Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
2
1. TOWN OF VALLEYVIEW BYPASS HIGHWAYS 43 AND 49 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2. HIGHWAY 22X:03/04 CALGARY EAST FREEWAY TO RANGE ROAD 273 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
3. (216:06) INTERCHANGE AT ANTHONY HENDAY DRIVE AND CAMERON HEIGHTS DRIVE IN THE CITY OF EDMONTON . . . . . . . . . . . . . . . . 8
4. HIGHWAY 22X:03/04 FUNCTIONAL PLANNING STUDY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
5. HWY. 686, PARSONS CREEK EAST INTERCHANGE (BF85196) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
6. HWY. 27 PLANNING STUDY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
7. BF76191, TRIBUTARY TO ATHABASCA RIVER ON HIGHWAY 2:46, NEAR HONDO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
8. BF13654, TRIBUTARY TO LITTLE BRULE CREEK ON HIGHWAY 16:08, NEAR CHIP LAKE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
9. BF79282, TRIBUTARY TO MURIEL CREEK ON HIGHWAY 657:02, 4 KM SW OF GURNEYVILLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
10. HWY. 43:22, NORTH OF HIGHWAY 16 TO NORTH OF HIGHWAY 33 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
11. HWY. 2:72 - HWY 672 TO S. CLAIRMONT ACCESS NBL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
12. HIGHWAY 16:20, EAST OF HWY. 824 TO WEST OF ELK ISLAND PARK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
13. REGIONAL ENVIRONMENTAL CONSULTING SERVICES - MANAGEMENT OF CONTAMINATED SITES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
14. RESOURCE ROADS AND BRIDGE LOAD RATING STUDY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
15. BF76055 - WATERCOURSE HWY. 35:04 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
16. (2A:16) INNISFAIL TO S. OF HWY. 42; (570:06) HWY. 884 TO HWY. 886 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
17. 791:08, HIGHWAY 791 REALIGNMENT AND RECONSTRUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
18. (20:02) FINAL STAGE PAVING OF INTERSECTION AT HIGHWAY 11A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
19. (16:30) INTERSECTION IMPROVEMENT AT JCT. HWY. 16:30 AND HWY. 897 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
20. HIGHWAY 22 (Hwy 3 to Hwy 543) CLIMBING AND PASSING LANE STUDY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
3
21. BF13767 - WATERCOURSE (TRIBUTARY TO BEAR RIVER) HWY. 670:02 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
22. HIGHWAY 3:14 TWINNING ALIGNMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
23. BF13384 - STRAWBERRY CREEK NEAR KINUSO, HWY. 2:52, SW SEC 15 TWP 73 RGE 10 W5M . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
24. HIGHWAY 63 SERVICE ROADS AND ACCESS MANAGEMENT FUNCTIONAL PLANNING STUDY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
25. (006:04) HIGHWAY 06:04 AND 507 INTERSECTION IMPROVEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
26. HWY. 35, HWY. 2 TO THE NORTHWEST TERRITORIES BORDER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
27. 877:04 NORTH OF HIGHWAY 61 TO HIGHWAY 513 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
28. BF00330, CARRYING HIGHWAY 16:20 OVER POINT AUX PINS CREEK, 2.25 KM NORTH OF ARDROSSAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
29. BF72816, CARRYING HIGHWAY 28:10 OVER CACHE CREEK, 4 KM WEST OF SPEDDEN (SSE 15-053-22-W4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
30. CAPITAL REGION RING ROAD CORRIDOR IDENTIFICATION STUDY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
31. BF73293, CARRYING HIGHWAY 44:02 OVER TRIBUTARY TO PEMBINA RIVER 5KM NORTH OF JARVIE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
32. BF09796, CARRYING HIGHWAY 2:42 OVER A TRIBUTARY TO BAPTISTE CREEK, 9KM WEST OF ATHABASCA . . . . . . . . . . . . . . . . . . . . . . . . 22
33. (43:00 & :02) S. OF TWP RD. 723 TO E. OF HWY. 723 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
34. BF71538, HIGHWAY 501 CROSSING BULLHORN COULEE; LOCATED NEAR MOUNTAINVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
35. HWY. 726 REALIGNMENT AT THE EUREKA RIVER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
36. BF76186N, CARRYING HIGHWAY 63:02 OVER THE LA BICHE RIVER, NEAR ATMORE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
37. (88:04) ROADSIDE TURNOUT, 60 KM S. OF RED EARTH CREEK (SRA P-018l) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
38. HIGHWAY 857 PLANNING STUDY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
39. BF86210, CARRYING 686:12 OVER A WATERCOURSE, NEAR TROUT LAKE (NE9-87-4-5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
40. TURNER VALLEY GAS PLANT - TREATMENT CORRIDOR AND CONTAINMENT SYSTEM IMPROVEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
4
41. BF08867, CARRYING HWY. 682:02 OVER A TRIBUTARY TO ISLAND CREEK, NEAR FAIRVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
42. (43:02) E. OF JCT. HWY. 723 TO E. OF JCT. HWY. 724 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
43. HIGHWAY 56 PLANNING STUDY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
44. (2A:22) INTERSECTION TREATMENT ON HWY. 2A AT JCT. OF SPRUCE ROAD (TWP RD 422) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
45. (58:08) JCT. HWY. 35 TO JCT. RANGE ROAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
46. BF86227, CARRYING 986:02 OVER A TRIBUTARY TO CADOTTE RIVER (NW 35-86-17-5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
47. (774:02) CASTLE MOUNTAIN RESORT TO S. OF CASTLE RIVER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
