Architect:
General Contractor:
Scope of Work:
Phase of Work:
Plans & Engineering $130,000 $130,000
Construction $7,658,000 $7,658,000
FFE $400,000 $400,000
Project Support
Total $8,188,000 $8,188,000 $0
* FY21 Program
Glen Burnie Park ES
Arundel MS
Approved
Budget *
Current
Appropriation*Encumbered
See following
sheet for details
See following sheet for details.
Project Schedule
See following sheet for details.
Fiscal Data
Crofton Woods ES
Current Status
Additions ‐ Various Schools
Administrative Data
Various
Various
Ongoing program to provide additions at various
schools.
Design and Construction
1 Construction Status July 2020
SchoolProject
DescriptionConst. Cost Fiscal Year
Ed Specs/
Schematic
Design Dev./
Const
Documents
Start
Const. Completion Architect
General
ContractorCurrent Status
11 Classroom
Addition
$10,000,000
(Estimate)FY 2020 Jun‐19/Nov‐19
Jan‐20/
May‐20Jul‐20 Dec‐21 HCM TBD 100%
SchoolProject
DescriptionConst. Cost Fiscal Year
Ed Specs/
Schematic
Design Dev./
Const
Documents
Start
Const. Completion Architect
General
ContractorCurrent Status
6 Classroom
Addition$3,126,300 FY 2020 Apr‐18 Oct‐18 / Jan‐19 Jul‐19 Aug‐20 G + P
Tech
Contracting 80%
Gym/Program
Addition $6,843,850 FY 2019 Aug‐17
Nov‐17/
Jan‐18Oct‐18 May‐20 SEI
Tech
Contracting 98%
Crofton Woods ES
The contractor is installing windows and finishing drywall in the addition. The security vestiuble work has started and will continue through the end of the summer.
Additions ‐ Various Schools ‐ continued
Schools in Design:
Glen Burnie Park ES
This project is substantially complete. The contractor is currently completing punchlist activites. This will be the last report for this project.
Schools in Construction:
Arundel MS
Building and grading permits have been approved. The construction bids were opened on June 10, 2020. The contract award is pending Board approval.
2 Construction Status July 2020
Architect: Before After
Construction Manager: State Rated Capacity n/a 1,696
Scope of Work: Gross Square Footage n/a 275,768
Phase of Work:
Percent Complete: 95%
Educational Specifications May‐16 May‐16 May‐16
Feasibility Study n/a n/a n/a
Schematic Design Aug‐16 Aug‐16 Aug‐16
Design Development Dec‐16 Nov‐16 Oct‐16
Construction Documents Aug‐17 Aug‐17 Aug‐17
Bid AwardDec‐17 Site Aug‐17
Bldg Oct‐17Aug‐18
Start Construction Jan‐18 Jan‐18 Jan‐18
Occupancy Aug‐20 Aug‐20
Plans & Engineering $10,078,000 $10,078,000 $7,017,089
Construction $114,304,000 $114,034,000 $106,620,164
FFE $8,641,000 $8,641,000 $4,813,513
Project Support $1,812,000 $1,812,000 $673,130
Total $134,835,000 $134,565,000 $119,123,896
Approved
Budget
Current
AppropriationEncumbered
Fiscal Data
Project Schedule
Approved
EdSpecCurrent Actual
Construction
Current Status .
Crofton HS is a 2 phase project.
Phase 1 ‐ Building site work is 99% complete. Prime contractors are completing
the building punchlist and furniture is being installed.
Phase 2 ‐ Athletic fields and site work are 91% complete.
Construction for a new high school to serve
Crofton and surrounding communities.
Crofton HS ‐ New School
Administrative Data Vital Statistics
GWWO Architects
Jacobs, Inc.
