Upload
trinhthu
View
218
Download
3
Embed Size (px)
Citation preview
Visit our website www.ashleyproject.euAvionics Systems Hosted on a distributed modular electronicsLarge scale dEmonstrator for multiple tYpes of aircraft
A EUROPEAN COMMISSION FUNDED PROGRAMME COORDINATED BY
PROJECT FUNDED BY THE EUROPEAN COMMISSION
ADVANCED STUDIES
IMPROVED DESIGN, DEVELOPMENT, CAPABILITIES AND PERFORMANCES FOR INTEGRATED MODULAR AVIONICS OF THE FUTURE: SAFER, BETTER, FASTER AND CHEAPER
NEW WAYS OF WORKING: INNOVATION GAMES AND AGILE MANAGEMENT
KEY CHARACTERISTICS
HOW THE IMA MATURITY CAN PROGRESS TO COVER ALL AIRCRAFT DOMAINS, INCLUDING STUDIES ON: FUTURE TRENDS IN IMA2G ARCHITECTURE, MINIATURIZATION AND FUNCTIONAL SCALING; HOW TO INTEGRATE CURRENT AND FUTURE NAVIGATIONAL TASKS IN IMA2G; REMOTE EQUIPMENT INTO THE IMA2G ARCHITECTURE; POWER LINE COMMUNICATION; REAL-TIME PUBLISH-SUBSCRIBE DATA DISTRIBUTION SERVICE (RTPS-DDS)
DESIGN & INNOVATION
SUPPORT OPTIMIZATION OF SOFTWARE WORK PROCESSES AND HARDWARE TO INCREASE EFFICIENCY IN IMA2G DEVELOPMENT, INCLUDING: ANALYSIS OF SINGLE CORE AND MULTICORE PROCESSORS IN IMA2G FOR SAFETY-CRITICAL APPLICATIONS; DESCRIPTION AND RECOMMENDATION OF A TAILORED SOFTWARE DEVELOPMENT PROCESS FOR ASHLEY; INTEGRATION OF ATA-SPECIFIC REMOTE COMPONENTS INTO IMA2G TOOL ARCHITECTURE.
DEVELOPMENT STUDIES
INCLUDING, AMONG OTHERS, STUDIES ON: IMA2G PERFORMANCE ANALYSIS AND BEHAVIOUR SIMULATION; DYNAMIC PROGRAM ANALYSIS TECHNIQUES FOR EMBEDDED SYSTEM SOFTWARE; MODELLING OF AIR SYSTEM CONTROL IMPACT FOR LATENCY; MODELLING OF NAVIGATION AND FLIGHT MANAGEMENT FUNCTIONS FOR PERFORMANCE ASSESSMENT.
CAPABILITIES AND PERFORMANCES
NAVIGATOR
WIN
DGA
LLIL
EO
AFDX + DB
MIS GPS
3DPAS.
VORDME
2D
ILS
IRU
ADR
SDRU
Complex Softwareon IMA2G example.
Software-Centric.
Uses many IMA2GBackend Functions.
Highly Flexible.
Mix and Match ofSoftware Features.
This
pro
ject
has
rece
ived
fund
ing
from
the
Euro
pean
Uni
on’s
Sev
enth
Fra
mew
ork
Prog
ram
me
for r
esea
rch,
tech
nolo
gica
l dev
elop
men
t and
dem
onst
ratio
n un
der g
rant
agr
eem
ent n
o AC
P2-G
A-20
13-6
0544
2.It
is th
e pr
oper
ty o
f the
ASH
LEY
cons
ortiu
m a
nd s
hall
not b
e di
strib
uted
or r
epro
duce
d w
ithou
t the
form
al a
ppro
val o
f the
ASH
LEY
Stee
ring
Com
mite
e.