Afghan National Defense and Security Forces (ANDSF)
Identification Card (ID CARD) System
Performance Work Statement (PWS)
10 SEPTEMBER 2016
Page2of29
TABLE OF CONTENTS
Contents 1. GENERAL ...................................................................................................................................... 5
1.10. Type of Contract: ........................................................................................................................... 7
1.11. Security Requirements: .................................................................................................................. 7
1.12. Post Award Conference: ................................................................................................................ 9
1.13. Key Personnel: ............................................................................................................................... 9
1.14. Identification of Contractor Employees: ...................................................................................... 11
PART 2 ................................................................................................................................................. 12
DEFINITIONS & ACRONYMS .......................................................................................................... 12
2. DEFINITIONS AND ACRONYMS: ........................................................................................... 12
2.1.Definitions: .................................................................................................................................... 12
3. GOVERNMENT FURNISHED ITEMS AND SERVICES: ........................................................ 15
3.1. Services: ......................................................................................................................................... 15
3.2. Facilities: ........................................................................................................................................ 15
3.3. Utilities: .......................................................................................................................................... 15
3.4. Equipment: ........................................................................................................................................ 15
3.5. Materials: ....................................................................................................................................... 15
4. CONTRACTOR FURNISHED FACILITIES, SUPPLIES, EQUIPMENT, AND SERVICES: .16
4.1. Equipment: ........................................................................................................................................ 16
Page3of29
4.2. Software: ........................................................................................................................................... 16
4.3. Data Rights: .................................................................................................................................... 16
4.4. Contractor Responsibilities: .............................................................................................................. 16
5. SPECIFIC TASKS: ....................................................................................................................... 17
5.1. Documents and reviews: ................................................................................................................ 17
5.2. System Capability .......................................................................................................................... 19
5.3. Card Production and Initial Supply .................................................................................................. 20
5.4. Equipment Purchase: ...................................................................................................................... 21
5.5. Deployable Support Team ................................................................................................................ 21
5.6. Additional Cards: ........................................................................................................................... 21
5.7. Program Management Support: ..................................................................................................... 21
5.8. Travel: ............................................................................................................................................ 21
5.9. System Fielding: ............................................................................................................................ 21
5.9.1 MoI: .............................................................................................................................................. 21
5.10. Training ........................................................................................................................................... 22
5.11. System Sustainment: .................................................................................................................... 23
5.12. Security Control Assessment: ...................................................................................................... 23
5.13. Information Security ....................................................................................................................... 23
5.14. REPORTING ............................................................................................................................... 25
5.15. PERFORMANCE REQUIREMENTS SUMMARY ................................................................... 25
5.16. Deliverables Schedule: ................................................................................................................. 26
Page5of29
Part 1 General Information
1. GENERAL
1.1. Contract: This is a non-personal services contract to list the requirements for the purchase,
integration, maintenance, training and sustainment of the Afghan National Security and Defense
Forces (ANDSF) Identification (ID) Card System. The U.S. Government shall not exercise any
supervision or control over the contract service providers performing the services herein. Such
contract service providers shall be accountable solely to the Contractor who, in turn is responsible to
the U.S. Government.
1.2. Description of Services/Introduction: The current ID Card System is aged and has been facing
obsolescence. This acquisition is to provide a common ID Card System to the Ministries of Defense
(MoD) (Afghan National Army (ANA)) and at the Ministries of Interior (MoI) (Afghan National
Police (ANP)) as one of the enabling capabilities that will allow automated payroll from
authorization to the person being paid. The top level requirements for this acquisition are as follows:
1) the ID Card System must be able to interoperate with the current biometric system, the Afghan
Personnel and Pay System (APPS)/ Afghan Human Resource Information Management
System (AHRIMS) and Electronic National Identification Card (e-NID) or e-Taskira; 2) the ID Card
System must be capable of producing biometrically-linked ID Cards which incorporate the latest
anti-fraud features, and have Dari, Pashtu, and English on them, with the database capturing
pertinent data in those three (3) languages; 3) proficiently train the ANDSF users of various
echelons of command, so they can initially issue approximately 500K ID Cards; and 4) provide
initial sustainment for the ID Card System and provide efficient transition of the ID Card System
sustainment with the required documents, source codes, hardware and software to ANDSF. The
Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools,
materials, supervision, and non-personal services necessary to perform the following key functions
in this PWS except in the event of GFE. The Contractor shall perform to the standards in this
contract.
1.3. Objectives: The Contractor shall expeditiously integrate the ID Card System with the biometric
system and APPS/AHRIMS, and field and train ID Card System to ANDSF users to enable ANDSF
to issue approximately 500K biometrically-linked ID Cards to all biometrically validated ANDSF
personnel within the base year; then transition the system with required documents, source codes,
software and hardware to ANDSF for continuation of ID Card issue, system management and
maintenance. During the base year, the contractor shall build the required interface in the ID Card
System to interoperate with e-NID but not required to complete the actual integration for operational
use.
1.4. Scope: This PWS requires the Contractor to perform acquisition of an ID Card System, integrate
with other systems as described in Para 1.3. (Objectives), and field and train users to print and issue
ID Cards to all eligible ANDSF personnel across both MoI and MoD of Afghanistan. Each job
Page6of29
function listed herein is to be accompanied with a plan for the integration, fielding, sustainment,
training, and transition of the following objectives to be performed during the period of performance
(PoP). At the end of fielding and training, the ANDSF shall be capable of not only issuing ID Cards,
but also managing and maintaining the ID Card System. The transition of functions from the
Contractor to ANDSF personnel shall occur in a phased manner as described herein. Following
transition, the Contractor shall maintain a support function until the expiration of the sustainment
options.
1.5. Period of Performance: One (1) year basic contract with two (2) one (1) year options for sustainment
only tasks.
1.6. Quality Assurance: The U.S. Government will evaluate the contractor’s performance under this
contract in accordance with the Quality Assurance Surveillance Plan (QASP). The QASP is
primarily focused on what the U.S. Government must do to ensure that the Contractor has performed
in accordance with the performance standards. It defines how the performance standards shall be
applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.1 Performance evaluation will be accomplished by monitoring compliance with the performance
requirements as described in the contract and in the QASP.
1.6.2 The surveillance methods to assess and evaluate the contractor will be used by the US
Government and described in the QASP. These methods are, but not limited to:
1.6.2.1. 100% Inspection - The US Government will evaluate 100% designated tasks.
