AGENDA ITEM M5 DATE: April 4, 2016
TO: Matt Jordan, General Manager
FROM: Charles H. Carden, Chief Operating Officer
SUBJECT: Water Production Activity Report
SUMMARY: The Water Production Activity report summarizes water supply, treatment, and delivery work efforts for the North & South Operations and Maintenance, Contracts & Construction and Engineering Support Sections for February and March 2016.
RECOMMENDATION: Receive and File. Attachments
Water Production Division Activity Report for February 2016 – Summary The major activities and work efforts of the departments which comprise the Water Production Division for the month of February 2016 are discussed below. Water Production The FY 2016 budgeted annual delivery to the member governments is 164.0 mgd. Table 1a summarizes the Water Year 2016 actual delivery amounts to the member governments through the month of February; total delivery for the month was 150.46 mgd. Table 1b provides the actual source usage for Water Year 2016. The budgeted source allocation for Water Year 2016 is 64.1% groundwater, 33.5% surface water (including purchased water), and 2.4% desalinated water. For the month of February 2016, 151.4 mgd was produced of which 33.6% was surface water, 0% was desalinated water, and 66.4% was groundwater. The Consolidated Water Use Permit Wellfields 12-month running average at the end of February was 80.58 mgd. At the end of February, the Regional Reservoir water elevation was 135.90 feet, correlating to a storage volume of 15.08 billion gallons. North and South Sections
The North and South Facilities Maintenance Departments completed 2,428 labor hours under work orders (1126 PM, 525 CM, 341 ADMIN, 436 PROJ). The labor comparisons are 46.4% PM, 21.6% CM, 14.0% ADMIN and 18.0% PROJ. The North and South Operations Departments completed 370 hours of labor under work orders (359 PM, 10 CM, 1 PROJ). The labor comparisons are 97.0% PM, 2.7% CM and 0.3% PROJ. Construction Department detailed project information can be found in the attached tables.
Engineering Support – March 2016
There are 52 Capital projects in progress including renewal and replacement projects (see CIP Report attached).
Requests for survey support are provided on the attached Survey Report.
Requests for real estate transactions are provided in the Real Estate Report in the March 2016
section.
TABLE 1A - (February 2016)
Water Delivery Budget
Water Year: 2016(Does Not Include TBC Flow to Tampa)
Tampa Pinellas County Hillsborough
County
St Pete New Port Richey Pasco County Total
Flow Avg Max Flow Avg Max Flow Avg Max Flow Avg Max Flow Avg Max Flow Avg Max SUM AVG
October 0.00 0.00 0.00 1451.41 46.82 52.33 1722.77 55.57 63.00 894.11 28.84 32.79 94.19 3.04 3.34 785.87 25.35 30.52 4948.35 159.62
November 0.00 0.00 0.00 1406.28 46.88 50.40 1634.02 54.47 68.51 854.42 28.48 30.36 92.17 3.07 3.91 752.29 25.08 29.45 4739.18 157.97
December 0.00 0.00 0.00 1492.37 48.14 53.25 1731.48 55.85 61.56 885.29 28.56 31.42 94.21 3.04 3.30 779.49 25.14 28.25 4982.84 160.74
January 0.00 0.00 0.00 1426.40 46.01 49.77 1526.65 49.25 55.93 862.66 27.83 31.57 92.64 2.99 3.38 707.66 22.83 25.78 4616.01 148.90
February 0.00 0.00 0.00 1364.89 47.07 51.20 1460.01 50.35 57.12 800.80 27.61 33.93 87.70 3.02 3.34 650.01 22.41 26.50 4363.41 150.46
0.00 7,141.35 8,074.93 4,297.28 460.91 3,675.32 23,649.79
0.00 53.25 68.51 33.93 3.91 30.52
0.00 46.98 53.12 28.27 3.03 24.18 155.59
6.00 45.60 53.52 28.84 2.70 27.34 164.00
TOTAL
AVG
MAX DAY
BUDGET
Tampa Bay Water
Aggregate Water Supply Sources(Includes Augmentation Flow)
(Does not include TBC Flow to Tampa)
TABLE 1B - (February 2016)
Water Year: 2016
Month: Febuary
Ground Water Consolidated
WUP
Surface Water Desal Water Total THIC Total 301T Total Water
Purchased
Total Water
Production
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
October 100.10 103.15 76.46 80.98 59.68 51.02 0.00 2.19 1.14 1.23 0.00 0.00 2.73 2.99 160.92 157.59
November 105.39 102.67 82.13 80.29 51.62 51.37 0.00 2.19 2.00 1.30 0.00 0.00 4.01 3.07 159.01 157.53
December 113.52 104.08 91.79 81.64 47.11 51.89 0.00 1.11 0.83 1.27 0.00 0.00 2.83 3.04 161.46 158.36
January 98.63 103.67 76.10 81.13 50.00 52.72 0.00 0.55 0.83 1.25 0.00 0.00 2.82 3.02 149.46 158.19
February 100.60 103.16 78.14 80.58 50.00 53.32 0.00 0.55 0.83 1.18 0.00 0.00 2.83 2.95 151.43 158.20
Construction Management Monthly Report
REPORTING PERIOD: February 2016
Contractor/Consultant
Board
Approval
Contractual
Substantial
Completion
Contractual
Final
Completion Contract Value
Contract
Expenditures
Invoiced to Date
Owner Direct
Purchases
Invoiced to Date
Project Allowance
Value
Project
Allowance
Expenditure To
Date
Percentage
Expended To
Date
In Service
Date
2014-046 07152 - Cross Bar WF Pumps Replacement FL Design Drilling Corp/Atkins 18-Aug-2014 24-Nov-2015 23-Jan-2016 $ 2,595,959.00 $ 1,041,481.76 $ 1,300,575.38 $ 190,000.00 $ - 90%
2015-019 07002 - US 41 and Odessa Pressure Modification Brandes/Carollo 15-Dec-2014 3-Feb-2016 18-Mar-2016 1,539,000.00$ $ 1,186,165.56 -$ 150,000.00$ 20,849.01$ 77%
2005-062 07402 - DESAL Additional Scavenger Tank/DE Storage Building AWAA/Florida Aqua Store NA 31-Dec-2015 31-Dec-2015 928,289.90$ 189,272.46$ -$ 80,000.00$ 16,401.06$ 20%
2014-05250013 - Cypress Creek Wellfield MCCs Replacement and Arc Flash
Mitigation
Electrical Engineering
Enterprises, Inc.20-Apr-2015 3-Feb-2016 17-Feb-2016 558,664.00$ 296,062.73$ -$ 127,000.00$ -$ 53%
2015-012 07403 - DESAL Realiability Program - Intake Pump Station Black & Veatch 15-Dec-2014 2-Dec-2015 31-Dec-2015 5,242,524.52$ 3,571,934.43$ 423,169.40$ 753,167.18$ 423,169.40$ 67%
2014-048 50028 - Facilities Site - SWTP Process Piping Repair Wharton-Smith/Arcadis 17-Aug-2015 1-Jun-2016 1-Jun-2016 278,200.00$ 11,520.00$ -$ 40,000.00$ -$ 4%
2014-052 50030 - South Central Hillsborough ARC Flash MitigationElectrical Engineering
Enterprises, Inc.17-Aug-2015 28-Oct-2016 25-Nov-2016 886,160.00$ 22,231.26$ -$ 133,000.00$ -$ 3%
2016-003 50020 - Alafia Pump Station Pumps 1, 2, and 3 Replacement Wharton-Smith, Inc. 19-Oct-2015 28-Jul-2017 31-Aug-2017 1,133,200.00$ -$ -$ 150,000.00$ -$
2014-04906318 - C.W. Bill Young Regional Reservoir Ponds Inlets/Outlets
RepairsQRC, Inc. 19-Oct-2015 7-Feb-2016 8-Mar-2016 417,100.00$ -$ -$ 35,000.00$ -$
2014-049 09005 - Cosme Bypass Analyzer Enclosure QRC, Inc. 17-Aug-2015 15-Feb-2016 15-Mar-2016 215,500.00$ -$ -$ 20,000.00$ -$
All contracts listed above are on schedule and within budget with the following exceptions:
dd/mm/yyyy
dd/mm/yyyy
NOTE: Information provided as of February 29, 2016
Project DescriptionsContract Number
Date Status Designation
Actual Dates
2014-052 Project 50013: Substantial and Final Completion dates will be adjusted pending execution of change order.
2015-012 Project 07403: Substantial and Final Completion dates will be adjusted pending execution of change order.
Planned Dates2014-046 Project 07152: Substantial and Final Completion dates will be adjusted pending execution of change order.