48. INTERSECTION IMPROVEMENTS AND OTHER WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
49. BF78549, CARRYING HWY. 525:02 OVER AN IRRIGATION CANAL, EAST OF ROLLING HILLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
50. BF599 - HIGHWAY 552:02 OVER HIGHWOOD RIVER EAST OF OKOTOKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
51. BF1308 - HIGHWAY 540:02 OVER STIMSON CREEK SOUTH WEEST OF LONGVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
52. BULLHORN WASTE WAY REPLACEMENT AND BELLY RIVER TO ST. MARY MAIN CANAL WORKS UPGRADES . . . . . . . . . . . . . . . . . . . . . . 32
53. (2:36) - HIGHWAY 2:36 AND CARDIFF ROAD INTERSECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
54. (727:02) HIGHWAY 49 to HIGHWAY 680 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
55. HIGHWAY 16:12-14 FUNCTIONAL PLANNING STUDY FROM KAPASIWIN ROAD (RR 40) TO HIGHWAY 779 . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
56. (201:08) SECOND STAGE PAVING NWST, HWY. 1 TO HWY. 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
57. (63:02) BF72186N/S, CARRYING HWY. 63:02 OVER THE WANDERING RIVER, 0.2 KM SOUTH OF WANDERING RIVER . . . . . . . . . . . . . . . . . . 35
58. (63:04) BF75731N, CARRYING HWY. 63:04 OVER THE WANDERING RIVER, 13 KM NORTH OF WANDERING RIVER . . . . . . . . . . . . . . . . . . . . 35
59. (3:02) INTERSECTION AT HIGHWAY 3/61ST STREET AND INTERSECTION AT HWY. 3/FRANK INDUSTRIAL PARK ACCESS IN MUNICIPALITYOF CROWSNEST PASS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
60. BF75946W - CARRYING HWY. 2 OVER THE PEACE RIVER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
5
61. (2:32) - S. OF 41 AVE. TO N. OF ELLERSLIE ROAD (628:02) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
62. BF78078, SHAFTESBURY FERRY, HIGHWAY 740, NEAR PEACE RIVER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
63. (947:12) ATHABASCA RIVER TO HWY. 43 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
64. BF13320, CARRYING HIGHWAY 786:02 OVER CROWLODGE CREEK, NEAR BROCKET . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
65. (526:02) HIGHWAY 25 TO HIGHWAY 36 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
66. (570:04) HWY. 876 TO HWY. 884 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
67. PROJECT A - (791:06) - S. OF HWY. 575 TO N. OF HWY. 581 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
68. (529:04) PAR 110 LITTLE BOW PROVINCIAL PARK TO JCT. HWY. 845 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
69. (833:04) HWY. 617 - HWY. 14 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
70. (679:06) E. OF HWY. 749 TO HWY. 750 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
71. (859:02) HWY. 652 TO HWY. 28 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
72. (661:04) HWY. 769 TO HWY. 776 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
73. (540:02) JCT. HWY. 22 - E. OF JCT. HWY. 22 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
74. (887:02) BF7097, CARRYING HWY. 887:02 OVER TRIBUTARY TO CANAL CREEK NEAR ORION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
75. (804:02) JCT. HWY. 534 TO JCT. HWY. 23 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
76. (885:04) N. OF JCT. HWY. 61 TO HWY. 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
77. (22:14) BF2047, CARRYING HWY. 22:14 OVER FISH CREEK NEAR PRIDDIS (SW-26-22-3-W5M) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
78. (875:04) BF72029, CARRYING HWY. 875:04 OVER E.I.D. DRAIN NORTH OF ROLLING HILLS (NW-32-15-13-W4M) . . . . . . . . . . . . . . . . . . . . . . . . 45
79. (2:28) HIGHWAY 2 & HIGHWAY 53 INTERCHANGE UPGRADE, PONOKA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
80. OWNER'S ENGINEER FOR HIGHWAY 63:12 REALIGNMENT - SYNCRUDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
81. BF75380, CARRYING HWY. 682:02 OVER A TRIBUTARY TO HINES CREEK, NEAR FAIRVIEW (N.E. 35-81-5-6) . . . . . . . . . . . . . . . . . . . . . . . . . . 47
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
6
82. (508:02) JCT. HWY. 5 TO JCT. HWY. 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
83. 2011 AND 2012 PROVINCIAL HIGHWAY BRIDGE REHABILITATION PROGRAM - SOUTHERN REGION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
7
1. TOWN OF VALLEYVIEW BYPASS HIGHWAYS 43 AND 49FUNCTIONAL PLANNING STUDY
List of Consultants invited to submit proposals:
1. Al-Terra Engineering Ltd.2. McElhanney Consulting Services Ltd.3. Stantec Consulting Ltd.
Proposals to be submitted by February 18, 2010
Consultant Selected - MCELHANNEY CONSULTING SERVICES LTD.
2. HIGHWAY 22X:03/04 CALGARY EAST FREEWAY TO RANGE ROAD 273FUNCTIONAL PLANNING STUDY
List of Consultants invited to submit proposals:
1. CastleGlenn Consultants Inc.2. Focus Corporation3. McElhanney Consulting Services Ltd.
Proposals to be submitted by March 2, 2010
Consultant Selected - CASTLEGLENN CONSULTANTS INC.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
8
3. (216:06) INTERCHANGE AT ANTHONY HENDAY DRIVE AND CAMERON HEIGHTS DRIVE IN THE CITY OF EDMONTON
List of Consultants invited to submit proposals for Design and Tender Review, Construction Supervision, Contract Administration,Material Fabrication Inspection, Post Construction and Warranty Inspection for Grading, Granular Base Course, Asphalt ConcretePavement, Bridge Construction and Other Work:
1. AECOM Canada Ltd.2. Associated Engineering Alberta Ltd.3. MMM Group Ltd.4. Stantec Consulting Ltd.
Proposals to be submitted by February 23, 2010
Consultant Selected - STANTEC CONSULTING LTD.
