DELAPAN MILYAR TIGA RATUS TIGA PULUH DELAPAN JUTA RUPIAH 8,338,000,000.00 SE SATU DUA DUA TIGA TIGA EMPAT EMPAT LIMA LIMA MILYAR ENAM ENAM JUTA TUJUH TUJUH DELAPAN DELAPAN SEMBILAN SEMBILAN 8338000000 0 8338000000 0 8338000000 0 8338000000 0 8338000000 0 8338000000 0 8338000000 0 8338000000 0 DELAPAN M 8338000000 8 DELAPAN 338000000 3 TIGA RATU 38000000 3 TIGA PULU 8000000 8 DELAPAN 0 0 0 0 0 0 0 0 0 0 0 0 0 0

AIR_BAKU_MATABONDU_ MINARTA REV02

Embed Size (px)

Citation preview

Page 1: AIR_BAKU_MATABONDU_ MINARTA REV02

DELAPAN MILYAR TIGA RATUS TIGA PULUH DELAPAN JUTA RUPIAH

8,338,000,000.00

SE SATU DUA DUA TIGA TIGA EMPAT EMPAT LIMA LIMA MILYAR ENAM ENAM JUTA TUJUH TUJUH DELAPAN DELAPAN SEMBILAN SEMBILAN

8338000000 0 8338000000 0 8338000000 0 8338000000 0 8338000000 0 8338000000 0 8338000000 0 8338000000 0 DELAPAN MILYAR 8338000000 8 DELAPAN

338000000 3 TIGA RATUS 38000000 3 TIGA PULUH DELAPAN JUTA

8000000 8 DELAPAN 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 2: AIR_BAKU_MATABONDU_ MINARTA REV02

TIGA PULUH DELAPAN JUTA

Page 3: AIR_BAKU_MATABONDU_ MINARTA REV02

Makassar, 28 Februari 2011Nomor : 010/MD-MKS/PEN/II/2011Lampiran : 1 (satu) berkas

Kepada Yth.Panitia Pelelangan LingkupBalai Wilayah Sungai Sulawesi IVTahun Anggaran 2011Jln. Balai Kota IV No. 1 Kendari,di - Kendari

Perihal :

addendumnya dengan hormat kami mengajukan penawaran untuk pekerjaan

sebesar Rp 8,338,000,000.00( DELAPAN MILYAR TIGA RATUS TIGA PULUH DELAPAN JUTA RUPIAH

Kami akan tunduk pada semua ketentuan yang tercantum dalam dokumen lelang.

1. Surat Penawaran, asli dan 1 (satu) berkas rekaman2. Surat Kuasa (bila dikuasakan) asli dan 1 (satu) berkas rekaman3. Jaminan Penawaran;asli dan 1 (satu) berkas rekaman4. Daftar Kuantitas dan Harga; asli dan 1 (satu) berkas rekaman5. Analisa Harga Satuan Pekerjaan Utama; asli dan 1(satu) berkas rekaman6. Daftar Harga Satuan Dasar Upah; asli dan 1 (satu) berkas rekaman7. Daftar Harga Satuan Dasar Bahan; asli dan 1 (satu) berkas rekaman8. Daftar Harga Satuan Dasar Peralatan; asli dan 1 (satu) berkas rekaman9. Metoda Pelaksanaan , asli dan 1 (satu) berkas rekaman

10. Jadwal Waktu Pelaksanaan; asli dan 1 (satu) berkas rekaman11. Daftar Peralatan Utama; asli dan 1 (satu) berkas rekaman12. Daftar Personil Inti dan Bagan Organisasi, asli dan 1 (satu) berkas rekaman13. Daftar Pekerjaan Yang Disubkontrakkan, asli dan 1 (satu) berkas rekaman14. Rekaman Surat Perjanjian Kemitraan (Bila diperlukan), asli dan 1 (satu) berkas rekaman15. Surat Dukungan Keuangan dari Bank, asli dan 1 (satu) berkas rekaman16. Data Kualifikasi Perusahaan, asli dan 1 (satu) berkas rekaman17. Manajemen Mutu/Rencana Mutu Kerja (RMK), asli dan 1 (satu) berkas rekaman

Penawar,

PT. Minarta Dutahutama

Leonardo. J. Prasetyo

Penawaran Pelelangan Paket Pekerjaan PEMBANGUNAN PRASARANA PENGAMBILAN DAN SALURAN PEMBAWA MATABONDU DI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN).

Sehubungan dengan Pengumuman Pelelangan Nomor : 288/PAN/BWS.S-IV/2011, tanggal 14 Februari 2011setelah kami mempelajari dengan seksama dokumen lelang termasuk berita acara penjelasan dan

PEMBANGUNAN PRASARANA PENGAMBILAN DAN SALURAN PEMBAWA MATABONDU DI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN).

Dalam penawaran ini sudah termasuk pengadaan tenaga kerja, bahan, peralatan, biaya umum dan keuntungan dan semua kewajiban pajak untuk melaksanakan pekerjaan tersebut di atas.

Jangka waktu pelaksanaan pekerjaan selama 180 ( seratus delapan puluh ) hari kalender sesuai dengan yang tercantum dalam Dokumen Lelang.Penawaran ini berlaku selama 60 (enam puluh) hari kalender sejak pembukaan penawaran.

Sesuai dengan persyaratan dokumen lelang, bersama surat penawaran ini kami lampirkan 1 (satu) asli dan 2 (dua) berkas rekaman terdiri dari :

Page 4: AIR_BAKU_MATABONDU_ MINARTA REV02

Direktur Utama

Page 5: AIR_BAKU_MATABONDU_ MINARTA REV02

)

Page 6: AIR_BAKU_MATABONDU_ MINARTA REV02

REKAPITULASI RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDUDI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN)

SCOPE PEKERJAAN : PEKERJAAN PENGAD. & PEMAS. PIPA PVC 11,500.00 M'PEKERJAAN GENERAL ITEM 1.00 Ls

LOKASI : KABUPATEN KONAWE DAN KOTA KENDARISATUAN KERJA : SNVT PJPA SULAWESI IV PROVINSI SULAWESI TENGGARA

BALAI WILAYAH SUNGAI SULAWESI IVTAHUN ANGGARAN : 2011

No. URAIAN PEKERJAAN HARGA

1 2 3

I. GENERAL ITEM 47,500,000.00

II. PEKERJAAN PENGAD. & PEMAS. PIPA PVC 7,532,500,000.00

TOTAL BIAYA FISIK 7,580,000,000.00 PPN 10 % 758,000,000.00 TOTAL BIAYA 8,338,000,000.00 TOTAL BIAYA DIBULATKAN 8,338,000,000.00

TERBILANG :

DELAPAN MILYAR TIGA RATUS TIGA PULUH DELAPAN JUTA RUPIAH

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYODirektur Utama

Page 7: AIR_BAKU_MATABONDU_ MINARTA REV02

REKAPITULASI RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDUDI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN)

SCOPE PEKERJAAN : PEKERJAAN GENERAL ITEM

LOKASI : KABUPATEN KONAWE DAN KOTA KENDARISATUAN KERJA : SNVT PJPA SULAWESI IV PROVINSI SULAWESI TENGGARA

BALAI WILAYAH SUNGAI SULAWESI IVTAHUN ANGGARAN : 2011

No. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN (Rp)

1 2 3 4 5

A Administrasi, P3K Ls 1.00 7,500,000 B Survey dan Pengukuran topografi Ls 1.00 7,500,000 C Laporan, As Build Drawing, Foto Dokumentasi Ls 1.00 7,500,000 D Pembuatan base camp / barak kerja Ls 1.00 25,000,000

TOTAL BIAYADIBULATKAN

REKAPITULASI RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDUDI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN)

SCOPE PEKERJAAN : PEKERJAAN PENGADAAN DAN & PEMASANGAN PIPA PVC

LOKASI : KABUPATEN KONAWE DAN KOTA KENDARISATUAN KERJA : SNVT PJPA SULAWESI IV PROVINSI SULAWESI TENGGARA

BALAI WILAYAH SUNGAI SULAWESI IVTAHUN ANGGARAN : 2011

No. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN (Rp)

1 2 3 4 5I PEKERJAAN PERSIAPAN

1 Pembersihan lokasi / Jalur pipa Ls 1.00 10,000,000 2 Mengukur kembali dan memasang / pematokan Ls 1.00 8,150,820

Sub Total III PEKERJAAN TANAH DAN PASIR

1 Galian tanah biasa M' 11,500.00 15,180 2 Buangan tanah disekitar lokasi M' 11,500.00 13,860 3 Urugan pasir M' 11,500.00 44,110 4 Urugan tanah dipadatkan M' 11,500.00 6,708

