  • Agenda for 283rd Meeti of Finance & Contract Com H tee

    Date : 23-05-2018 Time : 03.30 p.m. Venue : Conference Room

    MUNICIPAL CORPORATION New Deluxe Building, Sector 17-E, Chandigarh-160017

  • INDEX

    Agenda

    Item No.

    1 .

    2 .

    3 .

    4 .

    5 .

    6 .

    7 .

    Issuance of oil and soap to the Driver, Blacksmith, Helpers

    and cleaners of Mechanical Section, Road Wing , M .C .,

    Chandigarh.

    Requirement of 02 !70S . Drivers and 01 Cleaner of

    Enforcement Vehicles of Head Office, Municipal Corporation ,

    Chandigarh.

    Requirement of Site Supervisor for Road Divisions under MC. ,

    Chandigarh.

    Purchase of CIAZ Sigma Petrol (Euro-IV Complaint) (Maruti

    Suzuki India Ltd . ) as per government e-market place (G E M ) ,

    portal of DGS&D rate contract against the condemnation of i

    Ambasador Car ISZ CHO1 - Gl-1613 used by SEMCPH Circle

    Chandigarh.

    8. Rough cost estimate for providing equipment for Gym in

    Community Centre of Sector-49, Chandigarh.

    Rs.5 .98 lac

    Subiect

    Confirmation of the minutes of 282"0 meeting of the Finance

    and Contract Committee held on 30.4.2018 at 3.00 p .m . in the

    Conference Room of the Municipal Corporation, Chandigarh.

    Rough cost estimate for work of upgradation of Sewerage

    System at Anand Complex, Village Kajheri, Sector-52,

    Chandigarh.

    Rs. 17.08 lac

    Disposal of Booths and one Chill Room of Modern Air

    Condition Fish, Meat and Poultry Products Market, Sector 41 ,

    Chandigarh.

  • 9 . Policy/Guidelines for the management of Dhobi Ghat, Sector

    32,Chandigarh.

    10. Agenda/Proposal for requirement of data entry operator in the

    Road wing of M . C . , Chandigarh.

    11 . Rough cost estimate for the work of

    "Additions/Alternation/Renovation works in toilet blocks of

    cremation ground, Sector 25, Chandigarh.

    Rs.44.80 lac

    12. Estimate for reboring of B/1 one 12"x8" (304.80x203.20mm) i/d

    and any methoddeep bore tubewell (with reverse rig method_

    of latest technology) at t/well Green Belt, Sector 56,

    Chandigarh.

    Rs.36. 56 lac

    13. Rough cost estimate for providing and laying of DI pipe line in

    extended abadi adjoining Govt. High School in V illage K a jheri ,

    Chandigarh.

    R s .45 .45 la c

    Rough cost estimate for making by pass arrange m e nt of 1 O "

    i/d C . I pipe line com ing in premises/tree s of Saint Soldie r s

    International School, Sector 28, Chandigarh .

    14.

    R s . 6 . 3 9 l a c

    Estimate for B/1 one no.12" x8" (304.80x203.20mm) i/d d eep

    bore tubewell (with reve rse rig method a nd any m e thod o f

    latest technology) . Opposite# 3062 , Sector 20, C hand ig a rh .

    15.

    R s .37 .80 la c

    Providing and fixing of split type Air Conditioners and Allied

    works at Community Centre, Sector- 28, Chandigarh.

    16.

    Rs. 15. 54 lac

    Permission of space for District Pressure17. Regulating Station (DRS) within various Community Centres for supplying PNG (Piped National Gas) in Chandigarh.

    I

    http:Rs.15.54http:Rs.36.56

  • 1

    AGENDA FOR 283rd MEETING OF THE FINANCE AND CON.TRACT

    COMMITTEE TO BE HELD ON 23.5.2018 AT 3.30 P.M. IN THE

    CONFERENCE ROOM OF THE MUNICIPAL CORPORATION,

    CHANDIGARH.

    AGENDA ITEM N0.1

    Confirmation of the minutes of 282nd meeting of the Finance and

    Contract Committee held on 30.4.2018 at 3.00 p.m. in the Conference Room of

    the Municipal Corporation, Chandigarh.

  • :_•

  • Agendaltem__3~---Subject :- Disposal of Booths and one Chill Room of Modern Air

    Condition Fish, Meat and Poultry Products Market Sector 41, Chandigarh.