1 of 1
Project Number Project Name Schedule Financials
06316 Regional Reservoir Terrace Drains
Project Phase Start Date End Date % Complete
Professional Services Selection 03/02/2015 07/15/2015
Design 07/15/2015 02/15/2016
Bidding 02/16/2016 08/15/2016 36%
Construction 08/16/2016 08/21/2017
Close-Out 08/22/2017 12/18/2017
Baseline Budget $3,200,000
Current Budget $5,489,609
Variance Current vs. Baseline Budget 72%
Actuals to Date $235,848
Remaining Budget $5,253,761
% Budget Spent To Date 4%
06317South Central
Hillsborough Regional WF Improvements
Project Phase Start Date End Date % Complete
Planning 11/02/2015 05/24/2016
Professional Services Selection 05/25/2016 07/27/2016
Design 07/28/2016 01/18/2017 14%
Bidding 01/19/2017 05/25/2017
Construction 05/26/2017 04/09/2018
Baseline Budget $2,340,000
Current Budget $2,340,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $2,340,000
% Budget Spent To Date 0%
06318Regional Reservoir Ponds Inlets/Outlets
Repairs
Project Phase Start Date End Date % Complete
Design 04/27/2015 07/29/2015
Bidding 07/30/2015 10/19/2015 73%
Construction 10/20/2015 04/22/2016
Close-Out 04/22/2016 06/27/2016
Baseline Budget $462,100
Current Budget $462,100
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $462,100
% Budget Spent To Date 0%
07002 North System Pressure Modifications
Project Phase Start Date End Date % Complete
Professional Services Selection 06/17/2013 10/21/2013
Design 10/29/2013 06/13/2014 90%
Bidding 06/16/2014 01/21/2015
Construction 02/09/2015 06/20/2016
Baseline Budget $2,529,994
Current Budget $1,857,081
Variance Current vs. Baseline Budget -27%
Actuals to Date $1,416,547
Remaining Budget $440,534
% Budget Spent To Date 76%
Report Generated : 03/07/2016 11:54 AM Page 1 of 13
Capital Improvements Program Board Status Report - February 2016
07005 South Pasco WTP Improvements
Project Phase Start Date End Date % Complete
Professional Services Selection 01/04/2017 03/08/2017
Design 03/09/2017 05/14/2018 0%
Bidding 05/15/2018 09/20/2018
Construction 09/21/2018 03/25/2020
Baseline Budget $379,000
Current Budget $379,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $379,000
% Budget Spent To Date 0%
07006 South Pasco Generator and Fuel Tank
Project Phase Start Date End Date % Complete
Design 08/10/2015 04/22/2016
Bidding 07/11/2016 09/12/2016 23%
Construction 12/26/2016 01/15/2018
Baseline Budget $1,240,980
Current Budget $1,241,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $33,282
Remaining Budget $1,207,718
% Budget Spent To Date 3%
07007Cypress Creek WTP
Chemical System Upgrades
Project Phase Start Date End Date % Complete
Professional Services Selection 06/01/2017 08/03/2017
Design 08/04/2017 10/10/2018 0%
Bidding 10/11/2018 02/20/2019
Construction 02/21/2019 08/19/2020
Baseline Budget $619,000
Current Budget $619,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $619,000
% Budget Spent To Date 0%
07061South Pasco Wellfield
Underground Commercial Powerline
Project Phase Start Date End Date % Complete
Planning 10/03/2016 03/13/2018
Professional Services Selection 03/14/2018 05/15/2018
Design 05/16/2018 06/10/2019 0%
Bidding 06/11/2019 12/02/2019
Construction 12/03/2019 05/11/2021
Baseline Budget $1,951,000
Current Budget $1,951,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $1,951,000
% Budget Spent To Date 0%
Report Generated : 03/07/2016 11:54 AM Page 2 of 13
Capital Improvements Program Board Status Report - February 2016
07131Cosme Water Treatment
Plant Yard Piping Improvements
Project Phase Start Date End Date % Complete
Planning 05/01/2007 08/21/2015
Design 07/23/2015 07/31/2016 81%
Bidding 08/01/2016 10/31/2016
Construction 11/01/2016 02/19/2018
Baseline Budget $922,681
Current Budget $934,681
Variance Current vs. Baseline Budget 1%
Actuals to Date $31,144
Remaining Budget $903,538
% Budget Spent To Date 3%
07152Cross Bar Ranch Wellfield - Pumps
Replacement
Project Phase Start Date End Date % Complete
Construction: Phase 1 06/01/2011 09/30/2011
Professional Services Selection: Phase 2 04/11/2011 10/17/2011
Design: Phase 2 12/19/2011 10/22/2012 94%
Bidding: Phase 2 08/17/2013 08/18/2014
Construction: Phase 2 09/04/2014 06/20/2016
Baseline Budget $3,382,315
Current Budget $3,382,315
Variance Current vs. Baseline Budget 0%
Actuals to Date $2,698,962
Remaining Budget $683,354
% Budget Spent To Date 80%
07402
Tampa Bay Seawater Desalination Reliability Program-DE Building &
Scavenger Tank
Project Phase Start Date End Date % Complete
Design 10/01/2013 06/01/2015 89%
Construction 06/01/2015 06/20/2016
Baseline Budget $1,061,955
Current Budget $1,061,955
Variance Current vs. Baseline Budget 0%
Actuals to Date $241,417
Remaining Budget $820,538
% Budget Spent To Date 23%
07403
Tampa Bay Seawater Desalination Reliability Program-Intake Pump
Station
Project Phase Start Date End Date % Complete
Professional Services Selection 06/01/2014 12/23/2014
Design 12/24/2014 05/29/2015 96%
Construction 06/01/2015 03/31/2016
Baseline Budget $7,332,190
Current Budget $7,332,190
Variance Current vs. Baseline Budget 0%
Actuals to Date $2,195,544
Remaining Budget $5,136,646
% Budget Spent To Date 30%
Report Generated : 03/07/2016 11:54 AM Page 3 of 13
Capital Improvements Program Board Status Report - February 2016
07500
Vulnerability Assessment-
Recommended Improvements
Project Phase Start Date End Date % Complete
Design 06/01/2010 12/31/2011 94%
Construction 02/01/2011 06/30/2016
Baseline Budget $2,700,000
Current Budget $2,700,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $2,219,567
Remaining Budget $480,433
% Budget Spent To Date 82%
07535 Cypress Creek Console Area Upgrades
Project Phase Start Date End Date % Complete
Professional Services Selection 12/01/2014 07/01/2015
Design 07/01/2015 12/16/2015 46%
Bidding 12/16/2015 06/20/2016
Construction 06/21/2016 08/21/2017
Baseline Budget $452,000
Current Budget $452,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $23,950
Remaining Budget $428,050
% Budget Spent To Date 5%
07536 HSPS Console Area Upgrades
Project Phase Start Date End Date % Complete
Professional Services Selection 12/01/2014 07/01/2015
Design 07/01/2015 12/16/2015 46%
Bidding 12/16/2015 06/20/2016
Construction 06/21/2016 08/21/2017
Baseline Budget $396,000
Current Budget $396,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $23,950
Remaining Budget $372,050
% Budget Spent To Date 6%
07537 CYC WTP Post Node Analyzer Building
Project Phase Start Date End Date % Complete
Professional Services Selection 01/27/2017 03/15/2017
Design 03/22/2017 11/09/2017 0%
Bidding 11/10/2017 01/04/2018
Construction 01/05/2018 08/28/2018
Baseline Budget $215,000
Current Budget $215,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $215,000
% Budget Spent To Date 0%
Report Generated : 03/07/2016 11:54 AM Page 4 of 13
Capital Improvements Program Board Status Report - February 2016
07538 Cypress Creek WTP Yard Pipe
Project Phase Start Date End Date % Complete
Professional Services Selection 10/29/2014 02/23/2015
Design 02/23/2015 10/30/2015
Bidding 10/30/2015 05/02/2016 51%
Construction 05/02/2016 04/03/2017
Close-Out 04/03/2017 06/19/2017
Baseline Budget $2,174,175
Current Budget $2,174,175
Variance Current vs. Baseline Budget 0%
Actuals to Date $149,501
Remaining Budget $2,024,674
% Budget Spent To Date 7%
07539 HSPS Switchgear Modifications
Project Phase Start Date End Date % Complete
Planning 01/06/2015 06/24/2015
Design: Phase 1 10/01/2015 05/12/2016
Construction: Phase 1 07/11/2016 12/12/2017
Professional Services Selection: Phase 2 08/24/2015 02/12/2016 39%
Design: Phase 2 05/27/2016 10/21/2016
Bidding: Phase 2 01/09/2017 03/17/2017
Construction: Phase 2 05/01/2017 10/27/2017
Baseline Budget $2,955,000
Current Budget $2,955,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $2,955,000
% Budget Spent To Date 0%
09005 Cosme Bypass Analyzer Enclosure
Project Phase Start Date End Date % Complete
Design 12/17/2013 05/05/2015
Bidding 06/15/2015 09/24/2015 93%
Construction 09/24/2015 04/29/2016
Baseline Budget $307,229
Current Budget $307,229
Variance Current vs. Baseline Budget 0%
Actuals to Date $56,007