Sub Total IIIII PEKERJAAN PENGAD. & PEMAS. PIPA PVC

1 Pengadaan pipa Ø 400 mm PVC M' 2,000.00 702,067 2 Pemasangan pipa Ø 400 mm PVC M' 2,000.00 33,638 3 Pengadaan pipa Ø 350 mm PVC M' 4,000.00 587,883 4 Pemasangan pipa Ø 350 mm PVC M' 4,000.00 28,215 5 Pengadaan pipa Ø 300 mm PVC M' 5,500.00 427,622 6 Pemasangan pipa Ø 300 mm PVC M' 5,500.00 22,792 7 All Socket Bend 90⁰ Ø 400 mm PVC Bh 4.00 2,381,907 8 All Socket Bend 45⁰ Ø 400 mm PVC Bh 4.00 2,084,168 9 All Socket Bend 22,5⁰ Ø 400 mm PVC Bh 2.00 1,786,430

10 All Socket Bend 90⁰ Ø 350 mm PVC Bh 6.00 1,838,571 11 All Socket Bend 45⁰ Ø 350 mm PVC Bh 6.00 1,608,750 12 All Socket Bend 22,5⁰ Ø350 mm PVC Bh 2.00 1,378,929 13 All Socket Bend 90⁰ Ø 300 mm PVC Bh 6.00 1,450,797 14 All Socket Bend 45⁰ Ø 300 mm PVC Bh 6.00 1,269,447 15 All Socket Bend 22,5⁰ Ø300 mm PVC Bh 2.00 1,088,098 16 Flange Socket Ø 400 mm PVC Bh 4.00 2,381,907 17 Flange Socket Ø 350 mm PVC Bh 6.00 1,838,571 18 Flange Socket Ø 300 mm PVC Bh 6.00 1,450,797 19 Dresser Joint for PVC Ø 400 mm PVC Bh 2.00 2,400,000 20 Dresser Joint for PVC Ø 350 mm PVC Bh 2.00 2,000,000 21 Dresser Joint for PVC Ø 300 mm PVC Bh 2.00 1,700,000 22 Jembatan pendukung pipa, beton bertulang, < 10 m Bh 7.00 2,800,000

Sub Total IIIIV PEKERJAAN FINISHING1 Tes tekanan & kebocoran jaringan pipa M' 11,500.00 4,214

Page 8: AIR_BAKU_MATABONDU_ MINARTA REV02

( berbagai ukuran )2 Pembersihan / perapihan bekas pekerjaan Ls 1.00 10,000,000

Sub Total IVTOTAL BIAYADIBULATKAN

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYODirektur Utama

Page 9: AIR_BAKU_MATABONDU_ MINARTA REV02

REKAPITULASI RENCANA ANGGARAN BIAYA

JUMLAH HARGA (Rp)

6

7,500,000 7,500,000 7,500,000 25,000,000

47,500,000 47,500,000

REKAPITULASI RENCANA ANGGARAN BIAYA

JUMLAH HARGA (Rp)

6

10,000,000 8,150,820 18,150,820

174,570,000 159,390,000 507,265,000 77,136,499 918,361,499

1,404,133,980 67,276,000 2,351,532,857 112,860,000 2,351,922,746 125,356,000 9,527,627 8,336,673 3,572,860 11,031,429 9,652,500 2,757,857 8,704,780 7,616,683 2,176,195 9,527,627 11,031,429 8,704,780 4,800,000 4,000,000 3,400,000 19,600,000 6,537,522,022

48,465,696

Page 10: AIR_BAKU_MATABONDU_ MINARTA REV02

10,000,000 58,465,696 7,532,500,037 7,532,500,000

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYO

Page 11: AIR_BAKU_MATABONDU_ MINARTA REV02

ANALISA

PEKERJAAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDUDI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN)

SCOPE PEKERJAAN : PEKERJAAN PENGAD. & PEMAS. PIPA PVCPEKERJAAN GENERAL ITEM

LOKASI : KABUPATEN KONAWE DAN KOTA KENDARISATUAN KERJA : SNVT PJPA SULAWESI IV PROVINSI SULAWESI TENGGARA

BALAI WILAYAH SUNGAI SULAWESI IVTAHUN ANGGARAN : 2011

JENIS PEKERJAAN : GALIAN TANAH SATUAN : m'

NO URAIAN PEKERJAAN SATUAN KOEFISIEN

A TENAGA KERJA- Mandor orang / hari 0.0300 60,000 1,800 - Pekerja orang / hari 0.3000 40,000 12,000

Subtotal 13,800 Biaya Umum dan Keuntungan (10%) 1,380

Total 15,180

JENIS PEKERJAAN : BUANGAN TANAH DISEKITAR LOKASI SATUAN : m'

NO URAIAN PEKERJAAN SATUAN KOEFISIEN

A TENAGA KERJA- Mandor orang / hari 0.0100 60,000 600 - Pekerja orang / hari 0.3000 40,000 12,000

Subtotal 12,600 Biaya Umum dan Keuntungan (10%) 1,260

Total 13,860

JENIS PEKERJAAN : URUGAN PASIRSATUAN : m'

NO URAIAN PEKERJAAN SATUAN KOEFISIEN

A TENAGA KERJA- Mandor orang / hari 0.0100 60,000 600 - Pekerja orang / hari 0.3000 40,000 12,000

B BAHAN- Pasir urug m3 0.2500 110,000 27,500

Subtotal 40,100 Biaya Umum dan Keuntungan (10%) 4,010

Total 44,110

JENIS PEKERJAAN : URUGAN TANAH DIPADATKANSATUAN : m'

NO URAIAN PEKERJAAN SATUAN KOEFISIEN

A TENAGA KERJA- Mandor orang / hari 0.0080 60,000 480 - Operator orang / hari 0.0800 60,000 4,800

B BAHAN

C PERALATAN- Stamper jam 0.0100 31,775 318 - Alat bantu Ls 1.0000 500 500

Subtotal 6,098 Biaya Umum dan Keuntungan (10%) 610

Total 6,708

HARGA SATUAN(Rp)

JUMLAH HARGA (Rp)

HARGA SATUAN(Rp)

JUMLAH HARGA (Rp)

HARGA SATUAN(Rp)

JUMLAH HARGA (Rp)

HARGA SATUAN(Rp)

JUMLAH HARGA (Rp)

Page 12: AIR_BAKU_MATABONDU_ MINARTA REV02

JENIS PEKERJAAN : PEMASANGAN PIPA PVC D 400SATUAN : m'

No. URAIAN PEKERJAAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

A TENAGA KERJA- Tukang pipa org 0.3000 47,000.00 14,100.00 - Kepala tukang org 0.0300 56,000.00 1,680.00 - Pekerja org 0.3000 40,000.00 12,000.00

Mandor org 0.0300 60,000.00 1,800.00

C PERALATAN- Alat bantu ls 1.0000 1,000.00 1,000.00

Subtotal 30,580 Biaya Umum dan Keuntungan (10%) 3,058

Total 33,638

JENIS PEKERJAAN : PEMASANGAN PIPA PVC D 350SATUAN : m'

No. URAIAN PEKERJAAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

A TENAGA KERJA- Tukang pipa org 0.2500 47,000.00 11,750.00 - Kepala tukang org 0.0250 56,000.00 1,400.00 - Pekerja org 0.2500 40,000.00 10,000.00

Mandor org 0.0250 60,000.00 1,500.00

C PERALATAN- Alat bantu ls 1.0000 1,000.00 1,000.00

Subtotal 25,650 Biaya Umum dan Keuntungan (10%) 2,565

Total 28,215

JENIS PEKERJAAN : PEMASANGAN PIPA PVC D 300SATUAN : m'

No. URAIAN PEKERJAAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

A TENAGA KERJA- Tukang pipa org 0.2000 47,000.00 9,400.00 - Kepala tukang org 0.0200 56,000.00 1,120.00 - Pekerja org 0.2000 40,000.00 8,000.00

Mandor org 0.0200 60,000.00 1,200.00

C PERALATAN- Alat bantu ls 1.0000 1,000.00 1,000.00

Subtotal 20,720 Biaya Umum dan Keuntungan (10%) 2,072

Total 22,792

Page 13: AIR_BAKU_MATABONDU_ MINARTA REV02

JENIS PEKERJAAN : 500 M' PENGETESAN TEKANAN DAN KEBOCORAN PIPA SATUAN : m'

