Architect: General Contractor: Scope of Work: Phase of Work: Plans & Engineering $130,000 $130,000 Construction $7,658,000 $7,658,000 FFE $400,000 $400,000 Project Support Total $8,188,000 $8,188,000 $0 * FY21 Program Glen Burnie Park ES Arundel MS Approved Budget * Current Appropriation* Encumbered See following sheet for details See following sheet for details. Project Schedule See following sheet for details. Fiscal Data Crofton Woods ES Current Status Additions ‐ Various Schools Administrative Data Various Various Ongoing program to provide additions at various schools. Design and Construction 1 Construction Status July 2020

Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect:

General Contractor:

Scope of Work:

Phase of Work:

Plans & Engineering $130,000 $130,000

Construction  $7,658,000 $7,658,000

FFE $400,000 $400,000

Project Support 

Total $8,188,000 $8,188,000 $0

* FY21 Program

Glen Burnie Park ES

Arundel MS

Approved  

Budget *

Current 

Appropriation*Encumbered

See following 

sheet for details

See following sheet for details.

Project Schedule

See following sheet for details.

Fiscal Data

Crofton Woods ES

Current Status

Additions ‐ Various Schools

Administrative Data

Various

Various

Ongoing program to provide additions at various 

schools. 

Design and Construction 

1   Construction Status July 2020

Page 2: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

SchoolProject 

DescriptionConst. Cost  Fiscal Year

Ed Specs/    

Schematic 

Design Dev./    

Const 

Documents

Start           

Const. Completion Architect

General 

ContractorCurrent Status 

11 Classroom 

Addition

$10,000,000 

(Estimate)FY 2020 Jun‐19/Nov‐19

Jan‐20/         

May‐20Jul‐20 Dec‐21 HCM TBD 100%

SchoolProject 

DescriptionConst. Cost  Fiscal Year

Ed Specs/    

Schematic 

Design Dev./    

Const 

Documents

Start           

Const. Completion Architect

General 

ContractorCurrent Status 

6 Classroom 

Addition$3,126,300          FY 2020 Apr‐18 Oct‐18 / Jan‐19 Jul‐19 Aug‐20 G + P

Tech 

Contracting 80%

Gym/Program 

Addition $6,843,850  FY 2019 Aug‐17

Nov‐17/        

Jan‐18Oct‐18 May‐20 SEI

Tech 

Contracting 98%

Crofton Woods ES

The contractor is installing windows and finishing drywall in the addition. The security vestiuble work has started and will continue through the end of the summer. 

Additions ‐ Various Schools ‐ continued

Schools in Design:

Glen Burnie Park ES 

This project is substantially complete. The contractor is currently completing punchlist activites. This will be the last report for this project. 

Schools in Construction:

Arundel MS

Building and grading permits have been approved.  The construction bids were opened on June 10, 2020. The contract award is pending Board approval. 

2 Construction Status July 2020

Page 3: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity n/a 1,696

Scope of Work: Gross Square Footage n/a 275,768

Phase of Work:

Percent Complete:  95%

Educational Specifications  May‐16 May‐16 May‐16

Feasibility Study  n/a n/a n/a

Schematic Design  Aug‐16 Aug‐16 Aug‐16

Design Development  Dec‐16 Nov‐16 Oct‐16

Construction Documents Aug‐17 Aug‐17 Aug‐17

Bid AwardDec‐17 Site Aug‐17      

Bldg Oct‐17Aug‐18

Start Construction  Jan‐18 Jan‐18 Jan‐18

Occupancy Aug‐20 Aug‐20

Plans & Engineering $10,078,000 $10,078,000 $7,017,089

Construction  $114,304,000 $114,034,000 $106,620,164

FFE $8,641,000 $8,641,000 $4,813,513

Project Support  $1,812,000 $1,812,000 $673,130

Total $134,835,000 $134,565,000 $119,123,896

Approved  

Budget

Current 

AppropriationEncumbered

Fiscal Data

Project Schedule

Approved 

EdSpecCurrent Actual

Construction

Current Status .

Crofton HS is a 2 phase project.

Phase 1 ‐ Building site work is 99% complete.  Prime contractors are completing 

the building punchlist and furniture is being installed.       

Phase 2 ‐ Athletic fields and site work are 91% complete.  

Construction for a new high school to serve 

Crofton and surrounding communities. 

