4" CMU WALL -TOP OF CMU PORTION AT +9'-4" A.F.F. BRACED TO STRUCTURE ABOVE. PROVIDE 3 8"EPOXIED ANCHORS AT EXISTING WALLS @ 24" O.C. APPLY EPOXY PAINT OVER BLOCK FILLER PRIMER.(BOTH SIDES). FROM 9'-4" TO STRUCTURE ABOVE -212"x20 GA. METAL STUDS -BATT INSULATION -5 8" TYPE "X"GYPSUM BOARD BOTH SIDES.
G. NOT USED
H. INSTALL 812" METAL FRAMED WALL. -2) 3 5 8"X20 GA. METAL STUDS EDGE TO EDGE -R11 BATT INSULATION.FINISH WITH 58" TYPE "X" GYPSUM BOARD BOTH SIDES. TOP OF WALL AT STRUCTURE ABOVE..SEE DETAIL 8/A102.
I. REPAIR REMAINING BLOCK WALL AS NEEDED AT DEMOLITION TERMINATION. (APPLY BLOCK FILLER & EPOXYPAINT)
J. INSTALL 48"W X 48"H LEAD SHIELDED WINDOW AND LEAD SHIELDED HOLLOW METAL FRAME. SEE ELEVATION10/A102 & RAD SHEETS.
K. INFILL OPENING WITH CMU GROUTED SOLID, #5 BARS @ 24" O.C.. MATCH EXISTING WALL THICKNESS. RUNNINGBOND. APPLY EPOXY PAINT OVER BLOCK FILLER PRIMER. (BOTH SIDES)
L. NEW 8" NOM. CMU. WALL (RUNNING BOND) TO STRUCTURE ABOVE (APPROX 14'-7"). #5S @ 24" O.C., GROUTSOLID TO 7'-0" AFF, EXTEND SOLID CELL ABOVE 7'-0" EVERY 48". APPLY EPOXY PAINT OVER BLOCK FILLERPRIMER (BOTH SIDES). PROVIDE 12" EPOXIED ANCHORS AT EXISTING WALLS/COLUMNS @ 24" O.C. SEE 1/A501.
M. INSTALL H.M FRAME, DOOR, AND HARDWARE AS SCHEDULED.
4. FINISHES:
A. PATCH CONCRETE SLAB FLOOR TO A LEVEL FINISH. COORDINATE WITH ELECTRICAL SHEETS FOR POWERTRENCH. (AS NEEDED.)
B. PAINT ALL WALLS. METAL FRAMES, AND SURFACE CONDUIT AND PIPING. SEE FINISH SCHEDULE AND NOTESFOR ADDITIONAL INFORMATION. APPLY BLOCK FILLER TO NEW CMU WALLS AND PAINT.
C. APPLY EPOXY FLOOR FINISH.
D. EXISTING FLOOR SLAB TO REMAIN UNFINISHED.
E. GRIND/LEVEL AS REQUIRED PER TOSHIBA FACILITY REQUIREMENTS. USE ARDEX OR EQUAL.
5. FURNITURE AND EQUIPMENT:
A. PROVIDE & INSTALL PAPER TOWEL AND SOAP ACCESSORIES FOR EACH SINK LOCATION.
B. INSTALL EPOXY FINISHED METAL BASE CABINETS AND 24" DEEP STAINLESS STEEL TOP W/ MARINE EDGE.
C. INSTALL EPOXY FINISHED METAL WALL CABINETS WITH SWINGING GLASS PANEL DOORS.
D. INSTALL EPOXY FINISHED METAL BASE CABINETS AND 30" DEEP STAINLESS STEEL TOP W/ MARINE EDGE.
6. MISCELLANEOUS:
A. INTEGRAL STAINLESS STEEL SINK, GOOSENECK FAUCET, AND EYE WASH. SEE PLUMBING DRAWINGS FORADDITIONAL INFORMATION.
B. POWER WASH CMU WALLS AND EXISTING SLAB PRIOR TO RENOVATION WORK.
C. CARD ACCESS, SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
D. NOT USED.
E. OWNER PROVIDED AND INSTALLED EQUIPMENT. SEE EQUIPMENT SCHEDULE AND ELECTRICAL SHEETS FORMORE INFORMATION.
F. NOT USED.
G. INSTALL 6" THICK REINFORCED CONCRETE EQUIPMENT PAD.
7. CEILING NOTES:
A. GYPSUM DROP CEILING AT 8'-0" A.F.F. PROVIDE HEAD WALL TO 9'-3".
B. 2X2 LAY-IN CEILING (HEIGHT VARIES). SEE FINISH SCHEDULE FOR MATERIAL SPECIFICATION.
C. SEE MECHANICAL/ELEVATION SHEETS FOR ADDITION INFORMATION.
D. OPEN TO STRUCTURE ABOVE.
INDICATES NOTES LOCATED ON PLAN
ARCHITECTURAL RENOVATION NOTES (PHASE 1 MU-CS)
3K
3I
3J
3M
6A
6E
3A
3K
4C
4B
6E
2C
2B
7B
4" SHEET METAL TRIM
EXISTING CONCRETE COLUMN.
NEW METAL INSULATED DOOR &H.M FRAME (SEE SCHEDULE)
CONCRETE KNEE WALL (4 SIDES)(ALT #3)
EXISTING ROLL-UPDOOR TO REMAIN
1'-3" MIN. CLEAR BETWEEN DUCT ANDFACE OF EXISTING METAL SIDING
BASE BID CHAIN LINK FENCE 8'-0" HIGH.(ALTERNATE #3: EXTERIOR 8" NOM.GROUND-FACE CMU BLOCK WALL WITH 6"LIMESTONE CAP)
SEE MECHANICAL SHEET FOR EXTERIOREXHAUST RISER SHAPE, SIZE,ATTACHMENT, AND TERMINATION DETAILS.PAINT DUCT CASING TO MATCH EXTERIORMETAL PANEL.
EXISTING CAST STONE HEADER.
PREFINISHED METAL WALL PANEL
+ 8'-0"
+ 8'-0"
7G
7A
7B7B
7D
1'-10" 10'-0" 2'-0" 10'-012" 2'-0"
9'-4
"
3'-1
1 2"
9'-1
03
4"
SCALE
RENOVATION ELEVATION - EAST (PARTIAL)9A102 1/4" = 1'-0"
B141A.1
B141A.2
B141.1 B142.1
B14
1.2
B14
2A.1
B141.3
B142C.1
B142B.1
B14
2A.2
2A
4B
5B5C
5A
4B
4AB141B.1
6B
6E
4B
3A 6C
3A
3F
3F
3A
2A
1. GENERAL:
A. NOT USED
2. STRUCTURAL:
A. NOT USED.
B. PROVIDE STEEL HEADER WITH 4" BEARING AT CMU BLOCK WALL, AND 4" BEARING ON CUSTOM FABRICATEDSTEEL CLIP ANGLE AND 3 12" DIA. EPOXY SET STUDS INTO EXISTING ROUND CONCRETE COLUMN, WELDED TOHEADER. SEE DETAILS ON SHEET A501 FOR HEADER SIZING.