No. URAIAN PEKERJAAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

A TENAGA KERJA- Pekerja org 6.0000 40,000 240,000 - Tukang Pipa org 1.5000 47,000 70,500 - Mandor org 0.1500 60,000 9,000 - Sopir org 1.0000 50,000 50,000 - Operator semi terampil org 2.0000 75,000 150,000 - Pembantu Operator org 2.0000 40,000 80,000 - Pembantu sopir org 2.0000 35,000 70,000

B BAHAN- Air bersih m3 100.0630 3,500 350,221

C PERALATAN- Pompa Air jam 14.0000 21,066 294,920 - pressure Pump jam 12.0000 50,000 600,000 - Alat bantu Ls 1.0000 1,000 1,000

Subtotal 1,915,640 Biaya Umum dan Keuntungan (10%) 191,564

Total 2,107,204 Pengetesan per 1 m' 4,214.41

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYODirektur Utama

Page 14: AIR_BAKU_MATABONDU_ MINARTA REV02

PEKERJAAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDUDI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN)

SCOPE PEKERJAAN : PEKERJAAN PENGAD. & PEMAS. PIPA PVCPEKERJAAN GENERAL ITEM

LOKASI : KABUPATEN KONAWE DAN KOTA KENDARISATUAN KERJA : SNVT PJPA SULAWESI IV PROVINSI SULAWESI TENGGARA

BALAI WILAYAH SUNGAI SULAWESI IVTAHUN ANGGARAN : 2011

HARGA UPAH

No URAIAN SATUAN 1 Pekerja org / hr2 Tukang org / hr3 Kepala Tukang org / hr4 Mandor org / hr5 Operator org / hr6 Pembantu Operator org / hr7 Supir org / hr8 Pembantu Supir org / hr9 Operator org / jam

10 Pembantu Operator org / jam11 Supir org / jam12 Pembantu Supir org / jam13 Operator semi terampil org / hr

Page 15: AIR_BAKU_MATABONDU_ MINARTA REV02

PEKERJAAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDUDI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN)

SCOPE PEKERJAAN : PEKERJAAN PENGAD. & PEMAS. PIPA PVCPEKERJAAN GENERAL ITEM

LOKASI : KABUPATEN KONAWE DAN KOTA KENDARISATUAN KERJA : SNVT PJPA SULAWESI IV PROVINSI SULAWESI TENGGARA

BALAI WILAYAH SUNGAI SULAWESI IVTAHUN ANGGARAN : 2011

HARGA ALAT

No URAIAN SATUAN 1 Excavator - PC 200 Jam2 Dump Truck Jam3 Pick Up Jam4 Tackel Jam5 Pompa Air Jam6 Pressure pump 20 bar Jam7 Stamper Jam8 Beton Molen Jam9 Vibrator Molen Jam

10 Mesin Las Jam11 Alat tes pipa Jam12 Sney Pipa Jam13 Alat bantu Ls

Page 16: AIR_BAKU_MATABONDU_ MINARTA REV02

PEKERJAAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDUDI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN)

SCOPE PEKERJAAN : PEKERJAAN PENGAD. & PEMAS. PIPA PVCPEKERJAAN GENERAL ITEM

LOKASI : KABUPATEN KONAWE DAN KOTA KENDARISATUAN KERJA : SNVT PJPA SULAWESI IV PROVINSI SULAWESI TENGGARA

BALAI WILAYAH SUNGAI SULAWESI IVTAHUN ANGGARAN : 2011

HARGA BAHAN

No URAIAN SATUAN 1 Urugan pasir M32 Urugan Tanah M33 Pasir M34 Split beton M35 Semen Pc Kg6 Kawat beton Kg7 Besi beton Kg8 Papan bakestimg M39 Kayu balok bakesting M3

10 Paku campur Kg11 Minyak bakesting Ltr13 M'14 M'15 M'16 Bh17 Bh18 Bh19 Bh20 Bh21 Bh22 Bh23 Bh24 Bh25 Bh26 Bh27 Bh28 Bh29 Bh30 Bh31 Air bersih M332 Bensin ltr33 Solar ltr34 Minyak pelumas ltr

Pipa Ø 400 mm PVCPipa Ø 350 mm PVCPipa Ø 300 mm PVCAll Socket Bend 90⁰ Ø 400 mm PVCAll Socket Bend 45⁰ Ø 400 mm PVCAll Socket Bend 22,5⁰ Ø 400 mm PVCAll Socket Bend 90⁰ Ø 350 mm PVCAll Socket Bend 45⁰ Ø 350 mm PVCAll Socket Bend 22,5⁰ Ø350 mm PVCAll Socket Bend 90⁰ Ø 300 mm PVCAll Socket Bend 45⁰ Ø 300 mm PVCAll Socket Bend 22,5⁰ Ø300 mm PVCFlange Socket Ø 400 mm PVCFlange Socket Ø 350 mm PVCFlange Socket Ø 300 mm PVCDresser Joint for PVC Ø 400 mm PVCDresser Joint for PVC Ø 350 mm PVCDresser Joint for PVC Ø 300 mm PVC

Page 17: AIR_BAKU_MATABONDU_ MINARTA REV02

PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDU

HARGA UPAH

HARGA SATUAN (Rp) 40,000.00 47,000.00 56,000.00 60,000.00 60,000.00 40,000.00 50,000.00 35,000.00 8,571.43 5,714.29 7,142.86 5,000.00 75,000.00

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYODirektur Utama

Page 18: AIR_BAKU_MATABONDU_ MINARTA REV02

PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDU

HARGA ALAT

HARGA SATUAN (Rp) 297,558.04 227,690.27 130,660.76 100,000.00 21,065.69 50,000.00 31,774.69 52,338.87 40,472.36 32,133.68 32,133.68 100,000.00 1,000.00

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYODirektur Utama

Page 19: AIR_BAKU_MATABONDU_ MINARTA REV02

PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDU

HARGA BAHAN

HARGA SATUAN (Rp) 110,000.00 110,000.00 110,000.00 135,000.00 1,350.00 12,000.00 11,500.00 2,000,000.00 1,500,000.00 17,000.00 2,000.00 702,066.99 587,883.21 427,622.32 2,381,906.67 2,084,168.33 1,786,430.00 1,838,571.43 1,608,750.00 1,378,928.57 1,450,796.67 1,269,447.08 1,088,097.50 2,381,906.67 1,838,571.43 1,450,796.67 2,400,000.00 2,000,000.00 1,700,000.00 3,500.00 6,000.00 6,000.00 25,000.00

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYODirektur Utama

Page 20: AIR_BAKU_MATABONDU_ MINARTA REV02

NAMA ALAT : EXCAVATOR 80 - 140 HP

NO. U R A I A N KODE KOEFISIEN SATUAN KET.

A URAIAN PERALATAN1. Jenis Peralatan EXCAVATOR 80 - 140 HP

2. Tenaga Pw 80.00 HP3. Kapasitas Cp 0.504. Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jamc. Harga Alat B 950,000,000.00 Rupiah

5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Barub. Jam Kerja Dalam 1 Tahun W' 2,000.00 Jam Alat Baruc. Harga Alat (*) B' 950,000,000.00 Rupiah Alat Baru

B BIAYA PASTI PER JAM1. Nilai Sisa Alat = 10 % x B' C 95,000,000.00 Rupiah2. D 0.33438 -3. Biaya Pasti Per Jam :

a. Biaya Pengembalian Modal = {( B'-C ) x D} / W' E 142,947.32 Rupiahb. Asuransi, dll = ( 0,002 x B' ) / W' F 950.00 Rupiah

4. Biaya Pasti Per Jam = ( E + F ) G 143,897.32 Rupiah

C BIAYA OPERASI PER JAM KERJA1. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 60,000.00 Rupiah2. Pelumas = ( 0,01 - 0,02 Ltr/HP/Jam ) x Pw x Mp I 20,000.00 Rupiah3. Perawatan dan = {(12,5% - 17,5%)xB'} / W' K 59,375.00 Rupiah

Perbaikan4. Operator

L8,571.43 Rupiah

5. Sopir 7,142.86 Rupiah6.

M5,714.29 Rupiah

7. Pembantu Sopir 5,000.00 Rupiah8. Biaya Operasi / Jam = ( H + I + K + L + M ) P 153,660.71 Rupiah

D TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 297,558.04 Rupiah

E LAIN - LAIN1. Tingkat Suku Bunga i 20.00 %/Tahun2. Upah Operator 8,571.43 Rp./Jam3. Upah Sopir 7,142.86 Rp./Jam4. Upah Pembantu Operator 5,714.29 Rp./Jam5. Upah Pembantu Sopir 5,000.00 Rp./Jam6. Bahan Bakar Bensin Mb 6,000.00 Rp./Liter7. Bahan Bakar Solar Ms 6,000.00 Rp./Liter8. Minyak Pelumas Mp 25,000.00 Rp./Liter9. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

M3

Faktor Angsuran Modal = i x (1+i)A' / (1+i)A-1

= ( 1 Orang / Jam ) x U1

= ( 1 Orang / Jam ) x U2

Pembantu Operator = ( 1 Orang / Jam ) x U3

= ( 1 Orang / Jam ) x U4

U1

U2

U3

U4

Page 21: AIR_BAKU_MATABONDU_ MINARTA REV02

NAMA ALAT :

NO. U R A I A N KODE KOEFISIEN SATUAN KET.

