Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 1 0:10-10:40 Coffee Break 10:40-11:10 Prototype Prod. & Quality Li Zhou 11:10-11:30 Tension and capacitance Zian Zhu 11:30-11:45 Production Schedule Lingshu Wang 11:45-12:00 Lunch 12:00-2:00 Visit Production and Fast Site Lab 14:00 CSC Production Readiness Review Aug.2-3,2001 IHEP Beijing

Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Embed Size (px)

Citation preview

Page 1: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Agenda Aug.2,2001Chaired by Nelson ChesterWelcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40Coffee Break 10:40-11:10 Prototype Prod. & Quality Li Zhou 11:10-11:30 Tension and capacitance Zian Zhu 11:30-11:45Production Schedule Lingshu Wang 11:45-12:00Lunch 12:00-2:00Visit Production and Fast Site Lab 14:00 Questions and discussions 16:00 Peking Opera 18:30

CSC Production Readiness ReviewAug.2-3,2001 IHEP Beijing

Page 2: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Agenda(continue) Aug.3,2001Chaired by Nelson ChesterCommittee Meeting 9:30-10:30Coffee Break 10:30-11:00 Finding and Recommendations 11:00-12:00Closing Remark 12:00-12:10Lunch Party 12:10-14:00 Tour to Temple of Heaven 14:00

CSC Production Readiness ReviewAug.2-3,2001 IHEP Beijing

Page 3: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Production readiness Review at IHEP

Review CommitteeCommittee Members:Nelson Chester, FNAL ChairmanJohn Carson, FNALOleg Prokofoe, FNALObservers:Gena Mitselmakher, L2 Leader of CMS/EMUAndrey Korytov,UF, L3 LeaderYuri Ivanov, PNPI RussianUS Consulate at BeijingNational Science Funding Committee of ChinaMinistry of Science and Technology of ChinaAcademy of Science of China

Page 4: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Conclusion

CSC Production at IHEP Beijing

ME1/3ME1/2

IHEP Task:

72 ME1/2 & 72 ME1/3 CSC Assembly &Testing

For CMS Endcap Muon System

Page 5: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

CSC Prod. Milestones at IHEP

Oct.2000-Mar.2001, Prod.Clean Lab construction

Mar.29,2001 Critical tooling arrived at IHEP

Apr.1-30,2001 Tooling set up and tuning

Apr.26,2001 ME1/2 Prototype assembly started

May.20,2001 ME1/3 Prototype started in parallel

July 13,2001 ME1/2 Prototype completed

July 26,2001 ME1/3 Prototype completed

Aug.2-3,2001 CSC Production Readiness Review

Sep.1,2001 CSC Mass Production should start

Page 6: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Winding Machine

CSC Production at IHEP Beijing

Page 7: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Wire Tension

and Pitch Machine

CSC Production at IHEP Beijing

Page 8: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

CSC Production at IHEP Beijing

Glue Dispenser

Page 9: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Hand Soldering

Table

CSC Production at IHEP Beijing

Page 10: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Conclusion

CSC Production at IHEP Beijing

Training technicians

Page 11: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

CSC Production at IHEP Beijing

Anode wire

fixation bar glue

table

Page 12: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Conclusion

CSC Production at IHEP Beijing

Capacitance Measure

set up

Page 13: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

CSC Production at IHEP Beijing

Cathode Panel

Clamping Table

Page 14: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

CSC Production at IHEP Beijing

Ionized Air

Clean Machine

Page 15: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Final Assem. table

CSC Production at IHEP Beijing

Page 16: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

CSC Fast Site at IHEP Beijing

Page 17: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

The first ME1/2

Prototype finished

On 13th of July

CMS/CSC Production of IHEP

Page 18: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Cosmic Ray Signal of 1St

ME1/2 PrototypeOn July

13th

CSC Production at IHEP Beijing

Page 19: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

ME1/3 Prototype finished

Page 20: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Meter Setup

CSC Production at IHEP Beijing

Celebrate Party

Page 21: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Celebrate Party

CSC Production at IHEP Beijing

Page 22: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

IHEP CSC Management

Prod.Team

Fast Site Manag.Tech. SupportProd.Manager

FNAL ManagerCustom OfficeCSC Group Leader

L2,L3 Leaders IHEP Director

Fast Site Team

Page 23: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Production Chart

Prod.Manager & Process Engineer

Parts Proc1pers

Hand Solder

-ing2pers

Final Ass.&Leak.Train.2pers

Panel.Prep.4pers

Wire wind & Solder 2pers

Tension&Pitch Meas.