4. HIGHWAY 22X:03/04 FUNCTIONAL PLANNING STUDYCALGARY EAST FREEWAY TO RANGE ROAD 273
List of Consultants invited to submit proposals:
1. CastleGlenn Consultants Inc.2. Focus Corporation3. McElhanney Consulting Services Ltd.
Proposals to be submitted by March 2, 2010
Consultant Selected - CASTLEGLENN CONSULTANTS INC.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
9
5. HWY. 686, PARSONS CREEK EAST INTERCHANGE (BF85196)HWY. 686, PARSONS CREEK WEST INTERCHANGE (BF85197)
List of Consultants invited to submit proposals for Functional Planning Study, Preliminary Engineering, Detailed Design and TenderPackage Preparation for Grading, Granular Base Course, Asphalt Concrete Pavement, Bridge/Culvert Structures and Other Work:
1. AECOM Canada Ltd.2. ISL Engineering and Land Services Ltd.3. Stantec Consulting Ltd.
Proposals to be submitted by March 9, 2010
Consultant Selected - ISL ENGINEERING AND LAND SERVICES LTD.
6. HWY. 27 PLANNING STUDYHWY. 27:06, REALIGNMENT - TOWN OF OLDS
List of Consultants invited to submit proposals:
1. CastleGlenn Consultants Inc.2. ISL Engineering and Land Services Ltd.3. Stantec Consulting Ltd.
Proposals to be submitted by March 11, 2010
Consultant Selected - CASTLEGLENN CONSULTANTS INC.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
10
7. BF76191, TRIBUTARY TO ATHABASCA RIVER ON HIGHWAY 2:46, NEAR HONDOBF71616, TRIBUTARY TO BAPTISTE CREEK ON HIGHWAY 2:42, 11 KM WEST OF ATHABASCA
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, Construction Supervision, Material Fabrication Inspection, Contract Administration and Post Construction for Culvert Replacementand Other Work:
1. ARA Engineering Ltd.2. MPA Engineering Ltd.3. Yellowhead Engineering Services
Proposals to be submitted by March 10, 2010
Consultant Selected - MPA ENGINEERING LTD.
8. BF13654, TRIBUTARY TO LITTLE BRULE CREEK ON HIGHWAY 16:08, NEAR CHIP LAKE
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, Construction Supervision, Material Fabrication Inspection, Contract Administration and Post Construction for Culvert Replacementand Other Work:
1. Genivar Consultants LP2. MMM Group Ltd.3. MPA Engineering Ltd.
Proposals to be submitted by March 10, 2010
Consultant Selected - MPA ENGINEERING LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
11
9. BF79282, TRIBUTARY TO MURIEL CREEK ON HIGHWAY 657:02, 4 KM SW OF GURNEYVILLE
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, Construction Supervision, Material Fabrication Inspection, Contract Administration and Post Construction for Culvert Replacementand Other Work:
1. ARA Engineering Ltd.2. Genivar Consultants LP3. Yellowhead Engineering Services
Proposals to be submitted by March 10, 2010
Consultant Selected - YELLOWHEAD ENGINEERING SERVICES
10. HWY. 43:22, NORTH OF HIGHWAY 16 TO NORTH OF HIGHWAY 33FUNCTIONAL PLANNING STUDY
List of Consultants invited to submit proposals:
1. AECOM Canada Ltd.2. Al-Terra Engineering Ltd.3. CastleGlenn Consultants Inc.
Proposals to be submitted by April 8, 2010
Consultant Selected - CASTLEGLENN CONSULTANTS INC.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
12
11. HWY. 2:72 - HWY 672 TO S. CLAIRMONT ACCESS NBL
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration, and Post Construction for Selective Heave Repair and Other Work:
1. EBA Engineering Consultants Ltd.2. Morrison Hershfield Limited3. Yellowhead Engineering Services
Proposals to be submitted by April 29, 2010
Consultant Selected - EBA ENGINEERING CONSULTANTS LTD.
12. HIGHWAY 16:20, EAST OF HWY. 824 TO WEST OF ELK ISLAND PARKFUNCTIONAL PLANNING STUDY
List of Consultants invited to submit proposals:
1. CIMA+Partners in Excellence2. MMM Group Limited3. Urban Systems Ltd.
Proposals to be submitted by April 20, 2010
Consultant Selected - URBAN SYSTEMS LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
13
13. REGIONAL ENVIRONMENTAL CONSULTING SERVICES - MANAGEMENT OF CONTAMINATED SITES(WORK AREA - 1 & 2) (CENTRAL REGION)
List of Consultants invited to submit proposals for Contaminated Site Assessment & Remediation Consulting, Project Management andReporting:
1. Crimson Environmental Limited2. Genivar Consultants LP3. Thurber Engineering Ltd.
Proposals to be submitted by May 4, 2010
Consultant Selected - CRIMSON ENVIRONMENTAL LIMITED
14. RESOURCE ROADS AND BRIDGE LOAD RATING STUDY
List of Consultants invited to submit proposals:
1. AECOM Canada Ltd.2. BPTEC-DNW Engineering Ltd.3. Buckland & Taylor Ltd.
Proposals to be submitted by May 5, 2010
Consultant Selected - BPTEC-DNW ENGINEERING LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
14
15. BF76055 - WATERCOURSE HWY. 35:04 BF73271 - WATERCOURSE (TRIBUTARY TO ROUSSEAU)
List of Consultants invited to submit proposals for Detailed Design, Tender Package Preparation, Construction Supervision, Contract Administration and Post Construction for Culvert Replacement and Other Work:
1. ADI Limited2. MMM Group Ltd.3. Yellowhead Engineering Services
Proposals to be submitted by May 11, 2010
Consultant Selected - YELLOWHEAD ENGINEERING SERVICES
16. (2A:16) INNISFAIL TO S. OF HWY. 42; (570:06) HWY. 884 TO HWY. 886
List of Consultants invited to submit proposals for Detailed Design, Tender Package Preparation, Construction Supervision and Contract Administration for Asphalt Concrete Pavement (Final Stage) and Other Work:
1. Delcan Corporation2. Dillon Consulting Limited3. Wardrop Engineering Inc.
Proposals to be submitted by May 12, 2010
Consultant Selected - DELCAN CORPORATION
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
15
17. 791:08, HIGHWAY 791 REALIGNMENT AND RECONSTRUCTION HIGHWAY 590 TO HIGHWAY 42
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, Construction Supervision and Contract Administration for Grading, Granular Base Course, Asphalt Concrete Pavement and OtherWork:
1. Delcan Corporation2. Dillon Consulting Limited3. Wardrop Engineering Inc.
Proposals to be submitted by May 12, 2010
Consultant Selected - DILLON CONSULTING LTD.
