20
Air-cooled Generator Battery Charger Installation Guidelines

Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

Air-cooled GeneratorBattery Charger

Installation Guidelines

Page 2: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

Table of Contents ................................Inside Front CoverSection 1 — General Information ............................... IFC1.1 Introduction.......................................................... IFC1.2 Battery Charger Compatibility ................................. 1 1.2.1 Determination of Generator/Transfer

Switch Model Type ........................................ 1

Section 2 — Load Shed Transfer SwitchInstallation ....................................................2

2.1 Load Shed Transfer Switch (RTSS) Installation ...... 2 2.1.1 Wiring and Connections at the

Transfer Switch ............................................. 2 2.1.2 Wiring and Connections at the Generator ...... 2 2.1.3 Operational Testing ....................................... 2

Section 3 — Standard or Service Entrance Transfer Switch Installation ......................................3

3.1 Standard Transfer Switch (RTSN) or (RTSE) Service Entrance Rated Transfer Switch Installation ........... 3

3.1.1 Wiring and Connections at theTransfer Switch ............................................. 3

3.1.2 Charger Mounting.......................................... 4 3.1.3 Wiring and Connections at the Generator ...... 5 3.1.4 Operational Testing ....................................... 6

Section 4 – GenReady Installation .................................6 4.1.1 Wiring and Connections at the

Transfer Switch ............................................. 6 4.1.2 Charger Mounting.......................................... 7 4.1.3 Wiring and Connections at the Generator ...... 7 4.1.4 Operational Testing ....................................... 8

Section 5 – Interconnection Diagrams ..........................9Section 6 – Notes .............................................................16

1.1 INTRODUCTIONThis battery charger supplies a trickle charging cur-rent and voltage to maintain the charge on the gen-erator starting battery inside the generator enclosure. The charger will not replenish a fully discharged bat-tery. It is intended to be connected to a 120VAC gen-erator backed-up circuit only. If it is not connected to a generator backed-up circuit the battery could go “dead” while the generator is running for extended periods of time.

Figure 1.1 — Charger as Supplied Indicating Input and Output Wiring

DC OutputAC Input

This battery charger must be properly installed and wired for correct operation of all 2008 model line Air-cooled Standby Generators. Failure to do so will result in a dead battery condition at the generator.

NOTE:This installation guide should be used in conjunc-tion with the “Installation and Owner’s Manual” that is furnished with the Air-cooled Standby Generator and the Installation and appropriate transfer switch manual. Please review all manuals prior to installation of the generator and transfer switch. This battery charger is not required with the Liquid-cooled Generator product line. This battery charger is not required for Air-cooled Standby Generators prior to the 2008 model line. This unit is not compatible with other generator manufacturer’s products.

Table of Contents

For authorized service, reference

the dealer locator number found

in the generator owner’s manual

or on the generator.

Page 3: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

1

These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger required for the air-cooled generator only. It does not replace or supersede any information contained in any of the written documents shipped with the unit. This booklet should only be used in conjunction with the Owner’s Manual, Installation Guide and other technical documents shipped with the unit.

Future product updates and/or modifications will be reflected in the written documentation included with the equipment. Always read all accompanying docu-mentation carefully before attempting to install any generator, transfer switch or related equipment.

NOTE:It is essential to comply with all regulations estab-lished by the Occupational Safety and Health Administration (OSHA) and strict adherence to all local, state and national codes is mandatory.

This device should be installed with all local electrical codes and/or the latest edition of the National Electrical Code. All wiring must be the correct size and type, and must conform to local codes, standards, and regulations.

1.2 BATTERY CHARGER COMPATIBILITY

This battery charger is compatible, and required with all 2008 model line Air-cooled Standby Generators. For all generators that were supplied with a transfer switch/load center, the charger is already installed in the transfer switch enclosure and this charger is not needed. For all generators that were NOT supplied with a transfer switch/load center, the charger is NOT already installed and MUST be installed according to these guidelines.

1.2.1 DETERMINATION OF GENERATOR/ TRANSFER SWITCH MODEL TYPE

The Battery charger included with this manual only needs to be used with certain transfer switch configu-rations. Some transfer switch configurations already have the battery charger installed in the transfer switch. Before proceeding it is necessary to select the transfer switch used from the following table.