3 Construction Status July 2020
Architect: Before After
Construction Manager: State Rated Capacity 455 669
Scope of Work: Gross Square Footage 52,326 89,634
Phase of Work:
Percent Complete: 58%
Educational Specifications May‐16 May‐16 May‐16
Feasibility Study Nov‐16 Nov‐16 Oct‐16
Schematic Design Sep‐17 Apr‐17 May‐17
Design Development Jan‐18 Aug‐17 Sep‐17
Construction Documents Aug‐18 Apr‐18 Apr‐18
Bid Award Mar‐19 Aug‐18 Sep‐18
Start Construction Apr‐19 Oct‐18 Oct‐18
Occupancy Aug‐21 Aug‐21
Plans & Engineering $3,600,000 $3,600,000 $3,649,955
Construction $42,119,000 $42,119,000 $37,009,935
FFE $2,408,000 $2,408,000 $731,306
Project Support $1,845,000 $1,845,000 $418,724
Total $49,972,000 $49,972,000 $41,809,920
Construction for the revitalization of Edgewater
Elementary School.
Edgewater ES ‐ Revitalization
Administrative Data Vital Statistics
Hord Coplan Macht
J. Vinton Schafer & Sons, Inc.
Construction
Current Status
Edgewater ES is a 5 phase project
Phases 1 and 2: 100% Complete
Phases 3A‐Renovation 100% complete and occupied.
Phase 3B‐Addition 45% complete. The Prime Contractors are installing flooring
and casework.
Phases 4 ‐ Construction continues on the concrete masory walls.
Phase 5 ‐ Not started yet.
Project Schedule
Approved
EdSpecCurrent Actual
Fiscal Data
Approved
Budget
Current
AppropriationEncumbered
4 Construction Status July 2020
Architect: Before After
Construction Manager: State Rated Capacity 322 474
Scope of Work: Gross Square Footage 42,110 74,468
Phase of Work:
Percent Complete: 99%
Educational Specifications Sep‐13 Sep‐13 Nov‐13
Feasibility Study Nov‐13 Mar‐14 Mar‐14
Schematic Design Jul‐14 Jun‐16 Jul‐16
Design Development Nov‐14 Oct‐16 Oct‐16
Construction Documents Mar‐15 Jan‐17 Jan‐17
Bid Award Jan‐16 Jul‐17 Jul‐17
Start Construction Apr‐16 Aug‐17 Aug‐17
Occupancy Aug‐18 Mar‐20 Mar‐20
Plans & Engineering $2,855,000 $2,855,000 $2,773,356
Construction $30,541,000 $30,541,000 $29,614,358
FFE $1,900,000 $1,900,000 $1,293,644
Project Support $964,000 $964,000 $21,537
Total $36,260,000 $36,260,000 $33,702,895
Construction for the revitalization of George
Cromwell Elementary School.
George Cromwell ES ‐ Revitalization
Administrative Data Vital Statistics
Hord │Coplan │Macht, Inc.
Oak Contracting, LLC
Construction
Current Status
George Cromwell ES is a 4 phase project. Phases 1‐3 Complete.
Phase 4 ‐ 99% complete. The building is substantially complete. New furniture
deliveries are scheduled for Summer 2020. Site work will continue through
Summer 2020.
Project Schedule
Approved
EdSpecCurrent Actual
Fiscal Data
Approved
Budget
Current
AppropriationEncumbered
5 Construction Status July 2020
Architect: Before After
Construction Manager: State Rated Capacity 509 506
Gross Square Footage 45,885 68,042
Phase of Work:
Percent Complete: 35%
Educational Specifications May‐19 May‐19 May‐19
Feasibility Study Sep‐19 Oct‐19 Oct‐19
Schematic Design Jan‐20 Feb‐20 Mar‐20
Design Development Apr‐20 Aug‐20
Construction Documents Nov‐20 Dec‐20
Bid Award Jan‐21 Feb‐21
Start Construction Apr‐21 Apr‐21
Occupancy Aug‐23 Aug‐23
Plans & Engineering $3,056,000 $3,056,000 $751,724
Construction $30,428,000 $9,171,000 $12,960
FFE $2,054,000 $0 $0
Project Support $1,985,000 $794,000 $0
Total $37,523,000 $13,021,000 $764,684
Hillsmere ES ‐ Replacement
Administrative Data Vital Statistics
Gaudreau, Inc.
Whiting‐Turner Construction Co.
Scope of Work:Design for a replacement school for Hillsmere
Elementary School.
Design
Current Status
Design Development documents are schedule to be submitted to Board
of Education in late summer 2020.
