Upload
ahmed-sayed
View
92
Download
0
Embed Size (px)
Citation preview
Ahmed Sayed Mahmoud AbdelkaderMechanical engineer
Address: 9 6 October St., Elnoza – El Hawamdia – Giza - Egypt.
Email: [email protected] [email protected] [email protected]
Telephone: 00201115779812 - 0096590957203
Personal Information:
Birth Date: 01/02/1981 – Giza, Egypt Nationality: Egyptian
Military service: Attempted
Religion: Moslem
Marital Status: Married & have two children
Graduation: Education: B.SC. In Mechanical Engineering , El- Minia University, Egypt
(Mechanical Production and design Department) May 2003
Project: Effect of thermo mechanical treatment on Steel alloys.
Project grade: Excellent
Training courses: El Kuriemat Power Station steam turbine and auxiliaries (2 x 650 Mw) for one month in the site. Shoubra El Kheima Power Plant basics and site specifications training courses, constituting a
program of concentrated study of power plant equipment and systems theory and application for six months by Bechtel Company
Advanced courses in operating, maintenance and the automatic control of the gas turbines GE (Frame 9001EA - 110 Mw - Mark IV).
Advanced courses in mechanical maintenance of combined cycle (Frame 9001EA - Mark IV, DCIS).
Gas turbine generator operation program (Frame 9001FA - 250 Mw) controlled by Mark VI.
EHS& Safety training.
General electric company for six weeks in El Kuriemat III combined cycle power Station in the site
Previous Experience: 13 YEARS EXPERIENCES
From September 2011 up to Now
Position: Mechanical engineer
Company: GE power and water, SABIYA CCGT 2200 MW combined cycle power plant Project at Kuwait state, the plant content six (6) gas turbines GE frame 9FA, Six(6) HRSG by HHI, Three(3) GE STG GE D11, Six(6) Atlas copco fuel gas compressors, and all plant BOP equipment.
Review all design drawings and engineering documents for all plant Systems and General arrangement drawing & explanation of P&ID.
Enhance the flow of all the required technical documents of the project for procurement, construction, commissioning, operation and maintenance and quality smoothly and efficiently through project execution and O&M stage.
Review all received material, equipment & erection tools and release material request according erection manual and drawings.
Follow up all mechanical construction activates with subcontractors during construction stage. Commissioning, start up and operation of plant &BOP equipment. GTs, HSRGs, STGs &BOP troubleshooting and startup and shutdown procedures. Follow up spare parts of GTs, HSRGs, STGs, &BOP during Planed maintenance according
operation &maintenance manual.
From November 2009 up to August 2011.
Position: Senior mechanical engineer. Company: El kharafinational, Shuaiba CCPP 950 MW combined cycle power plant and water production project at Kuwait state.
Review all design drawings and engineering documents for all System description and General arrangement drawing & explanation of P&ID.
Follow up all mechanical constriction activates. Main feature of gas turbine, HRSG, steam turbine and all BOP. Commissioning, start up and operation of power side. GTs, HSRGs, STGs &BOP troubleshooting and startup and shutdown procedures.
From Jan 2009 to October 2009
Position: Technical support engineer
Company: MTTE Company in king Saudi university (KSU) at KSA the project content Four (4) Gas Turbines model GE frame 5001.
The project management program covered the following topics: All System of GT description and explanation of P&ID. Commissioning & start up and operation of power side of plant. Main feature of gas turbine auxiliaries. GT troubleshooting startup and shutdown procedures.
From December 2007 to December 2008
Position: Site Mechanical & startup engineer
Company: MTTE company Sub contracting of Arabian BEMCO contracting company at Saudi electric company SEC KSA in Al Riyadh - power station PP9 (32 x 75 Mw) model 7001 EA gas turbine controlled by Mark VI.
The project management program covered the following topics:
GT plant arrangement. System description explanation of P&ID. Commissioning, start up and operation. Spin operation & maintenance. Main feature of gas turbine auxiliaries. Turbine generator auxiliary systems. GT troubleshooting startup and shutdown procedures.
From December 2006 to November 2007
Position: Mechanical construction engineer
Company: Upper Egypt electricity Production Company - El Kuriemat II, Two (2 x 250) Mw – model Siemens V94.3
Review all design drawing and engineering documents for all System description and General arrangement drawing.
Follow up all mechanical constriction activates System description explanation of P&ID. Main feature of gas turbine auxiliary’s erection.
From May 2006 to November 2006
Position: Mechanical start up and commissioning engineer
Company: Cairo electricity Production Company – Cairo north combined cycle power station II (2 x 250 Mw - model 9001 FA gas turbine control by Mark VI and 1 x 250 Mw - steam turbine).
System description explanation of P&ID. Spin operation& commissioning. Fuel change over procedure. Main feature of gas turbine auxiliaries. GT inspection... GT troubleshooting startup and shutdown procedures.
From Dec 2003 to April 2006
Position: Shift Engineer.
Company: Cairo electricity Production Company – Cairo south power station, the plant content Four (4) gas turbine GE frame 9EA simple cycle.
Main feature of gas turbine auxiliaries. Turbine generator auxiliary systems description. GT operation and auxiliaries. GT troubleshooting startup and shutdown procedures.
Computer Skills:
Microsoft Office, Word & Excel.Internet applications
Languages:
Arabic: Native Language
English: Very good
Personal Skills:
Manage a teamwork group. Ability to work in groups. Work under Pressure. Self-Motivated. Good communications with people. Good leading skills. Good Research Abilities in new topics.