Crofton HS ‐ New School  

Administrative Data Vital Statistics

GWWO Architects

Jacobs, Inc.

3 Construction Status July 2020

Page 4: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 455 669

Scope of Work: Gross Square Footage 52,326 89,634

Phase of Work:

Percent Complete: 58%

Educational Specifications  May‐16 May‐16 May‐16

Feasibility Study  Nov‐16 Nov‐16 Oct‐16

Schematic Design  Sep‐17 Apr‐17 May‐17

Design Development  Jan‐18 Aug‐17 Sep‐17

Construction Documents Aug‐18 Apr‐18 Apr‐18

Bid Award Mar‐19 Aug‐18 Sep‐18

Start Construction  Apr‐19 Oct‐18 Oct‐18

Occupancy Aug‐21 Aug‐21

Plans & Engineering $3,600,000 $3,600,000 $3,649,955

Construction  $42,119,000 $42,119,000 $37,009,935

FFE $2,408,000 $2,408,000 $731,306

Project Support  $1,845,000 $1,845,000 $418,724

Total $49,972,000 $49,972,000 $41,809,920

Construction for the revitalization of Edgewater 

Elementary School. 

Edgewater ES ‐ Revitalization 

Administrative Data Vital Statistics

Hord Coplan Macht

J. Vinton Schafer & Sons, Inc.

Construction

Current Status

Edgewater ES is a 5 phase project

Phases 1 and 2: 100% Complete

Phases 3A‐Renovation 100% complete and occupied.

Phase 3B‐Addition 45% complete. The Prime Contractors are installing flooring 

and casework.

Phases 4 ‐ Construction continues on the concrete masory walls.

Phase 5 ‐ Not started yet.

Project Schedule

Approved 

EdSpecCurrent Actual

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

4 Construction Status July 2020

Page 5: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 322 474

Scope of Work: Gross Square Footage 42,110 74,468

Phase of Work:

Percent Complete: 99%

Educational Specifications  Sep‐13 Sep‐13 Nov‐13

Feasibility Study  Nov‐13 Mar‐14 Mar‐14

Schematic Design  Jul‐14 Jun‐16 Jul‐16

Design Development  Nov‐14 Oct‐16 Oct‐16

Construction Documents Mar‐15 Jan‐17 Jan‐17

Bid Award Jan‐16 Jul‐17 Jul‐17

Start Construction  Apr‐16 Aug‐17 Aug‐17

Occupancy Aug‐18 Mar‐20 Mar‐20

Plans & Engineering $2,855,000 $2,855,000 $2,773,356

Construction  $30,541,000 $30,541,000 $29,614,358

FFE $1,900,000 $1,900,000 $1,293,644

Project Support  $964,000 $964,000 $21,537

Total $36,260,000 $36,260,000 $33,702,895

Construction for the revitalization of George 

Cromwell Elementary School. 

George Cromwell ES ‐ Revitalization 

Administrative Data Vital Statistics

Hord │Coplan │Macht, Inc.

Oak Contracting, LLC

Construction 

Current Status

George Cromwell ES is a 4 phase project.  Phases 1‐3 Complete. 

Phase 4 ‐ 99% complete. The building is substantially complete.  New furniture 

deliveries are scheduled for Summer 2020. Site work will continue through 

Summer 2020.  

Project Schedule

Approved 

EdSpecCurrent Actual

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

5 Construction Status July 2020

Page 6: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 509 506

Gross Square Footage 45,885 68,042

Phase of Work:

Percent Complete: 35%

Educational Specifications  May‐19 May‐19 May‐19

Feasibility Study  Sep‐19 Oct‐19 Oct‐19

Schematic Design  Jan‐20 Feb‐20 Mar‐20

Design Development  Apr‐20 Aug‐20

Construction Documents Nov‐20 Dec‐20

Bid Award Jan‐21 Feb‐21

Start Construction  Apr‐21 Apr‐21

Occupancy Aug‐23 Aug‐23

Plans & Engineering $3,056,000 $3,056,000 $751,724

Construction  $30,428,000 $9,171,000 $12,960

FFE $2,054,000 $0 $0

Project Support  $1,985,000 $794,000 $0

Total $37,523,000 $13,021,000 $764,684

Hillsmere ES ‐ Replacement

Administrative Data Vital Statistics

Gaudreau, Inc. 

