Upload
dbevort
View
742
Download
0
Embed Size (px)
DESCRIPTION
Factsheet: Advanced Projects™ for Microsoft Dynamics AX is a project solution adapted to the needs of project-centric companies.
Citation preview
Advanced Projects™ for Microsoft Dynamics AXAdvanced Projects™ for Microsoft Dynamics AX is a project solution adapted to the needs of project-centric companies. It focuses on two key areas:
Project sales cycle support: Advanced Projects™ is the only system that supports giving project quotes directly based on complex WBS (work break structure) projects and at the same time combines all elements from costing, detailed tasks breakdown and material requirement and resourcing - taking the availability of sta�/tools/equipment into account, in one single solution.
Advanced Projects™ can within minutes give their customers very precise quotes, based on project templates, even imported MS Projects, in regards to both cost and delivery. After a win, Advanced Projects™ easily transfers the quote using the attached WBS project quote template to create the �rmed project in the project module. This takes out the typical painful and costly discrepancies between quotes and �rmed projects.
Project Management – the holistic approach: Only Advanced Projects™ o�ers a more holistic approach to project management. To really make a di�erence for project-centric companies project planning, resourcing, execution and material handling must be combined into one system. They all play vital role for the overall success of their projects.
Examples of target industries are (but not limited to):
• Industrial equipment manufacturing, assembly, installation and servicing.
• Research and development
• Engineering and construction
• Professional services (larger organizations)
This product is certi�ed for Microsoft Dynamics AX 2009.
Product Factsheet - Advanced Project’s™ for Microsoft Dynamics AX - © SoftEnigma 2009
Advanced Projects™
for Microsoft Dynamics AX
Solution for project-centric companies
KEY BENEFITS
• Optimizing the project sales cycle through WBS project assisted quotations.
• Fully Integrated WBS project planning solution for the ERP (AX) platform. No need for separate software like Microsoft Project server. One system, better integration, lowers training cost and overall TCO.
• Flexible resource and capacity planning for projects, by offering three levels of resource/capacity allocation: Finite, Capacity Leveling and In�nite. This enables better and more accurate short-term, mid-term and long-term planning.
• Support for fully automated resourcing of projects, by offering resource skill matching and having role-based project sta�ng.
• Project automation that offers the unique ability to “run” your projects as workflow, providing a much greater control over project execution and helps to maintain transparency.
• Built-In project analytics. Earned Value, S-Curve and Critical Path analysis enables easy and frequent performance reviews of all ongoing projects.
• Integration into Master Planning and Production to keep track of material and continually adjust the requirement dates or automatically managing project task constraints to optimize project WIP inventory.
PRODUCT HIGH LIGHTS
• One platform, only solution fully integrated into AX. Simple operation and training, low total cost of ownership.
• Sophisticated multi level WBS and workflow oriented project planning engine.
• Most advanced project and resource planning tools available for Dynamics.
• Only solution to o�er powerful project automation, runs projects as tightly controlled workflows.
• Only solution to o�er project assisted quotations. Much more accurate project quotations and precise delivery projections.
• Only solution to directly manage project WIP inventory through integration with Master Planning.
• Best graphical Gantt and status screens in industry. Sophisticated, but user friendly screens designed to create a high degree of transparency across projects and visibility of resource usage.
• Only project solution certi�ed by Microsoft.
Product Factsheet - Advanced Project’s™ for Microsoft Dynamics AX - © SoftEnigma 2009
SQL Server2008
Windows Server 2008
Windows XP/Vista/7
Windows Mobile
Financial Management
Project Accounting Master Planning Production
Purchasing
Project Planning
Analytics Earned Value
S-Curve
Project Work �ow Execution
Project CompactingPR
OJE
CT
MA
NAG
EMEN
T
Calendar Management
Roles & Skill Matching
Capacity Planning
Inter-CompanyResourceLeasingRE
SOU
RCE
MA
NAG
EMEN
T
Material Constraint Project Change Management
Project Controlled
Master Planning
Tracking Planned Project
OrdersMAT
ERIA
L M
AN
AGEM
ENT
Project Delivery Projections
Project Assisted Quotation
Budget ForecastingPR
OJE
CT
SALE
S
Exception &Event
Handling
Advanced Projects™
Product Factsheet - Advanced Project’s™ for Microsoft Dynamics AX - © SoftEnigma 2009
PRODUCT FEATURES
Project Quotation• Powerful project assisted quotation, built on top of the standard AX Project quotation. • Build up your quotations with quotation projects, which can be imported, made from
project templates or from scratch. • Use Advanced Project™’s quotation projects to simulate scheduling and give your customer
projected delivery dates and precise budget estimates.• Advanced Project™ easily transfers the quote using the attached WBS project quote
template to create the �rmed project in the project module. All you need to do is to schedule the project (1 click). No need for time consuming setup of an entirely new project after each win.
