GALIOM
Risk Based I nspection & Asset I ntegrity Management
What is Risk Based Insp ect ion
Risk Based Inspection (RBI) is a method for using Risk as a basis for
prioritizing and managing the efforts of an inspection program.
Why Use Risk Based Insp ect ion
In Operating Facilities, a relatively large percentage of the risk is
associated with only a small percentage of the equipment.
RBI focuses inspection & maintenance resources on the Higher Riskitems and an appropriate reduced effort on Lower Risk items.
What Benefi t in Using RBI
The benefit of an RBI program is to maximize Facility operating run
lengths whilst improving, or at least maintaining, the same level of risk.
What is the Purpose of RBI
Estimate a risk value associated with the operation of each item in a
Process Facility based on a consistent methodology
Prioritize items based on the measured risk.
Design an appropriate inspection program.
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 3/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
G ALI O M Risk Based Inspect ion Methodolo gy
Register Company
Register Location
Register Facility
Register Functional Groups
Register Equipment
Register Features
Record Mechanical Design Data
Record Process Design Data
Determine Failure Mode
Record Failure Mechanism
Determine Theoretical
Deterioration Rate
Determine Remaining Life
Utilize Actual
Deterioration Rate
Determine Consequence
of Failure
Determine Probability of Failure
Determine Risk
Determine Next
Inspection Date
Determine
DeteriorationMonitoring
Locations
Determine Inspection
EffectivenessReference Codes
API 580/581
API 571
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 4/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
What is Asset Integr i ty
Asset Integr i ty is def ined as fol low s:
An asset has integr i ty when i t performs as
specif ied and is being Operated, Inspected and
Maintained as specif ied so that the Risk to People,
Environm ent, Assets and Company Reputat ion
aris ing from i ts fai lure is As Low As Reasonably
Pract icable .
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 5/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
Asset Management
Preventative Maintenance (PM)
Work Scope Preparation
Work Execution
Inspection Report/Memo
Identify Anomaly
Corrective Maintenance (CM)
Asset Data Dictionary RBI - Risk Ranking
Asset Integrity
Status
Follow up actionStatus
Data Analysis
Overdue Status
Highlight Risk
GAL IOM Asset Integr i ty
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 6/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
As set Integr i ty Management Methodo log y
ASRM
(Asset Status Reporting
For Management)
APPLICATION SECURITY
INSPECTION HISTORY DATA
1) Ultrasonic Thickness Data
2) Radiography Data
3) Routine Pigging Data
4) Corrosion Inhibitor Monitoring
5) Cathodic Protection Monitoring
6) Teletest Data
7) SRV Service Records (Condition)
8) ROV Survey Data
9) Pulse Eddy Current
10) General Visual Examinations
TANKS RBI
PIPE RBI
VESSEL RBI
PSV RBI
PIPELINE RBI
TECHNICAL DATA
DESIGN DATA
PROCESS DATA
CMMS MRP SCADA/PI
PROCESS CHANGE
MANAGEMENT
ASSET
REGISTER
Proactive
Action
Required
Alert
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 7/21
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 8/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
G AL I O M Risk Repo rt ing – Risk Matr ix
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 9/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
ASSET INTEGRITY STATUS – Prevent ive Maintenance Overdue
Company Asset Hierarchy screen is color coded to
Highlight Preventative Maintenance Overdue
Immediate Attention - Overdue
Action By Date – within 30 Days
No Action Required
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 10/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
Company Asset Hierarchy screen is color coded to
Highlight Corrective Maintenance Overdue
ASSET INTEGRITY STATUS – Correct ive Maintenance Overdue
Immediate Attention - Overdue
Action By Date – within 30 Days
No Action Required
GA O
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 11/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
Development of GALIOM commenced in June 2004
Initial scope was for Piping, Vessel and Pressure Safety Valves
Initial Development schedule, 1 year to June 2005
Version 0.6 completed in March 2005
Version 1.0 completed in April
First project usage – GUPCO, Egypt in May 2005
Second project usage – PEMEX, Mexico in June 2005 Development & Implementation Team – Mathews Varkey and
Gareth Thomas
G ALI O M – Developm ent History
GALIOM
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 12/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
GLO AIM Group is currently involved in 3 major projects.
