    Aggreko Gas Power

    An Introduction

  • 8/13/2019 Agrekkogaspower Af

    2/33

    1. Overview of Aggreko

    2. Advantages of Power Rental

    3. Aggreko Gas Power

    4. Case Studies

    Contents

  • 8/13/2019 Agrekkogaspower Af

    3/33

    The Brand

    aggregaten+

    koopman

    = AGGREKO

  • 8/13/2019 Agrekkogaspower Af

    4/33

    Introduction to Aggreko

    The world leader in temporary power generation andtemperature control services

    The world’s largest fleet of containerized generator sets

    Nearly 50 years global experience in the power rental business

    Strategically located international service centres

    Strong network of over 144 locations in 34 countries

    6,000 highly skilled and experienced personnel

    Aggreko plc is headquartered in Scotland, listed on the LondonStock Exchange and is a member of the FTSE-100 index

  • 8/13/2019 Agrekkogaspower Af

    5/33

    Brief history of Aggreko

    • 1962 - Aggreko founded in the Netherlands

    • 1973 - UK business established in Scotland

    • 1986 - Entry into North America

    • 1989 - Entry into Asia Pacific Region

    • 1991 – Entry into the Middle East

    • 1997 - De-merger from Christian Salvesen

    • 1999 - Established Aggreko International Power

    Projects (AIPP) in Dubai to execute multi

    megawatt power projects around the world.

  • 8/13/2019 Agrekkogaspower Af

    6/33

  • 8/13/2019 Agrekkogaspower Af

    7/33

    2008

    Beijing Olympics

    40MW Khulna, Bangladesh

    First utility project in Argentina

    2009

    Entry into IndiaSouth Africa depot opened in Midrand

    Additional 140 MW in Kenya, 290 MW in total

    Entry into the FTSE 100

    Confederations Cup, South Africa

    2010Winter Olympics, Vancouver

    70 MVA for Football World Cup in South Africa

    Winner of Fast-Track Power Award, Africa

    70 MW gas project in Cote d’Ivoire

    200 MW project in Bangladesh

    Aggreko International

  • 8/13/2019 Agrekkogaspower Af

    8/33

    Aggreko in Africa

    • Over 15 years experiencedelivering interim powerprojects in Africa

    • Over 1,300 MW installedcapacity in operation today

    • Over 80% of the Aggrekoteam are locally employed

    Africans

    • Commitment to SocialResponsibility and givingback to the communitieswe work in

  • 8/13/2019 Agrekkogaspower Af

    9/33

    Aggreko South Africa• R120m investment in South Africa• Depots in Midrand, Durban, PE and Cape Town with further expansion planned• 40MVA of fleet country in country

    BEE Partner • Shanduka, a trusted and reputable partner

    • Successfully delivered the FIFA World Cup project

    Training• Over 32,848 hours of training completed in Africa to date

    Genuine Market Leader • Market leader in delivering fast-track power

    solutions in Africa

    Aggreko in Africa

  • 8/13/2019 Agrekkogaspower Af

    10/33

    Advantages ofPower Rental

  • 8/13/2019 Agrekkogaspower Af

    11/33

    Advantages of Aggreko temporary power services

    • No Capital ExpenditureImproved cash flow pay as you use

    • Rapid availability

    Can be mobilized, installed and operational in weeks ratherthan months

    Minimal site preparation / civil works required

    • Guaranteed power supplyISO9001;2008 accredited facility in the UK

    Redundancy built into solutions

    Risk free solution with performance guarantees,early termination penalties etc.

    • Total turn-key solutionFull responsibility for design, mobilisation,commissioning, operation and maintenance

    Package includes transformers, switchgear etc.

  • 8/13/2019 Agrekkogaspower Af

    12/33

    Advantages of Aggreko temporary power services

    • Flexible packages, tailored to individual situationsPower supply can be tailored to the requirements of eachlocation

    - Capacity, voltage or redundancy cover

    • Flexible contractsUp or downscale power as required

    Short, medium term, extendible…

    • QHSE Aggreko ‘Safety For Life’, H&S is a core value

    QHSE audits is a business KPI, reportedat Board level

    • Experience and support49 years experience, with team of engineering andtechnical specialists

    24/7 on-site service and support

  • 8/13/2019 Agrekkogaspower Af

    13/33

    The Aggreko 6-Pack

    • Modular system

    • Up or downscale power

    • Flexible footprint

    • Rapid deployment

    • Minimal civil works, nofoundations

    • Proximity of plant locationto connection point

  • 8/13/2019 Agrekkogaspower Af

    14/33

    Aggreko Gas Power

  • 8/13/2019 Agrekkogaspower Af

    15/33

    Aggreko Gas Generator – Mk1 (2004)

  • 8/13/2019 Agrekkogaspower Af

    16/33

    Aggreko Gas Generator – Mk2 (2008)