Project Schedule
Approved
EdSpecCurrent Actual
Fiscal Data
Approved
Budget
Current
AppropriationEncumbered
6 Construction Status July 2020
Architect: Before After
Construction Manager: State Rated Capacity 435 773
Scope of Work: Gross Square Footage 83,686 98,879
Phase of Work:
Percent Complete: 99%
Educational Specifications Sep‐13 Sep‐13 Nov‐13
Feasibility Study Nov‐13 Mar‐14 Mar‐14
Schematic Design Jul‐14 Sep‐15 Sep‐15
Design Development Nov‐14 Dec‐15 Dec‐15
Construction Documents Mar‐15 Oct‐16 Dec‐16
Bid Award Jan‐16 Feb‐17 Feb‐17
Start Construction Apr‐16 Apr‐17 Jun‐17
Occupancy Aug‐18 Aug‐19 Jun‐19
Plans & Engineering $3,477,000 $3,477,000 $2,989,809Construction $41,632,000 $41,632,000 $41,314,891
FFE $2,418,000 $2,418,000 $2,047,780
Project Support $982,000 $982,000 $397,445
Total $48,509,000 $48,509,000 $46,749,925
Approved
Budget
Current
AppropriationEncumbered
Fiscal Data
Project Schedule
Approved
EdSpecCurrent Actual
Construction
Current Status
Jessup ES is a 2 phase project.
Phase 1 ‐ 100 % Complete. Building and site closeout are in progress.
Phase 2 ‐ Site work is 98% complete. Work continues on the bus lot
landscaping and storm water management system bioretention ponds.
This will be the last report for this project.
Construction for a replacement school for Jessup
Elementary School.
Jessup ES ‐ Replacement
Administrative Data Vital Statistics
Grimm + Parker Architects
Heery International, Inc.
7 Construction Status July 2020
Architect:
General Contractor:
Scope Of Work:
Phase of Work:
Plans & Engineering $250,000 $250,000
Construction $4,650,000 $4,650,000
FFE $350,000 $350,000
Project Support $250,000 $250,000
Total $5,500,000 $5,500,000 $0
* FY21 Program
Current Status
Kindergarten Additions ‐ Various Schools
Administrative Data
Various
Various
Ongoing program to provide kindergarten
classroom additions at various schools.
Design and Construction
See following sheet for details.
Project Schedule
Linthicum ES
See following sheet for details.
Fiscal Data
Approved
Budget *
Current
Appropriation *Encumbered
See following
sheet for
details
Sunset ES
Van Bokkelen ES
8 Construction Status July 2020
School Project Description Const. Cost Fiscal YearEd Specs/
Schematic
Design Dev./
Const
Documents
Start
Const. Completion Architect
General
ContractorCurrent Status
4 Classroom Addition $3,200,000
(Estimate) FY 2020 May‐19 Dec‐19 Jul‐20 Jul‐21
Murphy
Dittenhafer TBD 98%
4 Classroom Addition $3,200,000
(Estimate) FY 2020 May‐19 Dec‐19 Jul‐20 Jul‐21 Moseley TBD 100%
School Project Description Const. Cost Fiscal YearEd Specs/
Schematic
Design Dev./
Const Cost
Start
Const. Completion Architect
General
ContractorCurrent Status
6 Classroom Addition $3,125,200 FY 2020 Apr‐18Oct‐18/
Feb‐19Jul‐19 Aug‐20 TCA
Towson
Mechanical 85%
4 Classroom Addition $2,800,000 FY 2020 Apr‐18Oct‐18/
Feb‐19Jul‐19 Aug‐20 HCM
James W. Ancel
Inc.97%
Millersville ESThis project is substantially complete and furniture has been installed. The punch list on the security vestiuble at the main entrance is ongoing. This is the last report for this
project.
Kindergarten Additions at Various Schools
Linthicum ES
Schools in Design:
Schools in Construction:
The contractor has started on the installation of vinyl tile in the kindergarten addition and the secure vestibule at the main entrance.
Sunset ES
Design complete. Grading permit is pending Critical Area approvals.
Van Bokkelen ES
The construction bids were opened on June 11, 2020. The contract award is pending Board approval.