2A URAIAN PERALATAN

1. Jenis Peralatan DUMP TRUCK 4 M3

2. Tenaga Pw 100.00 HP3. Kapasitas Cp 6.00 Ton4. Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jamc. Harga Alat B 530,000,000.00 Rupiah

5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Barub. Jam Kerja Dalam 1 Tahun W' 2,000.00 Jam Alat Baruc. Harga Alat (*) B' 530,000,000.00 Rupiah Alat Baru

B BIAYA PASTI PER JAM1. Nilai Sisa Alat = 10 % x B' C 53,000,000.00 Rupiah2. D 0.33438 -3. Biaya Pasti Per Jam :

a. Biaya Pengembalian Modal = {( B'-C ) x D} / W' E 79,749.56 Rupiahb. Asuransi, dll = ( 0,002 x B' ) / W' F 530.00 Rupiah

4. Biaya Pasti Per Jam = ( E + F ) G 80,279.56 Rupiah

C BIAYA OPERASI PER JAM KERJA1. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 75,000.00 Rupiah2. Pelumas = ( 0,01 - 0,02 Ltr/HP/Jam ) x Pw x Mp I 25,000.00 Rupiah3. Perawatan dan = {(12,5% - 17,5%)xB'} / W' K 33,125.00 Rupiah

Perbaikan4. Operator

L8,571.43 Rupiah

5. Sopir 7,142.86 Rupiah6.

M5,714.29 Rupiah

7. Pembantu Sopir 5,000.00 Rupiah8. Biaya Operasi / Jam = ( H + I + K + L + M ) P 147,410.71 Rupiah

D TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 227,690.27 Rupiah

E LAIN - LAIN1. Tingkat Suku Bunga i 20.00 %/Tahun2. Upah Operator 8,571.43 Rp./Jam3. Upah Sopir 7,142.86 Rp./Jam4. Upah Pembantu Operator 5,714.29 Rp./Jam5. Upah Pembantu Sopir 5,000.00 Rp./Jam6. Bahan Bakar Bensin Mb 6,000.00 Rp./Liter7. Bahan Bakar Solar Ms 6,000.00 Rp./Liter8. Minyak Pelumas Mp 25,000.00 Rp./Liter9. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

DUMP TRUCK 4 M3

Faktor Angsuran Modal = i x (1+i)A' / (1+i)A-1

= ( 1 Orang / Jam ) x U1

= ( 1 Orang / Jam ) x U2

Pembantu Operator = ( 1 Orang / Jam ) x U3

= ( 1 Orang / Jam ) x U4

U1

U2

U3

U4

Page 22: AIR_BAKU_MATABONDU_ MINARTA REV02

NAMA ALAT : PICK UP

NO. U R A I A N KODE KOEFISIEN SATUAN KET.

2A URAIAN PERALATAN

1. Jenis Peralatan PICK UP

2. Tenaga Pw 80.00 HP3. Kapasitas Cp 6.00 Ton4. Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jamc. Harga Alat B 170,000,000.00 Rupiah

5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Barub. Jam Kerja Dalam 1 Tahun W' 2,000.00 Jam Alat Baruc. Harga Alat (*) B' 170,000,000.00 Rupiah Alat Baru

B BIAYA PASTI PER JAM1. Nilai Sisa Alat = 10 % x B' C 17,000,000.00 Rupiah2. D 0.33438 -3. Biaya Pasti Per Jam :

a. Biaya Pengembalian Modal = {( B'-C ) x D} / W' E 25,580.05 Rupiahb. Asuransi, dll = ( 0,002 x B' ) / W' F 170.00 Rupiah

4. Biaya Pasti Per Jam = ( E + F ) G 25,750.05 Rupiah

C BIAYA OPERASI PER JAM KERJA1. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 60,000.00 Rupiah2. Pelumas = ( 0,01 - 0,02 Ltr/HP/Jam ) x Pw x Mp I 20,000.00 Rupiah3. Perawatan dan = {(12,5% - 17,5%)xB'} / W' K 10,625.00 Rupiah

Perbaikan4. Operator

L8,571.43 Rupiah

5. Sopir 7,142.86 Rupiah6.

M5,714.29 Rupiah

7. Pembantu Sopir 5,000.00 Rupiah8. Biaya Operasi / Jam = ( H + I + K + L + M ) P 104,910.71 Rupiah

D TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 130,660.76 Rupiah

E LAIN - LAIN1. Tingkat Suku Bunga i 20.00 %/Tahun2. Upah Operator 8,571.43 Rp./Jam3. Upah Sopir 7,142.86 Rp./Jam4. Upah Pembantu Operator 5,714.29 Rp./Jam5. Upah Pembantu Sopir 5,000.00 Rp./Jam6. Bahan Bakar Bensin Mb 6,000.00 Rp./Liter7. Bahan Bakar Solar Ms 6,000.00 Rp./Liter8. Minyak Pelumas Mp 25,000.00 Rp./Liter9. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Faktor Angsuran Modal = i x (1+i)A' / (1+i)A-1

= ( 1 Orang / Jam ) x U1

= ( 1 Orang / Jam ) x U2

Pembantu Operator = ( 1 Orang / Jam ) x U3

= ( 1 Orang / Jam ) x U4

U1

U2

U3

U4

Page 23: AIR_BAKU_MATABONDU_ MINARTA REV02

NAMA ALAT : POMPA AIR DIESEL

NO. U R A I A N KODE KOEFISIEN SATUAN KET.

4A URAIAN PERALATAN

1. Jenis Peralatan POMPA AIR DIESEL

2. Tenaga Pw 5.00 HP3. Kapasitas Cp - Ton4. Alat Baru : a. Umur Ekonomis A 4.00 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jamc. Harga Alat B 7,500,000.00 Rupiah

5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Barub. Jam Kerja Dalam 1 Tahun W' 2,000.00 Jam Alat Baruc. Harga Alat (*) B' 7,500,000.00 Rupiah Alat Baru

B BIAYA PASTI PER JAM1. Nilai Sisa Alat = 10 % x B' C 750,000.00 Rupiah2. D 0.38629 -3. Biaya Pasti Per Jam :

a. Biaya Pengembalian Modal = {( B'-C ) x D} / W' E 1,303.73 Rupiahb. Asuransi, dll = ( 0,002 x B' ) / W' F 7.50 Rupiah

4. Biaya Pasti Per Jam = ( E + F ) G 1,311.23 Rupiah

C BIAYA OPERASI PER JAM KERJA1. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 3,750.00 Rupiah2. Pelumas = ( 0,01 - 0,02 Ltr/HP/Jam ) x Pw x Mp I 1,250.00 Rupiah3. Perawatan dan = {(12,5% - 17,5%)xB'} / W' K 468.75 Rupiah

Perbaikan4. Operator

L8,571.43 Rupiah

5. Sopir 7,142.86 Rupiah6.

M5,714.29 Rupiah

7. Pembantu Sopir 5,000.00 Rupiah8. Biaya Operasi / Jam = ( H + I + K + L + M ) P 19,754.46 Rupiah

D TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 21,065.69 Rupiah

E LAIN - LAIN1. Tingkat Suku Bunga i 20.00 %/Tahun2. Upah Operator 8,571.43 Rp./Jam3. Upah Sopir 7,142.86 Rp./Jam4. Upah Pembantu Operator 5,714.29 Rp./Jam5. Upah Pembantu Sopir 5,000.00 Rp./Jam6. Bahan Bakar Bensin Mb 6,000.00 Rp./Liter7. Bahan Bakar Solar Ms 6,000.00 Rp./Liter8. Minyak Pelumas Mp 25,000.00 Rp./Liter9. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Faktor Angsuran Modal = i x (1+i)A' / (1+i)A-1

= ( 1 Orang / Jam ) x U1

= ( 1 Orang / Jam ) x U2

Pembantu Operator = ( 1 Orang / Jam ) x U3

= ( 1 Orang / Jam ) x U4

U1

U2

U3

U4

Page 24: AIR_BAKU_MATABONDU_ MINARTA REV02

NAMA ALAT : STAMPER

NO. U R A I A N KODE KOEFISIEN SATUAN KET.