C. NOT USED.
3. WALLS, DOORS AND WINDOWS:
A. NOT USED.
B. NOT USED.
C. NOT USED.
D. NOT USED.
E. NOT USED.
F. NOT USED
G. NOT USED.
H. NOT USED.
I. REPAIR WALL/COLUMN AS NEEDED AT DEMOLITION TERMINATION. (APPLY BLOCK FILLER & EPOXY PAINT)
J. NOT USED.
K. INFILL OPENING WITH CMU GROUTED SOLID, #5 BARS @ 24" O.C.. MATCH EXISTING WALL THICKNESS. RUNNINGBOND. APPLY EPOXY PAINT OVER BLOCK FILLER PRIMER. (BOTH SIDES)
L. NEW 8" NOM. CMU. WALL (RUNNING BOND) TO STRUCTURE ABOVE (APPROX 14'-0"). #5s @ 24" O.C., GROUTSOLID TO 7'-0" AFF, EXTEND SOLID CELL ABOVE 7'-0" EVERY 48". APPLY EPOXY PAINT OVER BLOCK FILLERPRIMER. (BOTH SIDES) PROVIDE 12" EPOXIED ANCHORS AT EXISTING WALLS/COLUMNS @ 24" O.C.
M. INSTALL H.M FRAME, DOOR, AND HARDWARE AS SCHEDULED.
N. PIPING SLEEVE IN CMU. COORDINATE SIZE AND HEIGHT WITH PLUMBING SHEETS.
O. PREFINISHED METAL WALL PANELS OVER, SPRAY APPLIED INSULATION AND WEATHER BARRIER, OVER 8"NOM. CMU WALL (RUNNING BOND) TO STRUCTURE ABOVE (APPROX 12'-0"). #5s VERTICAL @ 24" O.C., GROUTSOLID TO 7'-0" AFF. EXTEND SOLID CELLS ABOVE 7'-0" EVERY 48". APPLY EPOXY PAINT OVER BLOCKFILLER PRIMER AT INTERIOR SIDE ONLY.
P. BASE BID: INSTALL 4 78" STUD WALL (UNSHIELDED) PROVIDE FRP (BOTH SIDES) TO 8'-0" OVER MOISTURERESISTANT 58" TYPE 'X' GYPSUM OVER 3
58" 20GA STUDS, 16" O.C. TOP OF WALL TO STRUCTURE ABOVE,
(APPROX 14'-0" AFF.) - ALTERNATE #2: PROVIDE 4" CMU IN LIEU OF FRAME WALL, FOR PAINT FINISH.
Q. BASE BID CHAIN LINK FENCE 8'-0" HIGH. ALTERNATE #3: EXTERIOR 8" NOM. GROUND-FACE CMU BLOCKWALL (RUNNING BOND) SEE ELEVATIONS FOR HEIGHT. #5s @24" O.C., GROUT SOLID TO TOP OF WALL. CAPWITH 8" X 8" CAST STONE OVER THROUGH WALL FLASHING. REPAIR EXTERIOR SLAB. PROVIDE BONDBREAK COMPRESSIBLE JOINT AT NEW WALL.
4. FINISHES:
A. NOT USED
B. PAINT ALL WALLS. METAL FRAMES, AND SURFACE CONDUIT AND PIPING. SEE FINISH SCHEDULE AND NOTESFOR ADDITIONAL INFORMATION. SEE ALTERNATE #2.
C. ALTERNATE #2 APPLY EPOXY FLOOR FINISH AND 4" ROLL UP BASE.BASE BID: SEAL CONCRETE WITH SAND AGGREGATE.
D. NOT USED.
5. FURNITURE AND EQUIPMENT:
A. PROVIDE & INSTALL PAPER TOWEL AND SOAP ACCESSORIES FOR EACH SINK LOCATION.
B. INSTALL EPOXY FINISHED METAL BASE CABINETS AND 24" DEEP STAINLESS STEEL TOP W/ MARINE EDGE. SEEELEVATIONS SHEET A601.
C. INSTALL EPOXY FINISHED METAL WALL CABINETS WITH SWINGING GLASS PANEL DOORS. SEE ELEVATIONSSHEETA601.
D. CONTRACTOR TO INSTALL AND PLUMB OWNER PROVIDED KENNELS. SEE PLUMBING SHEETS.
E. PROVIDE AND INSTALL 21" X 18" KEY-LOCKABLE STAINLESS STEEL TRASH CHUTE. (HG409 BY OSWALD OREQ. "WWW.OSWALDSUPPLY.COM" (112 HR. FIRE RATED)
F. INSTALL 24" DEEP S.S. TOP W/ MARINE EDGE. PROVIDE WALL MOUNTED LEDGER AND WALL BRACKETS. SEEELEVATIONS AND SCHEDULE SHEET A601.
6. MISCELLANEOUS:
A. INTEGRAL STAINLESS STEEL SINK, GOOSENECK FAUCET, AND EYE WASH. SEE PLUMBING DRAWINGS FORADDITIONAL INFORMATION.
B. POWER WASH CMU WALLS AND EXISTING SLAB PRIOR TO RENOVATION WORK.
C. NOT USED.
D. NOT USED.
E. OWNER PROVIDED AND INSTALLED EQUIPMENT. SEE EQUIPMENT SCHEDULE AND MECHANICAL/ PLUMBING/ELECTRICAL SHEETS FOR MORE INFORMATION.
F. PROVIDE 3) 48" TALL, 6" DIAMETER CONCRETE FILLED STAINLESS STEEL PIPE BOLLARDS ON 12"X 12" X 12"STAINLESS STEEL PLATE, FASTEN TO CONCRETE WITH 4) 34" X 4
14" QUIK BOLTS, HILTI OR EQ. (COORDINATE
WITH EXISTING SLOPE)
G. CHAIN-LINK FENCING, 8'-0" HIGH, POSTS AND LOCKABLE ENTRY GATES. PROVIDE 30" TALL APPLIED SOLIDWEATHER RESISTANT PANELS (DOG RUN ONLY) EMBED TO 6" BELOW GRADE. (SEE ALTERNATE #3).
H. COMPACTED AND PERMEABLE PEA GRAVEL BED TO 8" DEPTH.
I. EXISTING EXTERIOR CONCRETE SLAB TO REMAIN.
J. 8" POURED IN PLACE STEM WALL TO 36" ABOVE GRADE WITH CHAIN LINK (C.L.) FENCE ABOVE TO 8'-0"(ALTERNATE #3).
K. NOT USED.
L. 2) 3 8" STAINLESS STEEL REINFORCED PLATES TO SPAN DRAINAGE PIT. FIXED, STAINLESS HINGE AT SOUTHWALL OF PIT WITH FLUSH BI-FOLD HINGE, AND REMOVABLE GUY WIRE HITCH FOR HOIST CONNECTION. SEEDETAILS SHEET A501.
M. PROVIDE TWO LEVEL REMOVABLE STEEL PLATFORM TO ELEVATE AND CARRY 4) 330 GAL TANKS. SEEA502 AND PLUMBING SHEETS FOR ADDITIONAL INFORMATION.
