Al-Shandagha RevitalizationDubai, UAE, 1996
Adil AbdallaRestoration Architect, then Head of Research Unit, Historical Buildings Section, Dubai Municipality
2
Ratio
nale
Historical, But Not Listed Buildings
No Formal Management Plan, But Apprentice Process
Simple Post Restoration Plans
Technical Merit is Minor due to Short Life-Time
Early Activities as Awareness was Mounted Up
Sim
ple
Syst
emati
c Ap
proa
ch
3
Consolidate the Structure, and Transfer the Loads
Remove or Reduce Structural Weights
Treat Humidity and Termite, and Isolate Wet Installations
Sequential Rebuild Deteriorated Foundations & Walls
Redo Lintels, Columns, Beams and Horizontal Ties
Redo Roofs & Ceilings with Minimal Weights
Redo Plaster and Ironmongery Frames
Insert New Electromechanical Utilities and Facilities
Provide New Flooring, and Surrounding Banks
Provide Finishing Accessories
Record, Survey & Document The Building1
3
4
5
6
7
8
9
10
11
12
Define Museology and Usage Requirements2
Pres
enta
tion
to A
KF
4
5
6
7
8
9
Stat
es 2
009
10