A URAIAN PERALATAN1. Jenis Peralatan STAMPER

2. Tenaga Pw 10.00 HP3. Kapasitas Cp - -4. Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jamc. Harga Alat B 35,000,000.00 Rupiah

5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Barub. Jam Kerja Dalam 1 Tahun W' 2,000.00 Jam Alat Baruc. Harga Alat (*) B' 35,000,000.00 Rupiah Alat Baru

B BIAYA PASTI PER JAM1. Nilai Sisa Alat = 10 % x B' C 3,500,000.00 Rupiah2. D 0.33438 -3. Biaya Pasti Per Jam :

a. Biaya Pengembalian Modal = {( B'-C ) x D} / W' E 5,266.48 Rupiahb. Asuransi, dll = ( 0,002 x B' ) / W' F 35.00 Rupiah

4. Biaya Pasti Per Jam = ( E + F ) G 5,301.48 Rupiah

C BIAYA OPERASI PER JAM KERJA1. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 7,500.00 Rupiah2. Pelumas = ( 0,01 - 0,02 Ltr/HP/Jam ) x Pw x Mp I 2,500.00 Rupiah3. Perawatan dan = {(12,5% - 17,5%)xB'} / W' K 2,187.50 Rupiah

Perbaikan4. Operator

L8,571.43 Rupiah

5. Sopir 7,142.86 Rupiah6.

M5,714.29 Rupiah

7. Pembantu Sopir 5,000.00 Rupiah8. Biaya Operasi / Jam = ( H + I + K + L + M ) P 26,473.21 Rupiah

D TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 31,774.69 Rupiah

E LAIN - LAIN1. Tingkat Suku Bunga i 20.00 %/Tahun2. Upah Operator 8,571.43 Rp./Jam3. Upah Sopir 7,142.86 Rp./Jam4. Upah Pembantu Operator 5,714.29 Rp./Jam5. Upah Pembantu Sopir 5,000.00 Rp./Jam6. Bahan Bakar Bensin Mb 6,000.00 Rp./Liter7. Bahan Bakar Solar Ms 6,000.00 Rp./Liter8. Minyak Pelumas Mp 25,000.00 Rp./Liter9. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Faktor Angsuran Modal = i x (1+i)A' / (1+i)A-1

= ( 1 Orang / Jam ) x U1

= ( 1 Orang / Jam ) x U2

Pembantu Operator = ( 1 Orang / Jam ) x U3

= ( 1 Orang / Jam ) x U4

U1

U2

U3

U4

Page 25: AIR_BAKU_MATABONDU_ MINARTA REV02

NAMA ALAT : CONCRETE MIXER

NO. U R A I A N KODE KOEFISIEN SATUAN KET.

A URAIAN PERALATAN1. Jenis Peralatan CONCRETE MIXER

2. Tenaga Pw 25.00 HP3. Kapasitas Cp 500.00 Liter4. Alat Baru : a. Umur Ekonomis A 4.00 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jamc. Harga Alat B 55,000,000.00 Rupiah

5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Barub. Jam Kerja Dalam 1 Tahun W' 2,000.00 Jam Alat Baruc. Harga Alat (*) B' 55,000,000.00 Rupiah Alat Baru

B BIAYA PASTI PER JAM1. Nilai Sisa Alat = 10 % x B' C 5,500,000.00 Rupiah2. D 0.38629 -3. Biaya Pasti Per Jam :

a. Biaya Pengembalian Modal = {( B'-C ) x D} / W' E 9,560.66 Rupiahb. Asuransi, dll = ( 0,002 x B' ) / W' F 55.00 Rupiah

4. Biaya Pasti Per Jam = ( E + F ) G 9,615.66 Rupiah

C BIAYA OPERASI PER JAM KERJA1. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 18,750.00 Rupiah2. Pelumas = ( 0,01 - 0,02 Ltr/HP/Jam ) x Pw x Mp I 6,250.00 Rupiah3. Perawatan dan = {(12,5% - 17,5%)xB'} / W' K 3,437.50 Rupiah

Perbaikan4. Operator

L8,571.43 Rupiah

5. Sopir 7,142.86 Rupiah6.

M5,714.29 Rupiah

7. Pembantu Sopir 5,000.00 Rupiah8. Biaya Operasi / Jam = ( H + I + K + L + M ) P 42,723.21 Rupiah

D TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 52,338.87 Rupiah

E LAIN - LAIN1. Tingkat Suku Bunga i 20.00 %/Tahun2. Upah Operator 8,571.43 Rp./Jam3. Upah Sopir 7,142.86 Rp./Jam4. Upah Pembantu Operator 5,714.29 Rp./Jam5. Upah Pembantu Sopir 5,000.00 Rp./Jam6. Bahan Bakar Bensin Mb 6,000.00 Rp./Liter7. Bahan Bakar Solar Ms 6,000.00 Rp./Liter8. Minyak Pelumas Mp 25,000.00 Rp./Liter9. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Faktor Angsuran Modal = i x (1+i)A' / (1+i)A-1

= ( 1 Orang / Jam ) x U1

= ( 1 Orang / Jam ) x U2

Pembantu Operator = ( 1 Orang / Jam ) x U3

= ( 1 Orang / Jam ) x U4

U1

U2

U3

U4

Page 26: AIR_BAKU_MATABONDU_ MINARTA REV02

NAMA ALAT : VIBRATOR CONCRETE

NO. U R A I A N KODE KOEFISIEN SATUAN KET.

4A URAIAN PERALATAN

1. Jenis Peralatan VIBRATOR CONCRETE

2. Tenaga Pw 25.00 HP3. Kapasitas Cp - Ton4. Alat Baru : a. Umur Ekonomis A 4.00 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jamc. Harga Alat B 5,000,000.00 Rupiah

5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Barub. Jam Kerja Dalam 1 Tahun W' 2,000.00 Jam Alat Baruc. Harga Alat (*) B' 5,000,000.00 Rupiah Alat Baru

B BIAYA PASTI PER JAM1. Nilai Sisa Alat = 10 % x B' C 500,000.00 Rupiah2. D 0.38629 -3. Biaya Pasti Per Jam :

a. Biaya Pengembalian Modal = {( B'-C ) x D} / W' E 869.15 Rupiahb. Asuransi, dll = ( 0,002 x B' ) / W' F 5.00 Rupiah

4. Biaya Pasti Per Jam = ( E + F ) G 874.15 Rupiah

C BIAYA OPERASI PER JAM KERJA1. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 18,750.00 Rupiah2. Pelumas = ( 0,01 - 0,02 Ltr/HP/Jam ) x Pw x Mp I 6,250.00 Rupiah3. Perawatan dan = {(12,5% - 17,5%)xB'} / W' K 312.50 Rupiah

Perbaikan4. Operator

L8,571.43 Rupiah

5. Sopir 7,142.86 Rupiah6.

M5,714.29 Rupiah

7. Pembantu Sopir 5,000.00 Rupiah8. Biaya Operasi / Jam = ( H + I + K + L + M ) P 39,598.21 Rupiah

D TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 40,472.36 Rupiah

E LAIN - LAIN1. Tingkat Suku Bunga i 20.00 %/Tahun2. Upah Operator 8,571.43 Rp./Jam3. Upah Sopir 7,142.86 Rp./Jam4. Upah Pembantu Operator 5,714.29 Rp./Jam5. Upah Pembantu Sopir 5,000.00 Rp./Jam6. Bahan Bakar Bensin Mb 6,000.00 Rp./Liter7. Bahan Bakar Solar Ms 6,000.00 Rp./Liter8. Minyak Pelumas Mp 25,000.00 Rp./Liter9. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Faktor Angsuran Modal = i x (1+i)A' / (1+i)A-1

= ( 1 Orang / Jam ) x U1

= ( 1 Orang / Jam ) x U2

Pembantu Operator = ( 1 Orang / Jam ) x U3

= ( 1 Orang / Jam ) x U4

U1

U2

U3

U4

Page 27: AIR_BAKU_MATABONDU_ MINARTA REV02

NAMA ALAT : WELDING SET

NO. U R A I A N KODE KOEFISIEN SATUAN KET.