Section 1 — General InformationBattery Charger Installation Guidelines

Switch Type Switch Description Notes Proceed to Section

RTSD Pre-wire with 8 circuit load center

Battery charger is included and pre-wired with the transfer switch. Discard this charger. No further installation is required

Stop Here

RTSFST100R10C

Pre-wire with 10 circuit load center

Battery charger is included and pre-wired with the transfer switch. Discard this charger. No further installation is required

Stop Here

RTSH Pre-wire with 12 circuit load center

Battery charger is included and pre-wired with the transfer switch. Discard this charger. No further installation is required

Stop Here

RTSPST100R14C

Pre-wire with 14 circuit load center

Battery charger is included and pre-wired with the transfer switch. Discard this charger. No further installation is required

Stop Here

RTSWST100R16C

KGATX0216100

Pre-wire with 16 circuit load center

Battery charger is included and pre-wired with the transfer switch. Discard this charger. No further installation is required

Stop Here

RTSSKGALT0101200

SR200RDPM

Power Manager LTS - Load Shed with 16 circuit load center

Battery charger is included with the transfer switch. Proceed with connections. 2

RTSNSRXXXRKGATX

Standard The included battery charger must be installed and connected 3

RTSESRXXXRD

KGATDService Entrance Rated The included battery charger must be installed

and connected 3

005448-0005449-0

KGATD0101RSPGenReady The included battery charger must be installed

and connected 4

NOTE: Switch Type is the first four (4) digits of the model number and can be found on the data label inside the switch.

Page 4: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

2

2.1 LOAD SHED TRANSFER SWITCH (RTSS) INSTALLATION

2.1.1 WIRING AND CONNECTIONS AT THE TRANSFER SWITCH

Connect the 15B, 0, and 23 low voltage control wires to the load shed controller connector J5 per the wir-ing diagram. Wires should be sized according to the following table.

CHARGER DC OUTPUT (TRANSFER SWITCH TO GENERATOR) WIRE SIZE CHART

Maximum Wire Run Length

Recommended Wire Size (stranded copper)

35 feet (10.67m) No. 16 AWG.

60 feet (18.29m) No. 14 AWG.

90 feet (27.43m) No. 12 AWG.

NOTE:

The charger is already mounted in the transfer switch (Figure 2.1).

NOTE:

See RTSS Installation/Wiring Diagram in the "Interconnection Diagrams" section for connec-tions.

Figure 2.1 — Wiring Connections at the Transfer Switch

Connections

Charger

2.1.2 WIRING AND CONNECTIONS AT THE GENERATOR

1. Crimp spade lugs onto all three low voltage wires, 15B, 0, and 23 (Purchased or supplied separate-ly).

2. Connect the low voltage wires, 15B, 0, and 23 to the terminal strip on the controller (Figure 2.2).

Figure 2.2 — Connection of Charger DC Output Wires in Generator Control Panel

2.1.3 OPERATIONAL TESTING 1. If already connected, disconnect the battery in

the generator. Remove the negative cable first fol-lowed by the positive cable. Take care not to short the cables together.

2. Ensure power is applied to the battery charger input.

3. Connect a volt meter across the battery leads. The voltage reading should be between 12.8 VDC and 13.8 VDC (Figure 2.3).

Figure 2.3 — Measurement of Charger Output with Battery Disconnected

Section 2 — Load Shed Transfer Switch InstallationBattery Charger Installation Guidelines

Page 5: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

3

4. If the voltage is within range installation of the battery charger is complete. If the voltage is not within range verify all wiring and sizing and retest.

5. Re-connect the battery cables. Positive cable first followed by the negative cable.

3.1 STANDARD TRANSFER SWITCH (RTSN) OR (RTSE) SERVICE ENTRANCE RATED TRANSFER SWITCH INSTALLATION

3.1.1 WIRING AND CONNECTIONS AT THE TRANSFER SWITCH

Choose the appropriate option.

NOTE:

See the appropriate RTSN or RTSE Installation/Wiring Diagram in the "Interconnection Diagrams" section for connections.

Option 1 — Protected Load Provided in Load Center

1. Install a 15A breaker in the load center (Purchased or supplied separately). The breaker must be on a generator backed-up circuit or the battery in the generator will not maintain its charge during extended run periods.

2. Run the 120VAC hot wire and neutral wires to the generator.

NOTE:

See the appropriate RTSN or RTSE Installation/Wiring Diagram in the "Interconnection Diagrams" section for connections.

Option 2 — Protected Load Provided in the RTS, Fuse Block Installation

NOTE:

This section is only appropriate for 2008 RTSN or RTSE transfer switches.

1. Mount the optional 5amp 600V fuse and holder in the transfer switch. (Purchased or supplied separately). Pre-2008 transfer switches will not have holes pre-drilled for the fuse holder. In this case, it is necessary to drill holes in the enclosure to mount the fuse holder (see Figures 3.1 and 3.4).