9 Construction Status July 2020
Architect: Before After
Construction Manager: State Rated Capacity 529 516
Scope Of Work: Gross Square Footage 72,267 71,576
Phase of Work:
Percent Complete: 98%
Educational Specifications Jun‐14 Jun‐14 Jun‐14
Feasibility Study Sep‐14 Sep‐14 Sep‐14
Schematic Design Jan‐15 Jan‐15 Sep‐15
Design Development May‐15 May‐15 Dec‐15
Construction Documents Nov‐15 Aug‐16 Dec‐16
Bid Award Mar‐16 Jan‐17 Jan‐17
Start Construction Jun‐16 Apr‐17 Apr‐17
Occupancy Aug‐18 Aug‐19 Jun‐19
Plans & Engineering $2,962,000 $2,962,000 $2,147,063
Construction $28,620,000 $28,620,000 $30,526,602
FFE $1,926,000 $1,926,000 $1,185,337
Project Support $891,000 $891,000 $45,323
Total $34,399,000 $34,399,000 $33,904,325
Approved
Budget
Current
AppropriationEncumbered
Fiscal Data
Project Schedule
Approved
EdSpecCurrent Actual
The project is 98% complete. The roofing contractor is on site and the new roof
is 50% complete. Metal panel sub framing is 100% complete.
Construction for the revitalization of Manor View
Elementary School.
Manor View ES ‐ Revitalization
Administrative Data Vital Statistics
WGM Architects
Whiting‐Turner Construction Co.
Construction
Current Status
10 Construction Status July 2020
Architect: Before After
Construction Manager: State Rated Capacity 2,527 2,527
Scope Of Work: Gross Square Footage 351,142 386,081
Phase of Work:
Percent Complete: 88%
Educational Specifications Jan‐18 Feb‐18 Feb‐18
Feasibility Study n/a n/a n/a
Schematic Design Apr‐18 Jun‐19 Jun‐19
Design Development Oct‐18 Nov‐19 Nov‐19
Construction Documents Apr‐19 Aug‐20
Bid Award Nov‐19 Oct‐20
Start Construction Jun‐20 Dec‐20
Occupancy Aug‐24 Aug‐24
Plans & Engineering $6,030,252 $6,030,252 $5,810,223
Construction $118,366,748 $118,366,748 $0
FFE $0
Project Support $0
Total $124,397,000 $124,397,000 $5,810,223
Meade HS ‐ Revitalization
Administrative Data Vital Statistics
Smolen‐Emr Ilkovitch Architects (SEI)
Jacobs, Inc.
Design for the revitalization of Meade High School.
Design
Current Status
Project Schedule
Construction Documents are being reviewed and will include value engineering
revisions for the review sessions with all agencies. The building permit has been
submitted for review by Anne Arundel County and the Maryland Department of
the Environment is currently reviewing the grading permit. On April 17, 2020,
US Senators Ben Cardin (D‐MD), Chris Van Hollen (D‐MD), along with US
Congressman C.A. Dutch Ruppersberger (D‐MD) and Anne Arundel County
Executive Steuart Pittman, announced a $113.7 million federal grant to
modernize and construct new facilities at Meade High School.
Approved
EdSpecCurrent Actual
Fiscal Data
Approved
Budget
Current
AppropriationEncumbered
11 Construction Status July 2020
Architect: Before After
Construction Manager: State Rated Capacity n/a 1,882
Gross Square Footage n/a 295,919
Phase of Work:
Percent Complete: 48%
Educational Specifications May‐19 May‐19 May‐19
Feasibility Study n/a n/a n/a
Schematic Design Oct‐19 Nov‐19 Nov‐19
Design Development Mar‐20 Mar‐20 Mar‐20
Construction Document Dec‐20 Dec‐20
Bid Award Apr‐21 Apr‐21
Start Construction May‐21 May‐21
Occupancy Aug‐23 Aug‐24
Plans & Engineering $10,007,000 $10,007,000 $8,450,218
Construction $135,946,000 $32,000,000 $0
FFE $9,866,000 $0 $0
Project Support $1,401,000 $0 $0
Total $157,220,000 $42,007,000 $8,450,218
Old Mill West HS ‐ New School
Administrative Data Vital Statistics
GWWO Architects
Jacobs, Inc.
Scope of Work: Construction for a new high school to serve Severn
and surrounding communities.
