AIP-2 Kickoff Workshop
Energy SBA Session Report
Ellsworth LeDrew, University of Waterloo, Canada
Thierry Ranchin, Mines ParisTech, France
GEOSS AIP-2 Kickoff
25-26 September 2008
Scenario objectives
• Support the SBA Energy by developing services providing irradiance data among other parameters
• Simulating the case of the sitting of a solar power plant.
?
What we have in hands
Meteorological data
• Access through WSDL to databases:– Monthly means of solar irradiance
– Min, max and mean values of air temperature at 2 m
– Min, max and mean values of relative humidity at 2 m
– HelioClim 3 time series of irradiance (year 2005)
– Forecast of meteo data at surface for 3 days to 3 hours
– SOLEMI time series irradiance data
– NASA–SSE–HelioClim 1 times series of daily irradiance
• Other types of access
– Real time information meteorological data
• Providers: Mines ParisTech, NCAR, DLR, NASA, Rutherford Appleton Lab
Geographical Information
• Hydrological information for US from NOAA
• Worldwide Geographical information from USGS
Tools
• PV assessments through PVGIS Server (JRC)
• Stochastical generation of test datasets for modelling of PV system (MeteoTest)
• PV Production calculator (MeteoTest)
• Computation of renewable energy parameters (NASA)
What are the missing datasets ?
• Inventory is needed for having a worldwide coverage. Use of GEO Portals and Registry but also other portals (hydrological network, grids, local demand, roads, environmental and biodiversity information, risks and hazards maps, …)
• Help from the Data and Products team
In the Workflow domain, what do we need?
Workflow
• Help form the Workflow Team
• Enterprise modeling that will lead to the workflow design
• Information and Computational Technology views for linking to GEOSS
• Recommendations for the setting of the service
• Help on technical bottlenecks
AIP-2 Master Schedule
• Within the coming month:– Planned meeting between Workflow Team,
INCOSE and the Team
• For Nov 2008:– Key design decisions– Refined agenda for setting up the service