1.6.2.2. Partial Inspection - The US Government will evaluate less than 100% of designated
tasks and on a selective basis.
1.6.2.3. Random Sampling - The US Government will evaluate less than 100% of designated
tasks on a random basis.
1.6.2.4. Independent Verification and validation (IV&V) - Verification and validation
performed by an IV&V contractor engaged by APPS PMO may be used to determine that
the work product delivered by the contractor matches the content requirement in the
contract.
1.6.3 Operational Monitoring - The US Government will examine reports generated by automated
tools and logs and websites.
1.6.4 Customer Feedback - The US Government will evaluate survey and random sampling, which
will be used to evaluate customer satisfaction.
1.7. Recognized Holidays:
New Year’s Day First Day of Ramadan
Mohammad’s Birthday Eid Days (3 Days)
Victory Day of Islamic Revolution Big Eid (4 Days)
Independence Day Ashura Day
Masood’s Day Ramadan (~30 Days)
Parliamentary Elections
Page7of29
1.8. Hours of Operation: The Contractor personnel co-located at ANDSF facilities shall provide services
during normal ANDSF working hours, matching the hours of the associated Ministries where they
work at. Normally, these hours are Saturday through Thursday from 0800–1700 Kabul local time
zone. Few exceptions exist, and these include but are not limited to Ramadan, and when a team is
traveling. Generally, the contractor shall match the ministries unless deemed necessary to deviate by
PMO and written notice will be given by the COR in these events.
1.9. Place of Performance: The work shall be performed at, but not limited to, the MoD/MoI and their
associated units throughout Afghanistan, HQ Resolute Support, and the Contractor’s facility.
1.9.1 In addition, the Contractor shall perform site visits as deemed appropriate by PMO to provide
training, oversight, and assistance as required. This shall include help desk assistance; inter-
operability issues with APPS/AHRIMS and e-NID; trouble-shooting; and continuity for on-site
personnel. The Contract employees shall work within the Force Protection umbrella of ANDSF
when conducting tasks at MoD/ANA and MoI/ANP sites.
1.10. Type of Contract: The U.S. Government will make a single award using Firm Fixed Price contract.
1.11. Security Requirements:
1.11.1 Contractor Security
1.11.1.1. Physical Security: The Contractor shall be responsible for safeguarding all contractor
acquired property and property provided for contractor use in this contract. At the close of
each work period, facilities, equipment, and materials shall be secured.
1.11.1.2. Any contractual tasks in this PWS required to be performed within Afghanistan should
be conducted, to the fullest extent possible, by an Afghanistan partner who has been
selected and vetted by the prime contractor and is approved by PMO.
1.11.1.3. Transportation and security below the Corps HQ or Provincial HQ shall be provided
by the ANDSF local commander in coordination with the Afghanistan Partner, the
contractor and PM APPS.
1.11.1.4. The contractor shall ensure that their individuals requiring ID card program access will
have the proper background investigations conducted by the MoI or MoD personnel office
respectively and obtain necessary training. Additionally, the contractor will have at the
supervisory level and above already vetted and approved personnel by the IBR so they can
expedite handling PII and other sensitive information.
1.11.1.5. PMO retains the right to remove any contractor personnel, regardless of prior
clearance or adjudication status, whose actions while assigned to this contract conflict with
the interests of the US Government or that of the Government of Afghanistan. The reason
for removal will be documented in writing by the COR and submitted to the KO for
approval and action.
1.11.2 Protecting Personally Identifiable Information (PII)
1.11.2.1. PII is information that can be used on its own or with other information to identify,
contact, or locate a single person, or to identify an individual in context.
Page8of29
1.11.2.2. All PII should be protected according to industry best practices, and by the
Recommendations of the National Institute of Standards and Technology, “Guide to
Protecting Confidential of Personally Identifiable Information (PII), NIST Special
Publication 800-122.
1.11.2.3. System shall have the following safe guards to limit access to PII:
1.11.2.3.1. All access or reports generated with PII shall be captured in the system
audit log to include, at a minimum:
1.11.2.3.1.1. User accessing the information/report
1.11.2.3.1.2. Date and time of access
1.11.2.3.1.3. Terminal used for access
1.11.2.3.1.4. Action generated by user: query, display, download, or print information
1.11.2.3.2. Repeated requests for an excessive amount of data (excessive is
defined as > 500 records) or similar PII reports shall be flagged in the system
upon the second request for such information within a seven (7) day period
with a report generated to the appropriate MoI or MoD designated security
officer and PM APPS.
1.11.3 Data at Rest (DAR) security and protection: Data at rest will be implemented on all
computers; removable storage devices (thumb drives, data CD, portable hard drives, etc.) used
on the network to access, store, or transport ID card personnel data. All encryption will comply
with Advanced Encryption Standard (AES) 192 at a minimum.
1.11.3.1. Full Disk Encryption (FDE): The FDE solution will protect against unauthorized
reading or copying of data off a protected hard drive or other components. Steps shall be
taken to ensure that pre-boot authentication (PBA) is also implemented which will allow
only registered users to boot workstations following token or other authentication methods.
1.11.3.2. Removable Storage Encryption (RSE): Mandatory encryption is required for data
copied to removable storage devices, such as USB thumb drives, external hard drives,
compact discs (CDs), digital versatile discs (DVDs), etc. This encryption must protect all
data transferred off of a DAR protected work station. Where necessary, and for official use
only, an inter-operability utility must be installed on removable storage devices that may be
used to decrypt data.
1.11.4 Safeguarding Classified Information and Materials. The contract is unclassified but some of
the information handled by the contractor will be Sensitive (FOUO).
1.11.4.1. The contractor will ensure requirements for safeguarding sensitive information and
sensitive materials, for obtaining and verifying personnel / background check, for verifying
security clearances and indoctrination of visitors, for controlling access to restricted areas,
for the security of automated and non-automated management information systems and
data are fulfilled.
Page9of29
1.11.4.2. The US Government (via PM APPS) shall be immediately notified of any security
incident or any indication of a potential unauthorized disclosure or compromise of sensitive
unclassified information.
1.12. Post Award Conference: The Contractor shall attend a post-award (“kick-off”) conference to be
conducted within seven (7) days after contract award. The conference date, place and time shall be
coordinated by the Contracting Officer upon contract award and obtaining Defense Base Act
insurance.