Remaining Budget $251,222
% Budget Spent To Date 18%
09007 Long-Term Master Water Plan
Project Phase Start Date End Date % Complete
Planning: Phase 1 08/06/2014 09/30/2018 36%
Planning: Phase 2 10/01/2018 12/31/2018
Baseline Budget $3,580,000
Current Budget $3,580,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $212,650
Remaining Budget $3,367,350
% Budget Spent To Date 6%
Report Generated : 03/07/2016 11:54 AM Page 5 of 13
Capital Improvements Program Board Status Report - February 2016
09103 Starkey Hydrologic Restoration
Project Phase Start Date End Date % Complete
Design 01/29/2013 08/22/2016
Bidding 08/22/2016 12/16/2016 69%
Construction 12/16/2016 07/26/2017
Baseline Budget $464,599
Current Budget $468,599
Variance Current vs. Baseline Budget 1%
Actuals to Date $80,682
Remaining Budget $387,917
% Budget Spent To Date 17%
09104Cypress Creek Wellfield
Surface Water Improvements
Project Phase Start Date End Date % Complete
Professional Services Selection 03/01/2013 06/15/2013
Design 06/16/2014 12/01/2014 100%
Bidding 12/02/2014 02/26/2015
Construction 02/27/2015 02/15/2016
Baseline Budget $496,168
Current Budget $496,168
Variance Current vs. Baseline Budget 0%
Actuals to Date $455,200
Remaining Budget $40,968
% Budget Spent To Date 92%
09106 Lake Dan Augmentation
Project Phase Start Date End Date % Complete
Planning 01/02/2013 08/01/2013
Design 06/01/2017 10/08/2017 51%
Bidding 10/08/2017 02/20/2018
Construction 02/20/2018 02/28/2019
Baseline Budget $347,665
Current Budget $347,665
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $347,665
% Budget Spent To Date 0%
11004Cypress Creek Crossing Wellfield Collection Main
Replacement
Project Phase Start Date End Date % Complete
Planning 05/01/2014 09/30/2014
Professional Services Selection 05/09/2016 09/15/2016
Design 09/16/2016 09/13/2017 39%
Bidding 09/14/2017 12/01/2017
Construction 12/04/2017 12/19/2018
Baseline Budget $2,129,000
Current Budget $2,129,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $317,347
Remaining Budget $1,811,653
% Budget Spent To Date 15%
Report Generated : 03/07/2016 11:54 AM Page 6 of 13
Capital Improvements Program Board Status Report - February 2016
11006South Pasco
Transmission Main Condition Assessment
Project Phase Start Date End Date % Complete
Planning: Phase 1 10/01/2014 09/30/2015
Planning: Phase 2 10/01/2015 09/30/2016 47%
Planning: Phase 3 10/03/2016 09/29/2017
Baseline Budget $1,547,871
Current Budget $1,547,871
Variance Current vs. Baseline Budget 0%
Actuals to Date $373,875
Remaining Budget $1,173,996
% Budget Spent To Date 24%
50010 HSPS Improvements Pumps 1-5
Project Phase Start Date End Date % Complete
Construction 03/21/2013 02/29/2016 100%
Baseline Budget $774,000
Current Budget $774,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $665,346
Remaining Budget $108,654
% Budget Spent To Date 86%
50012 Morris Bridge WF Pumps & Motors Replacement
Project Phase Start Date End Date % Complete
Design 06/01/2016 11/28/2016
Bidding 11/29/2016 04/27/2017 0%
Construction 05/10/2017 12/12/2018
Current Budget
Variance Current vs. Baseline Budget
Actuals to Date
Remaining Budget
% Budget Spent To Date
50013
Cypress Creek Wellfield Motor Control Center Replacement and Arc
Flash Mitigation
Project Phase Start Date End Date % Complete
Design 11/14/2014 12/30/2014
Bidding 01/30/2015 05/21/2015 78%
Construction 05/22/2015 07/18/2016
Baseline Budget $665,664
Current Budget $665,664
Variance Current vs. Baseline Budget 0%
Actuals to Date $349,051
Remaining Budget $316,613
% Budget Spent To Date 52%
Report Generated : 03/07/2016 11:54 AM Page 7 of 13
Capital Improvements Program Board Status Report - February 2016
50016Eldridge-Wilde WF Pumps & Motors
Replacement
Project Phase Start Date End Date % Complete
Professional Services Selection 01/04/2016 06/21/2016
Design 06/22/2016 11/20/2017 4%
Bidding 11/21/2017 05/14/2018
Construction 05/15/2018 10/15/2019
Baseline Budget $14,963,000
Current Budget $14,963,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $14,963,000
% Budget Spent To Date 0%
50017 Structures 160, 161, and 162 Actuator Upgrades
Project Phase Start Date End Date % Complete
Planning 10/06/2011 12/28/2011
Design 01/31/2013 08/30/2013 93%
Bidding 09/02/2013 11/29/2013
Construction 12/02/2013 06/30/2016
Baseline Budget $443,000
Current Budget $443,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $213,209
Remaining Budget $229,791
% Budget Spent To Date 48%
50018 South Pasco WF Pumps and Motors Replacement
Project Phase Start Date End Date % Complete
Design 11/01/2016 04/28/2017
Bidding 05/01/2017 09/29/2017 0%
Construction 10/02/2017 10/31/2018
Baseline Budget $903,000
Current Budget $903,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $903,000
% Budget Spent To Date 0%
50020 Alafia River Pump Station Pumps 1,2, 3
Project Phase Start Date End Date % Complete
Professional Services Selection 08/01/2014 09/04/2014
Design 09/05/2014 07/03/2015 49%
Bidding 07/03/2015 10/19/2015
Construction 11/02/2015 10/16/2017
Baseline Budget $1,761,000
Current Budget $1,761,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $107,806
Remaining Budget $1,653,194
% Budget Spent To Date 6%
Report Generated : 03/07/2016 11:54 AM Page 8 of 13
Capital Improvements Program Board Status Report - February 2016
50021 Morris Bridge WF Improvements
Project Phase Start Date End Date % Complete
Planning 04/01/2014 09/30/2015
Professional Services Selection 10/15/2015 11/20/2015
Design 11/13/2015 10/28/2016 46%
Bidding 12/12/2016 03/10/2017
Construction 05/22/2017 05/25/2018
Baseline Budget $1,590,000
Current Budget $1,590,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $83,152
Remaining Budget $1,506,849
% Budget Spent To Date 5%
50022Morris Bridge Booster Station Pumps 1 and 2
Replacement
Project Phase Start Date End Date % Complete
Professional Services Selection 01/02/2017 03/06/2017
Design 03/07/2017 08/23/2017 0%
Bidding 08/24/2017 01/03/2018
Construction 01/04/2018 10/16/2018
Baseline Budget $985,000
Current Budget $985,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $985,000
% Budget Spent To Date 0%
50023
Starkey WF Motor Control Centers
Replacement and Arc Flash Mitigation
Project Phase Start Date End Date % Complete
Planning 08/01/2014 10/24/2014
Design 05/20/2016 12/09/2016 46%
Bidding 01/09/2017 03/10/2017
Construction 05/08/2017 01/19/2018
Baseline Budget $1,518,000
Current Budget $1,518,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $5,287
Remaining Budget $1,512,713
% Budget Spent To Date 0%
50028Facilities Site-SWTP Process Water Piping
Repairs
Project Phase Start Date End Date % Complete
Design 01/31/2014 01/13/2015
Bidding 01/14/2015 08/17/2015 77%
Construction 08/18/2015 10/17/2016
Baseline Budget $416,200
Current Budget $416,200
Variance Current vs. Baseline Budget 0%
Actuals to Date $90,780
Remaining Budget $325,420
% Budget Spent To Date 22%
Report Generated : 03/07/2016 11:54 AM Page 9 of 13
Capital Improvements Program Board Status Report - February 2016
50029BUD Well Fields Arc Flash Mitigation and VFDs Replacement
Project Phase Start Date End Date % Complete
Planning 08/01/2014 06/22/2015
Design 06/23/2015 02/05/2016 67%
Bidding 02/15/2016 05/13/2016
Construction 07/11/2016 12/09/2016
Baseline Budget $698,000
Current Budget $698,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $5,287
Remaining Budget $692,713
% Budget Spent To Date 1%
50030South Central
Hillsborough WF Arc Flash Mitigation
Project Phase Start Date End Date % Complete
Planning 08/01/2014 09/05/2014
Design 09/05/2014 05/07/2015 68%
Bidding 06/19/2015 07/07/2015
Construction 09/22/2015 11/25/2016
Baseline Budget $988,160
Current Budget $988,160
Variance Current vs. Baseline Budget 0%
Actuals to Date $35,267
Remaining Budget $952,893
% Budget Spent To Date 4%
50031 Cypress Bridge WF Arc Flash Mitigation
Project Phase Start Date End Date % Complete
Planning 08/01/2014 06/17/2016
Design 08/19/2016 11/04/2016 45%
Bidding 12/19/2016 01/20/2017
Construction 03/13/2017 02/16/2018
Baseline Budget $1,488,000
Current Budget $1,488,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $5,287