    An agenda for disposal of Booths and one Chill Room of

    Modern Air Condition Fish, Meat and Poultry Products Market Sector

    41, Chandigarh was placed in the Finance & Contract Committee

    meeting held on 18.5.2016 vide agenda item No.261.7 for consideration

    and decision, whether we may consider the issue for disposal of these

    booths and One Chill room of said market for re-auction OR to change

    the use of this market for general trade subject to the approval of

    Chandigarh Administration (Annexure-A). The Finance & Contract

    Committee in its said meeting decided as under and its copy is enclosed

    at Annexure-B :-

    "The Committee considered and resolved that the trade of Modern Air Conditioned Fish, Meat & Poultry Products Market be changed into general trade. Further, it was also decided that the chill room be used for the storage of material except non-veg. Further it was also decided that the rent of the booths and chill room be accessed by the committee of the officers."

    As per above decision of the F&CC, the office requested to

    the Secretary Local Govt., Chandigarh Administration vide letter

    No.MCC/Estate/2016/5794 dated 24.08.2016 to grant necessary

    approval for change of trade of said market in to general trade and the

    matter was followed by subsequent reminders 05.10.2016, 13.12.2016,

    09_01.2011, 30_01 .11, 22.02.2011, 11 .os.2011, 23.oa.2011, 31 .oa:2011,

    26.09.17 & 23.11 .2017. Further, meeting was held on 07.3.2018 under

    the Chairmanship of the Advisor to the Administrator, U.T. Chandigarh

    http:26.09.17http:30_01.11

  • regarding change of trade of Booths and one Chill Room of Modern Air

    Conditioned Fish, Meat & Poultry Products Market, Sector-41,

    Chandigarh into general trade in the said meeting it was decided in .the

    first para of minutes that the nature of trade of Modern Air Conditioned

    Fish, Meat & Poultry Products Market, Sector-41, Chandigarh to General

    trade not to be done at present. The Commissioner, Municipal

    Corporation, Chandigarh will make all efforts to use the premises for the

    purpose it was considered and built. Copy of said minutes is enclosed

    at Annexure-C.

    Further, a meeting was held under the Chairmanship _of the

    ·Commissioner, Municipal Corporation, Chandigarh on 06 .04.2018, copy

    of minutes is enclosed at Annexure-0 and the part of the minutes is as

    under :-

    "It was decided by the Committee unanimously that the minimum

    monthly reserve license fee per booth for Booth Nos.1 to 24 of

    21.21 sq. mtr. against Rs.15,000/- already approved may be

    reduced to Rs. 12,000/- per month and Booth Nos.25 to 30 of

    19.02 sq. mtr. against Rs. 13,700/- to Rs. 10,000/-, Booth Nos.32

    and 33 wholesale booth of 39.51 sq. mtr. against Rs. 27,800/- to

    Rs. 15,000/- per month and Booth No.31 (Chill Room) of 35 .31 sq .

    mtr. against Rs.16,666/- to Rs. 10,000/- per month. "

    In view of above, the matter is placed before the F&CC

    for consideration and decision for disposal of Booths and one Chill

    Room of Modern Air Condition Fish , Meat and Poultry Products

    Market Sector 41, Chandigarh on monthly license fee basis

    through open auction. The terms & conditions for license out of

    said booths are also enclosed for consideration and approval.

    AC~

  • '· ·Agenda Item

    Subject:- Issuance of Oil and Soap to the Drivers, Blacksmith, Helpers and Cleaners of Mechanical Section, Road Wing, M.C., Chandigarh.

    The U.T. and M .C. Mechanical Worker Union Chandigarh (Regd.) has requested

    to issue o il and soap to the Drivers and Cleaners .of Mechanical Section, Road Wing. M.C..

    Chandigarh as the same arc heing issued to the other drivers and cleaners o f Horticulture.

    Flectrical and Public l lcalth Divisions or M.C.. Chandigarh.

    The similar agenda for issuance of oil and soap to the Drivers and Cleaners has

    already been approved in 275th meeting of Finance and Contract Committee held on 29.8.2017

    (copy enclosed). There is dire necessity for issuing the oil and soap to the Drivers. Blacksmith

    Ckaners & Helper of Road Wing as they have to pick and drop the malba and other building

    material as such there is ri sk of allergy. The bill for issuance of oil and soap to the Beldars.

    Drivers and Cleaners for the period from 1.1.20 17 was submitted to the Audit Wing of M.C. hut

    the same was ohjcL:ied by the J\udit Wing that drivc:rs and cleaners are not entitled for issuance

    o f soar and oil. Thus there is resentment amongst the Drivers, Blacksmith. Helpers as well as

    Cleaners. 43 persons are eligible as drivers. blacksmith. Helpers and cleaners to do the similar

    work .

    The matter is therefore. placed before the Finance and Contract Committee for

    approval for issuing of oil and soap to the Drivers. Blacksmith, Helpers and Cleaners of Road

    Wing of M.C.. Chandigarh.