    Mark 2 Overview

    • Gas Ancillary Module

    • Revised LT Cooling Configuration

    • Gempac Controls

    • Reduced Noise Levels

    • Reduced Installation Time

    • Service Accessibility

    • Product Improvements

  • 8/13/2019 Agrekkogaspower Af

    17/33

    50 Hz 1500rpm operating at Max temperature 35 oC, altitude 750m asl

    Continuous net electrical output @ 400V 1130kW

    Efficiency (net) 36.1%Heat rate 9972 KJ/kWh

    Exhaust emissions NOx 489 mg/m 3CO 676 mg/m 3Particulates 0

    Estimated noise level 80 dBA @ 7 metres

    Generator Performance

  • 8/13/2019 Agrekkogaspower Af

    18/33

    Completed Gas Power Projects

  • 8/13/2019 Agrekkogaspower Af

    19/33

  • 8/13/2019 Agrekkogaspower Af

    20/33

    Fleet Growth – GasPower

    0

    50

    100

    150

    200

    250

    300

    350

    400

    2005 2006 2007 2008 2009 2010

    Fleet

    Ave. on Hire

  • 8/13/2019 Agrekkogaspower Af

    21/33

    Synchronized or Island Mode• Rental power can be synchronized to run in parallel or in Island mode

    Supplement existing utility supplyMaintain operations independently of grid power

    Baseload Power • Aggreko power can provide continuous 24/7 baseload power

    Fixed monthly payments for uninterrupted baseload power, inclusive of alloperation, maintenance and servicing

    Peak-Shaving Power • Aggreko power can help ‘shave’ the peak tariff periods, hours or months

    Cost effective and reliable power supplyFlexible power to suit your requirements

    Operating Modes

  • 8/13/2019 Agrekkogaspower Af

    22/33

    Self-Generation• Rental power for your plant’s operations to guarantee continuous

    production

    Third Party Agreements• Aggreko power can be sold-on to third parties linked to a local sub-station

    and network

    Critical Power• SCADA technology enables Aggreko power to provide ‘spinning reserve’ for

    the critical parts of your process plant

    Excess Power

    • Provision of additional power for plant expansions prior to utility supply

    Potential Applications

  • 8/13/2019 Agrekkogaspower Af

    23/33

    Risk Mitigation• Reduce reliability on utility and risk of load-shedding

    Cost Effective• Aggreko provide cost effective power reliability, especially when compared

    to the cost of lost production• The IRP2010 estimates the Cost Of Unserved Energy (COUE) at R75/kWh• Performance guarantees offered by Aggreko

    Financed By Aggreko• No CAPEX required• Volatile economic period• Rental power is a risk free option

    Benefits in Uncertain Times

  • 8/13/2019 Agrekkogaspower Af

    24/33

  • 8/13/2019 Agrekkogaspower Af

    25/33

    70 MW gas power supplied to state utility in Ivory Coast to

    provide additional capacity

  • 8/13/2019 Agrekkogaspower Af

    26/33

    10 MW gas power for a cement plant to supplementutility power, Sococim

  • 8/13/2019 Agrekkogaspower Af

    27/33

    2 MW supplied to provide alternative power during maintenance offacility’s permanent power plant, Holland

  • 8/13/2019 Agrekkogaspower Af

    28/33

    40 MW gas powered turn-key project to support the utility grid due

    to droughts, Tanzania

  • 8/13/2019 Agrekkogaspower Af

    29/33

    1.1 MW of gas power prior to utility grid connection so earlyproduction could commence, CB&I Cabinda

  • 8/13/2019 Agrekkogaspower Af

    30/33

    1.3MW gas power to provide alternative power during periods of load

    shedding from the local utility, Mexico

  • 8/13/2019 Agrekkogaspower Af

    31/33

    9MW, downsized to 4MW as projects were completed, to support the

    construction of the London Olympic Village

  • 8/13/2019 Agrekkogaspower Af

    32/33

    “We are greatly satisfied withthe product & servicesreceived from your company.

    I also to commend your team for their greateffort to provide uninterrupted power during

    peak production times and utility outages.”V, Kulkarno, General Manager, Bosch

    “The projects, which were procured underinternational competitive bidding, met therequisite contractual performance.” Kaburu Mwirichia, Director General, Energy

    Regulatory Commission, Kenya

    Customer Testimonials“This is to acknowledge the excellent &successful business relationship with Aggreko...The services provided from Aggreko have beenof good quality and delivered on time.”

    Moustafa Hendy, Project Director, Lafarge Cement Syria

    “Aggreko has diligently worked with TANESCO to ensure that both Phase 1 and 2 Gas PowerProjects were operational ahead of the commitment made. This demonstrates the company’sflexibility and ability to respond rapidly to the client’s need.” Mr. Idris Rashidi, Managing Director, TANESCO

    “The quality and standard of OHS practices in Shanduka / Aggreko is some of the best that I have yet encountered. I was also impressed with the effort that the team applied incomplying with local legislation and meeting specific site requirements” DB Finaughty, Director OHS Management, FIFA Confederations Cup

  • 8/13/2019 Agrekkogaspower Af

    33/33

    Aggreko International

    Thank you