14
Aircraft Airworthiness & Sustainment 2018 Defence - AIRCDRE Phil Tammen

Aircraft Airworthiness & Sustainment 2018 Defence

  • Upload
    others

  • View
    15

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Aircraft Airworthiness & Sustainment 2018 Defence

Aircraft Airworthiness & Sustainment 2018 Defence - AIRCDRE Phil Tammen

Page 2: Aircraft Airworthiness & Sustainment 2018 Defence

• Air Domain

Overview &

Activities 2018

• CASG SPO Reform

Scope

Page 3: Aircraft Airworthiness & Sustainment 2018 Defence

Air Domain Overview & Activities 2018

Page 4: Aircraft Airworthiness & Sustainment 2018 Defence

Through partnerships and being Smart Integrators, we will set the global standard for military aviation asset management.

CASG Air Domain Purpose

The Air Domain partners with industry and global partners, to deliver aviation capability for the Defence Capability Managers.

CASG Air Domain Vision

Page 5: Aircraft Airworthiness & Sustainment 2018 Defence

$2.16 b acquisition

20 major projects

$1.4 b sustainment

21 products

955 FTE (Commonwealth)

871 actual at 3 Feb

7 Aus regional locations

8 System Program Offices

9 Project Offices

7 overseas locations

3 Foreign countries

Industry & Partners~14 significant companies

4 US services, RAF, …

2017/18 Activities

Page 6: Aircraft Airworthiness & Sustainment 2018 Defence

Air

Fo

rce

Tra

ns

itio

nMID TRANSITION FUTURE2009

F-111

FA-18 A/B F-35AJSF

B350CC08

C130H

AP-3C Triton

C17

HAWK

KC-30A MRTT

E-7A WEDGETAILAEW&C

C130J

PC9

Air Defence Systems

HERON UAS

ATC Systems

WARDEN

C27J

SUPER HORNET

GROWLER

PC-21 + New Training System

P-8A

MC55

Page 7: Aircraft Airworthiness & Sustainment 2018 Defence

2017/18 RAAF Materiel Activities

• Growler Deliveries completed

• C-27J Deliveries completed

• PC-21 Deliveries underway

• P-8 deliveries underway

• OneSKY

• JORN Upgrade

Page 8: Aircraft Airworthiness & Sustainment 2018 Defence

Safety Always!

Page 9: Aircraft Airworthiness & Sustainment 2018 Defence

Environmental Changes

• Support to Operations continues:

– Changes in force disposition

– Adjustments to priorities

• Increased Joint focus inside Defence

• ERP Roll-out nears

• Security, cyber protection

Page 10: Aircraft Airworthiness & Sustainment 2018 Defence

CASG & SPO Reform

Page 11: Aircraft Airworthiness & Sustainment 2018 Defence

Air Force Sustainment Strategy

• “Lean-SPO” model:

– Requires platform stewardship

• Different basic assumptions about roles

• Difficult adjustments

– A blended Industry (FIC) / Commonwealth workforce to grow skills.

• Industry Steward is held accountable and responsible at Platform or System level:

– Performance Based Contract – $ @ risk

• Long term relationship with industry:

– Rolling wave contracts

– Investment

Page 12: Aircraft Airworthiness & Sustainment 2018 Defence

Weapon System Strategy and Plans

Plans and Projects

Complex Issues

Routine Transactions

Air Force Unit

SPO 5%Contractor 95%

SPO 30%Contractor 70%

SPO 40%Contractor 60%

SPO 50%Contractor 50%

SPO 100%Contractor 0%

HALSPO

Over-arching Strategy

Platform Stewardship

Page 13: Aircraft Airworthiness & Sustainment 2018 Defence

SPO Reforms– Transition of legacy F/A-18A, AP-3C, PC-9A and B300 sustainment to

leaner Prime TLS contracts

– Establishing contemporary and leaner sustainment models for new C-27J, JSF, P-8A/Triton, and PC-21 platforms

– Modernisation and improvement of the KC-30A and C-130J sustainment contracts

– Establishment of in-country C-17A sustainment contract to complement FMS and improve flexibility, efficiency and responsiveness.

– Transition to a leaner sustainment model for Common Aviation Equipment.

– Consolidation of TASPO, AMSPO and ATPO to form ATACSPO

Page 14: Aircraft Airworthiness & Sustainment 2018 Defence

Defence Aviation

– “It’s a Team Effort”