7
1% 2% 2% 2% 1% 2% RL29.90 RL29.90 RL29.90 HEADWALL SPILLWAY RL29.40 2 x 2400x1200 RCBC DISCHARGE CONTROL DEVICES RL27.90 BASIN J GPT SUBSOIL CONNECTION ROCK ENERGY DISSIPATER 33m LONG SPILLWAY WITH 33m LONG TRENCH GRATE TO TAKE EXCESS 500YR ARI SURCHARGE SAG FUTURE GPT & PIT BY OTHERS CHANNEL TC11 FOR DETAILS REFER TO SK11 SPLITTER PIT RL29.90 IL 26.24 ILP DRAIANGE RESERVE BOUNDARY ILP DRAIANGE RESERVE BOUNDARY PLAN No. CLIENT: SCALES: DATUM: DESIGNED DRAWN CHECKED DATE ISSUE AMENDMENT FILE No. Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd. This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive use on the project being the subject of the plan. It is not to be copied, used, nor passed on, in part or full, without written permission from the owner. The user must make acknowledgement of any material used at the commence of, and within, any project documentation produced, including but not limited to, letters, reports and/or drawings. C Plotted: 1 Feb 2011 10:31:11 AM File Name: J:\8955W\Drawings\SKW - Concept Sketch Designs\8955_SK8.dwg J. WYNDHAM PRINCE CONSULTING CIVIL INFRASTRUCTURE ENGINEERS PO Box 4366 PENRITH WESTFIELD NSW 2750 P 02 4720 3300 F 02 4721 7638 W www.jwprince.com.au E [email protected] & PROJECT MANAGERS BY THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS SIGNED AS PART OF AN APPROVED CONSTRUCTION CERTIFICATE. ORIGIN: ADVANCE COPY ONLY NOT FOR CONSTRUCTION MARSDEN PARK DRAFT S94 BASIN REVIEW BASIN J 8955/SK8 E 8955_SK8 DEPARTMENT OF PLANNING C/- APP AHD 1:500 @ A1 DJH/JC DJH A FIRST ISSUE 23/04/10 TK B ISSUED FOR REVIEW 12/05/10 TK C COUNCIL COMMENTS AMENDMENTS 30/11/10 MP D COUNCIL COMMENTS AMENDMENTS 30/11/10 MP E ISSUED FOR EXHIBITION 01/02/11 GH 1:500 (AT A1) BASIN J TWL = 29.4 EDL = 28.2 APPROXIMATE EXTENT OF RAINGARDEN ALL BATTERS ARE 1:6 NOTE: RICHMOND ROAD

ADVANCE COPY ONLY NOT FOR CONSTRUCTION J ......ADVANCE COPY ONLY NOT FOR CONSTRUCTION MARSDEN PARK DRAFT S94 BASIN REVIEW CHANNELS 1, 4 AND 4A 8955/SK15 C 8955_SK15 DEPARTMENT OF PLANNING

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ADVANCE COPY ONLY NOT FOR CONSTRUCTION J ......ADVANCE COPY ONLY NOT FOR CONSTRUCTION MARSDEN PARK DRAFT S94 BASIN REVIEW CHANNELS 1, 4 AND 4A 8955/SK15 C 8955_SK15 DEPARTMENT OF PLANNING

1%

2%

2%

2%

1%

2%

RL29.90

RL29.90

RL29.90

HEADWALL

SPILLWAY

RL29.40

2 x 2400x1200 RCBC

DISCHARGE

CONTROL

DEVICES

RL27.90

BASIN J

GPT

SUBSOIL CONNECTION

ROCK

ENERGY

DISSIPATER

33m LONG SPILLWAY

WITH 33m LONG TRENCH

GRATE TO TAKE EXCESS

500YR ARI SURCHARGE

SAG

FUTURE GPT &

PIT BY OTHERS

CHANNEL TC11

FOR DETAILS

REFER TO SK11

SPLITTER PIT

RL29.90

IL 26.24

ILP DRAIANGE

RESERVE BOUNDARY

ILP DRAIANGE

RESERVE BOUNDARY

PLAN No.