4A URAIAN PERALATAN

1. Jenis Peralatan WELDING SET

2. Tenaga Pw 15.00 HP3. Kapasitas Cp - Ton4. Alat Baru : a. Umur Ekonomis A 4.00 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jamc. Harga Alat B 12,000,000.00 Rupiah

5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Barub. Jam Kerja Dalam 1 Tahun W' 2,000.00 Jam Alat Baruc. Harga Alat (*) B' 12,000,000.00 Rupiah Alat Baru

B BIAYA PASTI PER JAM1. Nilai Sisa Alat = 10 % x B' C 1,200,000.00 Rupiah2. D 0.38629 -3. Biaya Pasti Per Jam :

a. Biaya Pengembalian Modal = {( B'-C ) x D} / W' E 2,085.96 Rupiahb. Asuransi, dll = ( 0,002 x B' ) / W' F 12.00 Rupiah

4. Biaya Pasti Per Jam = ( E + F ) G 2,097.96 Rupiah

C BIAYA OPERASI PER JAM KERJA1. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 11,250.00 Rupiah2. Pelumas = ( 0,01 - 0,02 Ltr/HP/Jam ) x Pw x Mp I 3,750.00 Rupiah3. Perawatan dan = {(12,5% - 17,5%)xB'} / W' K 750.00 Rupiah

Perbaikan4. Operator

L8,571.43 Rupiah

5. Sopir 7,142.86 Rupiah6.

M5,714.29 Rupiah

7. Pembantu Sopir 5,000.00 Rupiah8. Biaya Operasi / Jam = ( H + I + K + L + M ) P 30,035.71 Rupiah

D TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 32,133.68 Rupiah

E LAIN - LAIN1. Tingkat Suku Bunga i 20.00 %/Tahun2. Upah Operator 8,571.43 Rp./Jam3. Upah Sopir 7,142.86 Rp./Jam4. Upah Pembantu Operator 5,714.29 Rp./Jam5. Upah Pembantu Sopir 5,000.00 Rp./Jam6. Bahan Bakar Bensin Mb 6,000.00 Rp./Liter7. Bahan Bakar Solar Ms 6,000.00 Rp./Liter8. Minyak Pelumas Mp 25,000.00 Rp./Liter9. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Faktor Angsuran Modal = i x (1+i)A' / (1+i)A-1

= ( 1 Orang / Jam ) x U1

= ( 1 Orang / Jam ) x U2

Pembantu Operator = ( 1 Orang / Jam ) x U3

= ( 1 Orang / Jam ) x U4

U1

U2

U3

U4

Page 28: AIR_BAKU_MATABONDU_ MINARTA REV02

METODE PELAKSANAAN

PEKERJAAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDUDI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN)

SCOPE PEKERJAAN : PEKERJAAN PENGAD. & PEMAS. PIPA PVCPEKERJAAN GENERAL ITEM

LOKASI : KABUPATEN KONAWE DAN KOTA KENDARISATUAN KERJA : SNVT PJPA SULAWESI IV PROVINSI SULAWESI TENGGARA

BALAI WILAYAH SUNGAI SULAWESI IVTAHUN ANGGARAN : 2011

No. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN (Rp)

1 2 3 4 5

A Administrasi, P3K Ls 1.00 - Tenaga manusia - Alat bantu

B Survey dan Pengukuran topografi Ls 1.00 - Tenaga manusia - Alat bantu

C Laporan, As Build Drawing, Fto Dokumentasi Ls 1.00 - Tenaga manusia - Alat bantu

D Pembuatan base camp / barak kerja Ls 1.00 - Tenaga manusia - Alat bantu

SCOPE PEKERJAAN : PEKERJAAN PENGAD. & PEMAS. PIPA PVC 11,500.00

No. URAIAN PEKERJAAN SAT. VOLUME TENAGA / PERALATAN

1 2 3 4I PEKERJAAN PERSIAPAN

1 Pembersihan lokasi / Jalur pipa Ls 1.00 - Tenaga manusia - Alat bantu

2 Mengukur kembali dan memasang / pematokan Ls 1.00 - Tenaga manusia - Alat bantu

II PEKERJAAN TANAH DAN PASIR1 Galian tanah biasa M' 11,500.00 - Tenaga manusia

- Alat bantu

2 Buangan tanah disekitar lokasi M' 11,500.00 - Tenaga manusia - Alat bantu

3 Urugan pasir M' 11,500.00 - Tenaga manusia - Alat bantu

4 Urugan tanah dipadatkan M' 11,500.00 - Tenaga manusia - Alat bantu

III PEKERJAAN PENGAD. & PEMAS. PIPA PVC1 Pengadaan pipa Ø 400 mm PVC M' 2,000.00 - Tenaga manusia 2 Pemasangan pipa Ø 400 mm PVC M' 2,000.00 - Alat bantu 3 Pengadaan pipa Ø 350 mm PVC M' 4,000.00 4 Pemasangan pipa Ø 350 mm PVC M' 4,000.00 5 Pengadaan pipa Ø 300 mm PVC M' 5,500.00 6 Pemasangan pipa Ø 300 mm PVC M' 5,500.00

7 All Socket Bend 90⁰ Ø 400 mm PVC Bh 4.00 - Tenaga manusia 8 All Socket Bend 45⁰ Ø 400 mm PVC Bh 4.00 - Alat bantu 9 All Socket Bend 22,5⁰ Ø 400 mm PVC Bh 2.00

10 All Socket Bend 90⁰ Ø 350 mm PVC Bh 6.00 11 All Socket Bend 45⁰ Ø 350 mm PVC Bh 6.00 12 All Socket Bend 22,5⁰ Ø350 mm PVC Bh 2.00 13 All Socket Bend 90⁰ Ø 300 mm PVC Bh 6.00 14 All Socket Bend 45⁰ Ø 300 mm PVC Bh 6.00 15 All Socket Bend 22,5⁰ Ø300 mm PVC Bh 2.00

16 Flange Socket Ø 400 mm PVC Bh 4.00 - Tenaga manusia 17 Flange Socket Ø 350 mm PVC Bh 6.00 - Alat bantu 18 Flange Socket Ø 300 mm PVC Bh 6.00

19 Dresser Joint for PVC Ø 400 mm PVC Bh 2.00 20 Dresser Joint for PVC Ø 350 mm PVC Bh 2.00 21 Dresser Joint for PVC Ø 300 mm PVC Bh 2.00

22 Jembatan pendukung pipa, beton bertulang, < 10 m Bh 7.00 - Tenaga manusia - Alat bantu

IV PEKERJAAN FINISHING1 Tes tekanan & kebocoran jaringan pipa M' 11,500.00 - Tenaga manusia

( berbagai ukuran ) - Alat bantu - Pompa Air

Page 29: AIR_BAKU_MATABONDU_ MINARTA REV02

- Preasure Pump

2 Pembersihan / perapihan bekas pekerjaan Ls 1.00 - Tenaga manusia - Alat bantu

Page 30: AIR_BAKU_MATABONDU_ MINARTA REV02

METODE PELAKSANAAN

PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDU

JUMLAH HARGA (Rp)

6

Pembuatan base camp / barak kerja dibuat dekat dengan lokasi pekerjaan/ proyek.

M'

METODE PELAKSANAAN

Jembatan pendukung pipa, beton bertulang, < 10 m dibuat sesuai dengan spesifikasi yang disyaratkan.

Tes tekanan dan kebocoran jaringan pipa dilakukan setelah semua pipa terpasang

Pekerjaan administrasi berupa persuratan kepada team direksi tentang kemajuan pekerjaan dan kendala-kendala pekerjaan, juga persuratan kepada pemerintah daerah setempat tempat berlangsungnya pekerjaan perihal pelaksanaan pekerjaan.

Pengukuran dilaksanakan sebelum pekerjaan lain dimulai dan setelah seluruh pekerjaan selesai diperlukan untuk menentukan titik BM, dan mendapatkan MC 0% dan MC 100%. Hasil-hasil pengukuran digambar di atas kertas dan digandakan. Jalan masuk ke lokasi pekerjaan diberihkan dan diratakan untuk mempermudah jalannya pekerjaan.

Setiap hari dibuat laporan harian yang berisikan tentang pelaksanaan pekerjaan, kemajuan pekerjaan, cuaca, jumlah tenaga kerja, peralatan yang digunakan dan informasi lain yang dianggap penting dan mempengaruhi jalannya pekerjaan. Dibuat pula as built drawing yang menunjukkan pelaksanaan pekerjaan dan perobahan-perobahannya dari rencana semula.. Foto-foto dokumentasi pekerjaan diambil dari titik yang sama diambil berdasarkan progres pekerjaan 0%; 30%; 50%; 80% dan 100%.