    1~___.-:--, S.E (B&R) M.C

  • Agenda Item No. _:;..._5'__

    . Subject : Requirement of 02 nos. Drivers and 01 Cleaner for Enforcement Vehicles of Head Office, Municipal Corporation, Chandigarh.

    The strength of vehicles including Enforcement Trucks and staff cars of

    Head Office is 32 vehicles. The total strength of the Drivers is 31, which are drawing

    salary from Head Office. Resultantly there is shortage of drivers in Head Office. It is

    further submitted that the chassis of TATA 1613 was purchased in the Enforcement

    Wing of Municipal Corporation, Chandigarh for the use in Enforcement Wing as

    Recovery Van. The said vehicle is now operational under Registration No.CH01-GA-

    6980, but due to shortage of drivers the service of vehicle is not fully utilised. The

    operation and driving of recovery van is an expertise job, thus every driver cannot

    operate the recovery van efficiently. Hence 01 Driver and 01 Cleaner for ..Recovery Van

    is required. In addition to it 01 Driver is also required as rest reliever for smooth

    functioning of Head Office and Enforcement vehicles.

    In view of the above, the office may be allowed to hire 02 Drivers

    and 01 Cleaner from the outsource agency, who is already providing manpower in the

    Head Office, Municipal Corporation, Chandigarh.

    The agenda is placed before the Finance & Contract Com ittee for

    consideration and approval.

  • AGENDA ITEM '

    Requirement of Site Supervi·sor for Road Divisions under M.C., Chd. Subject: -

    There is three Roads Division to look after 10 Sub Divisions for 26 ward in

    M.C., Chnadigarh. to look after the entire works of Building and Roads. There is 13 regular

    post are vacant for supervisory category staff for look after the works in field for construction

    and maintenance of roads and Building etc. The detail of supervisory staff is as under:-

    S. No Description Sanctioned Filled up Vacant Remarks oost

    l. Asstt. Foreman 1 0 1 2. Road insoector 2 I I 3. Charge man (civil) 3 l 2 4. Work inspector 3 0 3 5. Work Munshi 10 6 4 6. Motor Mate 6 4 2

    Total . 13 Filled through contract already 6 Vacant post available now 7 Financial implication as per D.C rate U.T Chandigarh 2017-18 for one year through outsource agency Site Supervisor - 7 Nos. @23971/- 167797 EPF 13.15 %- 7 Nos.(@ 1973 /- 13811 ESI 4.75% -7 Nos. (ii) 9981- 6986 Total 188495 Contractor profit (ii) I0% 18850 Total for one Month 207345 Net likely Exoenditure for one vear 2488140

    6 nos. ·site supervisors has already engaged on outsource to fill up the gap of

    vacant posts. Even after there is 7 vacancies ~e still available to fill up in public interest to take

    care of all construction works under (B&R) wing of M.C., Chd. Net likely expenditure will be

    Rs. 2488 140/- for one year for engagement of seven site supervisor against v_acant post as per

    D.C rates.

    In view c;>f above it is proposed that matter may please be placed before F&CC

    to fill up the 7 vacant post ofsite Supervisor/ Munshi.

    ~ EE R-11

  • Agenda Item No. f

    SUBJECT: PURCHASE OF CIAZ SIGMA PETROL (EURO-IV COMPLIANT) (MARUTI SUZUKI INDIA LTD.) AS PER GOVERNMENT E-MARKET PLACE (GEM) PORTAL OF DGS &D RATE CONTRACT AGAINST THE CONDEMNATION OF AMBASSADOR CAR ISZ CH0l-Gl-1613 USED BY SEMCPH CIRCLE CHANDIGARH.

    The A M BASSADOR C AR ISZ C HO 1-G 1- 1613 was purchased in the

    year 2004 a nd hos contro l mileage o f 2 7 5062 KM a g a ins t p rescribe of Kms of 1.5

    Lac s. Th e vehic le hos o utlived its life and its furthe r running will b ecom e

    u n economical. The A m b a ssado r C ar ISZ C H0l -G 1- 16 13 is being used by the

    SEMC PH C irc le fo r inspectio n o f o riginal a s well as mtc. work of wa te r sup p ly,

    sewerage. sto rm sys te m o f whole C handigarh & wate r w o rks Kajauli (Pb.)

    A committee was c o n stituted for the conde m na tion o f the sa id

    veh icle. The committee has rec ommende d fo r cond emnation of the veh ic le

    and to b e disp ose o f afte r wide publicity or E-auc tio n o f vehic le throug h M STC

    (Ponchk1Jlo) as the re pair o f the vehicle will n o t yield satisfactory results. The

    report of the committee is e n c lo sed.