N. CAST CONCRETE PLUMBING CHASE WITH GASKETED STAINLESS STEEL AND HDPE COVER PLATE. APPLYEPOXY FLOORING MATERIAL ON BOTTOM AND BOTH SIDES. SEE DETAILS ON SHEET A501.
O. NEW 6" LEVEL CONCRETE SLAB WITH W2.1XW2.1 WWF,OVER VAPOR BARRIER, OVER COMPACTED GRAVEL.PROVIDE CONTROL JOINTS ISOLATING AREAS TO NO MORE THAN 144 SQFT. SAW-CUT 14 OF SLAB DEPTHAND FILL IN WITH SEALANT.
7. CEILING NOTES:
A. NOT USED.
B. 2X2 LAY-IN CEILING (HEIGHT VARIES).
C. SEE MECHANICAL/ELEVATION SHEETS FOR ADDITION INFORMATION.
D. ALTERNATE #2 OPEN TO STRUCTURE ABOVE. POWER WASH CEILING. PRIME AND PAINT STRUCTURE, HOISTBEAM, CONDUITS, PIPING, AND DUCTS.
E. HOIST AND HOIST BEAM TO REMAIN.
F. EXISTING ROLL-UP DOOR TO REMAIN.
G. ALTERNATE #1 2x2 LAY-IN CEILING (HEIGHT VARIES).
7F
PHASE 2 - BIDPHASE 1 - MU-CS
PHASE 2 - BIDPHASE 1 - MU-CS
4C
4B
5D
3M
3P
3L
3N
6E
PHASE 2 - BIDPHASE 1 - MU-CS
3L
6L
6E
6M
5C 5F
6A5A
4B
5C5B
6A5A
4C
3P
3M
7A50
1
10A501
5A501
6E
6E
5D
3L
6N
6O
4C
4B6O
3N
6N
5D
4C
4B6O
6G
6H
6I
6I
7F
4A
4A
8A501
9A50
1
4C
5D
5C
4C
6B
6B
6B
6B
4B 4C
6N
4C
6B
3I
4A60
13 A
601
2A60
1
1A601
7B
4A
2C
4A
6E
3C
3I
3I
3C
3C
SCALE
WALL TYPE 22A102 1 1/2" = 1'-0"
SCALE:
RENOVATION REFLECTED CEILING PLAN (PHASE1 & 2)1/8" = 1'-0"
9A10
2
SCALE
WALL TYPE 11A102 1 1/2" = 1'-0"SCALE
WALL TYPE 33A102 1 1/2" = 1'-0"SCALE
WALL TYPE 44A102 1 1/2" = 1'-0"
4 3 2 1
1
8 3
2
4
3
3
3
3
2
2
4A
SCALE
WALL TYPE 55A102 1 1/2" = 1'-0"
5
SCALE
WALL TYPE 66A102 1 1/2" = 1'-0"
6
SCALE
WALL TYPE 77A102 1 1/2" = 1'-0"
7
SCALE
WALL TYPE 88A102 1 1/2" = 1'-0"
8
5
6
7
5
5
5A50
1
9A60
1
3L 3K10A601
DO NOT INSTALL GYPSUMBOARD ON INSIDE OFCONTROL ROOM
6O
11A50
1
4E
4E
4E
4E
4E
6G
6E
9
212"
3'-4
"6'
-81 2
"2'
-0"
10'-0
"
10'-2"
6F
SCALE
ENLARGED PLAN VIEWPIT COVER PLATE10
A102 1" = 1'-0"
1'-814" 1'-814" 1'-814" 1'-814"
14"
7'-65 8" FIELD VERITY OPENING WIDTH
MAX. CLEAR BETWEEN OPENINGAND COVER PALTE
EQ. EQ. EQ. EQ.
12" MAX. CLEAR BETWEEN LEDGE ANGLE AND
SUPPORT ANGLES WELDED TO BOT. OF PLATE
3x4x14"4 LOCATIONS
3x212x14"10 LOCATIONS
MINIMIZE GAPBETWEENPLATES
2'-1
134"
2'-1
134"
EQ.
EQ.
6'-0
" FI
ELD
VER
ITY
OPE
NING
WID
TH
1 4"
12A501
11A50
1
3) HIGH LOAD WELD-ONHINGES W/BRONZE BEARING.-WELD TO FLOOR ANGLEAND BOTTOM OF PITCOVER.
SEE1/A501
1'-4"
FACE OF NEWINTERIORSLAB
1 10A102
4A502
3A50
2
5) HEAVY DUTY WELD ONBUTT HINGES BELOW
6J
6J
6J
6C
6C
6C
9
9A102
9SEE 1/A501
C.L. FENCETO 8'-0"
2) HOIST POINT WITHRECESSED AND CONCEALEDATTACHMENT RING
HOISTPOINT
SEEA601
ALT.
BASE BID
6E
N.I.C.
N.I.C.
5D
2B
PHASE 1 N.I.C.
3) NOTCH OUT PIT COVERPLATE AND SUPPORT ANGLEAT HINGES
EXTEND SUPPORTANGLE TO PIT WALL
3) NO COVER SUPPORTANGLE AT HINGES
3L
3'-0
"
6I
6F 3'-0
"8"
3'-4
1 2"
3"
8"
6I
1
1
11
6G
4"
1
1
6N
1
MOVED LOCATION OF CROSSTRENCH TO PIT
1. SHORTENED LENGTH OF FENCED DOG RUN.2. MOVED RAD WASTE STORAGE GATES TOBETWEEN COLUMNS.3. REMOVED FENCE AT SOUTH SIDE OFAPPROACH TO RAD WASTE STORAGE.
1
1
ADDED SUSPENDED GRIDCEILING TO B142A AND B142CAS PART OF ALTERNATE #1
1
1
7D
+ 9'-0"
+ 9'-0"
7B
1
MOVED END OF WALL
1
goldenjJAG Seal
"Z" PURLINS AT 2'-0" CENTERS
2" FOAM IN PLACE INSULATION
PREFINISHEDMETAL PANELS
METAL SIDING BASE TRIM
BOND BEAM SEESTRUCTURAL SHEET A501
TOP OF SLAB AT NEWWALL ELV.746'-0"
EXISTING CONC. BEAM
EXISTING VENEER ON STL. HDR.
EXISTING CONC. COLUMN
#3 HORIZONTAL REBARDOWELS DRILLED INTOADJACENT WALLS AT SAMECOURSE AS HORIZONTALLADDER REINFORCING
8x8x16 CONCRETE BLOCKWALL GROUTED SOLID TOELEVATION 753'-0"
VERTICAL REINFORCEMENTSEE STRUCTURAL ON SHEETA501
SLAB REINFORCEMENTSEE STRUCTURAL ONSHEET A501
1'-23 4"
1"PERMEABLE COMPACTEDWASHED PEA GRAVEL BEDTO 8" DEPTH
FROST WALL (EXISTING)
SLOPE TO MATCHEXISTING SLABS
EXISTING CONC. BEAM
EXISTING VENEER ON STL. HDR.
