ADVANCED METERING SYSTEM
Supervisor:Dr. Sayeed GhaniCo-supervisor:M. Usman Arif
Group Members:Moomal NaerjoAfshan EjazArifa Rafiq
20 January 2015
OVERVIEW• Why introducing AMS in Pakistan?• What is AMS(Advanced metering system)?• Our Client.• Testing and results.• Our approach.• Project timeline
20 January 2015
WHY INTRODUCING AMS IN PAKISTAN?
20 January 2015
PROBLEM
Pakistan is swamped with energy crises and it hasn’t been able to meet the energy requirement of the general public for many years.
20 January 2015
MAJOR REASONS
• High growth in demand side.• Slow or no development work in supply side.• High variability in the usage of energy.• Electricity theft-Reported more than 80 billion per annum.
20 January 2015
BENEFITS OF AMS• Two-way communication (meter to utility company
& vice versa) .• Increased meter reading accuracy .• Easier energy theft detection.• Flexible billing cycles .• Reduced support expenses.• Improved energy management due to
consumption-based customer profiling.
20 January 2015
WHAT IS AMS?Advanced metering is the technology of automatically
collecting consumption , diagnostic and status data from energy metering device(gas, electric, water etc)
and transferring that data to central database for billing, troubleshooting and analyzing. It is a two way
communication technology.
20 January 2015
COUNTRIES WORKING ON AMS.
• Following countries are working or have implemented Advanced metering system:
• Pakistan (in progress).• Italy• Brazil• Netherland• UK• Australia• France• Canada• USA• Sri Lanka
20 January 2015
TESTING OF AMS IN
PAKISTAN
• http://www.pucsl.gov.lk/english/wp-content/uploads/2013/07/Smart-Metering-in-Sri-Lanka-Final.pdf
20 January 2015
OUR CLIENT
K-ELECTRIC & KBK ELECTRONICS
LAHORE
20 January 2015
K-ELECTRIC POWER REGIONS
20 January 2015
CLIENT RESPONSE
• We presented our idea to K-Electric and their manufacturers KBK Electronics Ltd.
• KBK already working on idea of smart metering.• They asked us to work with them on this idea
jointly. • They wanted us to design its server site DLMS
protocol only.
20 January 2015
WHAT IS DLMS/COSEM PROTOCOL?
• “Device Language Message specification” and “Companion Specification for Energy Metering” .
• DLMS/COSEM together is a application layer communication protocol and an interface model for metering applications. It can be used over TCP/IP or UDP/IP.
• DLMS/COSEM is based on a strict client- server structure. The server is meant to be written in the meter and client accessing the meter could be gateway or central office.
• Other use cases where the server is within the gateway and the client is in the central office.
20 January 2015
TESTING & RESULTS
20 January 2015
OUR APPROACH• After doing a little part of server site code we came over the
constraint of client server communication.• To overcome this constraint we decided to design a physical
emulator which will work as gateway between meter and server.
• For emulator we will be using programmable micro-controllers.
• Once the controller will be connected with meter and server it will start communication between them through secure network which is DLMS Protocol.
20 January 2015
20 January 2015
METER MICRO-CONTROLLER REMOTE SERVER UTILITY OFFICE
CONCEPTUAL MODEL
PROJECT TIMELINE
20 January 2015
JAN - FEB ’15• Literature review of existing systems and meter.• Studying and understanding all parts of meter.• Programming of micro-controller
MARCH ’15• Integration of meter with our controller.• Overcome integration issues if occur.• Coding of client site in the protocol.
APR - MAY ‘15• Final testing of system.• Practical implementation in KBK Electronics .
Thank You