1.13. Key Personnel: Those people considered essential to successful contractor performance. These key
personnel shall be designated in writing and such shall be provided to the Contracting Office and the
Requiring Activity. A formal, written request for Key Personnel changes shall be sent to the
Contracting Office as well as the Requiring Activity for written, Government approval. Such
written request shall contain a copy of the resume for the proposed replacement Key Personnel. No
change outs of personnel will take place without a written approval, signed by the Contracting Office
and the Requiring Activity.
1.13.1 Program Manager (PM)
1.13.1.1. The contractor shall provide a PM who shall be responsible for the performance of the
work. The name of this person and an alternate who shall act for the contractor when the
manager is absent shall be designated in writing to the government contracting officer. The
PM shall have a minimum of 10 years of program management experience and 5 years of
experience in Afghanistan.
1.13.1.2. The PM shall be overseeing the team using best business practices and working as an
integrated team and shall be responsible for all contractual responsibilities and delivery of
all contract deliverables listed in the Deliverable Schedule.
1.13.1.3. The PM shall work side-by-side with Government personnel and shall ensure an
efficient, effective and economical level of support is provided to the US Government.
1.13.1.4. The PM is responsible for translating high-level business requirements into detailed
functional specifications and managing requests for changes to the design specifications,
and assists the business in determining which business requirements can and should be
automated and how they are then integrated with other business and technical processes.
1.13.1.5. PM shall provide oversight of staff and support activities, oversee contract costs and
coordinate with the COR.
1.13.2 Technical Lead
1.13.2.1. The Technical Lead is responsible for developing, communicating, maintaining, and
enforcing the overall architecture of ID Card System, to include:
1.13.2.2. Applications
1.13.2.3. Data
1.13.2.4. Third Party products
1.13.2.5. Technical Infrastructure
Page10of29
1.13.2.6. The Technical Lead is responsible for program activities related to analysis, design
(including fit/gap analysis), documentation, development, testing of the ID Card System,
including but not limited to:
1.13.2.6.1. Presenting proposed ID card design options to ANDSF leadership.
1.13.2.6.2. Generating detailed ID card design documentation.
1.13.2.6.3. Documenting requirements or changes within the scope of this PWS.
1.13.2.7. The Technical Lead will be expected to understand all solutions components and how
they inter-operate to support business processes and management information needs.
1.13.2.8. The Technical Lead shall be responsible for interface and integration strategies with
external systems processes, including determining, understanding and maintaining business
requirement for those interactions.
1.13.2.9. The Technical Lead shall be responsible for ensuring compliance with external
requirements.
1.13.2.10. Serves as direct liaison to function process owners in order to translate and prioritize
requirements for assigned area project and maintenance work.
1.13.3 Life-Cycle and Configuration Manager
1.13.3.1. Responsible for configuration management (CM) tasks to include use of Software
Configuration Management tools for identification, control, status accounting, verification,
audits, product release, delivery, preparing / migrating builds and fielding.
1.13.3.2. Manages all ID Card System environments and enforces strict version control process
to ensure all environments are consistently configured.
1.13.3.3. Is responsible for managing and directing the system test activities for ID Card System
implementation.
1.13.3.4. Determine and execute the contingency requirements and solutions to ID Card System
and interface partners.
1.13.3.5. Determine integrated logistic support activities, roles, responsibilities, sequences and
timelines.
1.13.3.6. Participate in the creation of procedure and communication material that document
logistic practices.
1.13.4 Training Lead.
1.13.4.1. The Training Lead is responsible for the analysis, design, development, testing and
fielding of training artifacts, guides, classroom instruction and Computer Based Training
(CBT) offering in Dari, Pashtu, and English.
1.13.4.2. The Training Lead shall ensure quality control checks are built into the successful
implementation of training plans, deliverable and strategies.
1.13.4.3. The Training Lead must understand and translate business requirements and the
system configuration/solution into training artifacts for the ID Card System
implementation, and has demonstrated experience and strong knowledge of software
training development, implementation, and maintenance.
Page11of29
1.13.5 Fielding Lead.
1.13.5.1. The Fielding Lead is responsible for ensuring the training the Users and fielding of the
ID Card System at various MoI and MoD locations for operation.
1.13.5.2. The Fielding Lead shall ensure quality control checks are built into the successful roll
out of ID Card System and training of the Users.
1.13.5.3. The Fielding Lead must have the technical knowledge and concept of operation of the
ID card system, and has demonstrated experience and strong knowledge of program
implementation, and maintenance, including Help-Desk implementation and operation.
1.14. Identification of Contractor Employees: All contract personnel attending meetings, answering U.S.
Government telephones, and working in other situations where their contractor status is not obvious
to third parties are required to identify themselves as such to avoid creating an impression in the
minds of members of the public that they are U.S. Government officials. They must also ensure that
all documents or reports produced by contractors are suitably marked as contractor products or that
contractor participation is appropriately disclosed. The contractor shall be responsible for obtaining
security / identification badges for all employees within the scope of this PWS.
Page12of29
PART 2 DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to
the U.S. Government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer: A person with authority to enter into, administer, and or terminate
contracts, and make related determinations and findings on behalf of the U.S. Government.
2.1.3 Contracting Officer Representative (COR): An employee of the U.S. Government appointed
by the contracting officer to administer the contract. Such appointment shall be in writing and
shall state the scope of authority and limitations. This individual has authority to provide
technical direction to the Contractor as long as that direction is within the scope of the contract,
does not constitute a change, and has no funding implications.
2.1.4 Deliverable: Anything that can be physically delivered, but may include non-manufactured
things such as meeting minutes or reports.
2.1.5 Key Personnel: Contractor personnel that are evaluated in a source selection process and that
may be required to be used in the performance of a contract by the Key Personnel listed in the
PWS. When key personnel are used as an evaluation factor in best value procurement, an offer
can be rejected if it does not have a firm commitment from the persons that are listed in the
proposal.
2.1.6 Physical Security: Actions that prevent the loss or damage of U.S. Government property.
2.1.7 Quality Assurance: The U.S. Government procedures to verify that services being performed
by the Contractor are performed according to acceptable standards.
2.1.8 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the
surveillance methodology to be used for surveillance of contractor performance. This plan is
primarily focused on what the Government must do to ensure that the Contractor has performed
in accordance with the performance standards. It defines how the performance standards will
be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
2.1.9 Quality Control: The Contractor shall develop and maintain an effective quality control
program to ensure services are performed in accordance with the PWS. The Contractor shall
develop and implement procedures to identify, prevent, and ensure non-recurrence of defective
services. A draft is due 5 (five) days after contract award. The Contractor’s quality control
program is the means by which they assure themselves that their work complies with the
requirement of the contract. As a minimum, the Contractor shall develop quality control
procedures that address the areas identified in the Section 5 and submit to the Contracting
Officer for approval prior to the start of work.