Whiting‐Turner Construction Co. 

Scope of Work:Design for a replacement school for Hillsmere 

Elementary School. 

Design

Current Status

Design Development documents are schedule to be submitted to Board 

of Education in late summer 2020. 

Project Schedule

Approved 

EdSpecCurrent Actual

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

6 Construction Status July 2020

Page 7: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 435 773

Scope of Work: Gross Square Footage 83,686 98,879

Phase of Work:

Percent Complete: 99%

Educational Specifications  Sep‐13 Sep‐13 Nov‐13

Feasibility Study  Nov‐13 Mar‐14 Mar‐14

Schematic Design  Jul‐14 Sep‐15 Sep‐15

Design Development  Nov‐14 Dec‐15 Dec‐15

Construction Documents Mar‐15 Oct‐16 Dec‐16

Bid Award Jan‐16 Feb‐17 Feb‐17

Start Construction  Apr‐16 Apr‐17 Jun‐17

Occupancy Aug‐18 Aug‐19 Jun‐19

Plans & Engineering $3,477,000 $3,477,000 $2,989,809Construction  $41,632,000 $41,632,000 $41,314,891

FFE $2,418,000 $2,418,000 $2,047,780

Project Support  $982,000 $982,000 $397,445

Total $48,509,000 $48,509,000 $46,749,925

Approved  

Budget

Current 

AppropriationEncumbered

Fiscal Data

Project Schedule

Approved 

EdSpecCurrent Actual

Construction

Current Status

Jessup ES is a 2 phase project.

Phase 1 ‐ 100 % Complete. Building and site closeout are in progress.

Phase 2 ‐ Site work is 98% complete. Work continues on the bus lot 

landscaping and storm water management system bioretention ponds.          

This will be the last report for this project. 

Construction for a replacement school for Jessup 

Elementary School. 

Jessup ES ‐ Replacement 

Administrative Data Vital Statistics

Grimm + Parker Architects

Heery International, Inc.

7 Construction Status July 2020

Page 8: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect:

General Contractor:

Scope Of Work:

Phase of Work:

Plans & Engineering $250,000 $250,000

Construction  $4,650,000 $4,650,000

FFE $350,000 $350,000

Project Support  $250,000 $250,000

Total $5,500,000 $5,500,000 $0

* FY21 Program

Current Status

Kindergarten Additions ‐ Various Schools 

Administrative Data

Various

Various

Ongoing program to provide kindergarten 

classroom additions at various schools.  

Design and Construction 

See following sheet for details.

Project Schedule

Linthicum ES

See following sheet for details.

Fiscal Data

Approved  

Budget *

Current 

Appropriation *Encumbered

See following 

sheet for 

details

Sunset ES

Van Bokkelen ES

8 Construction Status July 2020

Page 9: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

School Project Description Const. Cost  Fiscal YearEd Specs/    

Schematic 

Design Dev./    

Const 

Documents

Start           

Const. Completion Architect

General 

ContractorCurrent Status 

 4 Classroom Addition $3,200,000       

(Estimate) FY 2020  May‐19 Dec‐19 Jul‐20 Jul‐21

 Murphy 

Dittenhafer  TBD  98%

 4 Classroom Addition $3,200,000       

(Estimate) FY 2020  May‐19 Dec‐19 Jul‐20 Jul‐21  Moseley   TBD  100%

School Project Description Const. Cost  Fiscal YearEd Specs/    

Schematic 

Design Dev./    

Const Cost 

Start           

Const. Completion Architect

General 

ContractorCurrent Status 

6 Classroom Addition $3,125,200 FY 2020 Apr‐18Oct‐18/         

Feb‐19Jul‐19 Aug‐20 TCA

Towson 

Mechanical 85%

4 Classroom Addition $2,800,000 FY 2020 Apr‐18Oct‐18/         

Feb‐19Jul‐19 Aug‐20 HCM

James W. Ancel 

Inc.97%

Millersville ESThis project is substantially complete and furniture has been installed.  The punch list on the security vestiuble at the main entrance is ongoing. This is the last report for this 

project. 

Kindergarten Additions at Various Schools 

Linthicum ES

Schools in Design:

Schools in Construction:

The contractor has started on the installation of vinyl tile in the kindergarten addition and the  secure vestibule at the main entrance.