Remaining Budget $1,482,713
% Budget Spent To Date 0%
50033 Mobile Generators
Project Phase Start Date End Date % Complete
Design 01/09/2017 05/26/2017
Bidding 06/12/2017 08/25/2017 0%
Construction 11/13/2017 06/22/2018
Baseline Budget $963,000
Current Budget $963,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $963,000
% Budget Spent To Date 0%
Report Generated : 03/07/2016 11:54 AM Page 10 of 13
Capital Improvements Program Board Status Report - February 2016
50034Medium Voltage Variable
Frequency Drive Upgrades - Alafia PS
Project Phase Start Date End Date % Complete
Design 06/26/2015 07/20/2015
Bidding 07/22/2015 10/20/2015 67%
Construction 12/21/2015 07/08/2016
Baseline Budget $336,662
Current Budget $336,662
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $336,662
% Budget Spent To Date 0%
50035Medium Voltage Variable
Frequency Drive Upgrade - CCPS
Project Phase Start Date End Date % Complete
Design: Phase 1 06/29/2015 07/20/2015
Bidding: Phase 1 07/20/2015 10/19/2015
Construction: Phase 1 12/21/2015 05/20/2016
Professional Services Selection: Phase 2 09/21/2015 10/19/2015 44%
Design: Phase 2 12/14/2015 04/22/2016
Bidding: Phase 2 05/23/2016 06/30/2016
Construction: Phase 2 08/29/2016 01/20/2017
Baseline Budget $839,448
Current Budget $839,448
Variance Current vs. Baseline Budget 0%
Actuals to Date $660
Remaining Budget $838,788
% Budget Spent To Date 0%
50036
Medium Voltage Variable Frequency Drive
Upgrade - Repump Station
Project Phase Start Date End Date % Complete
Design 05/20/2016 08/12/2016
Bidding 08/22/2016 09/16/2016 0%
Construction 11/07/2016 05/19/2017
Baseline Budget $765,612
Current Budget $765,612
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $765,612
% Budget Spent To Date 0%
50037 Cypress Creek WTP Stationary Generators
Project Phase Start Date End Date % Complete
Design 12/01/2016 04/10/2017
Bidding 04/11/2017 07/25/2017 0%
Construction 07/26/2017 03/05/2018
Baseline Budget $442,000
Current Budget $442,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $442,000
% Budget Spent To Date 0%
Report Generated : 03/07/2016 11:54 AM Page 11 of 13
Capital Improvements Program Board Status Report - February 2016
50038Regional Reservoir Toe Drain Outfall Monitoring
Points
Project Phase Start Date End Date % Complete
Professional Services Selection 02/16/2015 07/01/2015
Design 07/01/2015 02/15/2016 42%
Bidding 02/16/2016 08/15/2016
Construction 08/16/2016 08/15/2017
Baseline Budget $829,000
Current Budget $829,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $76,158
Remaining Budget $752,842
% Budget Spent To Date 9%
50039 TBC Air Burst System Improvements
Project Phase Start Date End Date % Complete
Professional Services Selection 10/02/2015 12/15/2015
Design 12/16/2015 08/16/2016 23%
Bidding 08/17/2016 11/09/2016
Construction 11/10/2016 07/27/2017
Baseline Budget $382,000
Current Budget $382,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $382,000
% Budget Spent To Date 0%
50040 Eldridge Wilde WF Underground Powerline
Project Phase Start Date End Date % Complete
Professional Services Selection 09/14/2015 08/15/2016
Design 08/16/2016 01/15/2018 8%
Bidding 01/16/2018 08/20/2018
Construction 08/21/2018 02/15/2021
Baseline Budget $4,827,000
Current Budget $4,827,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $4,827,000
% Budget Spent To Date 0%
50041NW Hillsborough WF Motor Control Centers
and Arc Flash Mitigation
Project Phase Start Date End Date % Complete
Design 04/05/2016 06/07/2016
Bidding 06/08/2016 08/10/2016 0%
Construction 08/11/2016 03/15/2017
Baseline Budget $489,000
Current Budget $489,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $489,000
% Budget Spent To Date 0%
Report Generated : 03/07/2016 11:54 AM Page 12 of 13
Capital Improvements Program Board Status Report - February 2016
50050Renewal and
Replacement Program As-needed Activities
Project Phase Start Date End Date % Complete
Construction 10/01/2015 09/30/2021 7%
Baseline Budget $600,000
Current Budget $600,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $3,665
Remaining Budget $596,335
% Budget Spent To Date 1%
52001Cypress Creek Pump Station Pumps Repair
Program
Project Phase Start Date End Date % Complete
Construction 06/02/2014 07/11/2018 42%
Baseline Budget $674,924
Current Budget $674,924
Variance Current vs. Baseline Budget 0%
Actuals to Date $175,639
Remaining Budget $499,285
% Budget Spent To Date 26%
91102High Service Pump
Station Auxiliary Power Generator No. 2 Failure
Project Phase Start Date End Date % Complete
Bidding 07/24/2015 08/17/2015 100%
Construction 07/24/2015 12/31/2015
Baseline Budget $530,000
Current Budget $530,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $435,092
Remaining Budget $94,908
% Budget Spent To Date 82%
91103 Morris Bridge Point of Connection Pipe Failure
Project Phase Start Date End Date % Complete
Design 08/19/2015 09/01/2015
Bidding 09/02/2015 09/22/2015 100%
Construction 09/23/2015 02/15/2016
Baseline Budget $319,016
Current Budget $319,016
Variance Current vs. Baseline Budget 0%
Actuals to Date $274,052
Remaining Budget $44,964
% Budget Spent To Date 86%
Report Generated : 03/07/2016 11:54 AM Page 13 of 13
Capital Improvements Program Board Status Report - February 2016
SURVEY REPORT FOR BOARD AGENDA For
February 2016
Facility/ProjectName Purpose Action Status Parcel No. Category Action Date Requested On
REGNL HIGH SERVICE PUMP STN
Stake for fence In Process N/A Stakeout 08/17/2015 07/21/2015
Survey 3 wells at Cone Ranch In Process N/A Monitoring Site Locate 01/27/2016 11/16/2015
ELDRIDGE WILDE WELLFIELD
Survey WE-ELW-SM5R Replacement Well Completed N/A Monitoring Site Locate 02/11/2016 01/27/2016
CYPRESS CREEK WELLFIELD
Track and save location on Augmentation line located at CYC Well #13
Completed N/A As-Built Survey 02/09/2016 02/01/2016
COSME WELLFIELD Survey two wells in Cosme Completed N/A Monitoring Site Locate 02/10/2016 02/01/2016
CROSSBAR WELLFIELD Shock Pad survey/GPS locate Completed N/A As-Built Survey 02/11/2016 02/09/2016
Clearwater Storm water Structure Accepted N/A Specific Purpose Survey 02/22/2016 02/22/2016
Printed On 3/23/2016
Water Production Division Activity Report for March 2016 – Summary The major activities and work efforts of the departments which comprise the Water Production Division for the month of March 2016 are discussed below. Water Production The FY 2016 budgeted annual delivery to the member governments is 164.0 mgd. Table 1a summarizes the Water Year 2016 actual delivery amounts to the member governments through the month of March; total delivery for the month was 163.22 mgd. Table 1b provides the actual source usage for Water Year 2016. The budgeted source allocation for Water Year 2016 is 64.1% groundwater, 33.5% surface water (including purchased water), and 2.4% desalinated water. For the month of March 2016, 164.07 mgd was produced of which 31.0% was surface water, 0% was desalinated water, and 69.0% was groundwater. The Consolidated Water Use Permit Wellfields 12-month running average at the end of March was 80.51 mgd. At the end of March, the Regional Reservoir water elevation was 135.39 feet, correlating to a storage volume of 14.93 billion gallons. North and South Sections
The North and South Facilities Maintenance Departments completed 2,520 labor hours under work orders (725 PM, 903 CM, 534 ADMIN, 358 PROJ). The labor comparisons are 28.8% PM, 35.8% CM, 21.2% ADMIN and 14.2% PROJ. The North and South Operations Departments completed 423 hours of labor under work orders (398 PM, 3 CM, 22 PROJ)). The labor comparisons are 94.1% PM, 0.7% CM and 5.2% PROJ. *Note – Labor hour data presented represents a partially complete record for the last week of March. Construction Department detailed project information can be found in the attached tables.
Engineering Support – March 2016
There are 52 Capital projects in progress including renewal and replacement projects (see CIP Report attached).
Requests for survey support are provided on the attached Survey Report.
There are 8 real estate transactions pending (see attached real estate report).