Page13of29
2.1.10 Work Day: The number of hours per day the Contractor provides services in accordance with
the contract.
2.1.11 Work Week: Sunday through Thursday
2.1.12 Portable ID Card System terminal(s): The portable ID Card System terminal(s) will have the
same capability to the fixed ID Card System terminal(s) that have the enrollment ability, with
one exception. The portable ID Card System must be easily deployable to austere locations.
2.1.13 Initial Operational Capability (IOC): IOC is defined as the proposed ID Card system fielded
in complete configuration to MOI and MOD and their designated operators trained for full
operation to issue ID cards at a PHQ and a Corps.
2.1.14 Full Operational Capability (FOC): FOC is defined as 90% of MOI and MOD units
trained/fielded for full operation.
2.1.15 Level 3 Language Definition: Can translate texts that contain not only facts but also abstract
language, showing an emerging ability to capture their intended implications and many
nuances. Such texts usually contain situations and events which are subject to value judgments
of a personal or institutional kind, as in some newspaper editorials, propaganda tracts, and
evaluations of projects. Linguistic knowledge of both the terminology and the means of
expression specific to a subject field is strong enough to allow the translator to operate
successfully within that field. Word choice and expression generally adhere to target language
norms and rarely obscure meaning. The resulting product is a draft translation, subject to
quality control.
2.2. Acronyms:
AHRIMS Afghanistan Human Resources Information Management System
ANA Afghanistan National Army
ANDSF Afghanistan National Defense and Security Forces
ANP Afghanistan National Police
APPS Afghan Personnel and Pay System
COR Contracting Officer Representative
DAR Data at Rest
DBA Database Administrator
e-NID Electronic National Identification Card or e-Taskira
FDE Full Disk Encryption
FOC Full Operational Capability
FOUO For Official Use Only
HR Human Resources
ID card Identification Card
Page14of29
IOC Initial Operational Capability
KO Contracting Officer
MoD Ministries of Defense
MoI Ministries of Interior
PHQ Provincial Headquarters
PM Project or Program Manager
PMO Program Management Office
PoP Period of Performance
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QASP Quality Assurance Surveillance Plan
RSE Removable Storage Encryption
TCN Transaction Control Number
TLS Transport Layer Security
Page15of29
PART 3 GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: No services shall be provided.
3.2. Facilities: No facilities shall be provided.
3.3. Utilities: No utilities shall be provided.
3.4. Equipment: No equipment shall be provided.
3.5. Materials: No materials shall be provided.
Page16of29
PART 4 CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED FACILITIES, SUPPLIES, EQUIPMENT, AND SERVICES:
4.1. Equipment: The Contractor shall acquire, install, maintain and provide any equipment required to
accomplish tasks in the PWS. At termination of completion of the contract or designated transition,
all equipment, software, and processes shall become the property of the U.S. Government.
4.2. Software: The Contractor shall acquire, install, maintain, and provide any additional software
products needed to accomplish the tasks related to the PWS. Contractor shall coordinate with the
U.S. Government to transfer all items procured and developed (such as source codes for interfaces
developed to meet integration requirements), and their respective documents, to the Afghan
Government at completion of the contract. The Contractor shall analyze and implement
commercially available solutions as well as Open Source software and hardware solutions when
applicable to meet user requirements as provided by the Government of Afghanistan.
4.3. Data Rights: The U.S. Government retains unlimited data rights to all efforts and products
developed in direct support of the ANDSF ID Card System effort, including but not limited to all
software, source code and documentation, without any restrictions whatsoever by the Contractor.
Does not include commercial off the shelf software that was not modified or customized to meet the
requirements of this PWS.
4.4. Contractor Responsibilities: The Contractor is responsible for providing its employees with base life
support and travel in order to achieve the objectives outlined in this PWS.
Page17of29
PART 5 SPECIFIC TASKS
5. SPECIFIC TASKS:
5.1. Documents and reviews:
5.1.1 Within seven (7) days after contract award, the contractor shall conduct Post-Award
Conference, where the contractor will present technical scope of work in accordance with
authorizing documents and current understanding of project risk.
5.1.2 Within thirty (30) days after contract award: The Contractor shall submit the following
products as a minimum, and execute the reviews (i.e., presentation) with the Program
Management Office (PMO):
5.1.2.1. Initial Baseline Review (IBR) shall cover the following items:
5.1.2.1.1. Key schedule milestones are identified
5.1.2.1.2. Supporting schedules reflect a logical flow to accomplish the technical
work scope
5.1.2.1.3. Resources (budgets, facilities, personnel, skills, etc.) are adequate and
available for the assigned tasks
5.1.2.1.4. Tasks are planned and can be measured objectively, relative to
technical progress
5.1.2.2. Work Breakdown Structure (WBS) should be down to level 3 which includes the major
elements listed in level 2 and all hardware and software services
5.1.2.3. Integrated Master Schedule (IMS) - An integrated and networked multi-layered
schedule of program tasks required to complete the work effort captured with specific
IOC/FOC referenced.
5.1.2.4. Requirements Traceability Matrix (RTM) - The purpose of the RTM is to show where
requirements, including the interface requirements, are satisfied by the design and the
design is satisfied by the code. The RTM is also used to assist in the analysis of proposed
changes. The RTM also shows where requirements are verified (tested) prior to fielding.
Requirements traceability refers to the ability to follow the life of a requirement, in both
forwards and backwards direction, i.e., from its origins, through its development and
specification, to its subsequent fielding and use, and through periods of ongoing refinement
and iteration. Requirements traceability is used to capture the relationships between
requirements, design, test, and implementation of a system.
5.1.3. Within forty-five (45) days after contract award: The contractor shall submit the following
documents and execute the reviews (i.e., presentation) with the PMO:
5.1.3.1. System Fielding Plan (SFP). The contractor shall detail how they are going to field and
train MoI and MoD ANDSF users on ID Card Systems, so that ANDSF users can effectively
issue new ID cards to all members of MoD and MoI.
Page18of29
5.1.3.2. Configuration Management Plan. The contractor shall create and maintain a software
and hardware configuration management plan. The plan will include management of interfaces
required to interoperate with the biometric system, APPS/AHRIMS and e-NID.