Sunset ES

 Design complete. Grading permit is pending Critical Area approvals.  

Van Bokkelen ES

 The construction bids were opened on June 11, 2020. The contract award is pending Board approval.  

9 Construction Status July 2020

Page 10: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 529 516

Scope Of Work: Gross Square Footage 72,267 71,576

Phase of Work:

Percent Complete: 98%

Educational Specifications  Jun‐14 Jun‐14 Jun‐14

Feasibility Study  Sep‐14 Sep‐14 Sep‐14

Schematic Design  Jan‐15 Jan‐15 Sep‐15

Design Development  May‐15 May‐15 Dec‐15

Construction Documents Nov‐15 Aug‐16 Dec‐16

Bid Award Mar‐16 Jan‐17 Jan‐17

Start Construction  Jun‐16 Apr‐17 Apr‐17

Occupancy Aug‐18 Aug‐19 Jun‐19

Plans & Engineering $2,962,000 $2,962,000 $2,147,063

Construction  $28,620,000 $28,620,000 $30,526,602

FFE $1,926,000 $1,926,000 $1,185,337

Project Support  $891,000 $891,000 $45,323

Total $34,399,000 $34,399,000 $33,904,325

Approved  

Budget

Current 

AppropriationEncumbered

Fiscal Data

Project Schedule

Approved 

EdSpecCurrent Actual

The project is 98% complete.  The roofing contractor is on site and the new roof 

is 50% complete.  Metal panel sub framing is 100% complete.    

Construction for the revitalization of Manor View 

Elementary School.

Manor View ES ‐ Revitalization 

Administrative Data Vital Statistics

WGM Architects 

Whiting‐Turner Construction Co. 

Construction

Current Status

10 Construction Status July 2020

Page 11: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect:  Before After

Construction Manager: State Rated Capacity 2,527 2,527

Scope Of Work: Gross Square Footage 351,142 386,081

Phase of Work:

Percent Complete: 88%

Educational Specifications  Jan‐18 Feb‐18 Feb‐18

Feasibility Study  n/a n/a n/a

Schematic Design  Apr‐18 Jun‐19 Jun‐19

Design Development  Oct‐18 Nov‐19 Nov‐19

Construction Documents Apr‐19 Aug‐20

Bid Award Nov‐19 Oct‐20

Start Construction  Jun‐20 Dec‐20

Occupancy Aug‐24 Aug‐24

Plans & Engineering $6,030,252 $6,030,252 $5,810,223

Construction  $118,366,748 $118,366,748 $0

FFE $0

Project Support  $0

Total $124,397,000 $124,397,000 $5,810,223

Meade HS ‐ Revitalization 

Administrative Data Vital Statistics

Smolen‐Emr Ilkovitch Architects (SEI)

Jacobs, Inc.

Design for the revitalization of Meade High School.

Design

Current Status

Project Schedule

Construction Documents are being reviewed and will include value engineering 

revisions for the review sessions with all agencies. The building permit has been 

submitted for review by Anne Arundel County and the Maryland Department of 

the Environment is currently reviewing the grading permit.  On April 17, 2020, 

US Senators Ben Cardin (D‐MD), Chris Van Hollen (D‐MD), along with US 

Congressman C.A. Dutch Ruppersberger (D‐MD) and Anne Arundel County 

Executive Steuart Pittman, announced a $113.7 million federal grant to 

modernize and construct new facilities at Meade High School. 

Approved 

EdSpecCurrent Actual

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

11 Construction Status July 2020

Page 12: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity n/a 1,882

Gross Square Footage n/a 295,919

Phase of Work:

Percent Complete: 48%

Educational Specifications  May‐19 May‐19 May‐19

Feasibility Study  n/a n/a n/a

Schematic Design  Oct‐19 Nov‐19 Nov‐19

Design Development  Mar‐20 Mar‐20 Mar‐20

Construction Document Dec‐20 Dec‐20

Bid Award Apr‐21 Apr‐21

Start Construction  May‐21 May‐21

Occupancy Aug‐23 Aug‐24

Plans & Engineering $10,007,000 $10,007,000 $8,450,218

Construction  $135,946,000 $32,000,000 $0

FFE $9,866,000 $0 $0

Project Support  $1,401,000 $0 $0

Total $157,220,000 $42,007,000 $8,450,218

Old Mill West HS ‐ New School

Administrative Data Vital Statistics

GWWO Architects

Jacobs, Inc.

