Upload
learningjapanese
View
220
Download
0
Embed Size (px)
Citation preview
8/13/2019 Agrekkogaspower Af
1/33
Aggreko Gas Power
An Introduction
8/13/2019 Agrekkogaspower Af
2/33
1. Overview of Aggreko
2. Advantages of Power Rental
3. Aggreko Gas Power
4. Case Studies
Contents
8/13/2019 Agrekkogaspower Af
3/33
The Brand
aggregaten+
koopman
= AGGREKO
8/13/2019 Agrekkogaspower Af
4/33
Introduction to Aggreko
The world leader in temporary power generation andtemperature control services
The world’s largest fleet of containerized generator sets
Nearly 50 years global experience in the power rental business
Strategically located international service centres
Strong network of over 144 locations in 34 countries
6,000 highly skilled and experienced personnel
Aggreko plc is headquartered in Scotland, listed on the LondonStock Exchange and is a member of the FTSE-100 index
8/13/2019 Agrekkogaspower Af
5/33
Brief history of Aggreko
• 1962 - Aggreko founded in the Netherlands
• 1973 - UK business established in Scotland
• 1986 - Entry into North America
• 1989 - Entry into Asia Pacific Region
• 1991 – Entry into the Middle East
• 1997 - De-merger from Christian Salvesen
• 1999 - Established Aggreko International Power
Projects (AIPP) in Dubai to execute multi
megawatt power projects around the world.
8/13/2019 Agrekkogaspower Af
6/33
8/13/2019 Agrekkogaspower Af
7/33
2008
Beijing Olympics
40MW Khulna, Bangladesh
First utility project in Argentina
2009
Entry into IndiaSouth Africa depot opened in Midrand
Additional 140 MW in Kenya, 290 MW in total
Entry into the FTSE 100
Confederations Cup, South Africa
2010Winter Olympics, Vancouver
70 MVA for Football World Cup in South Africa
Winner of Fast-Track Power Award, Africa
70 MW gas project in Cote d’Ivoire
200 MW project in Bangladesh
Aggreko International
8/13/2019 Agrekkogaspower Af
8/33
Aggreko in Africa
• Over 15 years experiencedelivering interim powerprojects in Africa
• Over 1,300 MW installedcapacity in operation today
• Over 80% of the Aggrekoteam are locally employed
Africans
• Commitment to SocialResponsibility and givingback to the communitieswe work in
8/13/2019 Agrekkogaspower Af
9/33
Aggreko South Africa• R120m investment in South Africa• Depots in Midrand, Durban, PE and Cape Town with further expansion planned• 40MVA of fleet country in country
BEE Partner • Shanduka, a trusted and reputable partner
• Successfully delivered the FIFA World Cup project
Training• Over 32,848 hours of training completed in Africa to date
Genuine Market Leader • Market leader in delivering fast-track power
solutions in Africa
Aggreko in Africa
8/13/2019 Agrekkogaspower Af
10/33
Advantages ofPower Rental
8/13/2019 Agrekkogaspower Af
11/33
Advantages of Aggreko temporary power services
• No Capital ExpenditureImproved cash flow pay as you use
• Rapid availability
Can be mobilized, installed and operational in weeks ratherthan months
Minimal site preparation / civil works required
• Guaranteed power supplyISO9001;2008 accredited facility in the UK
Redundancy built into solutions
Risk free solution with performance guarantees,early termination penalties etc.
• Total turn-key solutionFull responsibility for design, mobilisation,commissioning, operation and maintenance
Package includes transformers, switchgear etc.