5.1.3.3. Preliminary Design Review (PDR) - The Preliminary Design Review (PDR) ensures the
preliminary design and basic system architecture are complete, and that there is technical
confidence the capability need can be satisfied within cost and schedule goals. The PDR
provides the acquisition community, end user, and other stakeholders with an opportunity to
understand the trade studies conducted during the preliminary design, and thus confirm that
design decisions are consistent with the user’s performance and schedule needs prior to formal
validation of the Capability Development Document (CDD). The PDR also establishes the
system’s allocated baseline.
5.1.3.4. Functional Configuration Audit (FCA) - An audit formally examines that each
configuration item meets the functional characteristics stated in its item performance
specification. For a system as a whole, the audit examines the system functional characteristics
has achieved the requirements in the allocated baseline.
5.1.3.5. System Requirements Specification
5.1.4. Within sixty (60) days after contract award: The contractor shall submit the following
documents and execute the reviews (i.e., presentation) with the PMO:
5.1.4.1. Critical Design Review (CDR)
5.1.4.2. Integrated Test Plan
5.1.4.3. Data Archiving Plan. The contractor shall include but not limited to the following:
Roles and responsibilities, archiving strategy, archiving frequency and archive recovery strategy.
5.1.5. Monthly and Weekly requirements: The contractor shall provide the following:
5.1.5.1. Monthly - Execute Program Management Review
5.1.5.2. Weekly - Submit Weekly Status Report
5.1.6. No later than ninety (90) days prior to Initial Operational Capability (IOC) Date, submit first
draft for the following documents and all are required to be finalized and submitted no later than
thirty (30) days prior to IOC date: The contractor shall also execute the reviews (i.e., presentation)
with the PMO with the first draft and the final draft in accordance with the document submission
timeline:
5.1.6.1. System Fielding and Training Plan
5.1.6.2. System Security Plan
5.1.6.3. System Performance Assessment with risk assessment on IOC fielding and training.
5.1.6.4. Sustainment Plan that includes maintenance and help-desk implementation (Tiers I-III)
and transition of these sustainment activities to ANDSF.
5.1.7. No later than thirty (30) days before IOC and training, the contractors shall execute the
following at a minimum:
5.1.7.1. Conduct Physical Configuration Audit with the PMO.
Page19of29
5.1.7.2. Provide source codes for all software development; interface control documents; and
other documents required for training, maintenance and sustainment.
5.1.8. The contractor shall develop and maintain the following documents and artifacts, and
submitted at two different time periods. First will be thirty (30) days prior to Initial Operational
Capability (IOC). Second submission will include any updates and will be submitted thirty (30)
days before meeting Full Operational Capability (FOC).
5.1.8.1. System Architecture: Update and maintain the detailed system architectures to include:
5.1.8.2. System schematics
5.1.8.3. System Use Cases
5.1.8.4. Key interfaces
5.1.8.5. Hardware and Software Specifications: Update and maintain hardware and software
specifications to include:
5.1.8.5.1. Sizing and performance requirements
5.1.8.5.2. Interface control documents
5.1.8.5.3. Systems control requirements
5.1.8.5.4. Source code for any software development
5.1.8.6. Database and File Structures Maintenance: Update and maintain database and file
structures to include:
5.1.8.6.1. Definitions of file characteristics
5.1.8.6.2. Entry Relationship Diagram
5.1.8.6.3. Data dictionary
5.1.8.6.4. Maintenance manual on database
5.1.9. Preventive Maintenance Service Plan: The contractor shall develop and deliver a preventive
maintenance service plan based on the hardware and software components developed and delivered
as part of the ID Card System. Plan shall at a minimum shall include detailed requirements for
routine and non-routine maintenance. Preventative maintenance inspections and work shall be
conducted on a weekly basis with a monthly report to the ministries and U.S. Government.
5.1.10. The contractor shall provide meeting support and data analysis as directed by the PMO.
5.2. System Capability:
5.2.1. System Integration: The contractor shall integrate the ID Card System with the following 3rd
party systems: biometric system, APPS/AHRIMS, and e-NID. At a minimum, the contractor shall
integrate the ID Card system with the biometric system and APPS (based on Odoo open ERP
platform)/AHRIMS before the system gets fielded for operational use. While integration with e-
NID aka: Electronic Taskira (e-Taskira) does not have to be completed before the fielding begins,
the contractor shall, during the base year of the contract, build the required interface in the ID Card
System to interoperate with e-NID but is not required to complete the actual integration with e-NID
for operational use. Additionally, the ID Card System must be compatible with the existing/current
ID card system to migrate all the necessary data. The contractor shall finalize the required data
migration with the PMO before the IBR.
Page20of29
5.2.1.1. ID Card System shall be able to receive/import all data including the unique biometric
number known as Transaction Control Number (TCN) from the current biometric system. The
actual data required to import will be finalized at the Post Award Conference.
5.2.1.2. ID Card System shall be able to transmit and receive personnel data to and from
APPS/AHRIMS.
5.2.2. The ID Card System shall have the capability to take fingerprints and facial photos.
5.2.3. The ID Card System shall have the capability to print ID Cards with anti-fraud security
features. The security features of ID card will be in accordance with the ISO for ID cards. The
security features may include, but are not limited to:
5.2.3.1. All information stored on the magnetic strip and 2D bar code will be encrypted.
5.2.3.2. Cross-Link elements for a multi-layered approach
5.2.3.3. Laser Engraved Photo
5.2.3.4. Optically Variable Ink
5.2.3.5. Ultraviolet Luminescent Ink in card body, variable personalization and security
laminate
5.2.3.6. Built in visual and electronic verification
5.2.4. The ID Card System must be backward compatible with the current magnetic strip readers
used at ministries, and be flexible to be compatible with other commercial-off-the-shelf (COTS)
strip readers and bar code scanners to read ANSI/ISO/AAMVA standards and programmable
custom formats.
5.2.5. The ID Card System must have inherent capability to conduct data analysis and queries to
generate reports which can be exported to Microsoft Office Products.
5.2.6 Contractor shall invoice at the following stages of completion: 20%, 40%, 60%, 80%, 100%
completion. Contractor may submit multiple invoices for payment during the period of
performance. Contractor shall submit backup documentation for the completed work with each
invoice for review and approval by the COR and Contracting Officer.