TABLE 1A - (March 2016)
Water Delivery Budget
Water Year: 2016(Does Not Include TBC Flow to Tampa)
Tampa Pinellas County Hillsborough
County
St Pete New Port Richey Pasco County Total
Flow Avg Max Flow Avg Max Flow Avg Max Flow Avg Max Flow Avg Max Flow Avg Max SUM AVG
October 0.00 0.00 0.00 1451.41 46.82 52.33 1722.77 55.57 63.00 894.11 28.84 32.79 94.19 3.04 3.34 785.87 25.35 30.52 4948.35 159.62
November 0.00 0.00 0.00 1406.28 46.88 50.40 1634.02 54.47 68.51 854.42 28.48 30.36 92.17 3.07 3.91 752.29 25.08 29.45 4739.18 157.97
December 0.00 0.00 0.00 1492.37 48.14 53.25 1731.48 55.85 61.56 885.29 28.56 31.42 94.21 3.04 3.30 779.49 25.14 28.25 4982.84 160.74
January 0.00 0.00 0.00 1426.40 46.01 49.77 1526.65 49.25 55.93 862.66 27.83 31.57 92.64 2.99 3.38 707.66 22.83 25.78 4616.01 148.90
February 0.00 0.00 0.00 1364.89 47.07 51.20 1460.01 50.35 57.12 800.80 27.61 33.93 87.70 3.02 3.34 650.01 22.41 26.50 4363.41 150.46
March 0.08 0.00 0.03 1542.50 49.76 54.40 1734.77 55.96 64.85 872.02 28.13 31.18 99.72 3.22 3.49 810.71 26.15 29.46 5059.80 163.22
0.08 8,683.85 9,809.70 5,169.30 560.63 4,486.03 28,709.59
0.03 54.40 68.51 33.93 3.91 30.52
0.00 47.45 53.60 28.25 3.06 24.51 156.88
6.00 45.60 53.52 28.84 2.70 27.34 164.00
TOTAL
AVG
MAX DAY
BUDGET
Tampa Bay Water
Aggregate Water Supply Sources(Includes Augmentation Flow)
(Does not include TBC Flow to Tampa)
TABLE 1B - (March 2016)
Water Year: 2016
Month: March
Ground Water Consolidated
WUP
Surface Water Desal Water Total THIC Total 301T Total Water
Purchased
Total Water
Production
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
Monthly
Avg Q
12 Month
Rng Avg
October 100.10 103.15 76.46 80.98 59.68 51.02 0.00 2.19 1.14 1.23 0.00 0.00 2.73 2.99 160.92 157.59
November 105.39 102.67 82.13 80.29 51.62 51.37 0.00 2.19 2.00 1.30 0.00 0.00 4.01 3.07 159.01 157.53
December 113.52 104.08 91.79 81.64 47.11 51.89 0.00 1.11 0.83 1.27 0.00 0.00 2.83 3.04 161.46 158.36
January 98.63 103.67 76.10 81.13 50.00 52.72 0.00 0.55 0.83 1.25 0.00 0.00 2.82 3.02 149.46 158.19
February 100.60 103.16 78.14 80.58 50.00 53.32 0.00 0.55 0.83 1.18 0.00 0.00 2.83 2.95 151.43 158.20
March 113.14 103.32 87.79 80.51 49.95 53.32 0.00 0.55 0.97 1.16 0.00 0.00 2.97 2.94 164.07 158.36
Construction Management Monthly Report
REPORTING PERIOD: March 2016
Contractor/Consultant
Board
Approval
Contractual
Substantial
Completion
Contractual
Final
Completion Contract Value
Contract
Expenditures
Invoiced to Date
Owner Direct
Purchases
Invoiced to Date
Project Allowance
Value
Project
Allowance
Expenditure To
Date
Percentage
Expended To
Date
In Service
Date
2014-046 07152 - Cross Bar WF Pumps Replacement FL Design Drilling Corp/Atkins 18-Aug-2014 24-Nov-2015 23-Jan-2016 $ 2,595,959.00 $ 1,041,481.76 $ 1,319,125.00 $ 217,610.00 $ 215,458.95 91%
2015-019 07002 - US 41 and Odessa Pressure Modification Brandes/Carollo 15-Dec-2014 3-Feb-2016 18-Mar-2016 1,539,000.00$ $ 1,271,445.67 -$ 150,000.00$ 20,849.01$ 83%
2005-062 07402 - DESAL Additional Scavenger Tank/DE Storage Building AWAA/Florida Aqua Store NA 31-Dec-2015 31-Dec-2015 928,289.90$ 189,272.46$ -$ 80,000.00$ 16,401.06$ 20%
2014-05250013 - Cypress Creek Wellfield MCCs Replacement and Arc Flash
Mitigation
Electrical Engineering
Enterprises, Inc.20-Apr-2015 3-Feb-2016 17-Feb-2016 558,664.00$ 296,062.73$ -$ 127,000.00$ -$ 53% 2-Dec-2015
2015-012 07403 - DESAL Realiability Program - Intake Pump Station Black & Veatch 15-Dec-2014 2-Dec-2015 31-Dec-2015 5,242,524.52$ 3,571,934.43$ 522,800.00$ 753,167.18$ 423,169.40$ 80%
2014-048 50028 - Facilities Site - SWTP Process Piping Repair Wharton-Smith/Arcadis 17-Aug-2015 1-Jun-2016 1-Jun-2016 278,200.00$ 55,350.00$ -$ 40,000.00$ -$ 20%
2014-052 50030 - South Central Hillsborough ARC Flash MitigationElectrical Engineering
Enterprises, Inc.17-Aug-2015 28-Oct-2016 25-Nov-2016 886,160.00$ 61,399.89$ -$ 133,000.00$ -$ 7%
2016-003 50020 - Alafia Pump Station Pumps 1, 2, and 3 Replacement Wharton-Smith, Inc. 19-Oct-2015 28-Jul-2017 31-Aug-2017 1,133,200.00$ -$ -$ 150,000.00$ -$
2014-04906318 - C.W. Bill Young Regional Reservoir Ponds Inlets/Outlets
RepairsQRC, Inc. 19-Oct-2015 7-Feb-2016 8-Mar-2016 417,100.00$ 319,586.40$ -$ 35,000.00$ -$ 77%
2014-049 09005 - Cosme Bypass Analyzer Enclosure QRC, Inc. 17-Aug-2015 15-Feb-2016 15-Mar-2016 215,500.00$ -$ -$ 20,000.00$ -$
All contracts listed above are on schedule and within budget with the following exceptions:
dd/mm/yyyy
dd/mm/yyyy
NOTE: Information provided as of March 31, 2016
Project DescriptionsContract Number
Date Status Designation
Actual Dates
2014-052 Project 50013: Substantial and Final Completion dates will be adjusted pending execution of change order.
2014-049 Project 06318: Substantial and Final Completion dates will be adjusted pending execution of change order.
2015-012 Project 07403: Substantial and Final Completion dates will be adjusted pending execution of change order.
Planned Dates
1 of 1
Project Number Project Name Schedule Financials
06316 Regional Reservoir Terrace Drains
Project Phase Start Date End Date % Complete
Professional Services Selection 03/02/2015 07/15/2015
Design 07/15/2015 02/15/2016
Bidding 02/16/2016 08/15/2016 38%
Construction 08/16/2016 08/21/2017
Close-Out 08/22/2017 12/18/2017
Baseline Budget $3,200,000
Current Budget $5,489,609
Variance Current vs. Baseline Budget 72%
Actuals to Date $299,204
Remaining Budget $5,190,404
% Budget Spent To Date 5%
06317South Central
Hillsborough Regional WF Improvements
Project Phase Start Date End Date % Complete
Planning 11/02/2015 08/18/2016
Professional Services Selection 08/19/2016 10/21/2016
Design 10/24/2016 04/14/2017 15%
Bidding 04/17/2017 08/21/2017
Construction 08/22/2017 07/04/2018
Baseline Budget $2,340,000
Current Budget $2,340,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $2,340,000
% Budget Spent To Date 0%
06318Regional Reservoir Ponds Inlets/Outlets
Repairs
Project Phase Start Date End Date % Complete
Design 04/27/2015 07/29/2015
Bidding 07/30/2015 10/19/2015 79%
Construction 10/20/2015 04/22/2016
Close-Out 04/22/2016 06/27/2016
Baseline Budget $462,100
Current Budget $462,100
Variance Current vs. Baseline Budget 0%
Actuals to Date $334,890
Remaining Budget $127,210
% Budget Spent To Date 72%
07002 North System Pressure Modifications
Project Phase Start Date End Date % Complete
Professional Services Selection 06/17/2013 10/21/2013
Design 10/29/2013 06/13/2014 92%
Bidding 06/16/2014 01/21/2015
Construction 02/09/2015 06/20/2016
Baseline Budget $2,529,994
Current Budget $1,857,081
Variance Current vs. Baseline Budget -27%
Actuals to Date $1,416,547
Remaining Budget $440,534
% Budget Spent To Date 76%
Report Generated : 04/01/2016 9:04 AM Page 1 of 13
Capital Improvements Program Board Status Report - March 2016
07005 South Pasco WTP Improvements
Project Phase Start Date End Date % Complete
Professional Services Selection 01/04/2017 03/08/2017
Design 03/09/2017 05/14/2018 0%
Bidding 05/15/2018 09/20/2018
Construction 09/21/2018 03/25/2020
Baseline Budget $379,000
Current Budget $379,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $379,000
% Budget Spent To Date 0%
07006 South Pasco Generator and Fuel Tank
Project Phase Start Date End Date % Complete
Design 08/10/2015 04/22/2016
Bidding 07/11/2016 09/12/2016 26%
Construction 12/26/2016 01/15/2018
Baseline Budget $1,240,980
Current Budget $1,241,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $33,282
Remaining Budget $1,207,718
% Budget Spent To Date 3%
07007Cypress Creek WTP
Chemical System Upgrades
Project Phase Start Date End Date % Complete
Professional Services Selection 06/01/2017 08/03/2017
Design 08/04/2017 10/10/2018 0%
Bidding 10/11/2018 02/20/2019
Construction 02/21/2019 08/19/2020
Baseline Budget $619,000
Current Budget $619,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $619,000
% Budget Spent To Date 0%
07061South Pasco Wellfield
Underground Commercial Powerline
Project Phase Start Date End Date % Complete
Planning 10/03/2016 03/13/2018
Professional Services Selection 03/14/2018 05/15/2018
Design 05/16/2018 06/10/2019 0%
Bidding 06/11/2019 12/02/2019
Construction 12/03/2019 05/11/2021
Baseline Budget $1,951,000
Current Budget $1,951,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $1,951,000
% Budget Spent To Date 0%
Report Generated : 04/01/2016 9:04 AM Page 2 of 13
Capital Improvements Program Board Status Report - March 2016
07131Cosme Water Treatment
Plant Yard Piping Improvements
Project Phase Start Date End Date % Complete
Planning 05/01/2007 08/21/2015
Design 07/23/2015 07/31/2016 82%
Bidding 08/01/2016 10/31/2016
Construction 11/01/2016 02/19/2018
Baseline Budget $922,681
Current Budget $934,681
Variance Current vs. Baseline Budget 1%
Actuals to Date $37,775
Remaining Budget $896,906
% Budget Spent To Date 4%
07152Cross Bar Ranch Wellfield - Pumps
Replacement
Project Phase Start Date End Date % Complete
