Upload
iwl-pcu
View
54
Download
3
Embed Size (px)
DESCRIPTION
"Addressing Transboundary Concerns in the Volta River Basin and its Downstream Coastal Area," a presentation by Olumide Akinsola on the UNEP/GEF Volta River Basin Project. 2012.
Citation preview
Olumide AkinsolaUNEP/GEF Volta River Basin Project
Addressing Transboundary Concerns in the Volta River Basin and its Downstream Coastal Area
GEFGEF--VoltaVoltaGEFGEF--VoltaVoltaGEFGEF--VoltaVolta
• Project title: Addressing Transboundary Concerns in the Volta River Basin and its Downstream Coastal Area
• Regional initiative of the Volta River Basin within the six riparian countries of Benin, Burkina Faso, Côte d’Ivoire, Ghana, Mali and Togo.
Introduction
• Three Specific Objectives:– Specific Objective n° 1: Build capacity, improve
knowledge and enhance stakeholders’ involvement to support the effective management of the VRB
– Specific Objective n° 2: Develop river basin legal, regulatory and institutional frameworks and management instruments for addressing transboundary concerns in the Volta River Basin and its downstream coastal area
– Specific Objective n° 3: Demonstrate national and regional measures to combat transboundary environmental degradation in the Volta Basin.
Introduction
►Enhance countries ability : plan/manage
►Ensure effective management
►Regional institutional frameworks
►Legal and regulatory frameworks
►Develop National/regional priorities
Project long term objective
Equitable and sustainable management of water and associated
natural resources
►VBA – Ministers: Water & Environment
►Implementing Agency: UNEP/DGEF
►Executing agencies: UNOPS, UCC Water
►Project Steering Committee (PSC)
►Project Management Unit (PMU)
►Project Task Force (PTF)???
►National project body: NFP and NIC
Institutional framework: key components
Key Project Results
• Specific objective 1
• Establish the Project Management and Coordination mechanism with VBA
• Identify and fill training gaps: IRB/TDA/SAP process
• Develop stakeholders involvement plan
• Dev. information exchange mechanism
• Support establishment of VB Observatory
Specific Objective n° 1: Build capacity, improve knowledge and enhance stakeholders’ involvement to support the effective management of the VRB
Key Project Results
• Specific objective 2
• Aimed to finalize and agree on a geographically specific, quantitative TDA ; development of SAP and the APNP-VRB
• National TDA report finalized and validated
• 4 Regional Thematic reports on water resources, ecosystems, governance analysis and economic status completed by TDA regional experts (long delays)
• Regional TDA Document drafted• SAP Delayed, now commencing-TORs
posted on internet.
Specific Objective n° 2: Develop river basin legal, regulatory and institutional frameworks and management instruments for addressing transboundary concerns in the Volta River Basin and its downstream coastal area
Key Project Results
• Specific objective 3 ► Joint management of a flow release
warning system in the Sourou river valley (Mali – Burkina Faso)
► Installing and comparing technological models of waste water treatment in the Cities of Kara (Togo) and Natitingou (Benin)
► Restoring and protecting the river beds of the Black Volta and its tributaries through participative campaigns of reforestation (Côte d’Ivoire – Ghana)
Specific Objective n° 3: Demonstrate national and regional measures to combat transboundary environmental degradation in the Volta Basin.
Demo Project Challenges
Demo project 1 • Reluctant to share information
Demo Project 2 • Kara Municipality: Challenge to resettle
inhabitants along the river bank (Options proposed)
• How to deal with private sector involvement in project implementationDemo Project –Benin: Non relevance of demo project
Demo Project 3• Political situation in Cote d’Ivoire: Bilateral
meeting between Ghana & Côte d’Ivoire delayed• National Partners Capacity limited
• Reliance on consultants: Delay in submission of reports
• Resignation of consultants mid-way into activities/ Non completion on agreed assignments
• Lack of coordination/ feedback from national partners on specific issues, like MOA funding/ reporting
• Non mobilisation of national co-finance contribution• Political crisis in Côte d’Ivoire : Affected mainly the
TDA process and the Demo Project implementation.• Agreements issues: Executing and Implementation
partners
Main challenges with Project implementation
• Training of National Partners or Incentives to deliver?
• Limited Consultants to engage in TDA/SAP process
• Linking other institutional strengths in Groundwater issues to project process
• Linking Coastal issues
Priority Capacity-Building needs
Need for Collaboration
Activities Pictures
Thank you for your attention
http://gefvolta.iwlearn.org
GEFGEF--VoltaVoltaGEFGEF--VoltaVoltaGEFGEF--VoltaVolta