5.3. Card Production and Initial Supply: The ID Card system must be capable of producing the cards in
the following manner.
5.3.1 Basic description of the ID Card:
5.3.1.1. Size for the ID Card in accordance with codified International Organization for
Standards (ISO) in the specification document ISO 7810 (Identification Cards–Physical
Characteristics). Referring to the card type as ID-1, the dimensions were defined as 3.370
inches wide and 2.125 inches high.
5.3.1.2. High Resolution Color Photo (standard passport dimensions).
5.3.1.3. At a minimum one additional image on the front and back of the card as decided by the
respective ministries.
5.3.1.4. Magnetic Strip and Barcode capable of storing pertinent data for electronic verification
of the card owner’s identity. Data should include the following:
Page21of29
5.3.1.4.1. APPS/AHRIMS Number
5.3.1.4.2. ID card number
5.3.1.4.3. Biometric number known as TCN
5.3.1.4.4. Full Name
5.3.1.4.5. Father’s Name
5.3.1.4.6. Grandfather’s Name
5.3.1.4.7. Date of Birth (DOB)
5.3.1.4.8. Blood Type
5.3.1.4.9. Facial Photo
5.3.1.5. The data on the card must be in ANSI/ISO/AAMVA standards and programmable
custom format and be able to be read by COTS magnetic strip readers and bar code
scanners.
5.3.2 The contractor shall provide initial supply of cards for the ANDSF users to produce and issue
up to 500K ID cards to ANDSF.
5.4. Equipment Purchase: The contractor shall purchase all equipment under this PWS IAW the goals
and objectives identified wherein, this includes but is not limited to the projected quantity of 125 ID
card systems to be placed throughout Afghanistan; final quantity will be finalized after the contract
award and at the Post-Award Conference. Any purchase under this paragraph will be approved in
writing by the KO. The contractor shall develop and implement equipment accountability
procedures in their quality control system to ensure no equipment is lost or misplaced and not used
by unauthorized persons.
5.5. Deployable Support Team: Will consist of any miscellaneous tasks that need to be addressed after
initial fielding has taken place. Examples of this include additional training, or if a unit requires
additional support. A support team will consist of five (5) personnel in support of a given task for a
week.
5.6. Additional Cards: The contractor shall on notice from the contracting office provide additional cards
in increments of 100K that can be used beyond the initial 500K.
5.7. Program Management Support: Contractor shall provide program management support. This
support includes but is not limited to administrative support, such as brief(s) at various locations
throughout Afghanistan, briefing preparation, and video teleconference with various government
officials.
5.8. Travel: The contractor will conduct travel in accordance with this PWS and the deliverable timeline
which has been described herein.
5.9. System Fielding: (The number of sites and system quantities in Para 5.9.1 and 5.9.2 are projected
and they will be finalized after the contract award and at the Post-Award Conference)
5.9.1 MoI: The contractor shall field eighty-eight (88) ID Card Systems to the following locations as
a minimum. This includes two (2) at each PHQ (68 total) and 20 locations at the central
department(s) (11 for the mobile teams, 3 spares, and 6 at MoI).
Page22of29
5.9.2 MoD: The contractor shall field thirty seven (37) ID Card Systems to the following locations
as a minimum. This includes two (2) systems and one (1) spare at each of the six (6) Corps
Regional Training Center(s) (RMTC); three (3) systems for ANATEC; three (3) systems for
ANAREC; and three (3) systems for the Kabul Military Training Center. MoD HQ’s will
receive an additional ten (10) systems to replace the six (6) terminals associated with the old
system with four (4) as a back-up reserve or traveling terminals if needed.
5.9.3 Fielding: This will include ID Card System installation, training of ANDSF users, and transfer
of equipment ownership for the installed system to the ministries. The contractor shall be
capable to field concurrently to both MoI and MoD.
5.10. Training:
5.10.1 The contractor shall develop training manuals in three languages (English, Dari and Pashtu)
for the ID Card System in digital form and provide hard copies upon request or as appropriate
for training. The contractor shall develop the training and be able to conduct training in three
mentioned languages. At minimum, the training shall include the following;
5.10.1.1. ID Card transaction processes, including enrollment and issuance of the cards.
5.10.1.2. Analytical capability inherent in the ID Card System that allows data queries.
5.10.1.3. Reports generation from the data queries which can be exported into MS Office
Product.
5.10.1.4. Information assurance (IA)
5.10.1.5. Role-Based Training to support distinct classes of users, and at a minimum, the
training shall provide each class of users with all essential training and user manuals to
perform their duties as listed below:
5.10.1.5.1. Operators: Personnel assigned to input, update, and manage
individual and unit activities and transactions.
5.10.1.5.2. Leaders: Personnel who require the ability to review and/or approve
operator transactions and activities and generate reports for their
organization.
5.10.1.5.3. Audit and Inspectors: Personnel required to conduct audits of ID card
data to ensure compliance with applicable policy and law governing all
aspect of human resource management. i.e., Inspector General Personnel,
internal, and external auditors.
5.10.1.5.4. Help Desk Operators (Tier I, II and III level): Personnel assigned to
the ministries to provide real time responses to operators, leaders, and
auditors/inspectors providing them with assistance in performing their duties
or ensuring the system is available and ready for use.
5.10.1.5.5. Database Administrators: Personnel assigned to the ministries
responsible for the database administration and maintenance.
5.10.1.5.6. System Administrators: Personnel assigned to the ministries or
contractor responsible for the routine maintenance, sustainment, and upgrade
Page23of29
of the ID Card System at all locations. This shall the database to ensure
security, policy compliance, and make changes required to keep the ID Card
System application.
5.10.1.5.7. Train-the-Trainer: Personnel at the ministerial level, PHQ and Corps
levels, who will train all types of users (Operators, Leaders,
Audit/Inspectors, Help-Desk Operators, Network Administrators and System
Administrators).
5.10.1.6. Assessment of training: The contractor shall assess all trainees of their comprehension
level of the training on written documents for submission.
5.10.1.7. Training Materials:
5.10.1.7.1. Contractor shall prepare materials to support an average class size of
twenty (20) students per location for user and leader classes, and an average
class size of ten (10) students for Administrator class. The exact number of
student sizes for each type of user group will be determined prior to start of
the training.
5.10.1.7.2. Contractor shall prepare the training materials in three languages:
Dari, Pashtu and English.