    Keeping in v ie w o f abo v e 'tac ts o ne n o. n ew CIAZ DE LTA (PETROL)

    CAR (MARUTI SUZUKI INDIA LTD) is required to b e p u rc hased in liew of old

    vehicle . Accord ing ly Pe rfo rma invo ice has b een collected C M AUTO SALES (P )

    LTD. (Authorized Deale r o f Marufi Su zuki-Nexa ) B-64. ln dustriol area Phase-7.

    M o h a li.

    As such the e stimate amo unting to 8.26 Lac duly a llowed by the

    com peten t a utho rity. is here by plac ed befo re the Finance & Contrac t

    Committee of Munic ipa l Corporatio n C hand igarh fo r considera ti o n &

    approval.

    The funds shall be arrange d by Munic ipal Corpo ratio n unde r

    "He ad-4 2 15 -Capital He ad". The provision of 8 .26 Lacs has been made in the

    BLJdge t/distribution of the funds for the year 20 I 8- l 9 .

    r

    ~ EE M C PH-2

  • Agenda Item No: f5 Rough Cost Estimate for providing equipments for Gym InSubject: Community Centre of Sector 49, Chandigarh

    (~mount: Rs.5.98 lacs)

    This rough cost estimate has been framed to cover the probable cost of providing equipments for Gym in Community Centre of Sector 49, Chandigarh. It has been requested by area Councillor Smt. Heera Negi for Providing Gym Equipments (request letter attached). Accordingly the estimate has been prepared for required material on the basis of present market rates.

    Accordingly, this estimate amounting to Rs.5. 98 Lac has been prepared by taking the items explained in the scope of work. The work will be e x ecuted in the year 2017-2018 against budget provisions under head "Capital Head" "NRB". The estimate is submitted for arranging administrative approval and allotment of funds under the appropriate head. It is certified that the scope of work taken in this estimate has not been earlier included in any of the estimat~. The scope of work has been taken in the estimate as per approved policy of Municipal Corporation.

    1 . Supply of motorized treadmill commercial 2 . Supply of Elliptical cross trainer heavy duty: 3 . Supply of upright bike heavy duty:-4 . Supply of standing twister heavy duty . 5 . Supply of weight training benc h heavy duty: 6 . Supply of flat bench 7 . Supply of adjustable utility bench 8 . Supply of rubber coated hexagon dumbbell 9 . Supply of 12 pair dumbbell rack, 1 0 . Supply of colored r:.;bber coated Olympic plates 11 . Supply of bar rack with bars 12. Supply of different coloured yoga matasdidas or equipment 13. Providing and fixing 4 . 5 mm thick gymnasium P .V.C sheet 14. Providing and fixing looking mirror glass 4mm

    The expenditure on this work will be charged under H ead "Capital Head"

    "NRB". It is certified that scope of work taken in this estimate has not been earlier

    inc luded in any of the estimate.

    1

    2

    3

    4

    5

    6

    7

    8

    Head of Account

    Pending Liabilities of 2016 - 17

    Works already approved 2017- 18

    Budget approved/available (2017 18)

    Total Budget required for already

    approved estimate till date including oendina liabilities (2+3\ Amount of this estimate

    Total (5+6)

    Expenditure upto 01 .2018

    Fig. in Lacs

    (Capital) Road & Bridaes

    1483.50

    3079.81

    1500.00

    1781.08

    5 .98

    1787.06

    530.50

    The matter is placed before the F&CC of Municipal Corporation, Chandigarh

    for consideration and decision please.

    E. E. R-1, M.C., Chd~--S.E. (B&R), M.C.,

  • Policy/Guidelines for the management of Dhobi Ghat, Sector 32,Subject: -Chandigarh.

    The Dhobi Ghat. Sector 32. Chandigarh has recently been renovated. which is

    being used by some Dhobi/pressman for last so many year without any rent due to which. the

    Munici p a l Corporation is suffering financial loss . Moreover. the premises of Dhohi Ghat is also

    being u sed for residential purpose by these Dhobis/Pn::ssman. /\s such. it is propos

  • 4

    5

    6

    /0 ft- ~ I::. t--..1!> A I TEn-) N o'--- -_... - AGENDA/PROPOSAL FOR REQUIREMENT OF DATA ENTRYSUB:

    OPERATOR IN THE ROAD WING OF MC CHANDIGARH.

    It is intimated that there are 09 nos. post of Steno typist are sanctioned in the

    Engineering Wing (i.e. B&R and Public Health) of MC Chandigarh. At present, 03 nos. posts

    are filled up and 06 nos. posts are lying vacant. Resulting the work of all the d ivisions is

    suffering very badly due to shortage of regular Steno typist. In the absence of Steno typist, it

    is very d ifficult to carry out the job of preparation of agenda, allotment of works and minutes

    of meeting held in the Divisional office.

