Advanced Technology & Applied Science Building Project South Orange County Community College District Bi-Weekly Progress Update No. 18 September 1, 2020 – September 15, 2020 Project Status: ATAS Building – Task #2 Completed pouring the concrete southeast retaining wall. Completed excavating and forming the building footprint. Continued investigating the existing site utilities and points of connection for new site utilities. Started importing and filling engineered soil for the building foundations. Connector Road and Parking Lot 5B – Task #5 Completed relocation of High Voltage electrical line. Continued safing off, demolishing, and removing existing site utilities. Continued grading operation. Continued installing storm drain utility infrastructure. ATAS Building – Building Footprint Excavation, North Wings and Main Lobby

Advanced Technology & Applied Science Building Project...2015/09/20  · Bi-Weekly Progress Update No. 18 September 1, 2020 – September 15, 2020 Project Status: ATAS Building –

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Advanced Technology & Applied Science Building Project...2015/09/20  · Bi-Weekly Progress Update No. 18 September 1, 2020 – September 15, 2020 Project Status: ATAS Building –

Advanced Technology & Applied Science Building Project South Orange County Community College District

Bi-Weekly Progress Update No. 18 September 1, 2020 – September 15, 2020

Project Status:

ATAS Building – Task #2

Completed pouring the concrete southeast retaining wall.

Completed excavating and forming the building footprint.

Continued investigating the existing site utilities and points of connection for new site utilities.

Started importing and filling engineered soil for the building foundations.

Connector Road and Parking Lot 5B – Task #5

Completed relocation of High Voltage electrical line.

Continued safing off, demolishing, and removing existing site utilities.

Continued grading operation.

Continued installing storm drain utility infrastructure.

ATAS Building – Building Footprint Excavation, North Wings and Main Lobby

Page 2: Advanced Technology & Applied Science Building Project...2015/09/20  · Bi-Weekly Progress Update No. 18 September 1, 2020 – September 15, 2020 Project Status: ATAS Building –

ATAS Building – Building Footprint Excavation, South Wing

ATAS Building – The Southeast Retaining Wall

ATAS Building – Import and Fill Operation of Engineered Soil, North Wing

Page 3: Advanced Technology & Applied Science Building Project...2015/09/20  · Bi-Weekly Progress Update No. 18 September 1, 2020 – September 15, 2020 Project Status: ATAS Building –

ATAS Building – Import and Fill Operation of Engineered Soil, South Wing

Connector Road and Parking Lot 5B – Storm Drain Infrastructure Installation

Connector Road and Parking Lot 5B – Grading Operation from Baseball Stands

Page 4: Advanced Technology & Applied Science Building Project...2015/09/20  · Bi-Weekly Progress Update No. 18 September 1, 2020 – September 15, 2020 Project Status: ATAS Building –

Connector Road and Parking Lot 5B – Storm Drain Piping

Upcoming Activities:

ATAS Building – Task #2

Complete import and fill operation.

Continue site utilities investigations.

Begin excavating foundations and footings for the building.

Begin site utilities installation.

Begin pouring concrete foundations and footings for the building.

Connector Road and Parking Lot 5B – Task #5

Continue the grading operation.

Continue site utilities installation.