5.10.1.8. Language Requirements: Supervisory personnel and help desk operators at a minimum
shall speak at a level 3 in Pashtu and Dari. Additionally, as deemed appropriate by the
contractor it is preferred that of these positions have a level 3 understanding in English.
5.10.1.9. Refresher Training: The contractor shall provide quarterly refresher training for
database administrators, system administrators, help desk operators and ID Card System
operators for both ministries
5.11. System Sustainment: The contractor shall be responsible for the sustainment and support of all
hardware peripherals and software fielded with the ID Card System during the PoP of the contract.
5.11.1 The contractor shall stand up a Help Desk (Tiers I-III) and be fully operational no later than
first fielding of the system. The contractor shall transition the sustainment operation including
Help Desk operation to both ministries before the Full Operational Capability.
5.11.2 The contractor shall resolve sustainment and support issues from the time of receipt of the
problem within 24 hours for 90% of the reported issues.
5.12. Security Control Assessment: The contractor shall develop and submit a Security Control
Assessment Plan that defines the security methodology employed prior to the fielding of the system
or any workstation. This plan shall be presented for approval to the PMO prior to implementation
and before any updates/changes are implemented.
5.13. Information Security: The Contractor shall provide adequate security for all unclassified
information passing through non-government information system(s) including all subcontractor
information systems utilized on contract. Unclassified information shall only be disseminated within
the scope of assigned duties and with a clear expectation that confidentiality will be preserved.
Examples of such information include the following: non-public information provided to
Page24of29
contractors, information developed during the course of the contract, and privileged contract
information (e.g., program schedules, contract-related tracking).
5.13.1 Safeguards: The Contractor shall protect government information and shall provide
compliance documentation validating the requirements are being met. The Contractor and all
utilized subcontractors shall abide by the following safeguards:
5.13.1.1. Do not process information on public computers (e.g., those available for use by the
general public in kiosks or hotel business centers) or computers that do not have access
control.
5.13.1.2. Protect information by at least one physical or electronic barrier (e.g., locked container
or room, login and password) when not under direct individual control.
5.13.1.3. Sanitize media before external release or disposal.
5.13.1.4. Encrypt all information that has been identified as controlled unclassified information
when it is stored on mobile computing devices such as laptops and personal digital
assistants, or removable storage media such as portable hard drives and digital optical
disks, using Authorized Data-at-Rest encryption technology.
5.13.1.5. Limit information transfer to subcontractors or teaming partners with a need to know
and a commitment to at least the same level of protection.
5.13.1.6. Transmit e-mail, text messages, and similar communications using technology and
processes that provide the best level of privacy available, given facilities, conditions, and
environment. Examples of recommended technologies or processes include closed
networks, virtual private networks, public key-enabled encryption, and TLS. Encrypt
organizational wireless connections and use encrypted wireless connection where available
when traveling. If encrypted wireless is not available, encrypt application files (e.g.,
spreadsheet and word processing files), using at least application-provided password
protection level encryption.
5.13.1.7. Transmit voice and fax transmissions only when there is a reasonable assurance that
access is limited to authorized recipients.
5.13.1.8. Do not post information to Web site pages that are publicly available or have access
limited only by domain or Internet protocol restriction. Such information may be posted to
Web site pages that control access by user identification or password, user certificates, or
other technical means and provide protection via use of TLS or other equivalent
technologies. Access control may be provided by the intranet (vice the Web site itself or the
application it hosts).
5.13.1.9. Provide protection against computer network intrusions and data exfiltration,
minimally including the following:
5.13.1.9.1. Current and regularly updated malware protection services.
5.13.1.9.2. Monitoring and control of inbound and outbound network traffic as
appropriate (e.g., at the external boundary, sub-networks, individual hosts)
including blocking unauthorized ingress, egress, and exfiltration through
Page25of29
technologies such as firewalls and router policies, intrusion prevention or
detection services, and host-based security services.
5.13.1.9.3. Prompt application of security-relevant software patches, service
packs, and hot fixes.
5.13.1.10. As applicable, comply with other current best practices of information protection and
reporting requirements for specified categories of information.
5.13.1.11. Report loss or unauthorized disclosure of information in accordance with contract or
agreement requirements and mechanisms.
5.13.2 The Contractor shall ensure in their quality processes and procedures are compliant with
standard best practices security requirements.
5.14. REPORTING:
5.14.1 Reports should be generated on a daily, weekly, monthly, and yearly basis with the exception
of the audit reports which is on an as needed basis as per the deliverable schedule.
5.14.2 Reports shall be generated automatically via the ID card system, including but not limited to:
5.14.2.1. Initial ID Cards issued
5.14.2.2. Number of ID Cards destroyed
5.14.2.3. Number of ID Cards replaced due to expiration
5.14.2.4. Number of ID Cards replaced due to loss
5.14.2.5. Operational Audit Reports
5.15. PERFORMANCE REQUIREMENTS SUMMARY: The Contractor service requirements are
summarized into performance objectives that relate directly to mission essential items. The
performance threshold briefly describes the minimum acceptable levels of service required for each
requirement. These thresholds are critical to mission success.
Performance Objective Performance Standards
Acceptable Quality Levels (AQL)
Method Of Surveillance
The contractor shall provide all facilities, equipment with trained and vetted personnel in order to complete all tasks associated with this PWS according to the agreed timeline.
Full (100%) Compliance
No more than one (1) discrepancy per inspection
Observation by COR/KO & Stakeholder Input
The contractor shall establish in the new ANDSF-IDC System the ability to transfer data between systems listed in this PWS.
Full (100%) Compliance
No discrepancies permitted
100% Inspection of Contractor file by the COR/KO
The contractor shall migrate and load all records from the existing ID system to the ANDSF-IDC system relatively free of errors in accordance with the fielding plan.
Full (100%) Compliance
95% of all fields are migrated or loaded complete and free of error (a useable record)
Observation by COR/KO & Stakeholder Input
The contractor will ensure that all data will remain encrypted with best industry standards for every system, especially systems that are being fielded or transported in any way.
Full (100%) Compliance
No discrepancies permitted
Observation by COR/KO & Stakeholder Input
The contractor in accordance with this PWS will provide all training, and fielding of this
Full (100%) Compliance
No discrepancies permitted
Observation by COR/KO &
Page26of29
system in all locations within Afghanistan. Stakeholder Input
The contractor must transition the ANDSF- IDC system to MoD and MoI by the end of the base/option year(s).