    The present position of Steno typist of Engineering Wing of MC is given below:

    A). B&R Wing of MC

    Sr. No.

    1 S .E . (B&R) Circ le - - - -2 E.E. Road- 1, MC 1 - 1 3 E.E Road-2, MC 1 - 1

    Name of Division

    E.E R oad-3, MC

    E.E. Electrical Divn., MC E .E. Horticulture, Divn., MC

    Sanction

    1

    1

    1

    FIiied up

    -1

    -

    Vacant

    1

    -

    1

    Remarks

    Filled up on Contract basis

    B). Public Health Wing of MC

    Sr. No. Name of Division Sanction FIiied up Vacant Remarks

    1 S . E.P.H. Circle MC - - -2 E .E. P .H- 1, MC 1 - 1 3 E .E P .H-2, MC 1 1 -4 E.E P .H-3, M C 1 1 - F illed up on

    Contract basis 5 E .E P .H-4, MC 1 - 1

    It is hereby intimated that 06 Data Entry Operators have already been engaged

    to cope with the work against the sanctioned post of Steno typist through Outsource with the

    approval of Worthy CMC and they are working in the d ifferent Divisions of Engineering Wing

    (i.e. B&R and Public Health) of MC. As the fresh appointment of Steno typist will take some

    time and service of 06 nos. Data Entry Operator is still required for smooth function of

    Engineering Wing of MC. They were drawing salary against the vacant sanctioned post of

    Steno typist.

    As per position Eixplained above, it is requested that 06 posts of Data Entry

    Operator be engaged for the period 05.07.2018 to 04.07.2019 (for 12 months) through

    outsourcing against the post of Steno typist lying vacant in Engineering Wing of MC as per

    present prevailing practice or on prevailing DC rate , to cope of the work, so that the work of

  • ,...

    Engineering Wing (i.e. B&R and Public Health) of MC may run smoothly till the regular

    appointment of Steno typist in the MC.

    The financial implication to engag~ the above said posts at the DC rates for the

    period of one year is given below:

    Data Entry Operator 06 nos., DC rate Rs. 18575/- x 6 nos. x 12 months= 13,37,400/

    The total amount comes out for the one year to engage the 06 nos. Data Entry Operators is Rs.13,37,400/-. ·

    The agenda is to be placed before the F&CC of MC, Chandigarh for

    consideration and decision please.

    e,,.,c@I. engineer H,J::!c½:i.'~i:;;an No.-r. M.C.~/\NDlG/\RH.

    mailto:e,,.,c@I

  • AGENDA ITEM No........lJ... SUBJECT: ROUGH COST ESTIMATE FOR THE WORK OF "ADDITIONS/ ALTERATION/

    RENOVATION WORKS IN TOILET BLOCKS OF CREMATION GROUND, SECTOR-25 CHANDIGARH; ESTIMATED COST: R., +'.80 Lacs." '

    Chandigarh Administration had constructed Cremation Ground at sector-25,

    Chandigarh as per Hindus Law and also provided electric cremation to criminate the dead

    bodies as per their last rites /customs. The basic facilities such as washing/Toilets and sitting

    arrangement for the attendants were provided at cremation ground. The existing toilet blocks

    are outdated and their condition is very much deteriorated and requires the huge repair ~s per

    daily needs. The Chief Architect Department, Urban Planning has intimated that the meeting

    was held under the Chairmanship of Sh. Saurab Mishra, Additional Commissioner, MCC

    alongwith Chief Engineer and Superintending Engineer, Public Health, MCC on dated

    07.11 .2017 and desired that existing toilet blocks may be renovated as per latest specifications.

    Accordingly, Consultant Architect Mr. Vasu Bhasin was engaged who has prepared the

    drawings as per site conditions. The Chief Architect, Department of Urban Planning, Chd.

    Admn.has approved the proposal submitted by the aforesaid Consultant. Hence the estimate for

    the work cited as above has been prepared amounting to Rs. 44.80 Lacs including the cost of

    civil works, Public health fixtures and electrical installations. T ile proposal also contains the

    facilities of bathing etc. for male and female apart from 3 No, W .C. alongwith one number bath

    for male & female and toilet for differently able persons. The RC E has been duly checked for

    Rs. 44.80 Lacs and the detail of estimated cost is as under: -

    The Agenda of the estimate duly allowed by the Competent Authority is therefore

    placed before the Finance and Contract Committee for consideration and approval. The

    iture 4217 (Plan)- Civic Works

    Sr. No. DESCRIPTION

    1 CONSTRUCTION WORK (civil & public health)

    2 ADD 7 .50% OF THE BUILDING PORTION FOR INTERNAL ELECTRICAL INSTALLATION

    Total

    3 ADD 5% CONTINGENCY & P.E. CHARGES

    Grand Total (Rs.)

