Advanced Planning Briefing To Industry (APBI) Marriott Waterfront Hotel, Baltimore, Maryland Tuesday, 6 April 2010

Advanced Planning Briefing To Industry (APBI) Marriott … · 2017. 5. 19. · 2 PEO Land Systems “Guiding Programs in Turbulent Times” (Mr. Bill Taylor) PEO LS PMs Top Technology

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Advanced Planning Briefing To Industry (APBI) Marriott … · 2017. 5. 19. · 2 PEO Land Systems “Guiding Programs in Turbulent Times” (Mr. Bill Taylor) PEO LS PMs Top Technology

1

Advanced Planning Briefing To Industry (APBI)Marriott Waterfront Hotel, Baltimore, Maryland

Tuesday, 6 April 2010

Page 2: Advanced Planning Briefing To Industry (APBI) Marriott … · 2017. 5. 19. · 2 PEO Land Systems “Guiding Programs in Turbulent Times” (Mr. Bill Taylor) PEO LS PMs Top Technology

2

PEO Land Systems“Guiding Programs in Turbulent Times”

(Mr. Bill Taylor)

PEO LS PMs Top Technology Challenges

G/ATOR (Mr. Lee Bond)LW-155 (Mr. Joseph Lipinski)

MTVR & LVSR (Mr. Tom Miller)MPC (Dr. Bob Lusardi)

JLTV (Lt Col Ben Garza)EFV (Mr. Tom Stevenson)

CAC2S (Captain Pat Costello)

Advanced Technology Investment Plan (ATIP) (Mr. Mike Halloran)

Page 3: Advanced Planning Briefing To Industry (APBI) Marriott … · 2017. 5. 19. · 2 PEO Land Systems “Guiding Programs in Turbulent Times” (Mr. Bill Taylor) PEO LS PMs Top Technology

3

“…We have to be more honest in how we do cost estimates, so that

we don’t low ball ourselves into something that ends up costing more than we thought or were

willing to admit.” Dr. Ashton CarterUnder Secretary of

Defense for Acquisition, Technology & Logistics

“…I'm very committed to improving the way we do systems engineering.”

Page 4: Advanced Planning Briefing To Industry (APBI) Marriott … · 2017. 5. 19. · 2 PEO Land Systems “Guiding Programs in Turbulent Times” (Mr. Bill Taylor) PEO LS PMs Top Technology

4

Competitive Prototyping

Production & Deployment

MS CMS B

FRP DR

CPDCDDOperations &

Support

MS A

PDR PCDRATechnology Development

Materiel Solution Analysis

Engineering & Manufacturing Development

Enhanced Emphasis on:• Technology Maturity• Systems Engineering• Integrated Testing and Test Planning• Manufacturing and Producibility• Logistics and Sustainment Planning

Re-structured “EMD” PhaseEffective Contracting via Pre-Award Peer Reviews

Increased Emphasis on Milestone A

• Mandatory for MDAPs with Technology Development Programs

• Likely for Most Programs

Preliminary Design Review (PDR) before Milestone B to Enhance Understanding of

Derived Requirements and Improve Cost Estimation

PDRP-PDRA

Configuration Steering BoardsEstablished to Stabilize Requirements

ICD

MDD

Competitive Prototyping

Mandatory System/Critical Subsystem Competitive Prototyping

WSARA:Acquisition Business Process Changes

Page 5: Advanced Planning Briefing To Industry (APBI) Marriott … · 2017. 5. 19. · 2 PEO Land Systems “Guiding Programs in Turbulent Times” (Mr. Bill Taylor) PEO LS PMs Top Technology

55

Page 6: Advanced Planning Briefing To Industry (APBI) Marriott … · 2017. 5. 19. · 2 PEO Land Systems “Guiding Programs in Turbulent Times” (Mr. Bill Taylor) PEO LS PMs Top Technology

66

“Our first step is to continue to work with our partners to exploit technology to meet the Warfighter’s needs…”

Page 7: Advanced Planning Briefing To Industry (APBI) Marriott … · 2017. 5. 19. · 2 PEO Land Systems “Guiding Programs in Turbulent Times” (Mr. Bill Taylor) PEO LS PMs Top Technology

7

Technology Demonstration

Concept Refinement

Engineering, Manufacturing, Development

Production and Deployment

MS-A MS-B MS-C IOC FOC

Lightweight 155 (M777)

Joint Light Tactical Vehicle (JLTV)

Marine Personnel Carrier (MPC)

Common Aviation Command & Control System (CAC2S)

Logistics Vehicle System Replacement (LVSR)

Medium Tactical Vehicle Replacement (MTVR)

Expeditionary Fighting Vehicle (EFV)

Ground Air Task Oriented Radar G/ATOR

Page 8: Advanced Planning Briefing To Industry (APBI) Marriott … · 2017. 5. 19. · 2 PEO Land Systems “Guiding Programs in Turbulent Times” (Mr. Bill Taylor) PEO LS PMs Top Technology

8

William E. TaylorPEO Land Systems Marine Corps

Quantico, VA703-432-3370

[email protected]

Page 9: Advanced Planning Briefing To Industry (APBI) Marriott … · 2017. 5. 19. · 2 PEO Land Systems “Guiding Programs in Turbulent Times” (Mr. Bill Taylor) PEO LS PMs Top Technology

9

Advanced Planning Briefing To Industry (APBI)Marriott Waterfront Hotel, Baltimore, Maryland

Tuesday, 6 April 2010