Full (100%) Compliance
No discrepancies permitted
Observation by COR/KO & Stakeholder Input
The Contract shall provide and maintain workers’ compensation insurance before commencing performance under and during the entire performance of this contract for the payment of disability compensation and medical benefits to covered employees and death benefits to their eligible survivors. Proof of DBA insurance shall be submitted to the Contracting Officer 15 days after contract award and within 15 days of after exercising the option year period.
Full (100%) Compliance
No discrepancies permitted
100% Inspection of Contractor file by the KO
Acceptable surveillance methods:
100%Inspection and File Review: Performance is inspected/evaluated at each occurrence. This method is necessary due to health, safety and other considerations. Random Inspection: This method will be used as an efficient way to obtain an unbiased, comprehensive evaluation of performance. Some task/deliverables will be randomly selected to determine if the level of performance is acceptable. Observation: This method will be used to document relatively few observations from which the quality the task can be consistently projected from one observation period and throughout the next. Periodic Inspection: This method will be used to check the Contractor’s quality control to ensure the Contractor is capable of meeting the Government’s quality requirements. Inspection may vary based on the Contractor’s compliance to the PWS requirements; the frequency may increase or decrease based on inspection findings. Stakeholder Input: Stakeholder input can be used when written or telephonic evidence is provided and substantiated by the COR/KO in certain situations when the quality of performance poses a risk to the contract.
5.16. Deliverables Schedule:
PWS Task Deliverable Item Due Date Post-Award Conference
5.1.1 Post-Award Slides Within seven (7) business days
of contract award. Initial Baseline Review (IBR)
5.1.2.1 Work Breakdown Structure (WBS) Integrated Master Schedule (IMS) Requirements Traceability Matrix
(RTM)
Review(s) will be within thirty (30) days of contract award
(Not all presented on the same day)
System Fielding Plan (SFP) 5.1.3.1
Fielding Plan Due within forty-five (45) days of contact award
Configuration Management Plan
5.1.3.2
Software and Hardware configuration management plan
Due within forty-five (45) days of contract award
Preliminary Design Review (PDR) 5.1.3.3
Preliminary Design Review Due within forty-five (45) days of contract award
Functional Configuration Audit (FCA) 5.1.3.4
Functional Configuration Audit Due within forty-five (45) days of contract award
Page27of29
System Requirements Specification
5.1.3.5
System Requirements Specification Due within forty-five (45) days of contract award
Critical Design Review (CDR) 5.1.4.1
Critical Design Review Review(s) will be within sixty (60) days after contract award
Integrated Test Plan (ITP) 5.1.4.2
Integrated Test Plan Document Review(s) will be within sixty (60) days after contract award
Data Archiving Plan 5.1.4.3
Data Archiving Plan Review(s) will be within sixty (60) days after contract award
Program Management Review (PMR) 5.1.5.1
Program Management Review Meeting PMR Meeting will be conducted monthly, with
weekly updates and status reports.
Project Transition Review 5.1.6.1
Project Transition Review Review to be completed within ninety (90) days prior to Initial Operational Capability (IOC)
Training Plan 5.1.6.2
Training Plan Review to be completed within ninety (90) days prior to Initial Operational Capability (IOC)
Sustainment Plan 5.1.6.3
Sustainment Plan that includes Help Desk
Review to be completed within ninety (90) days prior to Initial Operational Capability (IOC)
Final submission will include any updates and be submitted
to PMO before Full Operational Capability (FOC)
System Performance Assessment
5.1.6.5
System Performance Assessment including associated risks
Review to be completed within ninety (90) days prior to Initial Operational Capability (IOC)
Physical Configuration Audit 5.1.7.1
Report findings of configuration audit Completed thirty (30) days before IOC and training
Source Code 5.1.7.2
Provide Source Code for all software development, interface control
documents, with all associated training, maintenance and sustainment
Completed thirty (30) days before IOC and training
Database Migration 5.2.1
Report Complete all legacy data migrated to the new ID Card system
Completed thirty (30) days before IOC and training
Refresher Training 5.10.1.7
Quarterly Refresher Training Report This report will be completed after training is conducted and
submitted to the PMO. System Architecture
5.11.3 Detailed System Architecture Report Review to be completed within
ninety (90) days prior to Initial Operational Capability (IOC)
Security Control Assessment 5.13
Security Control Assessment Plan Due within forty-five (45) days of contact award
Reporting 5.15
Standard Reporting as outlined in the PWS
Daily, Weekly, Monthly, and Yearly, reported automatically within the system for review by
PMO, MoD, MoI
15.17. Contracting Manpower Reporting
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report all contractor manpower (including subcontractor manpower) required for performance of this requirement. The contractor is required to
Page28of29
completely fill in all the information in the format using the following web address https://contractormanpower.army.pentagon.mil. Clause 5152.225-5904 applies.
Contractor shall provide monthly employee census information to the Contracting Officer, by province, for this contract. Information shall be submitted either electronically or by hard-copy. Information shall be current as of the 25th day of each month and received by the Contracting Officer no later than the first day of the following month.
The following information shall be provided for each province in which work was performed:
The total number (prime and subcontractors at all tiers) employees.
The total number (prime and subcontractors at all tiers) of U.S. citizens.
The total number (prime and subcontractors at all tiers) of local nationals (LN).
The total number (prime and subcontractors at all tiers) of third-country nationals (TCN). Name of province in which the work was performed.
The names of all company employees who enter and update employee data in the Synchronized Pre- deployment & Operational Tracker (SPOT) IAW DFARS 252.225-7995 or DFARS DoD class deviation 2014-O0018.
EXHIBIT A
PRICE LIST ANDSF-IDC System
This list is exclusive of the proposed CLINS 0003, 1003, and 2003. This is separate individual pricing for reference purposes. Intent is to understand all cost(s), or fee(s) associated with software renewal for the ANDSF-IDC system for both option years.
Software License Fee(s) Base Year Description Part Number Brand Name UOM QTY Unit Price Total
Software License Fee (if required)
Software License Fee(s) Option Period 1 Description Part Number Brand Name UOM QTY Unit Price Total
Software renewal (if required)
Page29of29
Software License Fee(s) Option Period 2
Description Part Number Brand Name UOM QTY Unit Price Total Software
renewal (if required)
EXHIBIT B
Identification Card System
Contractor shall complete PWS Exhibit B, Identification Card System,
below.
CLIN Description Brand
Name Part
Number Country of
Origin Unit Quantity
0002 Identification Card System
Each