CLIENT:

SCALES:

DATUM:DESIGNED

DRAWN

CHECKED

DATEISSUE AMENDMENT

FILE No.

Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd.

This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive

use on the project being the subject of the plan. It is not to be copied, used, nor passed

on, in part or full, without written permission from the owner. The user must make

acknowledgement of any material used at the commence of, and within, any project

documentation produced, including but not limited to, letters, reports and/or drawings.

C

Plo

tte

d:

1 F

eb

20

11

10

:31

:11

AM

F

ile N

am

e:

J:\

89

55

W\D

raw

ing

s\S

KW

- C

on

ce

pt

Ske

tch

De

sig

ns\8

95

5_

SK

8.d

wg

J. WYNDHAM PRINCECONSULTING CIVIL INFRASTRUCTURE ENGINEERS

PO Box 4366 PENRITH WESTFIELD NSW 2750

P 02 4720 3300 F 02 4721 7638 W www.jwprince.com.au E [email protected]

& PROJECT MANAGERS

BY

THIS DRAWING MUST NOT BE USED FOR

CONSTRUCTION UNLESS SIGNED AS PART OF AN

APPROVED CONSTRUCTION CERTIFICATE.

ORIGIN:

ADVANCE COPY ONLYNOT FOR CONSTRUCTION

MARSDEN PARK

DRAFT S94 BASIN REVIEWBASIN J

8955/SK8 E

8955_SK8

DEPARTMENT OF PLANNING

C/- APP

AHD

1:500 @ A1

DJH/JC

DJH

A FIRST ISSUE 23/04/10 TKB ISSUED FOR REVIEW 12/05/10 TKC COUNCIL COMMENTS AMENDMENTS 30/11/10 MPD COUNCIL COMMENTS AMENDMENTS 30/11/10 MPE ISSUED FOR EXHIBITION 01/02/11 GH

1:500 (AT A1)

BASIN J

TWL = 29.4

EDL = 28.2

APPROXIMATE EXTENT OF RAINGARDEN

ALL BATTERS ARE 1:6NOTE:

RIC

HM

ON

D R

OA

D

Page 2: ADVANCE COPY ONLY NOT FOR CONSTRUCTION J ......ADVANCE COPY ONLY NOT FOR CONSTRUCTION MARSDEN PARK DRAFT S94 BASIN REVIEW CHANNELS 1, 4 AND 4A 8955/SK15 C 8955_SK15 DEPARTMENT OF PLANNING

ILP DRAINAGE

RESERVE BOUNDARY

PUBLIC EXHIBITION

DRAINAGE RESERVE

BOUNDARY

HEADWALL

RL25.70

RL25.70

RL25.70

RL25.70

RL25.70

RL23.70

2%

2%

2%

2%

1%

1% SPILLWAY RL25.20

RL25.70

RL25.70

ROCK ENERGY

DISSIPATER

BASIN M

DISCHARGE

CONTROL

DEVICE

CHANNEL TC11

3000 x 1200 RCBC

CROSSING

GPT

GPT

3000 x 1200 RCBC

SPLITTER PIT

ILP DRAINAGE

RESERVE BOUNDARY

ILP DRAINAGE

RESERVE BOUNDARY

SUBSOIL

HEADWALL

HEADWALL

1%

EXTENT OF BACKWATER EFFECT

ON TC11 TO BE DETERMINED AT DA.

MAINTAIN FREEBOARD TO FINISHED

SURFACE LEVEL AT MIN 500mm.

I.L.26.24

I.L. 25.6

I.L.24.36

TAIL OUT DRAIN

AT MAX 0.5% TO EXISTING

RIC

HM

ON

D R

OA

D

AT 0.9%

IL22.20

PLAN No.

CLIENT:

SCALES:

DATUM:DESIGNED

DRAWN

CHECKED

DATEISSUE AMENDMENT

FILE No.

Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd.

This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive

use on the project being the subject of the plan. It is not to be copied, used, nor passed

on, in part or full, without written permission from the owner. The user must make

acknowledgement of any material used at the commence of, and within, any project

documentation produced, including but not limited to, letters, reports and/or drawings.

C

Plo

tte

d:

1 F

eb

20

11

10

:32

:58

AM

F

ile N

am

e:

J:\

89

55

W\D

raw

ing

s\S

KW

- C

on

ce

pt

Ske

tch

De

sig

ns\8

95

5_

SK

11

.dw

g

J. WYNDHAM PRINCECONSULTING CIVIL INFRASTRUCTURE ENGINEERS

PO Box 4366 PENRITH WESTFIELD NSW 2750

P 02 4720 3300 F 02 4721 7638 W www.jwprince.com.au E [email protected]

& PROJECT MANAGERS

BY

THIS DRAWING MUST NOT BE USED FOR

CONSTRUCTION UNLESS SIGNED AS PART OF AN

APPROVED CONSTRUCTION CERTIFICATE.

ORIGIN:

ADVANCE COPY ONLYNOT FOR CONSTRUCTION

MARSDEN PARK

DRAFT S94 BASIN REVIEWBASIN M & CHANNEL TC11

8955/SK11 D

8955_SK11

DEPARTMENT OF PLANNING

C/- APP

AHD

1:500 @ A1

DJH/JC

DJH

A FIRST ISSUE 23/04/10 TKB ISSUED FOR REVIEW 12/05/10 TKC COUNCIL COMMENTS AMENDMENTS 30/11/10 MPD ISSUED FOR EXHIBITION 01/02/11 GH

1:500 (AT A1)

BASIN M

TWL = 25.20

EDL = 24.00

APPROXIMATE EXTENT OF RAINGARDEN

CHANNEL TC11

CHANNEL BATTERS ARE 1:4NOTE:

BASIN BATTERS ARE 1:6NOTE:

Page 3: ADVANCE COPY ONLY NOT FOR CONSTRUCTION J ......ADVANCE COPY ONLY NOT FOR CONSTRUCTION MARSDEN PARK DRAFT S94 BASIN REVIEW CHANNELS 1, 4 AND 4A 8955/SK15 C 8955_SK15 DEPARTMENT OF PLANNING

2%

2%

1%

2%

2%

ILP DRAINAGE

RESERVE BOUNDARY

RL39.70

RL39.70

RL39.70

RL39.70

RL39.70

SPILLWAY

RL39.20

DISCHARGE

CONTROL

DEVICES

GPT

SPLITTER PIT

SUBSOIL CONNECTION

12m LONG SPILLWAY TRENCH

GRATE TO TAKE EXCESS

500yr ARI SURCHARGE

FUTURE GPT &

PITS BY OTHERS

RL37.70

BASIN K

PLAN No.

CLIENT:

SCALES:

DATUM:DESIGNED

DRAWN

CHECKED

DATEISSUE AMENDMENT

FILE No.

Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd.

This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive

use on the project being the subject of the plan. It is not to be copied, used, nor passed

on, in part or full, without written permission from the owner. The user must make

acknowledgement of any material used at the commence of, and within, any project

documentation produced, including but not limited to, letters, reports and/or drawings.

C

Plo

tte

d:

1 F

eb

20

11

10

:34

:06

AM

F

ile N

am

e:

J:\

89

55

W\D

raw

ing

s\S

KW

- C

on

ce

pt

Ske

tch

De

sig

ns\8

95

5_

SK

13

.dw

g

J. WYNDHAM PRINCECONSULTING CIVIL INFRASTRUCTURE ENGINEERS

PO Box 4366 PENRITH WESTFIELD NSW 2750

P 02 4720 3300 F 02 4721 7638 W www.jwprince.com.au E [email protected]

& PROJECT MANAGERS

BY

THIS DRAWING MUST NOT BE USED FOR

CONSTRUCTION UNLESS SIGNED AS PART OF AN

APPROVED CONSTRUCTION CERTIFICATE.