Design
Current Status
Construction documents continue to be developed and reviewed by the project
management team.
Project Schedule
Approved
EdSpecCurrent Actual
Fiscal Data
Approved
Budget
Current
AppropriationEncumbered
12 Construction Status July 2020
Architect:
General Contractor:
Scope of Work:
Phase of Work:
Plans & Engineering $0 $0
Construction $8,000,000 $8,000,000
FFE $0 $0
Project Support
Total $8,000,000 $8,000,000 $0
* FY19 Program
Chesapeake Bay MS
Current Status
See following sheet for details.
Project Schedule
See following sheet for details.
Open Space Enclosures ‐ Various Schools
Administrative Data
Various
Various
Provide full height walls, modification of ceilings,
lighting systems, fire alarms, public address
systems, and HVAC systems as required.
Construction
See following
sheet for details
Fiscal Data
Approved
Budget*
Current
Appropriation*Encumbered
13 Construction Status July 2020
School Const. Cost Fiscal YearEd Specs/
Schematic
Design Dev./
Const Doc.
Start
Const.Completion Architect
General
ContractorCurrent Status
$6,569,888 FY 2018 Nov‐15 Apr‐18 Oct‐18 Sep‐20 WGMBaltimore
Contractors99%
Open Space Enclosures at Various Schools
Chesapeake Bay MS
Construction of the security vestibule started on June 1, 2020. This is the last report for this project.
Schools in Construction:
14 Construction Status July 2020
Architect: Before After
Construction Manager: State Rated Capacity 463 585
Gross Square Footage 45,885 84,081
Phase of Work:
Percent Complete: 35%
Educational Specifications May‐19 May‐19 May‐19
Feasibility Study Sep‐19 Oct‐19 Oct‐19
Schematic Design Jan‐20 Feb‐20 Mar‐20
Design Development Apr‐20 Aug‐20
Construction Document Nov‐20 Dec‐20
Bid Award Jan‐21 Feb‐21
Start Construction Apr‐21 Apr‐21
Occupancy Aug‐23 Aug‐23
Plans & Engineering $3,692,000 $3,692,000 $889,863
Construction $37,073,000 $11,829,000 $12,960
FFE $2,304,000 $0 $0
Project Support $2,011,000 $805,000 $0
Total $45,080,000 $16,326,000 $902,823
Quarterfield ES ‐ Replacement
Administrative Data Vital Statistics
Hord │Coplan │Macht, Inc.
Oak Contracting, LLC
Scope of Work: Design for the construction of a replacement
school for Quarterfield Elementary School.
Design
Current Status
Design Development documents are schedule to be submitted to Board of
Education in late summer 2020.
Project Schedule
Approved
EdSpecCurrent Actual
Fiscal Data
Approved
Budget
Current
AppropriationEncumbered
15 Construction Status July 2020
Architect: Before After
Construction Manager: State Rated Capacity 479 509
Scope of Work: Gross Square Footage 61,000 80,979
Phase of Work:
Percent Complete: 83%
Educational Specifications May‐16 May‐16 May‐16
Feasibility Study Oct‐16 Oct‐16 Oct‐16
Schematic Design Sep‐17 Apr‐17 May‐17
Design Development Dec‐17 Jul‐17 Sep‐17
Construction Documents Aug‐18 Feb‐18 Mar‐18
Bid Award Feb‐19 Aug‐18 Aug‐18
Start Construction Apr‐19 Sep‐18 Oct‐18
Occupancy Aug‐21 Sep‐20
Plans & Engineering $3,248,000 $3,248,000 $2,978,225
Construction $33,662,000 $33,662,000 $29,146,203
FFE $2,026,000 $2,026,000 $1,091,204
Project Support $853,000 $853,000 $616,147
Total $39,789,000 $39,789,000 $33,831,779
Construction for the revitalization of Richard
Henry Lee Elementary School.
Richard Henry Lee ES ‐ Revitalization
Administrative Data Vital Statistics
Grimm + Parker Architects
Whiting‐Turner Contracting Co.
Construction
Current Status
The site work contractor continues with stormwater management, paving, and
landscaping . Interior and exterior finishes are near completion. Technology
and furniture installation has started and will continue through July.