    Say Rs. 44.80 Lacs

    AMOUNT (Rs.)

    40,30,983.00

    2 ,35,656.00

    42,66,639.00

    2, 13,332.00

    47,96,210.00

    http:47,96,210.00http:13,332.00http:42,66,639.00http:2,35,656.00http:40,30,983.00

  • Agenda No.__l_;J.__ Subject: Estimate for reboring ofB/1 one no.12''x8" (304.80 x 203.20mm) i/d deep bore tueewell

    (with reverse rig method and any method of latest technology.) at _t/well Green Belt Sector 56, Chandigarh.) -

    The estimate has been prepared to cover the cost reboring of B/1 one no.12''x8" (304.80

    ---x-20-Wmm) i/d deep bore tubewell (with reverse rig method and any-method of-latest-technology,)-at:--•

    ~well Green Belt Sector 56, Chandigarh.). The necessity for preparation of the estimate has arisen as

    Sector 56 has been observed worstly hit by the low pressure in water supply. The water pressure in the

    area cannot maintained upto the mark due to difference in levels with respect to feeding water works.

    The bore at Sector 56 has failed and had st!\rted pumping sand. This has hampered the water supply of

    Sector 56 which is densely populated. I

    The area is having rehabilitation colony where scarcity ofwater has been noticed in past

    summers and it became difficult to handle-the situation. On Assessing the situation, it was found that. water levels have been depleted, the t/well has started pwnping sand: It will be difficult to feed Sector

    56 Colony in summers. The Geo Scanning of the bore has been done (report attached). It has been

    concluded that the bore could not be used further hence reboring should be done.

    ---.-,.. , . ,.~~ ,provis.iq"1, of.~rilli.µg_. (Qr. ~.Qe:Y,;'!.l\, ..Ifla~hiA~D.'A,.M~~~O'...~ .J~xlM.

  • I Ju

    Agenda No.__,....,)__

    Subject: Rough cost estimate for proyiding and laying of DI pipe 11·ne d. · · G H" a ~ommg ovt. 1gh School in village Kajheri, Chandigarh .

    · t d d m ex en e b d" a a 1

    .The estimate has been prepared for the work of providing and laying of DI pipe line

    in extended abadi adjoining Govt. High School, village Kajheri Ghandigarh. The necessity for

    preparation of the estimate has arisen due to the reason that is no water supply pipe line in the

    extended abadi in the left out area in village Kajheri. The residents are using stand post in potable

    water consumption. The worthy Commissi~ner, Municipal Corporation, Chandigarh alongwith

    Chief Engineer, S.E.PH(MC) Chandigarh had visited the site and directed to solve the water

    supply problems to the residents of this pocket of the village Kajheri, Chandigarh by laying water

    supply lines & give the water connection to each resident. The proposal for the above said work

    has been marked on the layout plan.

    Accordingly an estimate amounting to Rs.45.45Lacs duly allowed by competent

    authority is placed before Finance & Contracts Committee for its consideration and approval. The

    expenditure shall be chargeable to the head:- Capital Head " Aug. of water supply in city

    Chandigarh".

    Budget details:-

    1

    2

    3

    4

    5

    6

    Capital Head " Aug. of water supply in city Chandigarh"

    Budget allocated during 2018-19

    Major Head/Head ofAccount

    Rs.

    Liability and cost of spill over works Rs.

    Amount of already processed estimate Rs. during 2018-19 (w.e.f. April 2018). Amount of this estimate Rs.45.45Lacs

    Total (Sr. No. 3,4 & 5) Rs.

    '\. /'· s.~ E.~P.H.-3

  • Agenda No. / 1 Subject: ~ough co~t est~mate for_making by pass arrangement

    Ime coming tn premises I trees of Sector-28, Chandigarh.

    saint soldier of JO" Internati

    i/d onal

    C.l. pipe School

    '

    The existing 1O" i/d water supply line is passif'!g_inside the boundary wall/

    campus of the Saint soldier International School, Sector 28, Chandigarh. The water supply !ine

    is leakage at various points leading to stagnation ofwater inside the school as well as in the green

    belt of sector 28 Chandigarh. A lot of problems to faced in repair the line as line passing inside

    the school. This water supply- has to shifted out side the school boandar)'. as such by 'pass

    arrangement of 10" water supply line is required to shift the line from school Campus.

    Accordingly an estimate amounting to Rs.6.39Lacs duly allowed by competent

    authority is placed before F_inance & Contracts Committee for its consideration and approval.

    The expenditure shall be chargeable to the head:- Capital Head " Aug. of water supply in city

    Chandigarh".