2. Connect one side of the fuse to terminal (T1) of the transfer switch using a spade lug. Pre-2008 transfer switches will not have the spade lug attached to terminal T1. The spade terminal is available separately if required (see Figures 3.2 and 3.4).

3. Run the other side of the fuse holder (120VAC Hot) along with the neutral from the neutral lug to the generator (see Figures 3.1 and 3.5).

NOTE:

See the appropriate RTSN or RTSE Installation/Wiring Diagram for connections.

Figure 3.1 — RTSN Fuse Block Installation and Neutral Connection

Figure 3.2 — RTSN Fuse Block Installation T1 Connection

Section 3 — Standard or Service Entrance Transfer Switch InstallationBattery Charger Installation Guidelines

Page 6: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

4

Section 3 — Standard or Service Entrance Transfer Switch InstallationBattery Charger Installation Guidelines

Figure 3.3 — RTSN Fuse Block Installation When Completed

Figure 3.4 — RTSE Fuse Block Installation T1 Connection

Figure 3.5 — RTSE Neutral Connection

Figure 3.6 — RTSE Fuse Block Installation When Completed

3.1.2 CHARGER MOUNTING 1. Remove the cover over the controller in the gen-

erator2. The battery charger can be located anywhere

within the controls area on the generator. It is convenient to mount the charger on the verti-cal surface on right-hand side of the controller (Figure 3.7).

3. Clean the surface where the charger is to be mounted prior to mounting with a damp cloth and wait for the area to dry.

4. Remove the adhesive covering on the backside of the charger and firmly press the charger into place as shown. Once mounted the charger may be removed for inspection by separating the hook & loop mounting (Figure 3.8).

Page 7: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

5

Figure 3.7 — Mounting Location of Charger in Generator

Charger Mounting

Figure 3.8 — Removal of Adhesive Covering on Hook and Loop for Mounting

3.1.3 WIRING AND CONNECTIONS AT THE GENERATOR

1. Identify the DC output wires on the battery char-ger and crimp spade lugs onto both the positive and negative lead (purchased or supplied sepa-rately) (see Figure 1.1).

2. Attach the positive and negative battery charger leads to the terminal strip in the controller. The positive lead is either a red wire or is marked with a (+) or (15B) designation. The negative lead is black and/or marked with a (-) or (0) designation. The positive lead attaches to the terminal labeled “15B”. Note that there will be two wires attached to the “15B” terminal when the full installation is completed. One for the battery charger and one for the common connection to the transfer switch. The negative lead attaches to the terminal labeled “0” (Figure 3.9).

Figure 3.9 — Connection of Charger DC Output Wires in Generator Control Panel

3. Using wire nuts attach the 120VAC input wires from the battery charger to the generator backed-up 120VAC circuit from the transfer switch (Figure 3.10).

Figure 3.10 — Connection of Charger AC Input Wires in Generator Control Panel

4. Dress all wires neatly (Figure 3.11).

Figure 3.11 — Completed Charger Connections on Generator Control Panel

Section 3 — Standard or Service Entrance Transfer Switch InstallationBattery Charger Installation Guidelines

Page 8: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

6

NOTE:

See the appropriate RTSN or RTSE Installation/Wiring Diagram in the "Interconnection Diagrams" section for connections.

3.1.4 OPERATIONAL TESTING 1. If already connected, disconnect the battery in

the generator. Remove the negative cable first fol-lowed by the positive cable. Take care not to short the cables together.

2. Ensure power is applied to the battery charger input.

3. Connect a volt meter across the battery leads. The voltage reading should be between 12.8VDC and 13.8VDC (Figure 3.12).

4. If the voltage is within range installation of the battery charger is complete. If the voltage is not within range verify all wiring and sizing and retest.

5. Re-connect the battery cables. Positive cable first followed by the negative cable.

Figure 3.12 — Measurement of Charger Output with Battery Disconnected

4.1 GENREADY INSTALLATIONNOTE:

See the GenReady Installation/Wiring Diagram in the "Interconnection Diagrams" section for con-nections.

4.1.1 WIRING AND CONNECTIONS AT THE TRANSFER SWITCH

1. Install a 15A breaker in the bottom portion of the load center (Purchased or supplied separately). The breaker must be on a generator backed-up circuit or the battery in the generator will not maintain its charge during extended run periods (Figure 4.1).