Project Schedule
Approved
EdSpecCurrent Actual
Approved
Budget
Current
AppropriationEncumbered
Fiscal Data
16 Construction Status July 2020
Architect: Before After
Construction Manager: State Rated Capacity 613 775
Gross Square Footage 76,500 101,523
Phase of Work:
Percent Complete: 43%
Educational Specifications May‐19 May‐19 May‐19
Feasibility Study Sep‐19 Oct‐19 Oct‐19
Schematic Design Jan‐20 Feb‐20 Mar‐20
Design Development Apr‐20 Jul‐20
Construction Document Nov‐20 Dec‐20
Bid Award Jan‐21 Feb‐21
Start Construction Apr‐21 Apr‐21
Occupancy Aug‐23 Aug‐23
Plans & Engineering $4,355,000 $4,355,000 $1,225,708
Construction $44,981,000 $12,992,000 $14,480
FFE $2,704,000 $0 $0
Project Support $1,914,000 $766,000 $0
Total $53,954,000 $18,113,000 $1,240,188
Rippling Woods ES ‐ Replacement
Administrative Data Vital Statistics
Grimm + Parker Architects
Heery International, Inc.
Scope of Work:Design for a replacement school for Rippling
Woods Elementary School.
Design
Current Status
Design Development documents are schedule for presentation at the July 8,
2020 Board of Education meeting.
Project Schedule
Approved
EdSpecCurrent Actual
Fiscal Data
Approved
Budget
Current
AppropriationEncumbered
17 Construction Status July 2020
Architect:
General Contractor:
Scope of Work:
Phase of Work:
Plans & Engineering $0 $0
Construction $2,521,000 $2,521,000
FFE
Project Support
Total $2,521,000 $2,521,000 $0
* FY21 Program
Building Systemics ‐ Various Schools
Current
Appropriation*Encumbered
Systemic Project ‐ Various Schools ‐ Building Systemics
Administrative Data
Various
Project Schedule
See following sheet for details.
See following sheet for details.
Various
Maryland City ES
North County HS
Construction
Current Status
Fiscal Data
Approved
Budget*
Annapolis MS
See following
sheet for details
18 Construction Status July 2020
SchoolProject
DescriptionConst. Cost Fiscal Year Const. Doc. Start Const. Completion Engineer
General
ContractorCurrent Status
HVAC/Windows $21,441,775 FY 2019 Feb‐18 Nov‐18 Dec‐20James Posey
Associates, Inc.
Phillips Way,
Inc.84%
Roof Replacement 1,543,000 FY 2020 Apr‐20 May‐20 Aug‐21 Gale Associates Vatica 30%
HVAC /Fire Alarm $25,373,000 FY2020 Dec‐19 Jun‐20 Aug‐23James Posey
Associates, Inc.
Phillips Way,
Inc.9%
The boiler room demolition is complete and the general contractor has started mechanical, electrical, and plumbing rough‐in work.
North County HS
Schools in Construction:
Building Systemics ‐ Various Schools
Maryland City ES
Roof replacement is underway.
Annapolis MS
Phased construction of the classroom HVAC equipment and windows continue.
19 Construction Status July 2020
Architect:
General Contractor:
Scope of Work:
Phase of Work:
Plans & Engineering $0 $0
Construction $175,000 $175,000
FFE
Project Support
Total $175,000 $175,000 $0
* FY21 Program
North County HS
Fiscal Data
Lindale MS
Approved
Budget*
Current
Appropriation*Encumbered
See following
sheet for details
Project Schedule
See following sheet for details.
Current Status
See following sheet for details.
Systemic Project ‐TIMS Electrical Upgrades
Administrative Data
Various
Construction
Various
Electrical system distribution upgrade projects at
selected schools.
20 Construction Status July 2020
SchoolProject
DescriptionConst. Cost Fiscal Year Const. Doc. Start Const. Completion Engineer
General
ContractorCurrent Status
TIMS $200,000 FY2020 Dec‐19 Jun‐20 Aug‐23James Posey
Associates, Inc.
Phillips Way,
Inc. 3%
TIMS $459,000 FY2020 Dec‐19 Apr‐20 Sep‐20 JMT Action Electric 5%
Submittal reviews are ongoing.