EXISTING CONC. COLUMN
SAW CUT FOOTERAS NECESSARY
REMOVE ROLL UPDOOR IN ENTIRETY
TOP OFEXISTINGSLAB ELV.745'-0"
SEE 3/A501FOR SLIP HEAD JOINT
EXISTING FLOOR SLAB TO REMAIN
REBAR. SEE STRUCTURAL ON SHEET A501
RUBBER WATER STOPBOTH SIDES
TOP OF WALLELV. ±761'-7"
TOP OF SLABELV. 746'-0"
SAW CUT EXISTING SLAB PHASE 1
COMPRESSIBLE FILL (2" MAX.)
EPOXY PAINT (OVER BLOCK FILLER)
CONCRETE SLAB. SEESTRUCTURAL ONSHEET A501 FORREINFORCEMENT
#4 REBARS ±12" CENTERS
GASKET ATTRENCH COVERBOTH SIDES
6"
1'-6"
6"
8" 1'-2" 75 8"
SEE DETAIL 8/A501 FORADDITIONAL NOTES
6"
6"
2"x2"x14" S.S. ANGLE
2"
#4 U-BARS AT 18" O.C. MIN.
312x212x14" S.S. ANGLEWITH 14"Ø STUDS AT 24"CENTERES
3/16 2-24STAGGERED TOPTO BOTTOM
CONSTRUCTION JOINT WITH SEALANTAND BOND BREAK
6 MILL VAPOR BARRIER, OVERCOMPACTED GRANULAR FILL
EPOXY REBAR SEE STRUCTURALON SHEET A501
VERTICAL REBAR. SEE 1/A501
#3 HORIZONTAL REBAR DOWELS DRILLEDINTO ADJACENT WALLS AT 24" CENTERSSAME COURSE AS STANDARD REINFORCING
8x8x16 CONCRETE BLOCK WALL GROUTEDSOLID TO ELEVATION 753'-0"
CONCRETE SLAB. SEE STRUCTURAL ONSHEET A501
CONSTRUCTION JOINT WITH SEALANT ANDBOND BREAK
EXISTING FLOOR SLAB TO REMAIN EASTOF SAW CUT
#4 L BARS AT I8" O.C. MIN.
TOP OF WALLELV. ±761'-7"
TOP OF SLABELV. 746'-0"
TOP OFEXISTINGSLAB ELV.745'-0"
SAW CUT EXISTING SLAB
CONTROL JOINTWITH SEALANT
COMPRESSIBLE FILL (2" MAX.)
REMOVE EXISTING FLOORSLAB IN ENTIRETY(PHASE 1C)
EPOXY PAINT BOTH SIDES (OVER BLOCK FILLER)
6"
SEE 3/A501 FOR SLIP HEAD JOINT
STANDARD HORIZONTAL REINFORCING.SEE 1/A501
WALL BUCK, STEEL IN-WALL INSERT FOR 21 X18 STAINLESS STEEL HG409 DOORS. HG414
21 x 18" STAINLESS STEEL TRASH CHUTEDOOR HG409 BY OSWALD SUPPLY OR EQ.
TOP OF CHUTEELV. 750'-0"
EPOXY REBAR SEESTRUCTURAL ON SHEET A501
6 MILL VAPORBARRIER, OVERCOMPACTEDGRANULAR FILL
TOP OF SLABELV. 746'-0"
CONCRETE SLABREINFORCEMENT. SEESTRUCTURAL ONSHEET A501
TRENCH COVER
1'-6"
6"
8" 1'-2" 8"
CONTINUE FLOOR FINISHSYSTEM INTO TRENCHWALLS AND FLOOR
#4 REBARS ±12" CENTERS
RUBBER WATER STOPBOTH SIDES
#4 U-BARS AT 18" O.C. MIN.6 MILL VAPOR BARRIER,OVER COMPACTEDGRANULAR FILL
TOP OFSLAB ELV.
746'-0"
COMPACTED GRANULAR FILL
RUBBER WATER STOP BOTHSIDES
#4 REBARS ±12" CENTERS
TOP OF WALLELV. ±761'-7"
TOP OF SLABELV. 746'-0"
COMPRESSIBLE FILL (2" MAX.)
EPOXY PAINT OVER BLOCKFILLER
CONCRETE SLAB SEESTRUCTURAL ONSHEET A501 FORREINFORCEMENT
GASKET ATTRENCH COVERBOTH SIDES
1'-6"
6"
8"1'-2"75 8"
SEE DETAIL 8/A501 FORADDITIONAL NOTES
SEE STRUCTURAL DETAILSFOR SLIP HEAD JOINT
2x2x14" S.S. ANGLE
2"
#4 U-BARS AT 18" O.C. MIN.
312x212x14" S.S. ANGLEWITH 14"Ø STUDS AT 24"CENTERES
3/16 2-24STAGGERED TOPTO BOTTOM
6 MILL VAPOR BARRIER, OVERCOMPACTED GRANULAR FILL
TOP OFSLAB ELV.746'-0"
6 MILL VAPOR BARRIER,OVER COMPACTEDGRANULAR FILL
EPOXY REBAR SEESTRUCTURAL ON SHEET A501
TOP OF WALLELV. ±761'-7"
TOP OF SLABELV. 746'-0"
COMPRESSIBLEFILL (2" MAX.)
EPOXY PAINT OVERBLOCK FILLER
CONCRETE SLABBEYOND
EXISTING PIT FLOOR
SEE DETAIL 8/A501 FORADDITIONAL NOTES
SEE 3/A501 FOR SLIPHEAD JOINT
EXISTING PIT WALL TOREMAIN
1'-2"
1'-6"
CUT PIT WALL TO MATCHINSIDE OF TRENCH
3) HIGH LOAD WELDON HINGES WITHBRONZE BEARING
SEE DETAIL13/A501 TOCUT PIT WALLS
NEW METAL FRAMED WALL WITHF.R.P. BOTH FACES (CMU -ALT #1)
NEW FLOOR SLAB BEYOND
L3x4x14" W/ 14"Øx4" STUDS AT 24"O.C. AND MITERED CORNERS
SCALE
PIT RENOVATION SECTION12A501 3/4" = 1'-0"
SCALE
WALL SECTION10A501 3/4" = 1'-0"
SCALE
DEMOLITION SECTION AT DOOR INFILL (PHASE 2)6A501 3/8" = 1'-0" SCALE
RENOVATION SECTION AT DOOR INFILL (PHASE 2)5A501 3/8" = 1'-0"
SCALE
EAST WALL SECTION AT HOLDING TANKS (PHASE 2)8A501 3/4" = 1'-0"
SCALE
PIT DEMOLITION SECTION13A501 3/4" = 1'-0"
SCALE
STRUCTURALWALL REINFORCEMENT AT OPENINGS2
A501 NOT TO SCALE
SCALE
SOUTH WALL SECTION AT HOLDING TANKS (PHASE 2)9A501 3/4" = 1'-0"
SCALE
TRENCH SECTION7A501 3/4" = 1'-0"
1/8"
1/4"
3/8"
3/4"
0
0
4'
4'
2'
6'
8'
8'
12'
16'
20'
24'
10'
12'
0
0
2'
2'
1'
4'
6'
8'
4'
3'
3'
6'
5'
4'
3'
2'
2'
1'
1'
0
0
1"
1/2"
1-1/2"
3"
0
0
1'
2'
1'
0
0
1:50
1:10
10'
20'
30'
50'
150'
100'
of
PROJECT NUMBER
SHEET
DR
AW
N B
Y:
CH
EC
KE
D B
Y:
CA
MP
US
FAC
ILIT
IES
UN
IV
ER
SIT
Y O
F M
IS
SO
UR
I
Pla
nn
in
g, D
es
ig
n,
& C
on
stru
ctio
n
Design S
ervices
ARCHITECT -
The P
rofessional A
rchitects seal and
signature affixed to this sheet applies only to
the m
aterial and inform
ation show
n on this
sheet. A
ll draw
ings, instrum
ents, or other
docum
ents not exhibiting this seal shall not
be considered prepared by this architect, and
this architect expressly disclaim
s any and all
responsibility for such plans, draw
ings, or
docum
ents not exhibiting this seal.