Scope of Work: Construction for a new high school to serve Severn 

and surrounding communities.  

Design 

Current Status

Construction documents continue to be developed and reviewed by the project 

management team. 

Project Schedule

Approved 

EdSpecCurrent Actual

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

12 Construction Status July 2020

Page 13: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect:

General Contractor:

Scope of Work:

Phase of Work:

Plans & Engineering $0 $0

Construction  $8,000,000 $8,000,000

FFE $0 $0

Project Support 

Total $8,000,000 $8,000,000 $0

* FY19 Program

Chesapeake Bay MS

Current Status

See following sheet for details.

Project Schedule

See following sheet for details.

Open Space Enclosures ‐ Various Schools 

Administrative Data

Various

Various

Provide full height walls, modification of ceilings, 

lighting systems, fire alarms, public address 

systems, and HVAC systems as required.

Construction 

See following 

sheet for details

Fiscal Data

Approved  

Budget*

Current 

Appropriation*Encumbered

13 Construction Status July 2020

Page 14: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

School Const. Cost  Fiscal YearEd Specs/    

Schematic 

Design Dev./    

Const Doc.  

Start           

Const.Completion Architect

General 

ContractorCurrent Status 

$6,569,888  FY 2018 Nov‐15 Apr‐18 Oct‐18 Sep‐20 WGMBaltimore 

Contractors99%

Open Space Enclosures at Various Schools 

Chesapeake Bay MS

Construction of the security vestibule started on June 1, 2020.  This is the last report for this project.  

Schools in Construction:

14 Construction Status July 2020

Page 15: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 463 585

Gross Square Footage 45,885 84,081

Phase of Work:

Percent Complete: 35%

Educational Specifications  May‐19 May‐19 May‐19

Feasibility Study  Sep‐19 Oct‐19 Oct‐19

Schematic Design  Jan‐20 Feb‐20 Mar‐20

Design Development  Apr‐20 Aug‐20

Construction Document  Nov‐20 Dec‐20

Bid Award Jan‐21 Feb‐21

Start Construction  Apr‐21 Apr‐21

Occupancy Aug‐23 Aug‐23

Plans & Engineering $3,692,000 $3,692,000 $889,863

Construction  $37,073,000 $11,829,000 $12,960

FFE $2,304,000 $0 $0

Project Support  $2,011,000 $805,000 $0

Total $45,080,000 $16,326,000 $902,823

Quarterfield ES ‐ Replacement

Administrative Data Vital Statistics

Hord │Coplan │Macht, Inc.

Oak Contracting, LLC

Scope of Work: Design for the construction of a replacement 

school for Quarterfield Elementary School.

Design

Current Status

Design Development documents are schedule to be submitted to Board of 

Education in late summer 2020. 

Project Schedule

Approved 

EdSpecCurrent Actual

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

15 Construction Status July 2020

Page 16: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 479 509

Scope of Work: Gross Square Footage 61,000 80,979

Phase of Work:

Percent Complete: 83%

Educational Specifications  May‐16 May‐16 May‐16

Feasibility Study  Oct‐16 Oct‐16 Oct‐16

Schematic Design  Sep‐17 Apr‐17 May‐17

Design Development  Dec‐17 Jul‐17 Sep‐17

Construction Documents Aug‐18 Feb‐18 Mar‐18

Bid Award Feb‐19 Aug‐18 Aug‐18

Start Construction  Apr‐19 Sep‐18 Oct‐18

Occupancy Aug‐21 Sep‐20

Plans & Engineering $3,248,000 $3,248,000 $2,978,225

Construction  $33,662,000 $33,662,000 $29,146,203

FFE $2,026,000 $2,026,000 $1,091,204

Project Support  $853,000 $853,000 $616,147

Total $39,789,000 $39,789,000 $33,831,779

Construction for the revitalization of Richard 

Henry Lee Elementary School. 

Richard Henry Lee ES ‐ Revitalization 

Administrative Data Vital Statistics

Grimm + Parker Architects

Whiting‐Turner Contracting Co.

Construction

Current Status

The site work contractor continues with stormwater management, paving, and 

landscaping .  Interior and exterior finishes are near completion.  Technology 

and furniture installation has started and will continue through July. 