HV test1pers

Page 24: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Production Manager: SUN HanshengProcess Engineer: WANG LingshuFast Site Manager: ZHOU Li, HE KanglingTechnique Support: ZHU Zian, ZHENG JP Custom Formality: DENG ChunqinFrame Manufacture: WEI Chenglin

Prod. Responsibility Distribution

Page 25: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Production Manager: SUN Hansheng

Responsibility: 1.Manpower management 2.Distribute task 3.Shifts arrangement 4.Quality Control

Prod. Responsibility Distribution

Page 26: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Process Engineer: WANG Lingshu

Responsibility: 1.Traveler and documents updating and translating

2.Engineering Drawing update

3.Prod.Process arrangement

4.Parts distribution

5.Record Discrepancies

Prod. Responsibility Distribution

Page 27: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Technique Support: ZHU Zian, ZHENG JP

Responsibility: Critical tooling maintaness and trouble shooting,Computer Networking

CSC Web page: http://mdc.ihep.ac.cn/cms_ihep/index.htm

Custom Formality: DENG Chunqin

Frame Manufacture: WEI Chenglin

Fast Site Manager: ZHOU Li, HE Kangling

Prod. Responsibility Distribution

Page 28: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

1 500SqMComplete New Clean Lab winding 60SqM, Tension meas.60SqM,Final 60SqM,Hand

Sodering 60SqM,Panel prep.80SqM,Storage Room80SqM,Parts procurement Room30SqM

2 Equipped with Air Conditional and Pressured Gas3 Local Tooling: Cathode Gluing Table(2),Working Table(2) Anode Wire Fixation bar Gluing Table(1&3) Hand Soldering table(4), Final Assembly Table(2) 10 sets Panel Brackets for ME1/2 and ME1/3 each

Prod.Lab readiness for Mass Production

Page 29: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

5. 6 Critical Tooling Operation Menus in Chinese ready at needed places

6. Travelers translated into Chinese and copies at each process room

Prod. Lab Readiness for Mass Production

7. 130 SqM Fast Site test room and supporting structure ready

8. Production Computers were connected to networking

Page 30: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Man Power for Mass Production1. 5 new hired Technicians were trained during the ME1/2

ME1/3 Prototype production, working on panel clean,gluing,hand soldering

2. Critical Tooling used by trained engineers, like Winding Machine

3. Quality Control by Engineers and Physicists(Only part time working on CSC)

4. Will have Ph.D students join the Tension Meas. And HV training soon

5. Final Assembly by Engineers

Prod.Lab readiness for Mass Production

Page 31: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Prod. Lab Readiness for Mass Production

Quality Control and Tech. Ready

1. ME1/2 and ME1/3 prototype successfully assembled,Tension,Pitch, HV training,leak test meet requirements(low Leak and dark current,no trip for 58&43 Hrs at 4KV)

2. Strict work process according to Travelers

3. Key persons at each step to control quality

4. Good Lab management fits the quality requirements

Page 32: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Other items1. Budget Situation:Expensive test Gas Mixture requires mo

re money(CF4 imported fromUS, Complicated Chamber Packing Wooden Boxes--expensive,Shipping fee by Sea container more expensive than to US(land trans.)

2. Shipping Custom formality : Three Months effort, US Consulate Great Help. More effort needed from FNAL side for doccumentation(take as scientific Gifts)

3. Frame Manufacture: More machine budget and manpower paid from IHEP

4. Fast Site manpower and Instrumentation budget not enough

Prod.Lab readiness for Mass Production

Page 33: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

O N D J F M A M J J A S O N D J F M A M J J A S O N D

2 4 4 3 6 6 6 6 6 6 6 6 6 6 6 3 6 6 6 6 6 6 6 6 6 6 6

Prod.Schedule

Chamber Ass.

Fast Site

Ship Unit to CERN

2001 2002 2003

Page 34: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Key points to keep the schedule

1.Material arrives on time

2.Documents well prep.for Custom all the time

3.More training for fast team work

Page 35: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Frame Manufacture-0

Page 36: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Receive the drawings and extrusion material from FNAL

Responsible Engineer Mr.WEI

Drawing translated to Meter System and Chinese

FeiHong company will manufacture Frames

Needed technology tools were discussed and 29 kinds

jigs should be made to keep the quality

In two months the FeiHong company could deliver the

Frame parts to IHEP when Money and Material arrive

Frame Manufacture-1

Page 37: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Frame Manufacture-2ME1/2 Frame Drawing Questions

368384 Tope Big End: 1.4*M5 parts missing, 2.6*Phi0.44,at Prototype, only 4, 3.6*M6, no at prototype frame, 4.6*phi5.2,only 5 at prototype, 5.no consistent drawing with Prototype

368385 Bottom Big End 6*Phi0.44,at Prototype, only 4

368387 Top Small End: 4*Phi8 ,4*M6, no exist at prototype

368382 Top HV Side: 8*M6,4*M6 at Prototype,Phi0.5+-0.3 no at Pro. 1 Full Rad Slot, 2 at Prototype

368467 Anode Side: No consistent with Prototype

368380 Top Anode Side:0.75wide*3.15Lg.Slot No consistent

Page 38: Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break

Summary

• Production Lab is ready

• Technicians trained, another 7 full working persons needed

•Budget may not enough(Gas, Shipping…

• Shipping schedule should be