Persiapan lokasi diperlukan untuk memudahkan pelaksanaan pekerjaan, lokasi yang akan dikerjakan dibersihkan dari semak-semak dan pohon-pohon atau bangunan yang dianggap akan mengganggu konstruksi setelah terlebih dahulu berkonsultasi dengan direksi.

Pengukuran dilaksanakan sebelum pekerjaan lain dimulai dan setelah seluruh pekerjaan selesai diperlukan untuk menentukan titik BM dengan memasang patok - patok, dan mendapatkan MC 0% dan MC 100%.

Galian tanah manual dilaksanakan oleh sekelompok orang/pekerja dengan menggunakan alat bantu hingga membentuk Profil dan dimensi yang direncanakan

Hasil Galian Orang/pekerja dibuang disekitar lokasi galian yang nantinya dapat digunakan untuk pekerjaan timbunan tanah hasil galian.

Ketebalan urugan pasir disesuaikan dengan gambar kerja dan spesifikasi teknis atau petunjuk dari direksi pengawas. Pasir urugan yang dipakai telah mendapat persetujuan dari direksi teknis. Urugan pasir bersih dari kotoran organik dan hal-hal yang dapat membahayakan kostruksi.

Ketebalan urugan pasir disesuaikan dengan gambar kerja dan spesifikasi teknis atau petunjuk dari direksi pengawas. Pasir urugan yang dipakai telah mendapat persetujuan dari direksi teknis. Urugan pasir bersih dari kotoran organik dan hal-hal yang dapat membahayakan kostruksi.

-Mutu dan jenis PVC yang digunakan ialah PVC dengan kelas mutu yang mapu menahan tekanan air 100 m kolom air atau 10 kg/cm2. Sebelum didadakan, terlebih dahulu diperlihatkan contoh/sampel pipa dan as shop drawingnya kepada direksi untuk disetujui.

All Socket Bend PVC yang digunakan mengikuti standar yang telah ditentukan dalam spesifikasi. Sebelum didadakan, terlebih dahulu diperlihatkan contoh/sampel pipa dan as shop drawingnya kepada direksi untuk disetujui.

Flange Socket PVC yang digunakan mengikuti standar yang telah ditentukan dalam spesifikasi. Sebelum didadakan, terlebih dahulu diperlihatkan contoh/sampel pipa dan as shop drawingnya kepada direksi untuk disetujui.

Dresser Joint PVC yang digunakan mengikuti standar yang telah ditentukan dalam spesifikasi. Sebelum didadakan, terlebih dahulu diperlihatkan contoh/sampel pipa dan as shop drawingnya kepada direksi untuk disetujui.

Page 31: AIR_BAKU_MATABONDU_ MINARTA REV02

Tes tekanan dan kebocoran jaringan pipa dilakukan setelah semua pipa terpasang

Hasil pekerjaan dibersihkan dan dirapihkan agar tidak ada kotoran yang melekat.

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYODirektur Utama

Page 32: AIR_BAKU_MATABONDU_ MINARTA REV02

ANALISA TEKNIS

PEKERJAAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDUDI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN)

SCOPE PEKERJAAN : PEKERJAAN PENGAD. & PEMAS. PIPA PVCPEKERJAAN GENERAL ITEM

LOKASI : KABUPATEN KONAWE DAN KOTA KENDARISATUAN KERJA : SNVT PJPA SULAWESI IV PROVINSI SULAWESI TENGGARA

BALAI WILAYAH SUNGAI SULAWESI IVTAHUN ANGGARAN : 2011

No. URAIAN PEKERJAAN SAT. VOLUME TENAGA/PERALATAN KAPASITAS PRODUKSI

1 2 3 4 5 6

A Administrasi, P3K Ls 1.00 - Tenaga manusia 0.071 14 - Alat bantu

B Survey dan Pengukuran topografi Ls 1.00 - Tenaga manusia 0.143 7 - Alat bantu

C Laporan, As Build Drawing, Fto Dokumentasi Ls 1.00 - Tenaga manusia 0.048 21 - Alat bantu

D Pembuatan base camp / barak kerja Ls 1.00 - Tenaga manusia 0.048 21 - Alat bantu

SCOPE PEKERJAAN : PEKERJAAN PENGAD. & PEMAS. PIPA PVC 11,500.00 M'

No. URAIAN PEKERJAAN SAT. VOLUME TENAGA/PERALATAN KAPASITAS PRODUKSI

1 2 3 4I PEKERJAAN PERSIAPAN

1 Pembersihan lokasi / Jalur pipa Ls 1.00 - Tenaga manusia 0.071 14 - Alat bantu

2 Mengukur kembali dan memasang / pematokan Ls 1.00 - Tenaga manusia 0.071 14 - Alat bantu

II PEKERJAAN TANAH DAN PASIR1 Galian tanah biasa M' 11,500.00 - Tenaga manusia 410.714 28

- Alat bantu

2 Buangan tanah disekitar lokasi M' 11,500.00 - Tenaga manusia 410.714 28 - Alat bantu

3 Urugan pasir M' 11,500.00 - Tenaga manusia 410.714 28 - Alat bantu

4 Urugan tanah dipadatkan M' 11,500.00 - Tenaga manusia 410.714 28 - Alat bantu

III PEKERJAAN PENGAD. & PEMAS. PIPA PVC1 Pengadaan pipa Ø 400 mm PVC M' 2,000.00 - Tenaga manusia 95.238 21

- Alat bantu

2 Pemasangan pipa Ø 400 mm PVC M' 2,000.00 - Tenaga manusia 71.429 28 - Alat bantu

3 Pengadaan pipa Ø 350 mm PVC M' 4,000.00 - Tenaga manusia 190.476 21 - Alat bantu

4 Pemasangan pipa Ø 350 mm PVC M' 4,000.00 - Tenaga manusia 142.857 28 - Alat bantu

5 Pengadaan pipa Ø 300 mm PVC M' 5,500.00 - Tenaga manusia 261.905 21 - Alat bantu

6 Pemasangan pipa Ø 300 mm PVC M' 5,500.00 - Tenaga manusia 196.429 28 - Alat bantu

7 All Socket Bend 90⁰ Ø 400 mm PVC Bh 4.00 - Tenaga manusia 0.571 7 - Alat bantu

8 All Socket Bend 45⁰ Ø 400 mm PVC Bh 4.00 - Tenaga manusia 0.571 7 - Alat bantu

DURASI (Hari)

DURASI (Hari)

Page 33: AIR_BAKU_MATABONDU_ MINARTA REV02

9 All Socket Bend 22,5⁰ Ø 400 mm PVC Bh 2.00 - Tenaga manusia 0.286 7 - Alat bantu

10 All Socket Bend 90⁰ Ø 350 mm PVC Bh 6.00 - Tenaga manusia 0.857 7 - Alat bantu

11 All Socket Bend 45⁰ Ø 350 mm PVC Bh 6.00 - Tenaga manusia 0.857 7 - Alat bantu

12 All Socket Bend 22,5⁰ Ø350 mm PVC Bh 2.00 - Tenaga manusia 0.286 7 - Alat bantu

13 All Socket Bend 90⁰ Ø 300 mm PVC Bh 6.00 - Tenaga manusia 0.857 7 - Alat bantu

Page 34: AIR_BAKU_MATABONDU_ MINARTA REV02

14 All Socket Bend 45⁰ Ø 300 mm PVC Bh 6.00 - Tenaga manusia 0.857 7 - Alat bantu

15 All Socket Bend 22,5⁰ Ø300 mm PVC Bh 2.00 - Tenaga manusia 0.286 7 - Alat bantu

16 Flange Socket Ø 400 mm PVC Bh 4.00 - Tenaga manusia 0.571 7 - Alat bantu

17 Flange Socket Ø 350 mm PVC Bh 6.00 - Tenaga manusia 0.857 7 - Alat bantu

18 Flange Socket Ø 300 mm PVC Bh 6.00 - Tenaga manusia 0.857 7 - Alat bantu

19 Dresser Joint for PVC Ø 400 mm PVC Bh 2.00 - Tenaga manusia 0.286 7 - Alat bantu

20 Dresser Joint for PVC Ø 350 mm PVC Bh 2.00 - Tenaga manusia 0.286 7 - Alat bantu

21 Dresser Joint for PVC Ø 300 mm PVC Bh 2.00 - Tenaga manusia 0.286 7 - Alat bantu

22 Jembatan pendukung pipa, beton bertulang, < 10 m Bh 7.00 - Tenaga manusia 0.500 14 - Alat bantu - Mixer Concrete - Vibrator Concrete

