11
INTERFACE ENGINEERING 2015 YEAR IN REVIEW

AirBnB Office Tenant Improvement - Interface Engineering€¦ · continued collaboration with our design and construction partners worldwide. Best regards, AWARDS EXPANDED OUTREACH

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AirBnB Office Tenant Improvement - Interface Engineering€¦ · continued collaboration with our design and construction partners worldwide. Best regards, AWARDS EXPANDED OUTREACH

i n t e r f a c e e n g i n e e r i n g20

15

YEAR IN

REVIEW

Page 2: AirBnB Office Tenant Improvement - Interface Engineering€¦ · continued collaboration with our design and construction partners worldwide. Best regards, AWARDS EXPANDED OUTREACH

AirBnB Office Tenant Improvement

San Francisco, CA

size: 107,000 sf

services: mep engineering,

fire/life safety, lighting

architect: wrns studio

photography: mark maheny

Page 3: AirBnB Office Tenant Improvement - Interface Engineering€¦ · continued collaboration with our design and construction partners worldwide. Best regards, AWARDS EXPANDED OUTREACH

20

16 2015 was one of the most exciting years in our firm’s

47 year history and our Managing Principals feel it is

important to celebrate our successes and thank our

clients for their continued trust.

Since our firm’s founding, our goal has been to meet the

needs of our clients, building owners, and occupants in a

manner that is sustainable and cost efficient.

We look forward 2016 — the relationships we will build,

the challenging projects that we will work on, and the

continued collaboration with our design and construction

partners worldwide.

Best regards,

AWARDS

EXPANDEDOUTREACH

CULTURESTAFF

PRESENTATIONS

SIGNATUREPROJECTS

PRESS

01

06

0302

04

07

05

BUILDING

FOR

THE

FUTURE20

15

andy frichtl pe, leed ap

rob matteson cpd, leed ap

roger frechette pe, leed ap

hormoz janssens pe, leed ap

Page 4: AirBnB Office Tenant Improvement - Interface Engineering€¦ · continued collaboration with our design and construction partners worldwide. Best regards, AWARDS EXPANDED OUTREACH

Project HonorsNumerous Interface projects earned awards this year, gaining regional and national recognition

for designs that challenged convention and enhanced energy and water efficiency.

Collaborative Life Sciences Building

& Skourtes Tower LEED Platinum

• AIA National COTE Award

ACEC Oregon Award, Project of the Year

• Energy Trust of Oregon’s High Performance

Building Award

• ACEC Oregon Award, Project of the Year

• ACEC National Recognition Award for

Engineering Excellence

• DJC Oregon Top Projects Award

• SCUP/AIA-CAE Excellence in Architecture

for a New Building, Merit Award

• ENR Northwest’s Best Project of the Year,

(Higher Education & Research)

Portland Mercado

• BetterBricks Commercial Real Estate Award

Boeddeker Park Net-Zero Goal

• AIA San Francisco, Honor Award

Stadium Fred Meyer

• BetterBricks Commercial Real Estate Award

Cal Maritime Physical

Education & Aquatics Center

• ENR California, Best Project of the Year

Sacred Heart Lower & Middle Schools

Stevens Library Net-Zero, LEED Platinum

• World Architecture News Sustainability Awards Shortlist

Tesla STEM School

• American Association of School Administrators,

Walter Taylor Award

Vashon High School High Performance School

• CEFPI Pacific NW Region, Pinnacle Award

Edith Green-Wendell Wyatt

Federal Building LEED Platinum

• World Architecture News Sustainability Award

San Ysidro US Land Port of Entry

Master Plan & Design LEED Platinum, Design Excellence

• APWA Project of the Year

UCSF Mission Hall

• ENR California, Award of Merit

2 0 1 5AWARDS01

Page 5: AirBnB Office Tenant Improvement - Interface Engineering€¦ · continued collaboration with our design and construction partners worldwide. Best regards, AWARDS EXPANDED OUTREACH

San Ysidro US Land Port of Entry leed platinum, design excellence

San Ysidro, CA

size: 225,000 sf

services: mep engineering, energy services,

fire/life safety, building technologies

architect: miller|hull partnership

photography: nic lehoux

Page 6: AirBnB Office Tenant Improvement - Interface Engineering€¦ · continued collaboration with our design and construction partners worldwide. Best regards, AWARDS EXPANDED OUTREACH

New FacesInterface saw tremendous growth in 2015, with a significant

increase in overall staff and employee retention. We welcome

our 2015 team members and look forward to continued growth

for many years to come!

47NEW HIRES

Portland

Office

San Francisco

Office

Washington, DC

Office

Honolulu

Office

2 0 1 502STAFF

Page 7: AirBnB Office Tenant Improvement - Interface Engineering€¦ · continued collaboration with our design and construction partners worldwide. Best regards, AWARDS EXPANDED OUTREACH

2 0 1 5PromotionsInterface Engineering was pleased to close 2015 with several staff promotions.

Introducing (From left):

LE

AD

ER

S I

N M

OT

ION

• Douglas Cansdale PE, LEED AP, CxA

Associate

• Andrew Craig PE, LEED AP

Associate Principal

• Melissa Crosman LEED AP, CPSM

Director of Marketing & Business

Development

• Thomas de Senna PE

Associate

• Kim De Alba CPSM

Marketing Manager, NW Region

• Ayman Elbarasi PE, LEED AP

Associate

• Shem Heiple PE, LEED AP

Associate

• Scott Holum CPD

Associate Principal

• Mark Jackson

Associate Principal

• Chris Larson PE, LEED AP

Associate Principal

• Nick Marcyan CxA, CCP

Associate

• Jim McClelland PE, LEED AP

Associate

• Mike Nelson MBA, LEED AP, BD+C, GGP

Associate

• Mark O’Leary PE

Associate

• Thomas Phuong PE, LEED AP

Associate Principal

• Joe Ripp CET

Associate

• Kristina Santi

Associate

• Scott Sato PE, LEED AP

Associate Principal

• Jon Schlitz CET

Associate

• Joe Schmid MCSE, VCP

Associate Principal

• Chris Scott CPD

Associate

• Darcy Tucker RCDD

Associate

• Glen Walson PE, LEED AP

Associate

• Shawn Wilson PE

Associate Principal

• Eunice Yoon PE, LEED AP, BD+C

Associate

Page 8: AirBnB Office Tenant Improvement - Interface Engineering€¦ · continued collaboration with our design and construction partners worldwide. Best regards, AWARDS EXPANDED OUTREACH

Seattle Waldorf High School Relocation

Seattle, WA

size: 15,000 sf remodel, 2,000 sf addition

services: mep engineering, fire/life safety,

lighting, building technologies

architect: johnson+southerland

photography: aaron leitz

Page 9: AirBnB Office Tenant Improvement - Interface Engineering€¦ · continued collaboration with our design and construction partners worldwide. Best regards, AWARDS EXPANDED OUTREACH

Employee Groups & EventsOur offices enjoyed a number of team outings, happy hours, parties, and community outreach events

in 2015. Listed below are just some of the highlights.

2 0 1 5CULTURE

Wellness Group

• Bike Commute Challenge | Portland Office

• JDRF Real Estate Games | Washington, DC Office

• Softball + soccer teams | Portland Office

• Weekly in-office yoga | Portland Office

• Just Hike It Challenge | Portland Office

Fun Committee

• GoKart Racing | San Francisco Office

• Annual Holiday Party | Portland Office

• White Salmon River rafting trip | Portland Office

• Halloween Costume Contest | Portland +

San Francisco Offices

• Timbers + Blackhawk games | Portland Office

• Hecklevision | Portland Office

• LEAP Sand Castle Contest | San Francisco Office

• Trivia Night | Portland Office

• Principal’s Happy Hour | Portland Office

• Office Cook-Off | Portland Office

Green Team

• Biweekly Newsletter | Portland Office

• Talking Trash Episodes | Portland Office

• Make Your Own Cleaning Supplies | Portland Office

• Balcony vegetable garden | Portland Office

• Kilowatt Cup Challenge | Portland Office

Community Outreach

• SOLVE Beach Clean Up | San Francisco Office

• Habitat for Humanity | Portland Office

• Community Energy Weatherizing Project | Portland

Office

• CANstruction Build | Portland Office

• Meals on Wheels | Portland Office

• Red Cross Blood Drive | Portland Office

• Holiday Toy Drive | Portland + San Francisco Offices

• Bike Commute Challenge | Portland Office

• Numerous non-profit donations | All Offices

03

Page 10: AirBnB Office Tenant Improvement - Interface Engineering€¦ · continued collaboration with our design and construction partners worldwide. Best regards, AWARDS EXPANDED OUTREACH

Cascades Academy of Central Oregon

Bend, OR

size: 43,000 sf

services: mep engineering, fire/life safety,

lighting, building technologies, commissioning

architect: hennebery eddy architects

photography: josh partee

Page 11: AirBnB Office Tenant Improvement - Interface Engineering€¦ · continued collaboration with our design and construction partners worldwide. Best regards, AWARDS EXPANDED OUTREACH

i n t e r f a c e e n g i n e e r i n g

covers Interface San Francisco Office

WRNS Studio © Jasper Sanidad