Project Schedule

Approved 

EdSpecCurrent Actual

Approved  

Budget

Current 

AppropriationEncumbered

Fiscal Data

16 Construction Status July 2020

Page 17: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 613 775

Gross Square Footage 76,500 101,523

Phase of Work:

Percent Complete: 43%

Educational Specifications  May‐19 May‐19 May‐19

Feasibility Study  Sep‐19 Oct‐19 Oct‐19

Schematic Design  Jan‐20 Feb‐20 Mar‐20

Design Development  Apr‐20 Jul‐20

Construction Document Nov‐20 Dec‐20

Bid Award Jan‐21 Feb‐21

Start Construction  Apr‐21 Apr‐21

Occupancy Aug‐23 Aug‐23

Plans & Engineering $4,355,000 $4,355,000 $1,225,708

Construction  $44,981,000 $12,992,000 $14,480

FFE $2,704,000 $0 $0

Project Support  $1,914,000 $766,000 $0

Total $53,954,000 $18,113,000 $1,240,188

Rippling Woods ES ‐ Replacement

Administrative Data Vital Statistics

Grimm + Parker Architects

Heery International, Inc.

Scope of Work:Design for a replacement school for Rippling 

Woods Elementary School.

Design 

Current Status

Design Development documents are schedule for presentation at the July 8, 

2020 Board of Education meeting. 

Project Schedule

Approved 

EdSpecCurrent Actual

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

17 Construction Status July 2020

Page 18: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect:

General Contractor:

Scope of Work:

Phase of Work:

Plans & Engineering $0 $0

Construction  $2,521,000 $2,521,000

FFE

Project Support 

Total $2,521,000 $2,521,000 $0

* FY21 Program

Building Systemics ‐ Various Schools 

Current 

Appropriation*Encumbered

Systemic Project ‐ Various Schools ‐ Building Systemics

Administrative Data

Various

Project Schedule

See following sheet for details.

See following sheet for details.

Various

Maryland City ES

North County HS

 Construction 

Current Status

Fiscal Data

Approved 

Budget*

Annapolis MS

See following 

sheet for details

18 Construction Status July 2020

Page 19: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

SchoolProject 

DescriptionConst. Cost Fiscal Year Const. Doc. Start Const. Completion Engineer

General 

ContractorCurrent Status 

HVAC/Windows $21,441,775 FY 2019 Feb‐18 Nov‐18 Dec‐20James Posey 

Associates, Inc.

Phillips Way, 

Inc.84%

Roof Replacement  1,543,000 FY 2020 Apr‐20 May‐20 Aug‐21 Gale Associates  Vatica 30%

HVAC /Fire Alarm $25,373,000  FY2020 Dec‐19 Jun‐20 Aug‐23James Posey 

Associates, Inc.

Phillips Way, 

Inc.9%

The boiler room demolition is complete and the general contractor has started mechanical, electrical, and plumbing rough‐in work. 

North County HS

Schools in Construction:

Building Systemics ‐  Various Schools 

Maryland City ES

Roof replacement is underway. 

Annapolis MS

Phased construction of the classroom HVAC equipment and windows continue.

19 Construction Status July 2020

Page 20: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect:

General Contractor:

Scope of Work:

Phase of Work:

Plans & Engineering $0 $0

Construction  $175,000 $175,000

FFE

Project Support 

Total $175,000 $175,000 $0

* FY21 Program

North County HS

Fiscal Data

Lindale MS

Approved 

Budget*

Current 

Appropriation*Encumbered

See following 

sheet for details

Project Schedule

See following sheet for details.

Current Status

See following sheet for details.

Systemic Project ‐TIMS Electrical Upgrades 

Administrative Data

Various

 Construction 

Various

Electrical system distribution upgrade projects at 

selected schools. 

20 Construction Status July 2020

Page 21: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

SchoolProject 

DescriptionConst. Cost Fiscal Year Const. Doc. Start Const.  Completion Engineer

General 

ContractorCurrent Status 

TIMS  $200,000  FY2020 Dec‐19 Jun‐20 Aug‐23James Posey 

Associates, Inc.

Phillips Way, 

Inc. 3%

TIMS  $459,000 FY2020 Dec‐19 Apr‐20 Sep‐20 JMT Action Electric 5%

Submittal reviews are ongoing. 