TIMS Electric ‐ Various Schools
Schools in Construction:
North County HS
Lindale MS
Submittal reviews are ongoing.
21 Construction Status July 2020
Architect: Before After
Construction Manager: State Rated Capacity 479 549
Scope of Work: Gross Square Footage 45,813 84,813
Phase of Work:
Percent Complete: 58%
Educational Specifications May‐16 May‐16 May‐16
Feasibility Study Oct‐16 Oct‐16 Oct‐16
Schematic Design Sep‐17 Apr‐17 May‐17
Design Development Dec‐17 Jul‐17 Sep‐17
Construction Documents Aug‐18 Jan‐18 May‐18
Bid Award Feb‐19 Aug‐18 Sep‐18
Start Construction Apr‐19 Oct‐18 Oct‐18
Occupancy Aug‐21 Mar‐21
Plans & Engineering $3,464,000 $3,464,000 $3,330,487
Construction $36,412,000 $36,412,000 $32,539,541
FFE $2,137,000 $2,137,000 $700,131
Project Support $1,084,000 $1,084,000 $244,928
Total $43,097,000 $43,097,000 $36,815,087
Construction for the revitalization of Tyler Heights
Elementary School.
Tyler Heights ES ‐ Revitalization
Administrative Data Vital Statistics
TCA
Heery International, Inc.
Construction
Current Status
Project Schedule
Tyler Heights ES is a nonconsecutive 5 phase project.
Phase 1 ‐ East classrooms and gym/cafeteria additions are 100% complete.
Phase 2‐ South classrooms and media center are 99% complete. Furniture is
scheduled for delivery in August 2020.
Phase 3 ‐ West classroom wing is 3% complete. Demolition started in mid‐June
and construction of this phase will continue through the end of the calendar
year.
Phases 4‐ South side sitework is 5% complete and will continue through the
summer of 2020.
Phase 5‐ North side sitework is scheduled to commence in early spring 2021.
Approved
EdSpecCurrent Actual
Fiscal Data
Approved
Budget
Current
AppropriationEncumbered
22 Construction Status July 2020
MAJOR SUBDIVISIONS REVIEWED APRIL THROUGH JUNE, 2020
Project Project Status
Number/Type of Units
Number of
Students School
A Tanyard Cove North, Sec. 3 (2nd Revised Final)
Final 45 TH 8 3 4
Marley Elementary Marley Middle Glen Burnie High
B The Willows Final 105 TH 16 8 10
Rippling Woods Elem. Old Mill Middle North Old Mill High
C Enclave at Severna Park Final 12 SF 3 2 2
Folger McKinsey Elem. Severna Park Middle Severna Park High
D Parkside, Phase 3, Sec. 2 and Bulk Par. 1RRRRRR
Resubmittal 121 TH 31 10 12
Meade Heights Elementary MacArthur Middle Meade High
E Watershed, Lot 2R, Resubdivision
Final 99 TH 28 6 10
Maryland City Elementary Meade Middle Meade High
F Hill Valley Farm Final 5 SF, net 4 1 1 1
Lothian Elementary Southern Middle Southern High
Development Process (Project Status)
Sketch: Developer refines the concept drawing to include the location of housing units on a lot, streets, sidewalks, and public spaces. This is a topographic line drawing that receives in-depth comments from the County review team. School capacities and the student population likely to be attributable to this development are recalculated.Site Development Plan: Applies to properties that will not be subdivided into individual lots, principally commercial and multi-family projects such as condominiums and apartments. Used to address APFO conformity. School capacities and the student population likely to be attributable to this development are recalculated. Final: Developer submits a detailed plan that addresses all of the County review team comments. Once a developer receives Final Submission Approval, applications for waivers and permits are submitted.
23
AnnapolisHigh School
BroadneckHigh School
ChesapeakeHigh School
Glen BurnieHigh School
Meade HighSchool
North CountyHigh School Northeast
HighSchool
Severna ParkHigh School
SouthernHigh School
Old MillHigh SchoolArundel
High School
CroftonHigh School
South RiverHigh School
C
Project Reviews for April-----June 2020ANNE ARUNDEL COUNTY SUBDIVISION REVIEW
A
BE
F
.
D