This D
ocum
ent is intended to be signed
digitally. If no digital signature is attached to
this file, this m
edia should not be considered
a certified docum
ent.
CP161171
CL
YD
ES
DA
LE
H
AL
L
CO
LU
MB
IA
, B
OO
NE
C
OU
NT
Y, M
IS
SO
UR
I 6
52
11
CL
YD
ES
DA
LE
C
PE
T / R
AD
IS
OL
AT
IO
N
DE
TA
ILS
A501
5
JASON ANDREW GOLDEN
Mo. # A-2007030507
LLL
JAG
11/2
2/16
ISSU
ED F
OR
BID
AND
CO
NSTR
UCTI
ON
112
/05/
16AD
DEN
DUM
#1
SCALE
STRUCTURALCMU TO CEILING STRUCTURE3
A501 NOT TO SCALE
SCALE
STRUCTURALCMU BASE TO EXISTING SLAB4
A501 NOT TO SCALE
SCALE
STRUCTURALCMU WALL DETAILS 1
A501 NOT TO SCALE
3A501
12" HDPE SHEET BONDED TO PLATE
L3x212x14" WELDED TO L3x4x14"
EXISTING SLAB FLOOR TO REMAIN
PHASE 2 DEMOLITION SAW CUTEXISTING PIT STEM WALLS TODIMENSIONS SHOWN, AND CUT PITWALL FOR PLUMBING TRENCH SEEELEVATION 11/A501
±2'-6
"
3A501
EXISTING SLAB TOREMAIN
PHASE 1 DEMOLITIONREMOVE SLAB AND REMOVEEXISTING CMU WALL
838"
SCALE
TRENCH COVER DETAIL7.1A501 3" = 1'-0"
3x3x14" S.S. ANGLE WITH14" x 4" STUDS AT 24"O.C.
12" HDPE SHEET ADHEREDTO COVER PLATE.
1/4" S.S. DIAMOND PLATE
2x112"x14" S.S. ANGLEWITH 14" x 4" STUDS AT24" O.C.
SCALE
WALL SECTION AT PIT11A501 3/4" = 1'-0"
14" ELASTOMERIC GASKETWHEN COMPRESSED
3A501
3A501
7.1A501
1"
7.1A501
7.1A50114
A501
SCALE
PIT DETAIL14A501 3" = 1'-0"
3x212"x14" S.S. ANGLE
4x3x14" S.S. ANGLE
3/8" S.S. DIAMOND PLATE
12" HDPE BONDED TO COVER
38" STAINLESS STEEL DIAMOND
PLATE W/2 CONTINUOUS HINGES.PROVIDE ANCHOR POINT FORHOISTING W/CABLE.
SCALE
PIT EDGE DETAIL AT NEW FLOOR12.1A501 3" = 1'-0"
38" STAINLESS STEEL DIAMOND PLATE
L3x4x14" W/ 14"Øx4"STUDS AT 24" O.C.AND MITEREDCORNERS
L3x212x14" WELDED TO L3x4x14"
78"
4"
12.1A501
12" HDPE SHEET BONDED TO PLATE
212"
EL 745'-358"
EL 745'-35 8"
TOP OF CUT PIT WALL(BEYOND)
EL 746'-0"
CONTINUE FLOOR FINISH SYSTEMINTO PIT WALLS AND FLOOR7 8
"21
2" 4"
3x212x14" S.S. ANGLEWELD TO 3x4x14"
MIRRORED
3"
EL 744'-6"
PHASE 1 DEMOLITIONREMOVE SLAB
2"
STRUCTURAL NOTES
3A501
3/16
14"Ø x 4" STUDS AT 24" O.C.
3/16 2-24STAGGERED TOPTO BOTTOM
3/16 2-24STAGGERED TOPTO BOTTOM
3/16
3/16 2-24STAGGERED TOPTO BOTTOM
3/16
3/16
3/16 2-24STAGGERED TOPTO BOTTOM
L3x4x14" W/ 14"Øx4"STUDS AT 24" O.C. ANDMITERED CORNERS
14" MAX.12
.1A50
1
BEYOND
6 MILL VAPOR BARRIER;OVER COMPACTEDGRANULAR FILL OR ASNEEDED
CONTINUE FLOOR FINISH SYSTEMINTO PIT WALLS AND FLOOT
NOT US
ED
9
WALL TYPE
7.1A501
3/8
1/4
3) HIGH LOAD WELD ONHINGES WITH BRONZEBEARING
1
1
1 REVISED DETAIL FOR NEW TRENCHLOCATION
1
1
CHANGED CONSTRUCTIONPHASE OF THIS DETAIL
1
goldenjJAG Seal
DOMESTIC HOT & COLD MIXING FAUCET
SPECIFICATION FOR ADDITIONAL INFORMATION ON ITEMS 2 THRU 3-REFER TO SINK ACCESSORIES SCHEDULE, AND
EYE WASH - SWING DOWN
2
3
CABINET NO. PRODUCT NO. DIMENSIONS W x H x DDESCRIPTION
1
(ALL DIMENSIONSARE IN INCHES)
-ACCESSORIES-PAPER TOWEL DISPENSER - STAINLESS STEEL BY OWNER
-STEEL CASEWORK - BASE CABINETS & WORK SURFACES -
S. S. WORK SURFACE W/CURB & MARINE EDGE 87 x 1-1/4 x 244
5
MF-1
EW-1
6
7
SINK BASE CABINET RH 21 x 35 x 228
DRAWER / DOOR BASE CABINET LH9 E60C352215L
G00C352221
E60C352212L10
11 E60C352218
12
13 E60C352218L
E61C352236
END SCRIBE W/ TOE RELIEFBESC350014
15 BESC3500
RIGHT SIDE PEDESTAL LEG
18
WALL CASE LH 18 x 30 x 12-3/420
21 W20C301336
W20C301318L
W20C30131822
23 W20C241330
24
25 W20C301348
W20C241336
1-1/2 x 30END SCRIBEWESC301326
27 1 x 24WESC3013
19
-STEEL CASEWORK - WALL CABINETS & ACCESSORIES -
S. S. WORK SURFACE W/CURB & MARINE EDGE
S. S. WORK SURFACE W/CURB & MARINE EDGE
S. S. WORK SURFACE W/CURB & MARINE EDGE
38 x 1-1/4 x 24
SEE DETAIL 7/A601
75 x 1-1/4 x 30
15 x 35 x 22
12 x 35 x 22
18 x 35 x 22
36 x 35 x 22
18 x 35 x 22
1-1/2 x 35
1 x 35
DRAWER / DOOR BASE CABINET LH