IV PEKERJAAN FINISHING1 Tes tekanan & kebocoran jaringan pipa M' 11,500.00 - Tenaga manusia 821.429 14

( berbagai ukuran ) - Alat bantu

2 Pembersihan / perapihan bekas pekerjaan Ls 1.00 - Tenaga manusia 0.071 14 - Alat bantu

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYODirektur Utama

Page 35: AIR_BAKU_MATABONDU_ MINARTA REV02

JADWAL PELAKSANAAN

PEKERJAAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDUDI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN)

SCOPE PEKERJAAN : PEKERJAAN PENGAD. & PEMAS. PIPA PVCPEKERJAAN GENERAL ITEM

LOKASI : KABUPATEN KONAWE DAN KOTA KENDARISATUAN KERJA : SNVT PJPA SULAWESI IV PROVINSI SULAWESI TENGGARA

BALAI WILAYAH SUNGAI SULAWESI IVTAHUN ANGGARAN : 2011

No. URAIAN PEKERJAAN SAT. VOLUME BOBOTI II III IV V VI

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2

A Administrasi, P3K Ls 1.00 0.099 14 0.05 0.05 B Survey dan Pengukuran topografi Ls 1.00 0.099 7 0.05 0.05 C Laporan, As Build Drawing, Fto Dokumentasi Ls 1.00 0.099 21 0.03 0.03 0.03 D Pembuatan base camp / barak kerja Ls 1.00 0.330 21 0.11 0.11 0.11

PEKERJAAN PENGAD. & PEMAS. PIPA PVCI PEKERJAAN PERSIAPAN

1 Pembersihan lokasi / Jalur pipa Ls 1.00 0.132 14 0.066 0.066 2 Mengukur kembali dan memasang / pematokan Ls 1.00 0.108 14 0.05 0.05

II PEKERJAAN TANAH DAN PASIR1 Galian tanah biasa M' 11,500.00 2.303 28 0.58 0.58 0.58 0.58 2 Buangan tanah disekitar lokasi M' 11,500.00 2.103 28 0.53 0.53 0.53 0.53 3 Urugan pasir M' 11,500.00 6.692 28 1.67 1.67 1.67 1.67 4 Urugan tanah dipadatkan M' 11,500.00 1.018 28 0.25 0.25 0.25 0.25

III PEKERJAAN PENGAD. & PEMAS. PIPA PVC1 Pengadaan pipa Ø 400 mm PVC M' 2,000.00 18.524 21 6.17 6.17 6.17 2 Pemasangan pipa Ø 400 mm PVC M' 2,000.00 0.888 28 0.22 0.22 0.22 0.22 3 Pengadaan pipa Ø 350 mm PVC M' 4,000.00 31.023 21 10.34 10.34 10.34 4 Pemasangan pipa Ø 350 mm PVC M' 4,000.00 1.489 28 0.37 0.37 0.37 0.37 5 Pengadaan pipa Ø 300 mm PVC M' 5,500.00 31.028 21 10.34 10.34 10.34 6 Pemasangan pipa Ø 300 mm PVC M' 5,500.00 1.654 28 0.41 0.41 0.41 0.41 7 All Socket Bend 90⁰ Ø 400 mm PVC Bh 4.00 0.126 7 0.126 8 All Socket Bend 45⁰ Ø 400 mm PVC Bh 4.00 0.110 7 0.110 9 All Socket Bend 22,5⁰ Ø 400 mm PVC Bh 2.00 0.047 7 0.047

10 All Socket Bend 90⁰ Ø 350 mm PVC Bh 6.00 0.146 7 0.146 11 All Socket Bend 45⁰ Ø 350 mm PVC Bh 6.00 0.127 7 0.127 12 All Socket Bend 22,5⁰ Ø350 mm PVC Bh 2.00 0.036 7 0.036 13 All Socket Bend 90⁰ Ø 300 mm PVC Bh 6.00 0.115 7 0.115 14 All Socket Bend 45⁰ Ø 300 mm PVC Bh 6.00 0.100 7 0.100 15 All Socket Bend 22,5⁰ Ø300 mm PVC Bh 2.00 0.029 7 0.029 16 Flange Socket Ø 400 mm PVC Bh 4.00 0.126 7 0.126 17 Flange Socket Ø 350 mm PVC Bh 6.00 0.146 7 0.146 18 Flange Socket Ø 300 mm PVC Bh 6.00 0.115 7 0.115 19 Dresser Joint for PVC Ø 400 mm PVC Bh 2.00 0.063 7 0.063 20 Dresser Joint for PVC Ø 350 mm PVC Bh 2.00 0.053 7 0.053 21 Dresser Joint for PVC Ø 300 mm PVC Bh 2.00 0.045 7 0.045 22 Jembatan pendukung pipa, beton bertulang, < 10 m Bh 7.00 0.259 14 0.129 0.129 IV PEKERJAAN FINISHING1 Tes tekanan & kebocoran jaringan pipa M' 11,500.00 0.639 14 0.32 0.32

( berbagai ukuran )2 Pembersihan / perapihan bekas pekerjaan Ls 1.00 0.132 14 0.07 0.07

Jumlah Nilai PekerjaanKemajuan Bulanan Dalam (%) 0.21 0.21 0.20 0.09 0.03 0.07 0.07 27.43 28.80 28.51 2.11 3.21 2.94 2.94 1.93 0.25 0.13 0.13 0.32 0.32 0.07 0.07 Kumulatuf Kemajuan Dalam (%) 0.21 0.42 0.61 0.70 0.73 0.80 0.87 28.30 57.10 85.60 87.71 90.92 93.85 96.79 98.72 98.97 99.10 99.23 99.55 99.87 99.93 100.00

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYODirektur Utama

DURASI (Hari)

Page 36: AIR_BAKU_MATABONDU_ MINARTA REV02

JADWAL PELAKSANAAN

VIKET

3 4

- - 100.00 100.00

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYODirektur Utama

Page 37: AIR_BAKU_MATABONDU_ MINARTA REV02

BAGAN ALIR

PEKERJAAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDUDI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN)

SCOPE PEKERJAAN : PEKERJAAN PENGAD. & PEMAS. PIPA PVCPEKERJAAN GENERAL ITEM

LOKASI : KABUPATEN KONAWE DAN KOTA KENDARISATUAN KERJA : SNVT PJPA SULAWESI IV PROVINSI SULAWESI TENGGARA

BALAI WILAYAH SUNGAI SULAWESI IVTAHUN ANGGARAN : 2011

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYODirektur Utama

START

Administrasi, P3K

CHECK

Survey dan Pengukuran

topografi

CHECK

Laporan, As buid drawing, foto dokumentasi

CHECK

Pembuatan Base camp / barak kerja

CHECK

Pembersihan lokasi / jalur pipa

CHECK

PEK. PERSIAPAN

Pengukuran kembali dan pematokan

CHECK

Galian tanah biasa & buangan tanah disekitar lokasi

CHECK

PEK. TANAH & PASIR

Urugan pasir & urugan tanah dipadatkan

CHECK

PEK. PENGAD. & PEMAS. PIPA

Pipa PVC

CHECK

All Socket Bend PVC

CHECK

Flange socket PVC

CHECK

Dresser joint for PVC

CHECK

Pemasangan Pipa

CHECK

Jembatan pendukung Pipa

CHECK

Tes tekanan & Kebocoran

CHECK

PEK. FINISHING

Pembersihan

CHECK

SELESAI

Page 38: AIR_BAKU_MATABONDU_ MINARTA REV02

DAFTAR PEKERJAAN YANG DISUBKONTRAKKAN

PEKERJAAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SAL. PEMBAWA AIR BAKU MATABONDUDI KAB. KONAWE DAN KOTA KENDARI (LANJUTAN)

SCOPE PEKERJAAN : PEKERJAAN PENGAD. & PEMAS. PIPA PVCPEKERJAAN GENERAL ITEM

LOKASI : KABUPATEN KONAWE DAN KOTA KENDARISATUAN KERJA : SNVT PJPA SULAWESI IV PROVINSI SULAWESI TENGGARA

BALAI WILAYAH SUNGAI SULAWESI IVTAHUN ANGGARAN : 2011

No Item Pekerjaan Nilai (Rp) Bobot(%) Keterangan1 Survey dan Pengukuran topografi 7,500,000.00 0.10

TOTAL 7,500,000.00 0.10

Kendari, 28 Februari 2011PT. MINARTA DUTAHUTAMA

LEONARDO J. PRASETYODirektur Utama