GUPCO/BP, Egypt – Currently Facilities include 9 Complexes and
approximately 100 Satellite Platforms. Latest information is that
Lloyds Register will be leaving the Rehabilitation Project by mid
October, 2005 resulting in GLO Egypt receiving another 1
Complex, all remaining Risers and all Onshore facilities.
PEMEX, Mexico – Currently Facilities, Reynosa and Matapionche.
Client comment during meeting September 26, 2005 “Want to
make GALIOM a Best practice within PEMEX”. To this end PEMEX
Gas is considering giving GLO Mexico total of 15 facilities
including facilities already assessed by COMIMSA. Murphy Oil, Malaysia – Three Platforms and interconnecting
Pipelines. Project start October 1, 2005 till December 2005.
G ALI O M – Project Implementat ion Histo ry
GALIOM
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 13/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
No application module development has been carried outsince May 2005
A Pipeline module is required for the Murphy Project inMalaysia. Needs to be completed prior to Mid November
A Structural module needs to be completed for GUPCO, Egyptat the earliest opportunity
A Boiler module needs to be completed for potential work inMalaysia
Remaining required modules are:
Risk Based Maintenance for Rotating Equipment Risk Based Maintenance Module for Electrical and Instrumentation
Storage Tanks
ALARP/MOC/CBA
Development Status
GALIOM
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 14/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
Lack of Personnel – 3 major projects in progress, only 2 staff
to implement, train, monitor and demonstrate application.
Lack of Experience of Assigned Personnel –
GUPCO has Qualified, Certified and Experienced personnel,
mostly Contract PEMEX project is attempting to perform the work with local staff
that is neither trained in RBI or experienced in Facility
Operations, Maintenance or Inspection. This will in the near future
lead to problems with the client
Murphy Oil project will be monitored by the AIM Group in Kuala
Lumpur. Competency of personnel being upgraded with API
Certification, due in December, and the employment of an
experience Operating Plant Inspector from Shell Malaysia Port
Dixon Refinery
Current Problems
GALIOM
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 15/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
A minimum of 5 programmers are required immediately (3
Powerbuilder and 2, .net). Advertisement and Interviews
conducted for these positions. Out of approximately 20
candidates only one considered acceptable.
Corrosion Engineer – To be based in KL. Will work ondeveloping the Failure Mode logics and reference data
Pipeline Engineer – To be based in KL. Will work on
developing the Pipeline RBI/AIM Module
Rotating Equipment Engineer – To be based in KL. Will workon developing the Risk Based Maintenance module for
Rotating Equipment
Immediate GLO A IM Staff ing Requirements
GALIOM
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 16/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
Two servers are required by the GLO AIM Group in KualaLumpur. One a Database server for back up copies of the installed
applications and for the development Databases.
The Second being a Web Server for the development of the .netapplication and remote access
Total Cost estimated RM 20,000
Laptop computers for the Pipeline Engineer, CorrosionEngineer and the Rotating Equipment Engineer.
Total Cost estimated RM 25,000
Oracle database software for application development as
required by clients.Total Cost estimated RM Unknown at present
Other software application to view drawings, compile reportsand assist with logic preparation and Manual writing.
Total Cost estimated RM 25,000
GLO AIM Hardw are and Software Requirements
GALIOM
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 17/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
Programming
Because of the difficulty of obtaining experienced Powerbuilder
and .Net programmers within Malaysia, it is proposed to contract
out parts of the programming to a “Software Development
Company”. For cost and communications reasons it is
considered that India would be preferred area. Mathews Varkey toreview and shortlist potential developers and write proposal.