DRAWER / DOOR BASE CABINET RH
DRAWER / DOOR BASE CABINET
DRAWER / DOOR BASE CABINET LH
END SCRIBE W/ TOE RELIEF
DOORS TO BE INSET SWINGING FRAMED CLEAR GLAZED
DOORS & DRAWERS TO BE INSET SQUARE EDGE - NO GLAZING
WALL CASE
WALL CASE RH
36 x 30 x 12-3/4
18 x 30 x 12-3/4
WALL CASE
WALL CASE
WALL CASE
30 x 24 x 12-3/4
36 x 24 x 12-3/4
48 x 30 x 12-3/4
END SCRIBE
NOT USED
16 A12C352202 2 x 35 x 22
17 CLOSURE STRIP AT REAR OF CASE 1 x 35
SEE SINK ACCESSORIES SCHEDULE BELOWSEE SINK ACCESSORIES SCHEDULE BELOW
BRSC3500
LEFT SIDE PEDESTAL LEGA11C352202 2 x 35 x 22
35 8"x20 GA. STUD
DOUBLE STUD ATHEAD AND JAMB
5/8" TYPE "X"GYPSUM BOARD
DOOR AND FRAMEAS SCHEDULED
GROUTED REINFORCEDCELL
TWO #4 REBARS
BOND BEAM
MASONRY ANCHOR
CONTINUOUS CAULKING(TYPICAL)
DO0R AND FRAME ASSCHEDULED
LEAD SHIELDING ASSCHEDULED
EW-1 EYE WASH: WATER SAVER FAUCET CO., MODEL EW849L OR EQUAL. DECK MOUNTED, SWINGDOWN TO ACTIVATE, 2 SPRAY HEADS WITH AUTO FLIP TOP DUST COVERS AND INTERNALFILTER, ANSI Z358.1 COMPLIANT, CHROME FINISH.
MF-1 HOT AND COLD WATER MIXING FAUCET: CHICAGO FAUCET CO.,DECK MOUNTED FAUCET: MODEL 930-K2E29-317XKCP OR EQUAL.GOOSENECK SPOUT WITH VACUUM BREAKER.AERATING LAMINAR FLOW OUTLET.WRIST BLADE HANDLES.HOT AND COLD IDENTIFICATION BUTTONS.CERAMIC QUARTER-TURN CARTRIDGES.
SINK ACCESSORIES SCHEDULEMARK REMARKS
DOOR TYPES FRAME TYPES
1 2 A B
4'-2
"2'
-0"
6" 6"
4"
2"
GROUTEDREINFORCED CELL
TWO #4 REBARS
BOND BEAM
MASONRY ANCHOR
CONTINUOUS CAULKING(TYPICAL)
DOOR AND FRAME ASSCHEDULED
WINDOW TYPES
14'-0"
4'-0
"
2"
GROUTEDREINFORCED CELL
TWO #4 REBARS
BOND BEAM
MASONRY ANCHOR
CONTINUOUS CAULKING(TYPICAL)
WINDOW AND FRAMEAS SCHEDULED
LEAD SHIELDING ASSCHEDULED
GLAZING ASSCHEDULED
1/8"
1/4"
3/8"
3/4"
0
0
4'
4'
2'
6'
8'
8'
12'
16'
20'
24'
10'
12'
0
0
2'
2'
1'
4'
6'
8'
4'
3'
3'
6'
5'
4'
3'
2'
2'
1'
1'
0
0
1"
1/2"
1-1/2"
3"
0
0
1'
2'
1'
0
0
1:50
1:10
10'
20'
30'
50'
150'
100'
of
PROJECT NUMBER
SHEET
DR
AW
N B
Y:
CH
EC
KE
D B
Y:
CA
MP
US
FAC
ILIT
IES
UN
IV
ER
SIT
Y O
F M
IS
SO
UR
I
Pla
nn
in
g, D
es
ig
n,
& C
on
stru
ctio
n
Design S
ervices
ARCHITECT -
The P
rofessional A
rchitects seal and
signature affixed to this sheet applies only to
the m
aterial and inform
ation show
n on this
sheet. A
ll draw
ings, instrum
ents, or other
docum
ents not exhibiting this seal shall not
be considered prepared by this architect, and
this architect expressly disclaim
s any and all
responsibility for such plans, draw
ings, or
docum
ents not exhibiting this seal.
This D
ocum
ent is intended to be signed
digitally. If no digital signature is attached to
this file, this m
edia should not be considered
a certified docum
ent.
CP161171
CL
YD
ES
DA
LE
H
AL
L
CO
LU
MB
IA
, B
OO
NE
C
OU
NT
Y, M
IS
SO
UR
I 6
52
11
CL
YD
ES
DA
LE
C
PE
T / R
AD
IS
OL
AT
IO
N
SC
HE
DU
LE
S
A601
5
JASON ANDREW GOLDEN
Mo. # A-2007030507
LLL
JAG
11/2
2/16
ISSU
ED F
OR
BID
AND
CO
NSTR
UCTI
ON
112
/05/
16AD
DEN
DUM
#1
REMARKS
TYPESIZE MATERIAL
FRAME
JAMB SILLTYPE
DO
OR
NUM
BER DOOR
MATERIAL HAR
DW
AR
EG
RO
UPDETAILS
HEAD
USAG
E
RO
OM
USAG
E
RO
OM
NUM
BER
GLA
ZING
TYPE
B141A.1 B141A CONTR.RM 3'-0" x 7'-0" x 1 3/4" 2 H.M. A H.M. Type 3
B141A.2 B141A CONTR.RM 3'-0" x 7'-0" x 1 3/4 1 H.M. A H.M. Type 3
B141.1 B141 SCANNER 6'-0" x 7'-0" x 1 3/4" 1 H.M. B H.M. Type 1
B141B.1 B141B RAD. LAB. 3'-0" x 7'-0" x 1 3/4" 1 H.M. A H.M. Type 2
B142.1 B142 VESTIBULE 3'-8" x 7'-0" x 1 3/4 1 H.M. A H.M. Type 2
B141.2 B141 SCANNER 3'-8" x 7'-0" x 1 3/4" 1 H.M. A H.M. Type 2
B142A.1 B142A ISOLATION 3'-6" x 7'-0" x 1 3/4" 2 H.M. A H.M. Type 3
B142B.1 B142B ISOLATION 3'-0" x 7'-0" x 1 3/4" 2 H.M. A H.M. Type 3
B142A.2 B142A ISOLATION 3'-0" x 7'-0" x 1 3/4" 1 H.M. A H.M. Type 4 Themally broken frame/ insulated dr.