ORIGIN:

ADVANCE COPY ONLYNOT FOR CONSTRUCTION

MARSDEN PARK

DRAFT S94 BASIN REVIEWBASIN K

8955/SK13 F

8955_SK13

DEPARTMENT OF PLANNING

C/- APP

AHD

1:500 @ A1

DJH/JC

TK

A FIRST ISSUE 20/04/10 TKB MINOR AMENDMENTS TO BASIN 27/04/10 TKC ISSUED FOR REVIEW 12/05/10 TKD MINOR AMENDMENTS 24/06/10 DJHE COUNCIL COMMENTS AMENDMENTS 30/11/10 MPF ISSUED FOR EXHIBITION 01/02/11 GH

1:500 (AT A1)

BASIN K

TWL = 39.2

EDL = 38.00

APPROXIMATE EXTENT OF RAINGARDEN

ALL BATTERS ARE 1:6NOTE:

ASSUMED UNSOUND MATERIAL)

Page 4: ADVANCE COPY ONLY NOT FOR CONSTRUCTION J ......ADVANCE COPY ONLY NOT FOR CONSTRUCTION MARSDEN PARK DRAFT S94 BASIN REVIEW CHANNELS 1, 4 AND 4A 8955/SK15 C 8955_SK15 DEPARTMENT OF PLANNING

PROPOSED ADJUSTED

ROAD ALIGNMENT

CURRENT DRAFT

ILP ROAD BOUNDARY

ILP DRAINAGE

RESERVE BOUNDARY

2%

1%

2%

2%

2%

1%

FUTURE 2x3000x1200 RCBC

ROAD CROSSING BY OTHERS

SPILLWAY

RL35.50

ROCK ENERGY

DISSIPATER

DISCHARGE

CONTROL

(SLOTTED WEIR)

STILLING POOL

FUTURE 100yr CAPACITY

PIPELINE LAID AT MINIMUM GRADE

RL32.60

PLAN No.

CLIENT:

SCALES:

DATUM:DESIGNED

DRAWN

CHECKED

DATEISSUE AMENDMENT

FILE No.

Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd.

This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive

use on the project being the subject of the plan. It is not to be copied, used, nor passed

on, in part or full, without written permission from the owner. The user must make

acknowledgement of any material used at the commence of, and within, any project

documentation produced, including but not limited to, letters, reports and/or drawings.

C

Plo

tte

d:

1 F

eb

20

11

10

:34

:36

AM

F

ile N

am

e:

J:\

89

55

W\D

raw

ing

s\S

KW

- C

on

ce

pt

Ske

tch

De

sig

ns\8

95

5_

SK

14

.dw

g

J. WYNDHAM PRINCECONSULTING CIVIL INFRASTRUCTURE ENGINEERS

PO Box 4366 PENRITH WESTFIELD NSW 2750

P 02 4720 3300 F 02 4721 7638 W www.jwprince.com.au E [email protected]

& PROJECT MANAGERS

BY

THIS DRAWING MUST NOT BE USED FOR

CONSTRUCTION UNLESS SIGNED AS PART OF AN

APPROVED CONSTRUCTION CERTIFICATE.

ORIGIN:

ADVANCE COPY ONLYNOT FOR CONSTRUCTION

MARSDEN PARK

DRAFT S94 BASIN REVIEWBASIN P

8955/SK14 F

8955_SK14

DEPARTMENT OF PLANNING

C/- APP

AHDDJH/JC

TK

A FIRST ISSUE 23/04/10 TKB MINOR AMENDMENTS TO BASIN 28/04/10 TKC ISSUED FOR REVIEW 12/05/10 TKD BASIN P ILP BOUNDARY ADJUSTED 23/06/10 DJHE COUNCIL COMMENTS AMENDMENTS 30/11/10 MPF ISSUED FOR EXHIBITION 01/02/11 GH

1:500 (AT A1)