Construction: Phase 1 06/01/2011 09/30/2011
Professional Services Selection: Phase 2 04/11/2011 10/17/2011
Design: Phase 2 12/19/2011 10/22/2012 95%
Bidding: Phase 2 08/17/2013 08/18/2014
Construction: Phase 2 09/04/2014 06/20/2016
Baseline Budget $3,382,315
Current Budget $3,382,315
Variance Current vs. Baseline Budget 0%
Actuals to Date $2,698,962
Remaining Budget $683,354
% Budget Spent To Date 80%
07402
Tampa Bay Seawater Desalination Reliability Program-DE Building &
Scavenger Tank
Project Phase Start Date End Date % Complete
Design 10/01/2013 06/01/2015 91%
Construction 06/01/2015 06/20/2016
Baseline Budget $1,061,955
Current Budget $1,061,955
Variance Current vs. Baseline Budget 0%
Actuals to Date $322,852
Remaining Budget $739,103
% Budget Spent To Date 30%
07403
Tampa Bay Seawater Desalination Reliability Program-Intake Pump
Station
Project Phase Start Date End Date % Complete
Professional Services Selection 06/01/2014 12/23/2014
Design 12/24/2014 05/29/2015 100%
Construction 06/01/2015 03/31/2016
Baseline Budget $7,332,190
Current Budget $7,332,190
Variance Current vs. Baseline Budget 0%
Actuals to Date $2,348,684
Remaining Budget $4,983,506
% Budget Spent To Date 32%
Report Generated : 04/01/2016 9:04 AM Page 3 of 13
Capital Improvements Program Board Status Report - March 2016
07500
Vulnerability Assessment-
Recommended Improvements
Project Phase Start Date End Date % Complete
Design 06/01/2010 12/31/2011 95%
Construction 02/01/2011 06/30/2016
Baseline Budget $2,700,000
Current Budget $2,700,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $2,220,457
Remaining Budget $479,543
% Budget Spent To Date 82%
07535 Cypress Creek Console Area Upgrades
Project Phase Start Date End Date % Complete
Professional Services Selection 12/01/2014 07/01/2015
Design 07/01/2015 12/16/2015 48%
Bidding 12/16/2015 06/20/2016
Construction 06/21/2016 08/21/2017
Baseline Budget $452,000
Current Budget $452,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $47,860
Remaining Budget $404,140
% Budget Spent To Date 11%
07536 HSPS Console Area Upgrades
Project Phase Start Date End Date % Complete
Professional Services Selection 12/01/2014 07/01/2015
Design 07/01/2015 12/16/2015 48%
Bidding 12/16/2015 06/20/2016
Construction 06/21/2016 08/21/2017
Baseline Budget $396,000
Current Budget $396,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $47,860
Remaining Budget $348,140
% Budget Spent To Date 12%
07537 CYC WTP Post Node Analyzer Building
Project Phase Start Date End Date % Complete
Professional Services Selection 10/03/2016 11/18/2016
Design 11/21/2016 07/17/2017 0%
Bidding 07/18/2017 09/11/2017
Construction 09/12/2017 05/03/2018
Baseline Budget $215,000
Current Budget $215,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $215,000
% Budget Spent To Date 0%
Report Generated : 04/01/2016 9:04 AM Page 4 of 13
Capital Improvements Program Board Status Report - March 2016
07538 Cypress Creek WTP Yard Pipe
Project Phase Start Date End Date % Complete
Professional Services Selection 10/29/2014 02/23/2015
Design 02/23/2015 10/30/2015
Bidding 10/30/2015 05/02/2016 53%
Construction 05/02/2016 04/03/2017
Close-Out 04/03/2017 06/19/2017
Baseline Budget $2,174,175
Current Budget $2,174,175
Variance Current vs. Baseline Budget 0%
Actuals to Date $149,501
Remaining Budget $2,024,674
% Budget Spent To Date 7%
07539 HSPS Switchgear Modifications
Project Phase Start Date End Date % Complete
Planning 01/06/2015 06/24/2015
Design: Phase 1 10/01/2015 05/12/2016
Construction: Phase 1 07/11/2016 12/12/2017
Professional Services Selection: Phase 2 08/24/2015 02/12/2016 42%
Design: Phase 2 05/27/2016 10/21/2016
Bidding: Phase 2 01/09/2017 03/17/2017
Construction: Phase 2 05/01/2017 10/27/2017
Baseline Budget $2,955,000
Current Budget $2,955,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $2,955,000
% Budget Spent To Date 0%
09005 Cosme Bypass Analyzer Enclosure
Project Phase Start Date End Date % Complete
Design 12/17/2013 05/05/2015
Bidding 06/15/2015 09/24/2015 96%
Construction 09/24/2015 04/29/2016
Baseline Budget $307,229
Current Budget $307,229
Variance Current vs. Baseline Budget 0%
Actuals to Date $58,440
Remaining Budget $248,789
% Budget Spent To Date 19%
09007 Long-Term Master Water Plan
Project Phase Start Date End Date % Complete
Planning: Phase 1 08/06/2014 09/30/2018 37%
Planning: Phase 2 10/01/2018 12/31/2018
Baseline Budget $3,580,000
Current Budget $3,580,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $346,163
Remaining Budget $3,233,837
% Budget Spent To Date 10%
Report Generated : 04/01/2016 9:04 AM Page 5 of 13
Capital Improvements Program Board Status Report - March 2016
09103 Starkey Hydrologic Restoration
Project Phase Start Date End Date % Complete
Design 01/29/2013 08/22/2016
Bidding 08/22/2016 12/16/2016 70%
Construction 12/16/2016 07/26/2017
Baseline Budget $464,599
Current Budget $468,599
Variance Current vs. Baseline Budget 1%
Actuals to Date $85,542
Remaining Budget $383,057
% Budget Spent To Date 18%
09104Cypress Creek Wellfield
Surface Water Improvements
Project Phase Start Date End Date % Complete
Professional Services Selection 03/01/2013 06/15/2013
Design 06/16/2014 12/01/2014 100%
Bidding 12/02/2014 02/26/2015
Construction 02/27/2015 02/15/2016
Baseline Budget $496,168
Current Budget $496,168
Variance Current vs. Baseline Budget 0%
Actuals to Date $455,200
Remaining Budget $40,968
% Budget Spent To Date 92%
09106 Lake Dan Augmentation
Project Phase Start Date End Date % Complete
Planning 01/02/2013 08/01/2013
Design 06/01/2017 10/08/2017 52%
Bidding 10/08/2017 02/20/2018
Construction 02/20/2018 02/28/2019
Baseline Budget $347,665
Current Budget $347,665
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $347,665
% Budget Spent To Date 0%
11004Cypress Creek Crossing Wellfield Collection Main
Replacement
Project Phase Start Date End Date % Complete
Planning 05/01/2014 09/30/2014
Professional Services Selection 05/09/2016 09/15/2016
Design 09/16/2016 09/13/2017 41%
Bidding 09/14/2017 12/01/2017
Construction 12/04/2017 12/19/2018
Baseline Budget $2,129,000
Current Budget $2,129,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $317,347
Remaining Budget $1,811,653
% Budget Spent To Date 15%
Report Generated : 04/01/2016 9:04 AM Page 6 of 13
Capital Improvements Program Board Status Report - March 2016
11006South Pasco
Transmission Main Condition Assessment
Project Phase Start Date End Date % Complete
Planning: Phase 1 10/01/2014 09/30/2015
Planning: Phase 2 10/01/2015 09/30/2016 50%
Planning: Phase 3 10/03/2016 09/29/2017
Baseline Budget $1,547,871
Current Budget $1,547,871
Variance Current vs. Baseline Budget 0%
Actuals to Date $591,611
Remaining Budget $956,260
% Budget Spent To Date 38%
50010 HSPS Improvements Pumps 1-5
Project Phase Start Date End Date % Complete
Construction 03/21/2013 02/29/2016 100%
Baseline Budget $774,000
Current Budget $774,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $665,346
Remaining Budget $108,654
% Budget Spent To Date 86%
50012 Morris Bridge WF Pumps & Motors Replacement
Project Phase Start Date End Date % Complete
Design 06/01/2016 11/28/2016
Bidding 11/29/2016 04/27/2017 0%
Construction 05/10/2017 12/12/2018
Current Budget
Variance Current vs. Baseline Budget
Actuals to Date
Remaining Budget
% Budget Spent To Date
50013
Cypress Creek Wellfield Motor Control Center Replacement and Arc
Flash Mitigation
Project Phase Start Date End Date % Complete
Design 11/14/2014 12/30/2014
Bidding 01/30/2015 05/21/2015 82%
Construction 05/22/2015 07/18/2016
Baseline Budget $665,664
Current Budget $665,664
Variance Current vs. Baseline Budget 0%
Actuals to Date $349,051
Remaining Budget $316,613
% Budget Spent To Date 52%
Report Generated : 04/01/2016 9:04 AM Page 7 of 13
Capital Improvements Program Board Status Report - March 2016
50016Eldridge-Wilde WF Pumps & Motors
Replacement
Project Phase Start Date End Date % Complete
Professional Services Selection 01/04/2016 06/21/2016
Design 06/22/2016 11/20/2017 6%
Bidding 11/21/2017 05/14/2018
Construction 05/15/2018 10/15/2019
Baseline Budget $14,963,000
Current Budget $14,963,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $14,963,000
% Budget Spent To Date 0%
50017 Structures 160, 161, and 162 Actuator Upgrades
Project Phase Start Date End Date % Complete
Planning 10/06/2011 12/28/2011
Design 01/31/2013 08/30/2013 94%
Bidding 09/02/2013 11/29/2013
Construction 12/02/2013 06/30/2016
Baseline Budget $443,000
Current Budget $443,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $236,479
Remaining Budget $206,521
% Budget Spent To Date 53%
50018 South Pasco WF Pumps and Motors Replacement
Project Phase Start Date End Date % Complete
Design 11/01/2016 04/28/2017
Bidding 05/01/2017 09/29/2017 0%
Construction 10/02/2017 10/31/2018
Baseline Budget $903,000