TIMS Electric ‐  Various Schools 

Schools in Construction:

North County HS

Lindale MS

Submittal reviews are ongoing. 

21 Construction Status July 2020

Page 22: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

Architect: Before After

Construction Manager: State Rated Capacity 479 549

Scope of Work: Gross Square Footage 45,813 84,813

Phase of Work:

Percent Complete: 58%

Educational Specifications  May‐16 May‐16 May‐16

Feasibility Study  Oct‐16 Oct‐16 Oct‐16

Schematic Design  Sep‐17 Apr‐17 May‐17

Design Development  Dec‐17 Jul‐17 Sep‐17

Construction Documents Aug‐18 Jan‐18 May‐18

Bid Award Feb‐19 Aug‐18 Sep‐18

Start Construction  Apr‐19 Oct‐18 Oct‐18

Occupancy Aug‐21 Mar‐21

Plans & Engineering $3,464,000 $3,464,000 $3,330,487

Construction  $36,412,000 $36,412,000 $32,539,541

FFE $2,137,000 $2,137,000 $700,131

Project Support  $1,084,000 $1,084,000 $244,928

Total $43,097,000 $43,097,000 $36,815,087

Construction for the revitalization of Tyler Heights 

Elementary School. 

Tyler Heights ES ‐ Revitalization 

Administrative Data Vital Statistics

TCA

Heery International, Inc.

Construction

Current Status

Project Schedule

Tyler Heights ES is a nonconsecutive 5 phase project.          

Phase 1 ‐ East classrooms and gym/cafeteria additions are 100% complete.            

Phase 2‐ South classrooms and media center are 99% complete.  Furniture is 

scheduled for delivery in August 2020.

Phase 3 ‐ West classroom wing is 3% complete. Demolition started in mid‐June 

and construction of this phase will continue through the end of the calendar 

year.

Phases 4‐ South side sitework is 5% complete and will continue through the 

summer of 2020.

Phase 5‐ North side sitework is scheduled to commence in early spring 2021.        

Approved 

EdSpecCurrent Actual

Fiscal Data

Approved  

Budget

Current 

AppropriationEncumbered

22 Construction Status July 2020

Page 23: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

MAJOR SUBDIVISIONS REVIEWED APRIL THROUGH JUNE, 2020

Project Project Status

Number/Type of Units

Number of

Students School

A Tanyard Cove North, Sec. 3 (2nd Revised Final)

Final 45 TH 8 3 4

Marley Elementary Marley Middle Glen Burnie High

B The Willows Final 105 TH 16 8 10

Rippling Woods Elem. Old Mill Middle North Old Mill High

C Enclave at Severna Park Final 12 SF 3 2 2

Folger McKinsey Elem. Severna Park Middle Severna Park High

D Parkside, Phase 3, Sec. 2 and Bulk Par. 1RRRRRR

Resubmittal 121 TH 31 10 12

Meade Heights Elementary MacArthur Middle Meade High

E Watershed, Lot 2R, Resubdivision

Final 99 TH 28 6 10

Maryland City Elementary Meade Middle Meade High

F Hill Valley Farm Final 5 SF, net 4 1 1 1

Lothian Elementary Southern Middle Southern High

Development Process (Project Status)

Sketch: Developer refines the concept drawing to include the location of housing units on a lot, streets, sidewalks, and public spaces. This is a topographic line drawing that receives in-depth comments from the County review team. School capacities and the student population likely to be attributable to this development are recalculated.Site Development Plan: Applies to properties that will not be subdivided into individual lots, principally commercial and multi-family projects such as condominiums and apartments. Used to address APFO conformity. School capacities and the student population likely to be attributable to this development are recalculated. Final: Developer submits a detailed plan that addresses all of the County review team comments. Once a developer receives Final Submission Approval, applications for waivers and permits are submitted.

23

Page 24: Additions ‐ Various Schools · 2020. 7. 8. · Schematic Design Jan‐15 Jan‐15 Sep‐15 Design Development May‐15 May‐15 Dec‐15 Construction Documents Nov‐15 Aug‐16

AnnapolisHigh School

BroadneckHigh School

ChesapeakeHigh School

Glen BurnieHigh School

Meade HighSchool

North CountyHigh School Northeast

HighSchool

Severna ParkHigh School

SouthernHigh School

Old MillHigh SchoolArundel

High School

CroftonHigh School

South RiverHigh School

C