BASIN P

TWL = 35.5

EDL = 34.3

APPROXIMATE EXTENT OF RAINGARDEN

ALL BATTERS ARE 1:6NOTE:

Page 5: ADVANCE COPY ONLY NOT FOR CONSTRUCTION J ......ADVANCE COPY ONLY NOT FOR CONSTRUCTION MARSDEN PARK DRAFT S94 BASIN REVIEW CHANNELS 1, 4 AND 4A 8955/SK15 C 8955_SK15 DEPARTMENT OF PLANNING

CH

AN

NE

L T

C1

I.L. BASIN 38.00

I.L. 38.20

I.L. 42.34

SMOOTH TRANSITION

TO EXISTING INVERT.

DETAILS AT DA

STAGE

TR

AN

SM

ISS

ION

LIN

E E

AS

EM

EN

T

1.3

%

ILP DRAINAGE

RESERVE

BOUNDARY

ILP DRAINAGE

RESERVE

BOUNDARY

BASIN A DETAILS

ON SK2

2x2700x1200 RCBC

CROSSING

GPT

CH

AN

NE

L T

C4A

CH

AN

NE

L T

C4A

SMOOTH TRANSITION

TO EXISTING INVERT.

DETAILS AT DA

STAGE

ILP DRAINAGE

RESERVE

BOUNDARY

ILP DRAINAGE

RESERVE

BOUNDARY

CH

AN

NE

L T

C4

I.L.45.07

ILP DRAINAGE

RESERVE

BOUNDARY

ILP DRAINAGE

RESERVE

BOUNDARY

CH

AN

NE

L T

C4

PLAN No.

CLIENT:

SCALES:

DATUM:DESIGNED

DRAWN

CHECKED

DATEISSUE AMENDMENT

FILE No.

Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd.

This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive

use on the project being the subject of the plan. It is not to be copied, used, nor passed

on, in part or full, without written permission from the owner. The user must make

acknowledgement of any material used at the commence of, and within, any project

documentation produced, including but not limited to, letters, reports and/or drawings.

C

Plo

tte

d:

1 F

eb

20

11

10

:35

:35

AM

F

ile N

am

e:

J:\

89

55

W\D

raw

ing

s\S

KW

- C

on

ce

pt

Ske

tch

De

sig

ns\8

95

5_

SK

15

.dw

g

J. WYNDHAM PRINCECONSULTING CIVIL INFRASTRUCTURE ENGINEERS

PO Box 4366 PENRITH WESTFIELD NSW 2750

P 02 4720 3300 F 02 4721 7638 W www.jwprince.com.au E [email protected]

& PROJECT MANAGERS

BY

THIS DRAWING MUST NOT BE USED FOR

CONSTRUCTION UNLESS SIGNED AS PART OF AN

APPROVED CONSTRUCTION CERTIFICATE.

ORIGIN:

ADVANCE COPY ONLYNOT FOR CONSTRUCTION

MARSDEN PARK

DRAFT S94 BASIN REVIEWCHANNELS 1, 4 AND 4A

8955/SK15 C

8955_SK15

DEPARTMENT OF PLANNING

C/- APP

AHD

1:1000 @ A1

DJH/JC

TK

A ISSUED FOR REVIEW 12/05/10 TKB COUNCIL COMMENTS AMENDMENTS 30/11/10 NMC ISSUED FOR EXHIBITION 01/02/11 GH

METRES

1:1000 (AT A1)

20 10 0 10 20 30 40 50 60 70 80 90 100

CHANNEL TC1

CHANNEL TC4

CHANNEL TC4 & TC4A

CHANNEL TC1

CHANNEL TC4

CHANNEL TC4A

ALL BATTERS ARE 1:4 UNONOTE:

NOTE:

NOTE:

ALL BATTERS ARE 1:4 UNO

ALL BATTERS ARE 1:4 UNO

Page 6: ADVANCE COPY ONLY NOT FOR CONSTRUCTION J ......ADVANCE COPY ONLY NOT FOR CONSTRUCTION MARSDEN PARK DRAFT S94 BASIN REVIEW CHANNELS 1, 4 AND 4A 8955/SK15 C 8955_SK15 DEPARTMENT OF PLANNING

GPT

BASIN E DETAILS

ON SK5

TC

7B

TC

7A

GPT

CONTINUED IN NEXT VIEW

GPTSPLITTER PIT

TREATMENT FLOWS FROM

GPT DIRECTED OVERLAND

TO RAINGARDEN IN BASIN G

FUTURE 100YR

CAPACITY PIPE

OVERLAND FLOWPATH

IL

32.48

IL

34.3

MAKE SMOOTH

TRANSITION TO

EXISTING INVERT.

DETAILS TO BE

PROVIDED AT DA STAGE

ILP DRAINAGE

RESERVE BOUNDARY

ILP DRAINAGE

RESERVE BOUNDARY

ILP DRAINAGE

RESERVE BOUNDARY

PLAN No.

CLIENT:

SCALES:

DATUM:DESIGNED

DRAWN

CHECKED

DATEISSUE AMENDMENT

FILE No.

Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd.

This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive

use on the project being the subject of the plan. It is not to be copied, used, nor passed

on, in part or full, without written permission from the owner. The user must make

acknowledgement of any material used at the commence of, and within, any project

documentation produced, including but not limited to, letters, reports and/or drawings.

C

Plo

tte

d:

1 F

eb

20

11

10

:36

:35

AM

F

ile N

am

e:

J:\

89

55

W\D

raw

ing

s\S

KW

- C

on

ce

pt

Ske

tch

De

sig

ns\8

95

5_

SK

16

.dw

g

J. WYNDHAM PRINCECONSULTING CIVIL INFRASTRUCTURE ENGINEERS

PO Box 4366 PENRITH WESTFIELD NSW 2750

P 02 4720 3300 F 02 4721 7638 W www.jwprince.com.au E [email protected]

& PROJECT MANAGERS

BY

THIS DRAWING MUST NOT BE USED FOR

CONSTRUCTION UNLESS SIGNED AS PART OF AN

APPROVED CONSTRUCTION CERTIFICATE.

ORIGIN:

ADVANCE COPY ONLYNOT FOR CONSTRUCTION

MARSDEN PARK

DRAFT S94 BASIN REVIEWCHANNELS 7 AND 8A

8955/SK16 C

8955_SK16

DEPARTMENT OF PLANNING

C/- APP

AHD

1:1000 @ A1

DJH/JC

TK

A ISSUED FOR REVIEW 12/05/10 TKB COUNCIL COMMENTS AMENDMENTS 30/11/10 MPC ISSUED FOR EXHIBITION 01/02/11 GH

METRES

1:1000 (AT A1)

20 10 0 10 20 30 40 50 60 70 80 90 100

CHANNEL TC7 A & B (CONTINUED)

CHANNEL TC7C

CHANNEL TC8A

CHANNEL TC8A

CHANNEL TC7

ALL BATTERS ARE 1:4NOTE:

ALL BATTERS ARE 1:4NOTE:

EXTENT OF RIPARIAN CORRIDOR

LOW FLOW DIVERSION

TO RAINGARDEN

Page 7: ADVANCE COPY ONLY NOT FOR CONSTRUCTION J ......ADVANCE COPY ONLY NOT FOR CONSTRUCTION MARSDEN PARK DRAFT S94 BASIN REVIEW CHANNELS 1, 4 AND 4A 8955/SK15 C 8955_SK15 DEPARTMENT OF PLANNING

1 in

-4

3%

1 in 4

2% 2%

1 in

4

3%

1 in 4

LANDTAKE

5m

ACCESS TRACK

2.5m

ACCESSTRACK

CL

FLOWDEPTH

CHANNELDEPTH

EXISTING

SURFACE

CHANNEL TYPICAL SECTION1:200 H

1:40 V

MARSDEN PARK

DRAFT S94 BASIN REVIEWCHANNEL TYPICAL SECTION & CHANNEL SUMMARY

8955/SK17 C

8955_SK17

DEPARTMENT OF PLANNING

C/- APP

AHD

H 1:200V 1:40

DJH/ER

DJH/TG

A ISSUED FOR REVIEW 12/05/10 TGB COUNCIL COMMENTS AMENDMENTS 30/11/10 MPC ISSUES FOR EXHIBITION 01/02/11 GH

PLAN No.