2. Run the 120VAC hot wire and neutral wires to the generator.

3. Run the low voltage wires, 15B, 0, and 23 to the generator (Figure 4.2)

Figure 4.1 — GenReady Breaker Installation for Battery Charger

Figure 4.2 — GenReady Charger Connections

Section 4 — GenReady InstallationBattery Charger Installation Guidelines

Page 9: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

7

4.1.2 CHARGER MOUNTING 1. Remove the cover over the controller in the gen-

erator2. The battery charger can be located anywhere

within the controls area on the generator. It is convenient to mount the charger on the verti-cal surface on right-hand side of the controller (Figure 4.3).

Figure 4.3 — Mounting Location of Charger in Generator

Charger Mounting

3. Clean the surface where the charger is to be mounted prior to mounting with a damp cloth and wait for the area to dry.

4. Remove the adhesive covering on the backside of the charger and firmly press the charger into place as shown. Once mounted the charger may be removed for inspection by separating the hook & loop mounting (Figure 4.4).

Figure 4.4 — Removal of Adhesive Covering on Hook and Loop for Mounting

4.1.3 WIRING AND CONNECTIONS AT THE GENERATOR

1. Identify the DC output wires on the battery char-ger and crimp spade lugs onto both the positive and negative lead (see Figure 1.1).

2. Attach the positive and negative battery charger leads to the terminal strip in the controller. The positive lead is either a red wire or is marked with a (+) or (15B) designation. The negative lead is black and/or marked with a (-) or (0) designa-tion. The positive lead attaches to the terminal labeled “15B”. The negative lead attaches to the terminal labeled “0”. Note that there will be two wires attached to both the “0” and the “15B” terminals when the full installation is completed (Figure 4.5).

Figure 4.5 — Connection of Charger DC Output Wires in Generator Control Panel

Section 4 — GenReady InstallationBattery Charger Installation Guidelines

Page 10: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

8

3. Using wire nuts attach the 120VAC input wires from the battery charger to the generator backed-up 120VAC circuit from the transfer switch (Figure 4.6).

Figure 4.6 — Connection of charger AC input wires in generator control panel

4. Dress all wires neatly (Figure 4.7).

NOTE:

See the GenReady Installation/Wiring Diagram for connections.

Figure 4.7 — Completed Charger Connections on Generator Control Panel

4.1.4 OPERATIONAL TESTING 1. If already connected, disconnect the battery in

the generator. Remove the negative cable first fol-lowed by the positive cable. Take care not to short the cables together.

2. Ensure power is applied to the battery charger input.

3. Connect a volt meter across the battery leads. The voltage reading should be between 12.8VDC and 13.8VDC (Figure 4.8.

4. If the voltage is within range installation of the battery charger is complete. If the voltage is not within range verify all wiring and sizing and retest.

5. Re-connect the battery cables. Positive cable first followed by the negative cable.

Figure 4.8 — Measurement of Charger Output with Battery Disconnected

Section 4 — GenReady InstallationBattery Charger Installation Guidelines

Page 11: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

9

Section 5 — Interconnection DiagramsBattery Charger Installation Guidelines

RTSS Diagram - Drawing No. 0G8774-A

Page 12: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

10

Section 5 — Interconnection DiagramsBattery Charger Installation Guidelines

RTSN Diagram: Option 1 - Drawing No. 0G8832-A

Page 13: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

11

Section 5 — Interconnection DiagramsBattery Charger Installation Guidelines

RTSN Diagram: Option 2 - Drawing No. 0G8832-A

Page 14: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

12

Section 5 — Interconnection DiagramsBattery Charger Installation Guidelines

RTSE Diagram: Option 1 - Drawing No. 0G8829-A

Page 15: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

13

Section 5 — Interconnection DiagramsBattery Charger Installation Guidelines

RTSE Diagram: Option 2 - Drawing No. 0G8829-A

Page 16: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

14

Section 5 — Interconnection DiagramsBattery Charger Installation Guidelines

GenReady Diagram - Drawing No. 0G4744-C

Page 17: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

Section 5 — Interconnection DiagramsBattery Charger Installation Guidelines

GenReady Diagram - Drawing No. 0G4744-C

Page 18: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

16

Section 6 — NotesBattery Charger Installation Guidelines

Page 19: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

17

Section 6 — NotesBattery Charger Installation Guidelines

Page 20: Air-cooled Generator Battery Charger Installation …...1 These Installation Guidelines are designed to famil-iarize personnel with the installation process for the battery charger

Part No. 0G7956 Revision A (04/11/08) Printed in U.S.A.