Current Budget $903,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $903,000
% Budget Spent To Date 0%
50020 Alafia River Pump Station Pumps 1,2, 3
Project Phase Start Date End Date % Complete
Professional Services Selection 08/01/2014 09/04/2014
Design 09/05/2014 07/03/2015 51%
Bidding 07/03/2015 10/19/2015
Construction 11/02/2015 10/16/2017
Baseline Budget $1,761,000
Current Budget $1,761,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $113,594
Remaining Budget $1,647,406
% Budget Spent To Date 6%
Report Generated : 04/01/2016 9:04 AM Page 8 of 13
Capital Improvements Program Board Status Report - March 2016
50021 Morris Bridge WF Improvements
Project Phase Start Date End Date % Complete
Planning 04/01/2014 09/30/2015
Professional Services Selection 10/15/2015 11/20/2015
Design 11/13/2015 10/28/2016 48%
Bidding 12/12/2016 03/10/2017
Construction 05/22/2017 05/25/2018
Baseline Budget $1,590,000
Current Budget $1,590,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $83,152
Remaining Budget $1,506,849
% Budget Spent To Date 5%
50022Morris Bridge Booster Station Pumps 1 and 2
Replacement
Project Phase Start Date End Date % Complete
Professional Services Selection 01/02/2017 03/06/2017
Design 03/07/2017 08/23/2017 0%
Bidding 08/24/2017 01/03/2018
Construction 01/04/2018 10/16/2018
Baseline Budget $985,000
Current Budget $985,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $985,000
% Budget Spent To Date 0%
50023
Starkey WF Motor Control Centers
Replacement and Arc Flash Mitigation
Project Phase Start Date End Date % Complete
Planning 08/01/2014 10/24/2014
Design 05/20/2016 12/09/2016 48%
Bidding 01/09/2017 03/10/2017
Construction 05/08/2017 01/19/2018
Baseline Budget $1,518,000
Current Budget $1,518,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $5,287
Remaining Budget $1,512,713
% Budget Spent To Date 0%
50028Facilities Site-SWTP Process Water Piping
Repairs
Project Phase Start Date End Date % Complete
Design 01/31/2014 01/13/2015
Bidding 01/14/2015 08/17/2015 79%
Construction 08/18/2015 10/17/2016
Baseline Budget $416,200
Current Budget $416,200
Variance Current vs. Baseline Budget 0%
Actuals to Date $108,180
Remaining Budget $308,020
% Budget Spent To Date 26%
Report Generated : 04/01/2016 9:04 AM Page 9 of 13
Capital Improvements Program Board Status Report - March 2016
50029BUD Well Fields Arc Flash Mitigation and VFDs Replacement
Project Phase Start Date End Date % Complete
Planning 08/01/2014 06/22/2015
Design 06/23/2015 02/05/2016 70%
Bidding 02/15/2016 05/13/2016
Construction 07/11/2016 12/09/2016
Baseline Budget $698,000
Current Budget $698,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $5,971
Remaining Budget $692,029
% Budget Spent To Date 1%
50030South Central
Hillsborough WF Arc Flash Mitigation
Project Phase Start Date End Date % Complete
Planning 08/01/2014 09/05/2014
Design 09/05/2014 05/07/2015 71%
Bidding 06/19/2015 07/07/2015
Construction 09/22/2015 11/25/2016
Baseline Budget $988,160
Current Budget $988,160
Variance Current vs. Baseline Budget 0%
Actuals to Date $80,304
Remaining Budget $907,856
% Budget Spent To Date 8%
50031 Cypress Bridge WF Arc Flash Mitigation
Project Phase Start Date End Date % Complete
Planning 08/01/2014 06/17/2016
Design 08/19/2016 11/04/2016 47%
Bidding 12/19/2016 01/20/2017
Construction 03/13/2017 02/16/2018
Baseline Budget $1,488,000
Current Budget $1,488,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $5,287
Remaining Budget $1,482,713
% Budget Spent To Date 0%
50033 Mobile Generators
Project Phase Start Date End Date % Complete
Design 01/09/2017 05/26/2017
Bidding 06/12/2017 08/25/2017 0%
Construction 11/13/2017 06/22/2018
Baseline Budget $963,000
Current Budget $963,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $963,000
% Budget Spent To Date 0%
Report Generated : 04/01/2016 9:04 AM Page 10 of 13
Capital Improvements Program Board Status Report - March 2016
50034Medium Voltage Variable
Frequency Drive Upgrades - Alafia PS
Project Phase Start Date End Date % Complete
Design 06/26/2015 07/20/2015
Bidding 07/22/2015 10/20/2015 74%
Construction 12/21/2015 07/08/2016
Baseline Budget $336,662
Current Budget $336,662
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $336,662
% Budget Spent To Date 0%
50035Medium Voltage Variable
Frequency Drive Upgrade - CCPS
Project Phase Start Date End Date % Complete
Design: Phase 1 06/29/2015 07/20/2015
Bidding: Phase 1 07/20/2015 10/19/2015
Construction: Phase 1 12/21/2015 05/20/2016
Professional Services Selection: Phase 2 09/21/2015 10/19/2015 48%
Design: Phase 2 12/14/2015 04/22/2016
Bidding: Phase 2 05/23/2016 06/30/2016
Construction: Phase 2 08/29/2016 01/20/2017
Baseline Budget $839,448
Current Budget $839,448
Variance Current vs. Baseline Budget 0%
Actuals to Date $2,352
Remaining Budget $837,096
% Budget Spent To Date 0%
50036
Medium Voltage Variable Frequency Drive
Upgrade - Repump Station
Project Phase Start Date End Date % Complete
Design 05/20/2016 08/12/2016
Bidding 08/22/2016 09/16/2016 0%
Construction 11/07/2016 05/19/2017
Baseline Budget $765,612
Current Budget $765,612
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $765,612
% Budget Spent To Date 0%
50037 Cypress Creek WTP Stationary Generators
Project Phase Start Date End Date % Complete
Design 06/01/2017 10/10/2017
Bidding 10/11/2017 01/24/2018 0%
Construction 01/25/2018 09/04/2018
Baseline Budget $442,000
Current Budget $442,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $442,000
% Budget Spent To Date 0%
Report Generated : 04/01/2016 9:04 AM Page 11 of 13
Capital Improvements Program Board Status Report - March 2016
50038Regional Reservoir Toe Drain Outfall Monitoring
Points
Project Phase Start Date End Date % Complete
Professional Services Selection 02/16/2015 07/01/2015
Design 07/01/2015 02/15/2016 45%
Bidding 02/16/2016 08/15/2016
Construction 08/16/2016 08/15/2017
Baseline Budget $829,000
Current Budget $829,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $99,102
Remaining Budget $729,898
% Budget Spent To Date 12%
50039 TBC Air Burst System Improvements
Project Phase Start Date End Date % Complete
Professional Services Selection 10/02/2015 12/15/2015
Design 12/16/2015 08/16/2016 27%
Bidding 08/17/2016 11/09/2016
Construction 11/10/2016 07/27/2017
Baseline Budget $382,000
Current Budget $382,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $17,110
Remaining Budget $364,890
% Budget Spent To Date 4%
50040 Eldridge Wilde WF Underground Powerline
Project Phase Start Date End Date % Complete
Professional Services Selection 09/14/2015 08/15/2016
Design 08/16/2016 01/15/2018 10%
Bidding 01/16/2018 08/20/2018
Construction 08/21/2018 02/15/2021
Baseline Budget $4,827,000
Current Budget $4,827,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $4,827,000
% Budget Spent To Date 0%
50041NW Hillsborough WF Motor Control Centers
and Arc Flash Mitigation
Project Phase Start Date End Date % Complete
Design 04/05/2016 06/07/2016
Bidding 06/08/2016 08/10/2016 0%
Construction 08/11/2016 03/15/2017
Baseline Budget $489,000
Current Budget $489,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $0
Remaining Budget $489,000
% Budget Spent To Date 0%
Report Generated : 04/01/2016 9:04 AM Page 12 of 13
Capital Improvements Program Board Status Report - March 2016
50050Renewal and
Replacement Program As-needed Activities
Project Phase Start Date End Date % Complete
Construction 10/01/2015 09/30/2021 8%
Baseline Budget $600,000
Current Budget $600,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $45,340
Remaining Budget $554,660
% Budget Spent To Date 8%
52001Cypress Creek Pump Station Pumps Repair
Program
Project Phase Start Date End Date % Complete
Construction 06/02/2014 07/11/2018 44%
Baseline Budget $674,924
Current Budget $674,924
Variance Current vs. Baseline Budget 0%
Actuals to Date $223,652
Remaining Budget $451,272
% Budget Spent To Date 33%
91102High Service Pump
Station Auxiliary Power Generator No. 2 Failure
Project Phase Start Date End Date % Complete
Bidding 07/24/2015 08/17/2015 100%
Construction 07/24/2015 12/31/2015
Baseline Budget $530,000
Current Budget $530,000
Variance Current vs. Baseline Budget 0%
Actuals to Date $435,392
Remaining Budget $94,608
% Budget Spent To Date 82%
91103 Morris Bridge Point of Connection Pipe Failure
Project Phase Start Date End Date % Complete
Design 08/19/2015 09/01/2015
Bidding 09/02/2015 09/22/2015 100%
Construction 09/23/2015 02/15/2016
Baseline Budget $319,016
Current Budget $319,016
Variance Current vs. Baseline Budget 0%
Actuals to Date $263,635
Remaining Budget $55,381
% Budget Spent To Date 83%
Report Generated : 04/01/2016 9:04 AM Page 13 of 13
Capital Improvements Program Board Status Report - March 2016
1
ATTACHMENT
AGENDA ITEM _N/A__ Pending Real Estate Transaction Report For: April 2016
Starting Date
County/ City
Facility/ Project Name
Tampa Bay Water
Parcel No.