8/13/2019 Agrekkogaspower Af
12/33
Advantages of Aggreko temporary power services
• Flexible packages, tailored to individual situationsPower supply can be tailored to the requirements of eachlocation
- Capacity, voltage or redundancy cover
• Flexible contractsUp or downscale power as required
Short, medium term, extendible…
• QHSE Aggreko ‘Safety For Life’, H&S is a core value
QHSE audits is a business KPI, reportedat Board level
• Experience and support49 years experience, with team of engineering andtechnical specialists
24/7 on-site service and support
8/13/2019 Agrekkogaspower Af
13/33
The Aggreko 6-Pack
• Modular system
• Up or downscale power
• Flexible footprint
• Rapid deployment
• Minimal civil works, nofoundations
• Proximity of plant locationto connection point
8/13/2019 Agrekkogaspower Af
14/33
Aggreko Gas Power
8/13/2019 Agrekkogaspower Af
15/33
Aggreko Gas Generator – Mk1 (2004)
8/13/2019 Agrekkogaspower Af
16/33
Aggreko Gas Generator – Mk2 (2008)
Mark 2 Overview
• Gas Ancillary Module
• Revised LT Cooling Configuration
• Gempac Controls
• Reduced Noise Levels
• Reduced Installation Time
• Service Accessibility
• Product Improvements
8/13/2019 Agrekkogaspower Af
17/33
50 Hz 1500rpm operating at Max temperature 35 oC, altitude 750m asl
Continuous net electrical output @ 400V 1130kW
Efficiency (net) 36.1%Heat rate 9972 KJ/kWh
Exhaust emissions NOx 489 mg/m 3CO 676 mg/m 3Particulates 0
Estimated noise level 80 dBA @ 7 metres
Generator Performance
8/13/2019 Agrekkogaspower Af
18/33
Completed Gas Power Projects
8/13/2019 Agrekkogaspower Af
19/33
8/13/2019 Agrekkogaspower Af
20/33
Fleet Growth – GasPower
0
50
100
150
200
250
300
350
400
2005 2006 2007 2008 2009 2010
Fleet
Ave. on Hire
8/13/2019 Agrekkogaspower Af
21/33
Synchronized or Island Mode• Rental power can be synchronized to run in parallel or in Island mode
Supplement existing utility supplyMaintain operations independently of grid power
Baseload Power • Aggreko power can provide continuous 24/7 baseload power
Fixed monthly payments for uninterrupted baseload power, inclusive of alloperation, maintenance and servicing
Peak-Shaving Power • Aggreko power can help ‘shave’ the peak tariff periods, hours or months
Cost effective and reliable power supplyFlexible power to suit your requirements
Operating Modes
8/13/2019 Agrekkogaspower Af
22/33
Self-Generation• Rental power for your plant’s operations to guarantee continuous
production
Third Party Agreements• Aggreko power can be sold-on to third parties linked to a local sub-station
and network
Critical Power• SCADA technology enables Aggreko power to provide ‘spinning reserve’ for
the critical parts of your process plant
Excess Power
• Provision of additional power for plant expansions prior to utility supply
Potential Applications
8/13/2019 Agrekkogaspower Af
23/33
Risk Mitigation• Reduce reliability on utility and risk of load-shedding
Cost Effective• Aggreko provide cost effective power reliability, especially when compared
to the cost of lost production• The IRP2010 estimates the Cost Of Unserved Energy (COUE) at R75/kWh• Performance guarantees offered by Aggreko
Financed By Aggreko• No CAPEX required• Volatile economic period• Rental power is a risk free option
Benefits in Uncertain Times
8/13/2019 Agrekkogaspower Af
24/33
8/13/2019 Agrekkogaspower Af
25/33
70 MW gas power supplied to state utility in Ivory Coast to
provide additional capacity
8/13/2019 Agrekkogaspower Af
26/33
10 MW gas power for a cement plant to supplementutility power, Sococim
8/13/2019 Agrekkogaspower Af
27/33
2 MW supplied to provide alternative power during maintenance offacility’s permanent power plant, Holland
8/13/2019 Agrekkogaspower Af
28/33
40 MW gas powered turn-key project to support the utility grid due
to droughts, Tanzania
8/13/2019 Agrekkogaspower Af
29/33
1.1 MW of gas power prior to utility grid connection so earlyproduction could commence, CB&I Cabinda
8/13/2019 Agrekkogaspower Af
30/33
1.3MW gas power to provide alternative power during periods of load
shedding from the local utility, Mexico
8/13/2019 Agrekkogaspower Af
31/33
9MW, downsized to 4MW as projects were completed, to support the
construction of the London Olympic Village
8/13/2019 Agrekkogaspower Af
32/33
“We are greatly satisfied withthe product & servicesreceived from your company.
I also to commend your team for their greateffort to provide uninterrupted power during
peak production times and utility outages.”V, Kulkarno, General Manager, Bosch
“The projects, which were procured underinternational competitive bidding, met therequisite contractual performance.” Kaburu Mwirichia, Director General, Energy
Regulatory Commission, Kenya
Customer Testimonials“This is to acknowledge the excellent &successful business relationship with Aggreko...The services provided from Aggreko have beenof good quality and delivered on time.”
Moustafa Hendy, Project Director, Lafarge Cement Syria
“Aggreko has diligently worked with TANESCO to ensure that both Phase 1 and 2 Gas PowerProjects were operational ahead of the commitment made. This demonstrates the company’sflexibility and ability to respond rapidly to the client’s need.” Mr. Idris Rashidi, Managing Director, TANESCO
“The quality and standard of OHS practices in Shanduka / Aggreko is some of the best that I have yet encountered. I was also impressed with the effort that the team applied incomplying with local legislation and meeting specific site requirements” DB Finaughty, Director OHS Management, FIFA Confederations Cup
8/13/2019 Agrekkogaspower Af
33/33
Aggreko International
Thank you
Any questions?