B142C.1 B142C KENNEL 3'-0" x 7'-0" x 1 3/4" 2 H.M. A H.M. Type 3
B141.3 B141 SCANNER 3'-8" x 7'-0" x 1 3/4" 1 H.M. A H.M. Type 2
SCALE
CASEWORK ELEVATION RM. B142A1A601 3/8" = 1'-0"SCALE
CASEWORK ELEVATION RM. B1422A601 3/8" = 1'-0"SCALE
CASEWORK ELEVATION RM. B1413A601 3/8" = 1'-0"SCALE
CASEWORK ELEVATION RM. B141B4A601 3/8" = 1'-0"
112" 1'-6" 1'-6"
112"
1'-6" 1'-6"
2'-6
"2'
-11"
2'-6"
2'-0
"2'
-11"
1"
2'-1
1"
3'-0"1"
1'-8"
1'-8"
2'-0
"
1'-2"
4'-0" 3'-0"
2'-6
"1'-
2"
2'-0
"2'
-0"
114"7'-3"
1'-5"
3'-218"
1'-3" 1'-9"
114"
1'-0" 1'-9"112"
112"
6'-3"
SCRIBESCRIBE
SCRIBESCRIBE
114"
OPEN TOWALL
OPEN TOWALL
SINKBASE
CENTER CASEON BACK WALL
SINKBASE
2"x2"x18"ANGLE LEDGER-PAINT BLACK
OWNER SUPPLIED DISHWASHERCONTRACTOR MAKE CONNECTIONS
OWNER SUPPLIED ANDINSTALLED TRASH COMPACTOR
NOTE. PROVIDE SOLID BLOCKING IN WALLFOR CASE WORK ATTACHMENT. TYPICAL.
1"
OWNER SUPPLIED ANDINSTALLED DEEP FREEZE
B142A.1
BOTTOM OFSUSPENDEDCEILING
3'-4
"
256'
-0"
256'
-0"
32'-0
"
BOTTOM OF GYPSUM BOARDSOFFIT AND HEADWALL
BOTTOM OF SUSPENDED CEILING
2"
2'-1
1"
114"
SCALE
COUNTER TOP PLAN RM. B142A5A601 3/4" = 1'-0"SCALE
COUNTER TOP PLAN RM. B1426A601 3/4" = 1'-0"SCALE
COUNTER TOP PLAN RM. B1417A601 3/4" = 1'-0"SCALE
COUNTER TOP PLAN RM. B141B8A601 3/4" = 1'-0"
3'-0"
3'-0"
4"8
A601
7A601
6A601
5A601
1" x 4"CURB
1" x 4"CURB
MARINE EDGE
STAINLESS STEELCOUNTER
2'-0
"
6'-912"
111 2
"
312"
FIELD VERIFY
1" x 4" CURB
MARINE EDGE
STAINLESSSTEELCOUNTER
4" EPOXY ROLL UPBASE AT WALL
4" EPOXY ROLL UPBASE AT WALLVINYL BASE AT LEGS
1" x 4"CURB
7'-3"
1'-4" 10"
2'-0
"
111 2
"41
2"
1" x 4" CURB
PLUMBINGTRENCHCOVER
STAINLESS STEEL COUNTER
1" x 4" CURBMARINE EDGE
PIT COVER PLATE
4"4"
3'-2"
2'-0
"
2'-6
"
6'-3" FIELD VERIFY2'-912"
FIELD VERIFY
1'-4" 2'-27 8"
2'-0
"CO
UNTE
R T
OP
45.00° 45.00°
1" x 4" CURB3 SIDES
MARINEEDGE
STAINLESS STEELCOUNTER
MARINEEDGE
1" x 4"CURB
1" x 4"CURB
1" x 4"CURB
4" EPOXY ROLL UP BASEON WALL BEHIND CASES
4" EPOXY ROLL UPBASE AT WALLS
4"
4"
TOP OF HEAD WALL
SCRIBE
CASE WORK NOTES:
1. ALL UNITES TO BE EPOXY COATEDSTEEL.
2. BASE CABINETS TO ABE INSET SQUAREEDGE STYLE WITH SWINGING STEELPANEL DOORS. DRAWER SLIDES TOBE FULL EXTENSION BALL BEARINGRATED AT A MINIMUM OF 100 POUNDSIN OPEN POSITION, WITH CUSHIONED INAND OUT STOPS AND POSITIVEDRAWER HOLD-IN DETENT.
3. UPPER WALL MOUNTED CASES TO BEINSET STYLE WITH FRAMED SWINGINGGLASS DOORS; 13" DEPTH MAXIMUM;WITH ADJUSTABLE SHELVES. TO BEMOUNTED WITH HANGER RAILS.
4. DRAWER AND DOOR PULLS TO BESTAINLESS STEEL WIRE PULL, MINIMUM4" IN LENGTH,
5. DOORS TO HAVE POSITIVE CATCH.
6. HINGES TO BE STAINLESS STEEL INSET5-KNUCKLE.
7. CASE WORK PRODUCT NUMBERS AREFROM KEWAUNEE STEEL LABORATORYFURNITURE CATALOG.
4"8"
16
25 24
1 3
2
3
2
3
2
11
24
9 8
23
10 811
22
12
21
13
20
1414
2626
15
27
4
2"
2 3
6'-0
"
412"
2'-8
"
5'-4"
21'-4"
10'-8"
5
2
3
6
2 3
111 2
"
2"
2"x2"x18"ANGLE LEDGER-PAINT BLACK-BOTH SIDES
1717 17
4"8"
7
1 2"
SCALE
INTERIOR WALL ELEVATION AT CONTROL ROOM WINDOW9
A601 3/8" = 1'-0"
1'-4"
4'-0"
SCALE
INTERIOR WALL ELEVATION AT CORRIDOR WALL10
A601 3/8" = 1'-0"
SCALE
DOOR HEAD GYP BOARD WALL13
A601 3" = 1'-0" SCALE
DOOR HEAD8" CMU WALL12
A601 3" = 1'-0"
SUSPENDED GRIDCEILING ASSCHEDULED
EXISTING CMUWALL
38" EPOXY SET
ANCHORS AT 2'-0"CENTERS INTOEXISTING CMU WALLS
38" EPOXY SET
ANCHORS AT BONDBEAM INTO EXISTINGCMU WALLS
EXISTING STRUCTURALCEILING
GYPSUM BOARD WALLTO STRUCTURALCEILING
SEE WALL TYPE #3FOR CONNECTION TOCEILING
NEW
4" V
INYL
BASE
PAIN
T NE
W G
YP. B
D. S
OFF
IT
PAIN
T M
ETAL
DO
OR
S AND
FR
AM
ES
AND
MIS
C. T
O M
ATC
H W
ALL
SPA
INT
ALL
RACEW
AY,
PIP
ING
,
GR
ID C
EILI
NGR
EPAIR
EXI
STIN
G S
USPE
NDED
& NE
W:
PIPE
S, H
VAC, C
OND
UIT,
ETC
.PA
INT
EXIS
TING
CEI
LING
; EXI
STIN
G
B141
B140
PAIN
T EX
ISTI
NG A
ND N
EW W
ALL
S
ROOM FINISH SCHEDULE
EXIS
TING
TO
REM
AIN
FLOORING WALLS CEILING REMARKS
EAST
NORTH
WEST
SOUTH
CEI
LING
HEI
GHT
NEW
REI
NFO
RCED
CO
NCR
ETE
SLAB
EXIS
TING
TO
REM
AIN
NEW
SUS
PEND
ED G
RID
CEI
LING
9'-0"
ROOM NAME
FEED STORAGE
CPET SCANNER
BASEROOM
NUMBER
EXIS
TING
TO
REM
AIN
EXIS
TING
TO
REM
AIN
14'-7"
B141A CPET CONTROL RM
B141B RAD. LAB.
