AGS Data for BIMUsing AGS Data to assist with the delivery of geotechnical data into the BIM Process
Simon Miles
Principal Geotechnical Engineer
&
Jérôme Chamfray
BIM Manger
Atkins Ground Engineering
Introduction
2
● What is BIM?
● Why is BIM Important?
● AGS data in a BIM environment
What is BIM?
3
● Management of information through the project lifecycle.
● An activity not an object
● Not just about 3D CAD or technology
● Will require a change in practice, processes and behaviours.
Why is BIM Important?
4
www.bimtaskgroup.org
● Government& Industry
● ATKINS UK
Why is BIM Important?
5
Current civils BIM model
6
Autocad
Civil 3D
WinDES
REVIT
NAVISWORKS
Third
Party Info
MS
ProjectREVIT
AGS data in a BIM environment
7
Silvertown Tunnel:
By kind permission of Transport for London
8
Silvertown Tunnel:
By kind permission of Transport for London
9
How could we use AGS data in a BIM
environment?
10
Questions?