24
Slide # Rev. Leading Indicators and Dashboarding for Advanced Work Packaging Lloyd Rankin

Advanced Work Packaging - groupasi.net

  • Upload
    others

  • View
    18

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Advanced Work Packaging - groupasi.net

Slide #Rev.

Leading Indicators and Dashboarding for Advanced Work Packaging

Lloyd Rankin

Page 2: Advanced Work Packaging - groupasi.net

Slide #Rev.

AWP KPIs

2017-10-24 2

POC

EWP

PWP CWP

RFI

IWP

Page 3: Advanced Work Packaging - groupasi.net

Slide #Rev.

POC Defined

• Path of Construction (POC)

• Path of Construction is defined as the articulation of the optimum building sequence of the physical components of a facility. It is considered complete when the owner agreed procedure is followed with input from all of the identified stakeholders.

2017-10-24 3

Page 4: Advanced Work Packaging - groupasi.net

Slide #Rev.

POC Deliverables

• Optimal Project Schedule

• Geographical boundaries of

EWPs/CWPs/PWPs

• WBS structure of project to align with

EWPs/CWPs/PWPs

• EWP/PWP Releases to support the CWP

Execution Schedule

• Contracting Strategy for the project

• Modularization / Fabrication Strategy for the

Project

• Format / Content / Schedule of inputs for

Project Database

• Metadata requirements to input into the

Project Model (3D)

2017-10-24 4

Page 5: Advanced Work Packaging - groupasi.net

Slide #Rev.

POC KPIs

• Project Type

• Inputs

• Outputs

• Stakeholders

• Meetings

• Deliverables

2017-10-24 5

Page 6: Advanced Work Packaging - groupasi.net

Slide #Rev.

EWP Defined

• Defined as IFC when the EWP has all vendor documentation, is hold and error free, accurately reflects the revision status and has been reviewed and signed of by the required stakeholders.

2017-10-24 6

Page 7: Advanced Work Packaging - groupasi.net

Slide #Rev.

EWP Deliverables

• EWP completeness, including all required

information, attributes and updating frequencies

• EWP sequencing, release of IFC EWP in accordance

with the schedule

• EWP progressing and forecasting, reporting EWP

based on agreed upon rules of credit

• EWP completeness checks, creation and updating of

readiness checklists for each EWP

• EWP expediting, applying the EWP Expediting

procedure as required

• EWP auditing, reviewing EWPs in accordance with

the EWP audit procedure

2017-10-24 7

Page 8: Advanced Work Packaging - groupasi.net

Slide #Rev.

EWP KPIs

• EWP completeness

• EWP sequencing

• EWP progressing and

forecasting

• EWP completeness

• EWP Expediting

• EWP auditing

2017-10-24 8

Page 9: Advanced Work Packaging - groupasi.net

Slide #Rev.

Generic EWP ProgressGENERAL % CUM

Initial Scope Identified 5 5

Initial Design (Modelling) 35 40

Preliminary Vendor Data Received (Where Applicable) 5 45

Preliminary MTO/BOM (Bulks) to Supply Chain 5 50

Final Vendor Data Received / Checks (Where Applicable) 5 55

Model Finalized (90%) 15 70

Deliverables (incl. final MTOs, etc) 15 85

EWP Reviews (Including: Eng Checking / Squad Check / IFR, etc) 5 90

EWP c/w Drawing/Spec/MTOs Issued IFC 5 95

EWP Accepted by Construction 5 100

2017-10-24 9

Page 10: Advanced Work Packaging - groupasi.net

Slide #Rev.

Example: Discipline Progressing

• Piping deliverables

o Development of 3D Model o Drawings (Isometrics, plans, etc.)o P & IDso Requisitionso Specificationso Pipe Stress Analysiso Calculationso Scope write-upo …

2017-10-24 10

Page 11: Advanced Work Packaging - groupasi.net

Slide #Rev.

Piping EWP ProgressingPIPING / MECHANICAL % CUM

Initial Scope Identified 5 5

P&IDs / LDTs IFC Milestone 20

Preliminary Stress Milestone 35

Initial Design (Modelling) 35 40

Preliminary Vendor Data Received (Where Applicable) 5 45

Preliminary MTO/BOM (Bulks) to Supply Chain 5 50

Final Vendor Data Received / Checks (Where Applicable) 5 55

Final Stress Milestone 65

Model Finalized (90%) 15 70

Deliverables (incl. final MTOs, etc) 15 85

EWP Reviews (Incl Eng Checking / IDR(SQK) / IFR, etc) 5 90

EWP c/w Drawing/Spec/MTOs Issued IFC 5 95

EWP Accepted by Construction 5 100

2017-10-24 11

Page 12: Advanced Work Packaging - groupasi.net

Slide #Rev.