CLIENT:

SCALES:

DATUM:DESIGNED

DRAWN

CHECKED

DATEISSUE AMENDMENT

FILE No.

Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd.

This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive

use on the project being the subject of the plan. It is not to be copied, used, nor passed

on, in part or full, without written permission from the owner. The user must make

acknowledgement of any material used at the commence of, and within, any project

documentation produced, including but not limited to, letters, reports and/or drawings.

C

Plo

tte

d:

1 F

eb

20

11

10

:36

:51

AM

F

ile N

am

e:

J:\

89

55

W\D

raw

ing

s\S

KW

- C

on

ce

pt

Ske

tch

De

sig

ns\8

95

5_

SK

17

.dw

g

J. WYNDHAM PRINCECONSULTING CIVIL INFRASTRUCTURE ENGINEERS

PO Box 4366 PENRITH WESTFIELD NSW 2750

P 02 4720 3300 F 02 4721 7638 W www.jwprince.com.au E [email protected]

& PROJECT MANAGERS

BY

THIS DRAWING MUST NOT BE USED FOR

CONSTRUCTION UNLESS SIGNED AS PART OF AN

APPROVED CONSTRUCTION CERTIFICATE.

ORIGIN:

ADVANCE COPY ONLYNOT FOR CONSTRUCTION

METRES

1:200 (AT A1)

4 2 0 4 8 12 16 20432101

1:40

METRES (FOR A1 PLOT)

Channel Channel Length Channel Grade Manning's n Base Width Batter Slope 100yr Design Flow Flow Depth Freeboard Channel Depth Channel Width (m) Maintenance Provisions (looking downstream)(m) (%) (m) (__H: 1V) (m /s) (m) (m) (m) Hydraulic Conveyance

Overall Width5m wide Major Access 2.5m wide Minor Access

TC1 310 1.3% 0.07 14.0 4 21.6 1.0 0.5 1.5 25.0 36 Left Right

TC4A 280 0.6% 0.07 10.7 4 12.0 1.0 0.5 1.5 21.8 30 Right Left

TC4 480 0.6% 0.07 18.8 4 18.3 1.0 0.5 1.5 29.3 32 Internal Road at Right Left

TC6 400 0.5% 0.07 21.3 4 18.3 1.0 0.5 1.5 31.6 40 Left Right

TC7A 200 0.8% 0.07 9.5 4 12.7 1.0 0.5 1.5 20.7 21 Internal Road at Left Internal Road at Right

TC7B 200 0.8% 0.07 10.0 4 13.2 1.0 0.5 1.5 21.2 22 Internal Road at Left Internal Road at Right

TC7C 175 0.8% 0.07 11.0 4 14.2 1.0 0.5 1.5 22.2 23 Internal Road at Left Internal Road at Right

TC8A 300 0.8% 0.07 33.2 4 32.0 1.0 0.5 1.5 42.7 51 Left Right

TC8B 215 existing grade retained 0.07 varies varies (4H:1V max) 28.2 varies 0.5 varies varies varies Right Left

TC11 210 0.5% 0.07 6.0 4 7.3 1.0 0.5 1.5 17.5 20 Internal Road at Left Right

TC12A 272 0.5% 0.07 2.0 4 10.4 1.5 0.5 2.0 17.8 23 Left Richmond Road at Right

TC13 103 0.5% 0.07 7.1 4 8.2 1.0 0.5 1.5 18.6 27 Left Right

(m)3

*

*- POST CLIMATE CHANGE