Project Planning and Scheduling• Advanced project and resource/capacity planning with three distinct levels of capacity
planning: In�nite, Leveling and Finite. This allows you to do �nite planning with named resources or plan with unspeci�ed (bulk) capacity, or a mix of the two, on your projects.
• Planning models, allowing you run planning simulations in parallel and asses impact of changes to resources, capacity and constraints across multiple projects at one time.
• Basic features: • WBS task structured projects.• Project milestone management.• Advanced task predecessor/successor control. • Task date constraint rules.• Multiple role/resource assignments per task.• Unit based role/resource load.• Duration only tasks (no assignments)• Define task by work or duration.• Sub project embedment, which enables you to break up larger project and also link sub
projects.• Add notes and attachments.• Standard, role and resources calendars, to define working hours, shifts, company holidays
and personal time o�.
Project Automation• The unique ability to “run” your projects as workflow. This provides greater control over
project execution and helps to maintain transparency as to who’s doing what and when. • The ability for users to create workflow exception tasks on the fly, to catch errors and
problems, and make them part of the project, workflow and schedule. No need for creating separate project issue list that competes with the project.
• Collect task status and actual time from users that will automatically promote the project workflows. No need for project managers to do statusing.
• Project Compacting gives option to provide a prioritized rescheduling of all active projects, with the extra option of auto-sta�ng projects.
Project Material Management• Advanced Project™ allow you to add items and expense lines to tasks, to plan project
material consumption and expenses, using standard Project forecast. • Automatically keep track of any Master Planning generated planned order, PO and
production orders, related to any task.• Continuously adjust the requirement dates to task scheduling. • Project views for "Late delivery", "Early delivery", "Planned orders" and "Item requirements.• Offer the option to automatically apply date constraints to project tasks in case of
latedelivery or material constraints.
Product Factsheet - Advanced Project’s™ for Microsoft Dynamics AX - © SoftEnigma 2009
Project Issue Tracking• Track any issue that comes during execution of projects effectively.• Issues are linked to projects and project tasks.• Full tracking of issue change history (field level).• Issue level notification to one or more users, employees or external email addresses, when
status changes.• Optional to link issue to related issued.
Advanced Graphical Charts• Advanced Project™'s advanced time and Gantt charts for better overview and managing
projects. Central status screens oversee all active projects and resources.
Project Reporting• Combined T&E (time & expense) and status reporting, allows automated project statusing.
The solution collects task T&E and status from users/resources that automatically promote the project workflows. No need for project statusing, easing the burden for the project owner/manager.
• Role based resource and capacity allocation• Advanced Project™ manages resources and/or capacity assignments via project roles which
is a unique and powerful feature for Advanced Project™. • This new way of managing resource on your project, makes it much simpler to assign and
change resources or capacity. It uses an advanced skill matrix to match up resource to roles, and can suggest which resources would be the best to perform a certain role.
• This also enables Advanced Project™ to auto assign the right resources to projects at the beginning or whenever the project is rescheduled.
Project Analytics• Use of Earned Value and S-Curve analysis on projects to judge real-world performance. • Critical Path Management to facilitate smarter choices when running and editing projects.
Other• Import and export Microsoft Projects (XML).
For further information please go to our website or email us at:
web : www.softenigma.com email : [email protected]
®
“Advanced Projects” and chart logo is trademarks of SoftEnigma Inc in United States and other counties. Microsoft Dynanamics is registred trademark of Mircosoft Corporation in the United States and other countries. All other product names may be registred trademarks of the their respective owners.
All rights reserved; no part of the publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means without the permission of the publishers.
© Copyright - SoftEnigma Inc 2009