Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Advanced Treatment Systems for Lagoons
Marc W. Salmi, P.E.
Environmental Dynamics International
May 10, 2016
Michigan Lagoon Seminar
Agenda
• Lagoons: History and Background
• EPA Ammonia Criteria
• Lagoon Upgrades for Nitrification
• Case Study: Miner, MO
• Final Thought
Lagoon Solutions
Lagoon Solutions
Lagoon Solutions
Lagoon Solutions - Basic
PM QZ
CM PM/QZ
Complete Mix Lagoon System
Partial Mix Lagoon System
Lagoon Solutions - Basic
Complete Mix Lagoon
Partial Mix Lagoon
EPA Ammonia Criteria
EPA Ammonia Criteria
EPA Ammonia Criteria
EPA Ammonia Criteria
EPA Ammonia Criteria
EPA Ammonia Criteria
EPA Ammonia Criteria
Lagoon Technologies
for Nitrification
• Post-Lagoon Polishing
• In-Lagoon Polishing
• Activated Sludge Lagoons
• IDEAL Process
Lagoon Technologies
for Nitrification
• Post-Lagoon Polishing
Lagoon Technologies
for Nitrification
• Post-Lagoon Polishing
Lagoon Technologies
for Nitrification
Complete Mix or
Partial Mix Cell
Partial Mix Cell with
Quiescent Zone
Ammonia Polishing Reactor
• Post-Lagoon Polishing
Lagoon Technologies
for Nitrification
• Post-Lagoon Polishing
• In-Lagoon Polishing
Lagoon Technologies
for Nitrification
• Post-Lagoon Polishing
• In-Lagoon Polishing
Lagoon Technologies
for Nitrification
Complete Mix or
Partial Mix Cell
Partial Mix Cell with Polishing Modules and
Quiescent Zone
• Post-Lagoon Polishing
• In-Lagoon Polishing
Lagoon Technologies
for Nitrification
• Post-Lagoon Polishing
• In-Lagoon Polishing
• Activated Sludge Lagoons
Lagoon Technologies
for Nitrification
Internal Clarifier (IC) External Clarifier (EC)
Lagoon Solutions - Advanced
• Post-Lagoon Polishing
• In-Lagoon Polishing
• Activated Sludge Lagoons
Lagoon Technologies
for Nitrification
Internal Settler (IS)
Lagoon Solutions - Advanced
EDI Lagoon Solutions - Advanced
• Applying design expertise to advanced biological processes for 35+ years
– Activated sludge and extended aeration plants
– Over 3,500 installations world-wide
Botina, Paraguay Millbury, MA
EDI Lagoon Solutions - Advanced
• 25 Years of Sequencing Batch Reactor Systems
– Over 300 international installations
Greater Noida, India – 72 MGD Zywiec, Poland – 27 MGD
EDI Lagoon Solutions - Advanced
• Integrated Fixed-Film System (IFAS) Innovation and Lagoon Installation
– 50+ domestic MBBR installations
BioReef™ Media BioCurtain (Installed)
Lagoon Solutions - Advanced
• Intermittently Decanted Extended Aeration Lagoon (IDEAL) – An advanced upgrade for lagoon-based treatment
processes • Especially nutrient (ammonia, nitrogen, phosphorous)
removal
– Achieves stable treatment even at near-freezing water temperatures
– Incorporates proven technologies across 40 years of EDI wastewater treatment experience
Intermittently Decanted Extended Aeration Lagoon (IDEAL)