18. (20:02) FINAL STAGE PAVING OF INTERSECTION AT HIGHWAY 11A
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, Construction Supervision, Contract Administration and Post Construction Services for Asphalt Concrete Pavement, IntersectionImprovement and Other Work:
1. Al-Terra Engineering Ltd.2. Clifton Associates3. Focus Corporation
Proposals to be submitted by May 12, 2010
Consultant Selected - AL-TERRA ENGINEERING LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
16
19. (16:30) INTERSECTION IMPROVEMENT AT JCT. HWY. 16:30 AND HWY. 897
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, Construction Supervision, Contract Administration and Post Construction Services for Intersection Improvement and Other Work:
1. Al-Terra Engineering Ltd.2. Clifton Associates3. Focus Corporation
Proposals to be submitted by May 12, 2010
Consultant Selected - CLIFTON ASSOCIATES LTD.
20. HIGHWAY 22 (Hwy 3 to Hwy 543) CLIMBING AND PASSING LANE STUDY
List of Consultants invited to submit proposals:
1. ADI Engineering Ltd.2. ARA Engineering Ltd.3. EBA Engineering Consultants Ltd.
Proposals to be submitted by May 26, 2010
Consultant Selected - EBA ENGINEERING CONSULTANTS LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
17
21. BF13767 - WATERCOURSE (TRIBUTARY TO BEAR RIVER) HWY. 670:02 BF77835 - WATERCOURSE (TRIBUTARY TO SWEATHOUSE CREEK) HWY. 747:01
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, Construction Supervision and Post Construction Services for Bridge and Culvert Replacement and Other Work:
1. ADI Ltd.2. MPA Engineering Ltd.3. Yellowhead Engineering Services
Proposals to be submitted by May 27, 2010
Consultant Selected - MPA ENGINEERING LTD.
22. HIGHWAY 3:14 TWINNING ALIGNMENT WEST OF BURDETT TO WEST OF SEVEN PERSONS
List of Consultants invited to submit proposals:
1. CastleGlenn Consultants Inc.2. ISL Engineering and Land Services Ltd.3. EBA Engineering Consultants Ltd.
Proposals to be submitted by June 2, 2010
Consultant Selected - ISL ENGINEERING AND LAND SERVICES LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
18
23. BF13384 - STRAWBERRY CREEK NEAR KINUSO, HWY. 2:52, SW SEC 15 TWP 73 RGE 10 W5M BF09301 - TRIBUTARY TO UTIKUMA RIVER NEAR GROUARD HWY. 750:04, C127.084, SW SEC 7 TWP 79 RGE 12 5M
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, Construction Supervision and Post Construction Services for Standard Bridges Rehabilitation and Other Work:
1. MPA Engineering Ltd.2. Most Engineering Ltd.3. YMCL Engineering Ltd.
Proposals to be submitted by June 8, 2010
Consultant Selected - MPA ENGINEERING LTD.
24. HIGHWAY 63 SERVICE ROADS AND ACCESS MANAGEMENT FUNCTIONAL PLANNING STUDY FUTURE PARSONS CREEK INTERCHANGE TO SUNCOR INTERCHANGE
List of Consultants invited to submit proposals:
1. ADI Limited2. EBA Engineering Consultants Limited3. ISL Engineering and Land Services Ltd.
Proposals to be submitted by June 22, 2010
Consultant Selected - EBA ENGINEERING CONSULTANTS LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
19
25. (006:04) HIGHWAY 06:04 AND 507 INTERSECTION IMPROVEMENT
List of Consultants invited to submit proposals for Tender Preparation, Project Management, Construction Supervision and PostConstruction Services for Grading, Granular Base Course, Asphalt Concrete Pavement (EPS) and Other Works
1. ISL Engineering Sevices Ltd.2. Focus Corporation3. Stantec Consulting Ltd.
Proposals to be submitted by June 28, 2010
Consultant Selected - ISL ENGINEERING SERVICES LTD.
26. HWY. 35, HWY. 2 TO THE NORTHWEST TERRITORIES BORDERFREEWAY CORRIDOR MANAGEMENT STUDY
List of Consultants invited to submit proposals:
1. Associated Engineering Alberta Ltd.2. CIMA+Partners in Excellence3. Dillon Consulting Ltd.
Proposals to be submitted by June 29, 2010
Consultant Selected - ASSOCIATED ENGINEERING ALBERTA LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
20
27. 877:04 NORTH OF HIGHWAY 61 TO HIGHWAY 513
List of Consultants invited to submit proposals for Project Management, Construction Supervision and Post Construction Services forGranular Base Course, Asphalt Concrete Pavement and Other Works:
1. All pre-qualified Consultants for ACP
Proposals to be submitted by July 6, 2010
Consultant Selected - GENIVAR CONSULTANTS LTD.