    Budget details:-

    1 Major Head/Head of Account Capital Head " Aug. of water . supply in city Chandigarh"

    2 Budget allocated during 2018-19 Rs.

    3 Liability and cost of spill over works --4 Amount · of ·already processed estimate during --

    2018-1 9 (w.e.f. April 2018). 5 Amount of this estimate Rs.6.39 Lacs

    6 Total (Sr. No. 3,4 & 5) Rs. Lacs

    ~~/t\~ s~~ ~cP~ E.E.M.C.P.H.-3

  • 15"Agenda No.._____ Subject: Estimate for B/1 one no. I2"x8" (304.80 x 203.20mm) i/d deep bore tubewell, (with

    reverse rig method and any method of latest technology.) Opposite # 3062, Sector 20, Chandigarh

    The estimate has been prepared to cover the cost of B/1 one no.12"x8" (304.80 x

    203.20mm) i/d deep bore tubewell (with reverse rig method and any method of latest technology.)

    ~ector 20, Chandigarh. This sub division is looking after maintenance Sector 20 has been triggered

    as thirst area in previous summer. There is need of increasing source of water in the sub sector.

    Presently the distribution sysiem is mixed type, having supply of canal water coming from water

    works Sector 32, Chandigarh and one no. t/well booster in Sector 20-C, Chandigarh. There is an

    urgent need of additional water supply source. For this reason, a survey has been conducted and

    found that a t/well can be installed at Sector 20, Chandigarh. The t/well shall be used to charge

    water supply distribution lines so that water can be fed with ample pressure to the residents of

    Sector 20, Chandigarh. A location has been identified in an open space Opposite #3062, Sector20-

    D, Chandigarh . A permission may also be accorded to install this borewell.

    The provision of drilling for tubewell, machinery, MS delivery pipe & special and

    making connection with existing boosting station etc. Provision for construction of control panel

    room and other civil work has been taken in the estimate. The work shall be carried in the

    following parts :-: Tube well Drilling with stainless steel cage type wire wound screen. Part-1 :Pumping machinery of T/well & construction of control panel room & other civilPart -2

    work. Accordingly an estimate amounting to Rs.37.80Lacs duly allowed by competent

    authority is placed before Finance & Contracts Committee for its consideration and approval. The

    expenditure shall be chargeable to the head:- Capital Head" Aug. of water supply in city Chandigarh".

    Budget details:-

    Major Head/Head ofAccount

    Budget allocated during 2018-19

    Liability and cc-st of spill over works

    Amount of already processed estimate durin 2018-19 w.e.f. A ril 2018 . Amount of this estimate

    2

    3

    4

    5

    Rs.

    Rs.

    Rs.37.80Lacs

    Total (Sr. No. 3,4 & 5) Rs.

    E.E.M.C.P.H.-3

  • i-Agenda -- )-{;,

    Subject:- Providing and fixing of split type Air Conditioners and Allied Works at Community Centre, Sector 28, Ch~ndigarh.

    (Amount Rs. 15.54 Lacs.)

    The Area Councillor vide his letter dated 16.11.2017 addressed to C.E.M.C. has

    desired to provide Air Conditioners in the Community Centre, Sector 28. Chandigarh.

    Accordingly the site has been checked and estimate framed for providing and fix ing of Air

    Conditioners for the facility of users of Community Centre.

    The scope of work in estimate is providing I 7 Nos. split type ACs of 2 ton

    capacity and 3 Nos. Air Conditioner of I.5 tone along with stabilizers and piping etc.

    This estimate amounting to Rs. 15.54 Lacs has been framed under head 42 l 7(P)

    Electrification;

    The agenda is placed before the Finance & Contract Committee of Municipal

    Corporation, Chandigarh for its consideration and decision please.

    ,~ "E.E. (Elect.)S.E. (B&R), M.C. Chd.M.C. Chd.

  • Subject: Permission of space for District Pressure Regulating Station (DRS) within various community centres for supplying PNG (Piped National Gas) in Chandigarh.

    The Indian Oil - Adani Gas Pvt. Ltd . vide their application

    dated. 11 .9.2017 (copy enclosed) has applied for permission for use of space

    for installation of District Pressure Regulating Station (DRS) within various

    community centres for supplying PNG (Piped National Gas) in· Chandigarh as

    below:

    Sr. No.

    1 .

    2 .

