21
1 Al Thomas Playground Replacement & Park Improvements March 16, 2011 Presenters: Amanda Peterson Jeanette Sanchez Joliette Woodson

Al Thomas Playground Replacement & Park Improvements

  • Upload
    leif

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

Al Thomas Playground Replacement & Park Improvements. March 16, 2011 Presenters: Amanda Peterson Jeanette Sanchez Joliette Woodson. Funding. 2011 Capital Improvement Project Budget $80,000 Funding Source Is ADCO Open Space. Budget Breakdown. TOTAL BUDGET$80,000 - PowerPoint PPT Presentation

Citation preview

Page 1: Al Thomas Playground Replacement &  Park Improvements

1

Al Thomas Playground Replacement & Park Improvements

March 16, 2011

Presenters:Amanda PetersonJeanette SanchezJoliette Woodson

Page 2: Al Thomas Playground Replacement &  Park Improvements

2

Funding

• 2011 Capital Improvement Project Budget $80,000 Funding Source Is ADCO Open Space

Page 3: Al Thomas Playground Replacement &  Park Improvements

3

Budget Breakdown• TOTAL BUDGET $80,000• Mobilization and Administration Costs $ 8,000• Demolition $ 2,000• Fence Construction $11,000• Painting of Existing Equipment $ 1,000• Sidewalk Construction $ 7,000• Wood Fiber Play Surface $ 3,000• Contingency $ 8,000• New Playground Equipment Budget $40,000

Page 4: Al Thomas Playground Replacement &  Park Improvements

4

Park Improvement Prioritization

• New Playground Equipment

• ADA Accessible Sidewalk and Ramps

• Partial Fence Replacement

• Re-painting of 4-Square Court and Existing Equipment

• Basic Landscaping Improvements

Page 5: Al Thomas Playground Replacement &  Park Improvements

5

EXISTING PARK Equipment To Remain

Page 6: Al Thomas Playground Replacement &  Park Improvements

6

EXISTING PARK Equipment To Be Replaced

Page 7: Al Thomas Playground Replacement &  Park Improvements

7

Playground Design Considerations

• ADA Compliant• Vandal Resistant

Graffiti• Safety Zone Compliant

ASTM 1487 US Consumer Product Safety Commission

• Ease of Maintenance

Page 8: Al Thomas Playground Replacement &  Park Improvements

8

Playground Equipment Strategy

• Leave in place playground equipment that is in good condition. This includes the climber and swings. Repaint existing equipment to match new equipment.

• Replace large play structure Focus Age Group: 5 to 12 years of age.

• Any questions regarding playground prioritization and strategy?

Page 9: Al Thomas Playground Replacement &  Park Improvements

9

Type of Playground Equipment

• Modern Play Equipment

• Traditional Play Equipment

• Hybrid (Modern/Traditional) Equipment

Page 10: Al Thomas Playground Replacement &  Park Improvements

10

Modern Playground Equipment

Page 11: Al Thomas Playground Replacement &  Park Improvements

11

Traditional Playground Equip.

Page 12: Al Thomas Playground Replacement &  Park Improvements

12

Hybrid Playground Equip.

Page 13: Al Thomas Playground Replacement &  Park Improvements

13

Preferred Play Equipment Components

• Slides

• Independents

• Climbing Structures

Page 14: Al Thomas Playground Replacement &  Park Improvements

14

Preferred Play Equipment Components

• Activity Panels

• Spinners

• Overhead

Page 15: Al Thomas Playground Replacement &  Park Improvements

15

Layout Option A

Page 16: Al Thomas Playground Replacement &  Park Improvements

16

Layout Option B

Page 17: Al Thomas Playground Replacement &  Park Improvements

17

Layout Option C

Page 18: Al Thomas Playground Replacement &  Park Improvements

18

Layout Option D

Page 19: Al Thomas Playground Replacement &  Park Improvements

19

Layout Option E

Page 20: Al Thomas Playground Replacement &  Park Improvements

20

Al Thomas Park Improvement Selection Process

-Presentation Available at www.northglenn.org/p60.html

-Email comments/questions to [email protected]

Page 21: Al Thomas Playground Replacement &  Park Improvements

21

NEXT STEPS• Second Community Meeting

May 11, 2011 at 6:30 p.m. at Northglenn Christian Church

• Presentation outlining several design options Based on March’s community meeting feedback Based on available budget Based on safety zone & space constraints

Thank you for your time and your feedback