28. BF00330, CARRYING HIGHWAY 16:20 OVER POINT AUX PINS CREEK, 2.25 KM NORTH OF ARDROSSAN
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Preparation, Material FabricationInspection, Construction Supervision, Contract Administration and Post Construction for Culvert Replacement and Other Work:
1. Genivar Consultant LP2. ISL Engineering Land Services Ltd.3. MMM Group Ltd.
Proposals to be submitted by July 6, 2010
Consultant Selected - ISL ENGINEERING LAND SERVICES LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
21
29. BF72816, CARRYING HIGHWAY 28:10 OVER CACHE CREEK, 4 KM WEST OF SPEDDEN (SSE 15-053-22-W4)
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Preparation, Material FabricationInspection, Construction Supervision, Contract Administration and Post Construction for Bridge Replacement and Other Work:
1. BPTEC-DNW Engineering Services2. MPA Engineering Ltd.3. Stantec Consulting Ltd.
Proposals to be submitted by July 6, 2010
Consultant Selected - MPA ENGINEERING LTD.
30. CAPITAL REGION RING ROAD CORRIDOR IDENTIFICATION STUDY
List of Consultants invited to submit proposals:
1. AECOM Canada Ltd.2. ISL Engineering Land Services Ltd.3. Stantec Consulting Ltd.
Proposals to be submitted by July 8, 2010
Consultant Selected - ISL ENGINEERING AND LAND SERVICES LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
22
31. BF73293, CARRYING HIGHWAY 44:02 OVER TRIBUTARY TO PEMBINA RIVER 5KM NORTH OF JARVIE
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Preparation, Material FabricationInspection, Construction Supervision, Contract Administration and Post Construction for Culvert Replacement and Other Work:
1. ISL Engineering Land Services Ltd.2. MMM Group Ltd.3. MPA Engineering Ltd.
Proposals to be submitted by July 13, 2010
Consultant Selected - MPA ENGINEERING LTD.
32. BF09796, CARRYING HIGHWAY 2:42 OVER A TRIBUTARY TO BAPTISTE CREEK, 9KM WEST OF ATHABASCA (SSE 28-066-23-W4)
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Preparation, Material FabricationInspection, Construction Supervision, Contract Administration and Post Construction for Culvert Replacement and Other Work:
1. ARA Engineering Ltd.2. BPTEC-DNW Engineering Ltd.3. Yellowhead Engineering Services Ltd.
Proposals to be submitted by July 13, 2010
Consultant Selected - BPTEC-DNW ENGINEERING LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
23
33. (43:00 & :02) S. OF TWP RD. 723 TO E. OF HWY. 723
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration and Post Construction for Four-Lane Grading, Granular Base Course, Asphalt Concrete Pavementand Bridge File Construction and Other Work:
1. ARA Engineering Ltd.2. Stantec Consulting Ltd.3. Stewart, Weir & Co. Ltd.
Proposals to be submitted by July 27, 2010
Consultant Selected - ARA ENGINEERING LTD.
34. BF71538, HIGHWAY 501 CROSSING BULLHORN COULEE; LOCATED NEAR MOUNTAINVIEW
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration for Culvert Replacement and Other Work:
1. Genivar Consultants LP2. ISL Engineering and Land Services Ltd.3. MPE Engineering Ltd.
Proposals to be submitted by July 27, 2010
Consultant Selected - ISL ENGINEERING AND LAND SERVICES LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
24
35. HWY. 726 REALIGNMENT AT THE EUREKA RIVER FUNCTIONAL PLANNING STUDY
List of Consultants invited to submit proposals:
1. EBA Engineering Consultants Ltd.2. Focus Corporation3. Morrison Hershfield Limited
Proposals to be submitted by July 27, 2010
Consultant Selected - MORRISON HERSHFIELD LIMITED
36. BF76186N, CARRYING HIGHWAY 63:02 OVER THE LA BICHE RIVER, NEAR ATMORE
List of Consultants invited to submit proposals for Detailed Design, Tender Package Preparation, Material Fabrication Inspection,Contract Administration, Post Construction and Warranty Inspection for Bridge Construction and Other Work:
1. Associated Engineering Alberta Ltd.2. CH2M Hill Canada Limited3. ISL Engineering and Land Services Ltd.
Proposals to be submitted by July 29, 2010
Consultant Selected - ASSOCIATED ENGINEERING ALBERTA LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
25
37. (88:04) ROADSIDE TURNOUT, 60 KM S. OF RED EARTH CREEK (SRA P-018l)
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration for Roadside Turnout Construction/Upgrades and Other Work:
1. ARA Engineering Ltd.2. Clifton Associates Ltd.3. Yellowhead Engineering Services
Proposals to be submitted by July 29, 2010
Consultant Selected - ARA ENGINEERING LTD.
38. HIGHWAY 857 PLANNING STUDY
List of Consultants invited to submit proposals:
1. AMEC Earth & Environmental2. CH2M Hill Canada Limited3. Dillon Consulting Limited
Proposals to be submitted by August 4, 2010
Consultant Selected - AMEC EARTH & ENVIRONMENTAL
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
26
39. BF86210, CARRYING 686:12 OVER A WATERCOURSE, NEAR TROUT LAKE (NE9-87-4-5) BF86234, CARRYING 88:08 OVER A WATERCOURSE, NEAR RED EARTH (NE 11-87-9-5)
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration for Culvert Replacements and Other Work:
1. Morrison Hershfield Limited2. MPA Engineering Ltd.3. Yellowhead Engineering Services
Proposals to be submitted by August 17, 2010
Consultant Selected - MPA ENGINEERING LTD.
40. TURNER VALLEY GAS PLANT - TREATMENT CORRIDOR AND CONTAINMENT SYSTEM IMPROVEMENTS
List of Consultants invited to submit proposals:
1. AMEC Earth & Environmental2. CH2M Hill Canada Ltd.3. Stantec Consulting Ltd.4. Worley Parsons
Proposals to be submitted by August 25, 2010
Consultant Selected - AMEC EARTH & ENVIRONMENTAL
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
27
41. BF08867, CARRYING HWY. 682:02 OVER A TRIBUTARY TO ISLAND CREEK, NEAR FAIRVIEWBF74728, CARRYING HWY. 684:02 OVER MCALLISTER CREEK, NEAR GRIMSHAW
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Post Construction Services for Culvert/Bridge Replacement and Other Work:
1. ADI Limited2. Genivar Consultants LP3. MPA Engineering Ltd.
Proposals to be submitted by August 26, 2010
Consultant Selected - MPA ENGINEERING LTD.