Lagoon Solutions - Advanced
Intermittently Decanted Extended Aeration Lagoon (IDEAL)
EDI Lagoon Solutions - Advanced
IDEAL Miner, MO
Case Study
IDEAL Miner, MO Case Study
IDEAL Component Specifics
IDEAL Miner, MO Case Study
0
500
1000
1500
2000
2500
3000
3500
4000
0
0.2
0.4
0.6
0.8
1
1.2
Nov Dec Jan Feb Mar Apr
Flo
w R
ate
(m
^3
/da
y)
Flo
w R
ate
(M
GD
)
Date
Flow Rate vs. Time
MGD
m^3/d
Note: Design Flow is 0.3 MGD (1136 m^3/d)
IDEAL Miner, MO Case Study
IDEAL Miner, MO Case Study
IDEAL Miner, MO Case Study
-10
-5
0
5
10
15
20
Nov Dec Jan Feb Mar Apr
Tem
per
atu
re (
Cel
siu
s)
Date
Temperature vs. Time
Avg. Weekly Mean Air Temp (°C)
Bioreactor Temperature (°C)
IDEAL Miner, MO Case Study
0
50
100
150
200
250
300
350
400
450
Nov Dec Jan Feb Mar Apr
BO
D C
on
cen
tra
tio
n (
mg
/L)
Date
BOD5 Concentration (mg/L) vs. Time
Inf
Eff
IDEAL Miner, MO Case Study
0
20
40
60
80
100
120
140
160
180
Nov Dec Jan Feb Mar Apr
TS
S C
on
cen
tra
tio
n (
mg
/L)
Date
TSS Concentration (mg/L) vs. Time
Inf
Eff
IDEAL Miner, MO Case Study
0
5
10
15
20
25
30
35
40
Nov Dec Jan Feb Mar Apr
NH
3-N
Co
nce
ntr
ati
on
(m
g/L
)
Date
NH3-N Concentration (mg/L) vs. Time
Inf
Eff
IDEAL Miner, MO Case Study
0
10
20
30
40
50
60
70
80
Nov Dec Jan Feb Mar Apr
TK
N C
on
cen
tra
tio
n (
mg
/L)
Date
TKN Concentration (mg/L) vs. Time
Inf
Eff
IDEAL Miner, MO Case Study
0
10
20
30
40
50
60
70
80
Nov Dec Jan Feb Mar Apr
TN
Co
nce
ntr
ati
on
(m
g/L
)
Date
Total Nitrogen Concentration (mg/L) vs. Time
Inf
Eff
IDEAL Miner, MO Case Study
Process Data Summary (2013-2014 Winter) b/f Warm Up
Constituent Influent (mg/L) Effluent (mg/L)
BOD 220 +/- 60 4.5 +/- 1.2
TSS 96 +/- 38 5.3 +/- 1.7
Ammonia-N 27 +/- 5 0.05 +/- 0
TKN 32 +/- 3 0.5 +/- 0.01
Nitrate-N 0.06 +/- 0.07 11 +/- 4
Nitrite-N 0.13 +/- 0.21 0.22 +/- 0.25
Total Nitrogen 32 +/- 3 11 +/- 3
Bioreactor Characteristics
Flow (MGD) 0.22 +/- 0.03
Temperature (°C) 5.5 avg (10 max, 2.3 min)
MLSS (mg/L) 1300 +/- 300
F:M Ratio 0.045
IDEAL Miner, MO Case Study
Process Data Summary (2013-2014 Winter) a/ Warm Up
Constituent Influent (mg/L) Effluent (mg/L)
BOD 280 +/- 80 13 +/- 6
TSS 77 +/- 23 26 +/- 9
Ammonia-N 31 +/- 4 0.05 +/- 0
TKN 43 +/- 10 2.7 +/- 1.2
Nitrate-N 0.05 +/- 0.07 11 +/- 4
Nitrite-N 0.13 +/- 0.19 0.98 +/- 0.93
Total Nitrogen 44 +/- 10 14 +/- 4
Bioreactor Characteristics
Flow (MGD) 0.18 +/- 0.02
Temperature (°C) 11 avg (16 max, 4.4 min)
MLSS (mg/L) 1300 +/- 300
F:M Ratio 0.045
IDEAL Miner, MO Case Study
Process Data Summary (2013-2014 Winter) b/f Warm Up
Constituent Influent
(lb/day)
Effluent
(lb/day)
Removal (%)
BOD 400 10 98
TSS 180 9.8 95
Ammonia-N 49 0 >99
TKN 59 1 98
Total Nitrogen 59 21 65
Process Data Summary (2013-2014 Winter) a/ Warm Up
BOD 420 20 95
TSS 120 40 66
Ammonia-N 47 0 >99
TKN 65 4 94
Total Nitrogen 65 22 67
Final Thought
EnvironmentalDynamics.com
Or
Wastewater.com
Q&A