Description of Action and Other Parties Existing Agency Property Interest
Proposed Agency Action
1/12/15 Pinellas Mid-Pinellas Brackish Water Project
2601.01.01-.04
The property is currently listed with Coldwell Banker for $525,000.
Fee List property for sale with
realtor
12/6/13 Hills. Eastshore Commerce Park-Reg. WSTP-HSPS
1201.01 Other Parties: Trademark Nitrogen Corporation; Rob Wallace. The purchase and sale agreement was approved by the Board in January. The deposit has been received. Trademark is currently preforming due diligence. The survey of the property has been completed for Trademark and a copy furnished to Tampa Bay Water. Trademark has been granted a 90 extension for the PSA. The first amendment to the PSA was approved at the August, 2015 Board. A Second Amendment to the PSA, for an additional 90 days, approved by the Board at the December, 2015 meeting. Trademark has decided to close on the parcel by the end of March, 2016.
Fee Sell fee to adjacent
landowner
2/17/14 Hills. Eldridge-Wilde WF-Lake Dan\ELAPP
018.01 Other Parties: Hillsborough County; Florida Communities Trust. The final draft for terms of the agreement with Hillsborough County has been received and accepted by staff. Hillsborough County is preparing the exhibits to be a part of the final agreement document. Tampa Bay Water staff has completed the exhibits for the documents and is awaiting draft documents from the county.
Assignment of 1953
Agreement
Permanent easement
and agreement with Hills.
Co.
7/22/14 Hills. C.W. Bill Young Regional Reservoir Chito North & East Parcels
1301.103 Contracted by Myke Morris with SWFWMD about Tampa Bay Water releasing the permanent easement on the two parcels. The parcels are currently for sale. Final agreement between Tampa Bay Water and SWFWMD has been signed by both parties. Two of the three conditions required by the agreement have been completed. FDEP stated that a permit modification would not be required. Hillsborough County EPC agreed to release the entire property from the Mitigation Agreement. A signed document has been received from EPC. An offer of $485,000 for the East parcel has been received by the District and will be considered by the Governing Board the end of April. The third condition of the agreement, a partial release of Tampa Bay Water’s easement is being reviewed by District staff.
Easement & 28% land
value
Release of easement in exchange for 28% share
of land sales.
11/6/14 Pinellas Eldridge Wilde WF- Tri County Trail
N/A Pinellas County and FDOT: The final alignment for the trail eliminates any direct impact to the 1 acre well site parcels. Pepper Contracting was low bidder for the design/build. A design conference was held Oct. 14 at FDOT headquarters for all utilities. 60% plans have received and mark ups sent back to the design firm for FDOT. The 90% plans were reviewed by staff and comments and mark ups were returned to the FDOT utility coordinator,
Fee Temp. Const. Access
Agreement
2
OMNI Comm. on 1-25-16. Notice to proceed has been issued to the trail contractor and fencing has been installed and clearing for the Trail will begin the end of April, 2016. Tampa Bay Water’s utility relocations will be funded by the County and are underway at the north end of the well field.
1/2014 Hills. South Central Hills.
301.60 Highview
The property was declared surplus by the Board at the Feb., 2014 meeting. Neighboring property owners have not expressed an interest in purchasing the property. The property is currently listed with a local realtor for sale. The property is currently listed with Coldwell Banker for $7,500. An offer of $5,000 has been made and accepted by the GM.
Fee Deed for parcel
2/5/15 Hills Fishhawk Ranch-West
1301.12P Other Parties: Fishhawk CDD IV. The developer will be requesting a MUA for a portion of the Tampa Bay Water easement to Hillsborough County for an emergency access and road rights of way cross TBW easement. The proposed landscaping will be approved by the terms of the easement document. No further action is required at this time.
Perm. Pipeline
Easement
Mutual Use Agreement
10/28/15 Hills Desalination Transmission Main
01101.012P A developer has requested Tampa Bay Water subordinate a portion of its desalination transmission main easement to a future county right of way. The developer has installed a new water line over the Tampa Bay Water line. An item regarding this project was approved by the Board its December meeting. A letter was sent to Hillsborough County December 2015 stating that after the plat was recorded an MUA with the county would be executed upon request.
Easement Conditioned subordination to protect Tampa Bay Water’s pre- existing interests.
Report submitted by: Raymond T. Brigham PLS/PSM Senior Professional Land Surveyor/ Real Estate Coordinator
SURVEY REPORT FOR BOARD AGENDA For
March 2016
Facility/ProjectName Purpose Action Status Parcel No. Category Action Date Requested On
REGNL HIGH SERVICE PUMP STN
Stake for fence In Process N/A Stakeout 08/17/2015 07/21/2015
Survey 3 wells at Cone Ranch In Process N/A Monitoring Site Locate 01/27/2016 11/16/2015
CYPRESS CREEK WELLFIELD
Cypress Creek Jeep Trail J-1 Staking Completed N/A Stakeout 03/16/2016 01/06/2016
REGIONAL RESERVOIR Survey New Staff Gauge Replacement Completed N/A Monitoring Site Locate 03/09/2016 01/13/2016
CYPRESS CREEK WELLFIELD
CYPRESS CREEK HEADWALL EROSION Completed N/A Specific Purpose Survey 03/02/2016 01/21/2016
REGIONAL RESERVOIR Survey Two Staff Gauges Completed N/A Monitoring Site Locate 03/16/2016 02/04/2016
COSME WELLFIELD Depression in Gunn Highway Completed N/A Specific Purpose Survey 03/16/2016 02/11/2016
Clearwater Storm water Structure Accepted N/A Specific Purpose Survey 02/22/2016 02/22/2016
CYPRESS CREEK WELLFIELD
Survey Center Well Completed N/A Monitoring Site Locate 03/02/2016 02/25/2016
STARKEY/N.PASCO WELLFIELD
Survey Staff Gauge at Starkey Completed N/A Monitoring Site Locate 03/09/2016 03/02/2016
STARKEY/N.PASCO WELLFIELD
Survey New Edge Gauge at Starkey Completed N/A Monitoring Site Locate 03/09/2016 03/02/2016
SECTION 21 WELLFIELD Survey new staff gauge at S21 Completed N/A Monitoring Site Locate 03/15/2016 03/02/2016
TAMPA/HILLS INTERCONNECT
Utility Conflict Completed N/A Infrastructure Locate 03/11/2016 03/04/2016
ELDRIDGE WILDE WELLFIELD
Eldridge Wilde Wellfield - Tri County Trail Accepted N/A Locate GPS Position 03/14/2016 03/11/2016
Printed On 3/23/2016
Facility/ProjectName Purpose Action Status Parcel No. Category Action Date Requested On
CYPRESS CREEK WELLFIELD
Cypress Creek Headwall Project Additional Information Request
Accepted N/A Specific Purpose Survey 03/14/2016 03/14/2016
EAGLES WELLS Survey two monitor wells at Eagles in NWH Accepted N/A Monitoring Site Locate 03/15/2016 03/15/2016
NW HILLSBOROUGH WELLFIELD
Survey Monitor Well in NWH Accepted N/A Monitoring Site Locate 03/15/2016 03/15/2016
SECTION 21 WELLFIELD Survey 2 lake staff gauges at Section 21 Accepted N/A Monitoring Site Locate 03/16/2016 03/15/2016
LAKE BR WATER TRMT PLANT
Lake Bridge - Pond Re-grading Check In Process N/A Topographical Survey 03/16/2016 03/16/2016
CROSSBAR WELLFIELD Monsees Pond Survey SID 206 - CBR-Monsees_P Accepted N/A Monitoring Site Locate 03/16/2016 03/16/2016
CROSSBAR WELLFIELD CBR Pond 8 AUG CG2 Accepted N/A Monitoring Site Locate 03/16/2016 03/16/2016
NW HILLSBOROUGH WELLFIELD
Survey 5 wells in the NWH wellfield Accepted N/A Monitoring Site Locate 03/23/2016 03/21/2016