42. (43:02) E. OF JCT. HWY. 723 TO E. OF JCT. HWY. 724 (43X/43:04) W. OF 116 STREET (R.R.63) TO E. OF HWY. 2/HWY. 43 INTERCHANGE N. OF GRANDE PRAIRIE
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration for Asphalt Concrete Pavement and Other Work:
1. ARA Engineering Ltd.2. ISL Engineering and Land Services Ltd.3. Stewart, Weir & Co. Ltd.
Proposals to be submitted by August 26, 2010
Consultant Selected - STEWART, WEIR & CO. LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
28
43. HIGHWAY 56 PLANNING STUDY
List of Consultants invited to submit proposals:
1. Delcan Corporation2. iTrans Consulting3. MMM Group
Proposals to be submitted by September 14, 2010
Consultant Selected - DELCAN CORPORATION
44. (2A:22) INTERSECTION TREATMENT ON HWY. 2A AT JCT. OF SPRUCE ROAD (TWP RD 422) (11A:06) INTERSECTION TREATMENT ON HWY. 11A T JCT. OF POPLAR RIDGE ROAD
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration and Post Construction Services for Grading, Granular Base Course, Asphalt Concrete Pavementand Other Work:
1. Al-Terra Engineering Ltd.2. Associated Engineering Ltd.3. Delcan Corporation
Proposals to be submitted by September 14, 2010
Consultant Selected - DELCAN CORPORATION
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
29
45. (58:08) JCT. HWY. 35 TO JCT. RANGE ROAD
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration for Intersection Relocation, Intersection Improvements, Service Road Construction and OtherWork:
1. AMEC Earth & Environmental2. Genivar Consultants LP3. Stewart, Weir & Co. Ltd.
Proposals to be submitted by September 14, 2010
Consultant Selected - GENIVAR CONSULTANTS LP
46. BF86227, CARRYING 986:02 OVER A TRIBUTARY TO CADOTTE RIVER (NW 35-86-17-5) BF81288, CARRYING 986:02 OVER A TRIBUTARY TO CARMON CREEK (NW10-85-20-5)
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration for Culvert Replacements and Other Work:
1. Genivar Consultants LP2. MPA Engineering Ltd.3. Yellowhead Engineering Services
Proposals to be submitted by September 21, 2010
Consultant Selected - GENIVAR CONSULTANTS LP
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
30
47. (774:02) CASTLE MOUNTAIN RESORT TO S. OF CASTLE RIVER
List of Consultants invited to submit proposals for Preliminary Engineering for Grading (Selective), Granular Base Course, AsphaltConcrete Pavement and Other Work:
1. Associated Engineering Alberta Ltd2. CH2M Hill Canada Ltd.3. Urban Systems
Proposals to be submitted by September 21, 2010
Consultant Selected - ASSOCIATED ENGINEERING LTD.
48. INTERSECTION IMPROVEMENTS AND OTHER WORK
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration and Post Construction for Grading, Granular Base Course, Asphalt Concrete Pavement and OtherWork:
1. ADI Limited2. Focus Corporation3. Stewart, Weir & Co. Ltd.
Proposals to be submitted by September 28, 2010
Consultant Selected - ADI LIMITED
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
31
49. BF78549, CARRYING HWY. 525:02 OVER AN IRRIGATION CANAL, EAST OF ROLLING HILLS
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration and Post Construction Services for Culvert Replacement and Other Work:
1. Mish Engineering Ltd.2. MMM Group Ltd.3. MPE Engineering Ltd.
Proposals to be submitted by September 29, 2010
Consultant Selected - MPE ENGINEERING LTD.
50. BF599 - HIGHWAY 552:02 OVER HIGHWOOD RIVER EAST OF OKOTOKS
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, MaterialFabrication Inspection, Construction Supervision and Contract Administration for Bridge Replacement and Other Work:
1. Associated Engineering Ltd.2. ISL Engineering and Land Services Ltd.3. Read Jones Christoffersen Ltd.
Proposals to be submitted by October 5, 2010
Consultant Selected - ISL ENGINEERING AND LAND SERVICES LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
32
51. BF1308 - HIGHWAY 540:02 OVER STIMSON CREEK SOUTH WEEST OF LONGVIEW
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, MaterialFabrication Inspection, Construction Supervision and Contract Administration for Bridge Replacement and Other Work:
1. Buckland & Taylor Ltd.2. Delcan Corporation3. Dillon Consulting Ltd.
Proposals to be submitted by October 5, 2010
Consultant Selected - DILLON CONSULTING LTD.
52. BULLHORN WASTE WAY REPLACEMENT AND BELLY RIVER TO ST. MARY MAIN CANAL WORKS UPGRADES
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration for Bullhorn Water Management Project:
1. AECOM Canada Ltd.2. AMEC Earth & Environmental3. Golder Associates Ltd.4. Hatch Acres5. Klohn Crippen Consultants6. MPE Engineering Ltd.7. Stantec Consulting Ltd.
Proposals to be submitted by October 5, 2010
Consultant Selected - MPE ENGINEERING LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
33
53. (2:36) - HIGHWAY 2:36 AND CARDIFF ROAD INTERSECTION
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration for Granular Base Course, Asphalt Concrete Pavement (ACP) and Other Work:
1. Al-Terra Engineering Ltd.2. ISL Engineering and Land Services Ltd.3. MMM Group Limited
Proposals to be submitted by October 6, 2010
Consultant Selected - AL-TERRA ENGINEERING LTD.