PWP Defined

• A database that tracks the materials and equipment necessary to complete an Engineering Work Package (EWP) and Construction Work Package (CWP). The PWP will track the EP materials and identify owner and contractor supplied materials.

2017-10-24 12

Page 13: Advanced Work Packaging - groupasi.net

Slide #Rev.

PWP Deliverables

2017-10-24 13

• PWP completeness, including all material, equipment, and related documentation

• PWP sequencing, release of complete PWP in accordance with the schedule

• PWP progressing and forecasting, reporting PWP based on agreed upon rules of credit

• PWP completeness checks, creation and updating of readiness checklists for each PWP

• PWP expediting, applying the PWP Expediting procedure as required

• PWP auditing, reviewing PWPs in accordance with the PWP audit procedure

Page 14: Advanced Work Packaging - groupasi.net

Slide #Rev.

PWP Deliverables

2017-10-24 14

o PWP completeness PWP sequencing

o PWP progressing and forecasting

o PWP completeness

o PWP Expediting

o PWP auditing

Page 15: Advanced Work Packaging - groupasi.net

Slide #Rev.

Request for Information (RFI) Defined

• RFIs are defined as construction contractor requests made to the engineer to get clarification or get a change approved

2017-10-24 15

Page 16: Advanced Work Packaging - groupasi.net

Slide #Rev.

RFI Deliverables

• Design clarifications (conflicts, incomplete plans, specifications)

• Requests for a design change (often due to errors in construction, sequencing problems)

• Requests for substitutions (value engineering, material availability, ease of use)

• Constructability issues

• Differing site conditions

2017-10-24 16

Page 17: Advanced Work Packaging - groupasi.net

Slide #Rev.

RFI KPIs

• RFIs compliance checking includes:o Responding to the RFI within

the agreed upon timelines

o Providing sufficient information to resolve 90% of the RFIs on the first response

2017-10-24 17

Page 18: Advanced Work Packaging - groupasi.net

Slide #Rev.

CWP Defined

2017-10-24 18

An executable construction deliverable that

defines in detail a specific scope of work

and should include a budget and schedule

that can be compared with actual

performance. The scope of work is such

that it does not overlap another CWP. The

CWP can be used as a scoping document

for Requests for Proposal and Contracts.

Page 19: Advanced Work Packaging - groupasi.net

Slide #Rev.

CWP Deliverables

2017-10-24 19

• Scope of Work

• EWP

• Materials

• Quality

• Safety

• Labor

• And 15 other items

Page 20: Advanced Work Packaging - groupasi.net

Slide #Rev.

CWP KPIs

2017-10-24 20

• Rules of Credit for EWPs Progressing

and Forecasting

• Rules of Credit for PWPs Progressing

and Forecasting

• Rules of Credit for CWP Progressing and

forecasting

• CWP Release in accordance with

Release Plan

Page 21: Advanced Work Packaging - groupasi.net

Slide #Rev.

IWP Defined

A detailed execution plan that ensures all

elements necessary to complete the scope

of the IWP are organized and delivered

before work is started. This detailed

planning enables craft persons to perform

quality work in a safe, effective, and efficient

manner.

2017-10-24 21

Page 22: Advanced Work Packaging - groupasi.net

Slide #Rev.

IWP Deliverables

2017-10-24 22

1. Scope of Work

2. Safety

3. Quality

4. Engineering Information

5. Materials and Equipment

6. Man-hour Basis and Manpower

7. Progress Measurement Basis

8. Mechanical / Systems Completion Requirements

9. Regulatory and Approvals Permits

10. Construction Subcontractors

11. Vendor Support

12. Rigging Studies and Plans

13. Scaffolding

14. Waste Management

15. Contact List

16. Other Pertinent Information

Page 23: Advanced Work Packaging - groupasi.net

Slide #Rev.

IWP KPIs

• IWP Development (Done/Not)

• IWP Release in accordance with Schedule

2017-10-24 23

Page 24: Advanced Work Packaging - groupasi.net

Slide #Rev.

Executive Dash Board

2017-10-24 24