Deadline December 2005
Module Development
There exists a possibility of forming a partnership with a
Specialist NDE Company that has an API reviewed Tank module.Same Company also has specialist resources for Structural RBI
as Well. Currently using their Certified personnel on the GUPCO
Project
GLO AIM Staff ing Op tion s
GALIOM
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 18/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
Key Focal Point Staff ing
Plant Inspectors
Reliability Engineers
Corrosion Engineers (Not Full Time)
IT/Data Coordinator Specialist
GALIOM
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 19/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management Reliability Engineer
QUALIFICATIONS & EXPERIENCE
B.Sc. in Materials & Corrosion or Mechanical Engineering or an equivalent degree or experience will beconsidered.
Comprehensive knowledge of On-Stream and Off Stream Inspection techniques, specifications and codes
of practice for the inspection of in service oil and gas related equipment.
Comprehensive knowledge of corrosion and maintenance repair techniques of Oil and Gas related
equipment.
Familiar with API 580 and API 581 Risk Based Inspection Recommended Practices.
Knowledge and Experience in the application of API 579 Recommended Practice for Fitness For Service.
At least 5 years experiences in the Oil and Gas industry with at least 2 years experience in an InspectionEngineering role.
Ability to explain Risk Based Inspection and Asset Integrity Management principles is required.
RESPONSIBILITIES
To provide Reliability Engineering support to the Asset Integrity Management Team.
To analyze Inspection data to determine Remaining Life and recommend Inspection and Maintenance
requirements.
To participate in the development of Risk-Based Inspection and Maintenance methodologies.To develop methodologies that assist in the Technical Integrity of Oil and Gas Facilities
Stays current with emerging technologies and Non Destructive Testing-related activities in the Oil and Gas
Industries such as NACE, API, etc.
Compiling and updating Best Practice procedures for analysis of Inspection Anomalies including a
thorough Design review to determine system design parameters and justification for repair.
Carry out "Fitness For Service" analysis of anomalies and make recommendations regarding Repair, Re-
Rate and Replacement Strategies.
GALIOM
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 20/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management Corrosion/Metallurgical Engineer
QUALIFICATIONS & EXPERIENCE
Bachelor of Science Degree in Metallurgical Engineering or Materials Engineering, Mechanical or Chemical Engineering with Metallurgy/Materials emphasis.
Minimum of four years experience in the Oil and Gas Industrial sector.
Self-motivated and strong interpersonal and communication skills required.
Ability to explain materials and corrosion and corrosion control concepts.
Ability to work in a team environment
RESPONSIBILITIES
To provide Metallurgical, Materials and Corrosion Engineering support to the Asset Integrity
Management Team.
To provide Corrosion and Metallurgical expertise in identifying potential Failure Modes and Failure
Mechanisms for the Up-Stream, Mid-Stream and Down-Stream Oil and Gas business sectors.
To participate in the development of Risk-Based Inspection and Maintenance methodologies.
To review Chemical Injection and Cathodic Protection Systems as they relate to Asset Integrity.
Stays current with emerging technologies and materials-related activities in the Oil and Gas Industries
such as NACE, API, etc.
Applies knowledge of engineering principles and practices in broad areas of assignments and relatedfields.
OTHER REQUIREMENTS
Knowledge of Process Safety Management, Plant Operations and Risk experience is desirable.
Knowledge of Computer applications generally used within the Oil and Gas Industry for Corrosion
Monitoring, Risk Based Inspection and Asset Integrity Management.
A “Hands-on” Engineer who has applied him/herself to Oil and Gas Industry Corrosion and Metallurgical
problems is desirable.
GALIOM
7/28/2019 Aim -Methodologies Presentation at Glo - October 2005
http://slidepdf.com/reader/full/aim-methodologies-presentation-at-glo-october-2005 21/21
GALIOM
Risk Based I nspection & Asset I ntegrity Management
Plant Inspector
API 510 &/or API 570 Certification (API 653 as Required)
or
CSWIP Level 1 (preferably Level 2/3)
&
5 years experience In-Service & Shutdown Inspections of
Pressure Equipment
Proposed Progression
Reliability Engineer
As Plant Inspector with:
API 581, Risk Based Inspection 3 or 5 Day CourseAPI 579, Fitness for Purpose Course
2 years experience in an Inspection Engineering role
GALIOM Training – 1 month application familiarization