    3

    4

    5

    6

    7

    8

    9

    Community Centre, Sector/Area

    Sector-19

    Sector-21

    Sector-33

    Sector-37

    Sector-40

    Sector-42

    Industrial Area PH-I

    Sector-38

    Sector-53

    Area (LXB)

    3mx4m

    3mx4m

    3mx4m

    3mx4m

    3mx4m

    3mx4m

    3mx4m

    3mx4m

    3mx4m

    In this rega rd, it is stated that the Municipal Corporation h a d

    a lready given permission to Indian Oil - Adani Gas Pvt. Ltd . to install DRS in

    Community Centre of Sector 49 and Dhanas as approved in 265th meeting of

    the Finan ce & Contract Committee held on 20.9 .2016. The company was

    allowed to u se space measuring 3mx4m to install DRS at a monthly rent of "Tl"\ tJu ~ and

    Rs. 29,550/- or Rs. 3 ,54,600 (Rs. Three Lacs Fifty Four,...Six Hundred Only)

    annually with a n increase @10% every yaar alongwith the deposit of non

    refundable security amounting to Rs.6QO00/- per site before the possession of

    site is g iven. The rent of land was calculated and approved on the basis of

    District col lector rates applicable in U .T . w.e.f . 2 . 1 .2016 i.e. Rs. 3,08,880/- per

    sq. yrds .

    It is therefore proposed that keeping in view the decision of the

    F inance & Contract committee in its meeting held on 20.9 .2016, as255th

    a bove, the request of Indian Oil - Adani Gas Pvt. Ltd for above said

    community centres may also be considered on the same terms and

    conditions. It is also proposed that decision may also be applicable for all

    future installation in community centres in general as per the feasibility of site.

    Matter is placed before the Finance & Contract Con, ·tt f .m1 ee or its

    conside,ation and decl•l,ease.

    S .k:) EE. • E~ E~

    w lolird r: MUNICIPAL CORPORATIO: 2: 3: 4: 5: 6: 8: 9: 11: 12: of latest: 13: 14: id: 15: 16: Providing and fixing of split type Air: Rs1554 lac: 17: undefined: S No: Description: Vacant: 1: I: 0: RemarksI: 2_2: 2_3: I_2: RemarksI_2: 3_2: 3_3: l: Remarks2: 4_2: 3_4: 0_2: Remarks3: 5_2: 10: 6_2: Remarks4: 6_3: Remarks2_2: 6Row1: Motor MateRow1: 4Total: Remarks13: 6Row2: Filled through contract already: Remarks6: 6Row3: Vacant oost available now: Remarks7: 6Row4: 6Row5: 167797: 6Row6: 13811: 6Row7: ESI 475 7 Nos 998: 6986: 6Row8: Total: 188495: 6Row9: Contractor profit 10: 18850: 6Row10: Total for one Month: 207345: 6Row11: 2488140: Fig in Lacs: 1_2: Head of Account: Pending Liabilities of 2016 17: 148350: 307981: 4_3: 150000: 5_3: 6_4: 598: 7: 178706: 8_2: 53050: undefined_2: Name of Division: Vacant_2: Remarks: 1_3: SE BR Circle: fill_14: 2_4: 1_4: 1_5: 3_5: EE Road2 MC: 1_6: fill_20: 1_7: 4_4: 1_8: 1_9: 5_4: 1_10: fill_25: 6_5: 1_11: fill_28: 1_12: Sr No: Sanction: FIiied up: Vacant_3: 1_13: fill_34: fill_35: Remarks_2: 2_5: 1_14: fill_38: Remarks1: 3_6: 1_15: 1_16: Remarks_3: 4_5: 1_17: 5_5: 1_18: fill_46: Filled up on Contract basis1: Sr No_2: 2_6: 23565600: INSTALLATION: Total_2: 2 1333200: Grand Total Rs: Say Rs 4480 Lacs: Agenda No: x20Wmm id deep bore tubewell with reverse rig method and anymethodoflatesttechnologyat: A proviqii of illi9g qr whe1 JllahiADAMJltY Gl a: Major HeadHead of Account: 3_7: Liability and cost of spill over works: Rs: 4_6: Rs_2: 5_6: Agenda No_2: Rs_3: Rs_4: 4_7: Amount of this estimate: Rs4545Lacs: Total Sr No 34 5: Rs_5: 2_7: Rs_6: 3_8: undefined_3: 5_7: undefined_4: Rs639 Lacs: s lP11: undefined_5: Major HeadHead of Account_2: 2_8: 3_9: Rs_7: 4_8: Rs_8: 5_8: durin 201819 wef A ril 2018: Rs37S0Lacs: Total Sr No 34 5_2: Sr No_3: Area LXB: 1_19: Sector19: 3mx4m: 2_9: Sector21: 3mx4m_2: 3_10: Sector33: 3mx4m_3: 4_9: Sector37: 3mx4m_4: 5_9: Sector40: 3mx4m_5: 6_6: Sector42: 3mx4m_6: 7_2: Industrial Area PHI: 3mx4m_7: 8_3: 9_2: