2
: E-mail [email protected] : Phone 919650518359 : Address G-77/1 jagat puri near parwana road street no.14, Delhi-110051 B.tech and M.Tech August 2011 — May 2016 Prabhjot singh Chawla Objective To start my career with an organization that will utilize my management, supervision & administrative skills to benefit mutual growth and success. Qualifications Integrated Dual Degree (B.Tech+M.Tech) B.Tech in Civil Engineering 2011-2016 M.Tech in Environmental Engineering C.G.P.A (5.8) Higher Secondary Examination Board - C.B.S.E 2010-2011 Percentage-62% Secondary School Examination Board - C.B.S.E 2008-2009 Percentage-76% Education Gautam Buddha University, Greater Noida Interests Sold 1000+ printed T-shirts within 5 Days At Abhivyanjana - University Cultural Festival 2014-2015 Internship and Projects Tunelling, Base Slab and Wall Construction Hindustan Construction Company 2014-2015 Duration - 6 Weeks Apartment Building Construction H.R. Infratech pvt. ltd. 2015-2016 Duration - 6 Weeks Thesis on Numerical Modelling of Tropical Cyclones using ARW-WRF model 2016 Duration - 6 Months Prabhjot singh Chawla 1

akash(5)

Embed Size (px)

Citation preview

Page 1: akash(5)

:E-mail [email protected] :Phone 919650518359:Address G-77/1 jagat puri near parwana road street no.14, Delhi-110051

B.tech and M.Tech August 2011 — May 2016

Prabhjot singh Chawla

ObjectiveTo start my career with an organization that will utilize my management, supervision & administrativeskills to benefit mutual growth and success.

QualificationsIntegrated Dual Degree (B.Tech+M.Tech)B.Tech in Civil Engineering 2011-2016M.Tech in Environmental EngineeringC.G.P.A (5.8)

Higher Secondary ExaminationBoard - C.B.S.E 2010-2011Percentage-62%

Secondary School ExaminationBoard - C.B.S.E 2008-2009Percentage-76%

Education

Gautam Buddha University, Greater Noida

InterestsSold 1000+ printed T-shirts within 5 DaysAt Abhivyanjana - University Cultural Festival 2014-2015

Internship and ProjectsTunelling, Base Slab and Wall ConstructionHindustan Construction Company 2014-2015Duration - 6 Weeks

Apartment Building Construction H.R. Infratech pvt. ltd. 2015-2016Duration - 6 Weeks

Thesis on Numerical Modelling of Tropical Cyclones using ARW-WRF model 2016Duration - 6 Months

Prab hjo t s ing h Chawla 1

Page 2: akash(5)

Duration - 6 Months

Prab hjo t s ing h Chawla 2