B142 VESTIBULE
B142A CANINE ISOLATION
B142B FELINE ISOLATION
B142C PET KENNEL
B143 RAD. WASTE STORAGE
8'-0"
8'-0"
8'-0"
9'-0"
8'-0"
9'-0"
15'-7"
GYPSUM BOARD SOFFITS AT 8'-0" A.F.F.
NEW
4" R
OLL
UP
EPO
XY
BASE
EPO
XY F
LOO
R
PAIN
T NE
W W
ALL
S O
NLY
PHASE
1 N
.I.C.
PHASE
2
PROVIDE SOUND BATTS ABOVE CEILING
ALTERNATE = EPOXY FLOOR WITH VINYL BASE
SEALE
D C
ONC
. W/
FINE
AG
GR
EGATE
BASE BID
BASE BIDALTERNATE #2ALTERNATE #2
BASE BID
3'-4" 8"
SCALE
DOOR JAMB8" CMU WALL11
A601 3" = 1'-0"
3
REINFORCED CAVITIESGROUTED FULL HIGHT
2"
2'-2"
2"
18
VINYL BASE ATCASEWORK
VINYL BASE ATCASEWORK
VINYL BASE ATCASEWORK
3'-4
"
4'-0
"
B141A.2
1" x 4"CURB
PHASE
1 N
.I.C.
PHASE
2
*
SCALE
DOOR HEAD4" CMU WALL15
A601 3" = 1'-0" SCALE
DOOR JAMB4" CMU WALL14
A601 3" = 1'-0"
CMU INFILL AT WALLOPENING ( RUNNINGBOND)
EXISTING BLOCK WALL
NEW FRAME AND DOORAS SCHEDULED
B141A.1
GROUTED CELL WITH 1) #5REBAR TYPICAL
BONDBEAM
2'-8"TYPICAL
EPOXYPAINTFINISH
EXIS
TING
CO
LUM
N
EXIS
TING
CO
LUM
N
B141.1B142.1
SEE STRUCTURAL DETAILSFOR SURFACE MOUNTEDSTEEL BUCKS
RO
OM
USAG
E
RO
OM
NUM
BER
SIZE MATERIALTYPE HEAD
DETAILS
JAMB SILL
REMARKS
GLA
ZING
TYPE
1 B141A CONTROL 4'-0" X 4'-0" 1 H.M.
SCALE
WINDOW HEAD4" CMU WALL17
A601 3" = 1'-0" SCALE
WINDOW JAMB4" CMU WALL16
A601 3" = 1'-0"
PHASE 1N.I.C.
35 8"
35 8"
35 8"
35 8"
47 8"
75 8"
75 8"
164" LEAD SHIELDED DOOR & FRAME
164" LEAD SHIELDED DOOR & FRAME
164" LEAD SHIELDED DOOR & FRAME
164" LEAD SHIELDED DOOR & FRAME
164" LEAD SHIELDED DOOR & FRAME
164" LEAD SHIELDED DOOR & FRAME
164" LEAD SHIELDED FRAME -164" LEAD EQUIVALENT GLAZING SPEC 13.4905; 2.03
See Spec Section 08-1113 & 08-7100 for additional information & Hardware Types
CMU INFILL AT WALLOPENING ( RUNNINGBOND)
PHASE 2 INCONTRACT
REINFORCED CAVITIESGROUTED FULL HIGHT
38" EPOXY SET
ANCHORS AT 2'-0"CENTERS INTOEXISTING CMU WALLS
REINFORCED CAVITIESGROUTED FULL HIGHT
38" EPOXY SET
ANCHORS AT 2'-0"CENTERS INTOEXISTING CMU WALLS
1
PHASE 1N.I.C.
1. ALTERED PHASE LINE.2. CHANGED FULL HEIGHTINFILL TO INFILL OFEXISTING OPENING ONLY.
1
NEW GRID CEILING ALTERNATE #1
NEW GRID CEILING ALTERNATE #1
ALTERNATE #11 REVISED CEILING FINISHES
AutoCAD SHX TextLABORATORY EQUIPMENT SCHEDULE
AutoCAD SHX TextDOOR AND FRAME SCHEDULE
AutoCAD SHX Text12
AutoCAD SHX TextA601
AutoCAD SHX Text11
AutoCAD SHX TextA601
AutoCAD SHX Text15
AutoCAD SHX TextA601
AutoCAD SHX Text14
AutoCAD SHX TextA601
AutoCAD SHX Text12
AutoCAD SHX TextA601
AutoCAD SHX Text11
AutoCAD SHX TextA601
AutoCAD SHX Text15
AutoCAD SHX TextA601
AutoCAD SHX Text14
AutoCAD SHX TextA601
AutoCAD SHX Text12
AutoCAD SHX TextA601
AutoCAD SHX Text11
AutoCAD SHX TextA601
AutoCAD SHX Text15
AutoCAD SHX TextA601
AutoCAD SHX Text14
AutoCAD SHX TextA601
AutoCAD SHX Text13
AutoCAD SHX TextA601
AutoCAD SHX Text13
AutoCAD SHX TextA601
AutoCAD SHX Text13
AutoCAD SHX TextA601
AutoCAD SHX Text13
AutoCAD SHX TextA601
AutoCAD SHX Text12
AutoCAD SHX TextA601
AutoCAD SHX Text11
AutoCAD SHX TextA601
AutoCAD SHX Text13
AutoCAD SHX TextA601
AutoCAD SHX Text13
AutoCAD SHX TextA601
AutoCAD SHX Text15
AutoCAD SHX TextA601
AutoCAD SHX Text14
AutoCAD SHX TextA601
AutoCAD SHX TextWINDOW/LOUVER SCHEDULE
AutoCAD SHX TextWINDOW NUMBER
AutoCAD SHX TextWINDOW/LOUVER
AutoCAD SHX Text17
AutoCAD SHX TextA601
AutoCAD SHX Text16
AutoCAD SHX TextA601
goldenjJAG Seal
WL
WL
WL
OC
A
B
A
A
D
E
B
B B B B
A
A
A
B
1/8"