54. (727:02) HIGHWAY 49 to HIGHWAY 680
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Utility Coordination, ROW Acquisition,Tender Package Preparation, Construction Supervision, Post Construction and Warranty Inspection for Grading, Granular Base Course,Asphalt Concrete Pavement and Other Work:
1. AECOM Canada Ltd.2. ARA Engineering Ltd.3. Associated Engineering Alberta Ltd.
Proposals to be submitted by October 6, 2010
Consultant Selected - ARA ENGINEERING LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
34
55. HIGHWAY 16:12-14 FUNCTIONAL PLANNING STUDY FROM KAPASIWIN ROAD (RR 40) TO HIGHWAY 779
List of Consultants invited to submit proposals:
1. Associated Engineering Alberta Ltd.2. CH2M Hill Canada Ltd.3. Delcan Corporation
Proposals to be submitted by October 7, 2010
Consultant Selected - CH2M HILL CANADA LTD.
56. (201:08) SECOND STAGE PAVING NWST, HWY. 1 TO HWY. 2
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Post Construction and Warranty Inspection for Asphalt Concrete Pavement and Other Work:
1. AECOM Canada Ltd.2. EBA Engineering Ltd.3. Parsons Overseas Company of Canada Ltd.
Proposals to be submitted by October 13, 2010
Consultant Selected - AECOM CANADA LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
35
57. (63:02) BF72186N/S, CARRYING HWY. 63:02 OVER THE WANDERING RIVER, 0.2 KM SOUTH OF WANDERING RIVER
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration, Material Fabrication Inspection, Post Construction and Warranty Inspection for BridgeConstruction and Other Work:
1. BPTEC-DNW Engineering Ltd. (declined)2. Dialog (Cohos Evamy)3. Most Engineering (2001) Ltd.
Proposals to be submitted by October 13, 2010
Consultant Selected - ASSOCIATED ENGINEERING ALBERTA LTD.
58. (63:04) BF75731N, CARRYING HWY. 63:04 OVER THE WANDERING RIVER, 13 KM NORTH OF WANDERING RIVER
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration, Material Fabrication Inspection, Post Construction and Warranty Inspection for BridgeConstruction and Other Work:
1. AECOM Canada Ltd.2. Dillon Consulting Ltd.3. Most Engineering (2001) Ltd.
Proposals to be submitted by October 13, 2010
Consultant Selected - MOST ENGINEERING (2001) LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
36
59. (3:02) INTERSECTION AT HIGHWAY 3/61ST STREET AND INTERSECTION AT HWY. 3/FRANK INDUSTRIAL PARKACCESS IN MUNICIPALITY OF CROWSNEST PASS
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration, Post Construction and Warranty Inspection for Intersection Improvements and Other Work:
1. Associated Engineering Alberta Ltd.2. Delcan Corporation3. McElhanney Consulting Services Ltd.
Proposals to be submitted by October 13, 2010
Consultant Selected - ASSOCIATED ENGINEERING ALBERTA LTD.
60. BF75946W - CARRYING HWY. 2 OVER THE PEACE RIVER
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration and Post Construction for New Bridge Construction, Bridge Widening, Grading, Granular BaseCourse, Asphalt Concrete Pavement and Other Work:
1. AECOM Canada Ltd.2. CH2M Hill Canada Ltd.3. Stantec Consulting Ltd.
Proposals to be submitted by October 14, 2010
Consultant Selected -
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
37
61. (2:32) - S. OF 41 AVE. TO N. OF ELLERSLIE ROAD (628:02)
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation for Grading,Granular Base Course, Asphalt Concrete Pavement, Bridge Construction and Other Work:
1. AECOM Canada Ltd.2. CH2M Hill Canada Ltd.3. ISL Engineering and Land Services Ltd.
Proposals to be submitted by October 21, 2010
Consultant Selected - CH2M HILL CANADA LTD.
62. BF78078, SHAFTESBURY FERRY, HIGHWAY 740, NEAR PEACE RIVERBF76074, LACRETE FERRY, HIGHWAY 697, NEAR LACRETE
List of Consultants invited to submit proposals for Detailed Design, Tender Package Preparation, Construction Supervision, ContractAdministration and Post Construction Services for Ferry Repairs:
1. Genivar Consultants LP2. Stantec Consulting Ltd.
Proposals to be submitted by November 4, 2010
Consultant Selected - GENIVAR CONSULTANTS LP
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
38
63. (947:12) ATHABASCA RIVER TO HWY. 43
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration for Asphalt Concrete Pavement and Other Work:
1. AMEC Earth & Environmental2. Morrison Hershfield Limited3. Stewart, Weir & Co. Ltd.
Proposals to be submitted by November 4, 2010
Consultant Selected - STEWART, WEIR & CO. LTD.
64. BF13320, CARRYING HIGHWAY 786:02 OVER CROWLODGE CREEK, NEAR BROCKETBF801, CARRYING HIGHWAY 5:04 OVER AN UNNAMED WATERCOURSE, NEAR CARDSTON
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, MaterialFabrication Inspection, Construction Supervision and Contract Administration for Culvert Replacement and Other Work:
1. ARA Engineering Ltd.2. CIMA+Partners in Excellence3. Dillon Consulting Ltd.
Proposals to be submitted by November 9, 2010
Consultant Selected - ARA ENGINEERING LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
39
65. (526:02) HIGHWAY 25 TO HIGHWAY 36
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, Right-of-WayAcquisition, Construction Supervision, Contract Administration, Post Construction and Warranty Inspection for Sideslope Improvements(Selective) and Other Work:
1. AMEC Earth & Environmental2. Associated Engineering Alberta Ltd.3. ISL Engineering and Land Services Ltd.
Proposals to be submitted by November 9, 2010
Consultant Selected - AMEC EARTH & ENVIRONMENTAL
66. (570:04) HWY. 876 TO HWY. 884
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration for Asphalt Concrete Pavement and Other Work:
1. Delcan Corporation2. Stantec Consulting Ltd.3. Wardrop Engineering Inc.
Proposals to be submitted by November 22, 2010
Consultant Selected - STANTEC CONSULTING LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
40
67. PROJECT A - (791:06) - S. OF HWY. 575 TO N. OF HWY. 581 PROJECT B - (791:08) - HWY. 27 TO S. OF HWY. 587
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration for Asphalt Concrete Pavement and Other Work:
1. ADI Limited2. DillonConsulting Ltd.3. Urban Systems Ltd.
Proposals to be submitted by November 23, 2010
Consultant Selected - URBAN SYSTEMS LTD.
68. (529:04) PAR 110 LITTLE BOW PROVINCIAL PARK TO JCT. HWY. 845
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration, Post Construction and Warranty Inspection for Granular Base Course, Asphalt ConcretePavement (EPS) and Other Work:
1. Associated Engineering Alberta Ltd.2. Eagle Engineering Corp.3. EBA Engineering Consultants Ltd.
Proposals to be submitted by November 23, 2010
Consultant Selected - EAGLE ENGINEERING CORP.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
41
69. (833:04) HWY. 617 - HWY. 14(870:08) VILLAGE OF INNISFREE - HWY. 631(631:04) HWY. 36 - HWY. 870(N)
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision and Contract Administration for Asphalt Concrete Pavement and Other Work:
1. Al-Terra Engineering Ltd.2. AMEC Earth & Environmental3. Focus Corporation
Proposals to be submitted by November 23, 2010
Consultant Selected - FOCUS CORPORATION
70. (679:06) E. OF HWY. 749 TO HWY. 750
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration, Post Construction and Warranty Inspection for Asphalt Concrete Pavement (ACP) and OtherWork:
1. ARA Engineering Ltd.2. Genviar Consultants LP3. Stewart, Weir & Co. Ltd.
Proposals to be submitted by November 24, 2010
Consultant Selected - ARA ENGINEERING LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
42
71. (859:02) HWY. 652 TO HWY. 28
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration, Post Construction and Warranty Inspection for Asphalt Concrete Pavement and Other Work:
1. AL-Terra Engineering Ltd.2. Stewart, Weir & Co. Ltd.3. Yellowhead Engineering Services
Proposals to be submitted by November 30, 2010
Consultant Selected - STEWART, WEIR & CO. LTD.
72. (661:04) HWY. 769 TO HWY. 776
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration, Post Construction and Warranty Inspection for Subgrade Preparation, GBC, Asphalt ConcretePavement and Other Work:
1. ARA Engineering Ltd.2. CH2M Hill Canada Limited3. Stewart, Weir & Co. Ltd.
Proposals to be submitted by December 2, 2010
Consultant Selected - ARA ENGINEERING LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
43
73. (540:02) JCT. HWY. 22 - E. OF JCT. HWY. 22
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration, Post Construction and Warranty Inspection for Asphalt Concrete Pavement (ACP) and OtherWork:
1. CIMA+Partners in Excellence2. Dillon Consulting Limited3. Parsons Overseas Company of Canada Ltd.
Proposals to be submitted by December 7, 2010
Consultant Selected - CIMA+PARTNERS IN EXCELLENCE
74. (887:02) BF7097, CARRYING HWY. 887:02 OVER TRIBUTARY TO CANAL CREEK NEAR ORION
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, MaterialFabrication Inspection, Construction Supervision and Contract Administration for Bridge Replacement and Other Work:
1. Mish Engineering Ltd.2. MPE Engineering Ltd.3. YMCL Engineering Ltd.
Proposals to be submitted by December 7, 2010
Consultant Selected - MPE ENGINEERING LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
44
75. (804:02) JCT. HWY. 534 TO JCT. HWY. 23
List of Consultants invited to submit proposals for Detailed Design, Tender Package Preparation, Construction Supervision, ContractAdministration, Post Construction and Warranty Inspection Services for Asphalt Concrete Pavement (ACP) and Other Work:
1. AECOM Canada Ltd.2. Eagle Engineering Corp.3. Morrison Hershfield Limited
Proposals to be submitted by December 7, 2010
Consultant Selected - EAGLE ENGINEERING CORP.
76. (885:04) N. OF JCT. HWY. 61 TO HWY. 3
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration, Post Construction and Warranty Inspection for Asphalt Concrete Pavement (ACP) and OtherWork:
1. Associated Engineering Alberta Ltd.2. Genivar Consultants LP3. ISL Engineering and Land Services Ltd.
Proposals to be submitted by December 7, 2010
Consultant Selected - GENIVAR CONSULTANTS LP
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
45
77. (22:14) BF2047, CARRYING HWY. 22:14 OVER FISH CREEK NEAR PRIDDIS (SW-26-22-3-W5M)
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, MaterialFabrication Inspection, Construction Supervision and Contract Administration, Post Construction for Bridge Replacement/Widening,Intersection Treatments, Climbing Lanes and Other Work:
1. ADI Limited2. AMEC Earth and Environmental3. ISL Engineering and Land Services Ltd.
Proposals to be submitted by December 7, 2010
Consultant Selected - ISL ENGINEERING AND LAND SERVICES LTD.
78. (875:04) BF72029, CARRYING HWY. 875:04 OVER E.I.D. DRAIN NORTH OF ROLLING HILLS (NW-32-15-13-W4M)(544:02) BF78432, CARRYING HWY. 544;02 OVER E.I.D. IRRIGATION CANAL NEAR DUCHESS (SW-13-20-15-W4M)
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, MaterialFabrication Inspection, Construction Supervision and Contract Administration for Culvert Replacement and Other Work:
1. AMEC Earth and Environmental2. CIMA+Partners in Excellence3. Mish Engineering Ltd.
Proposals to be submitted by December 7, 2010
Consultant Selected - CIMA+PARTNERS IN EXCELLENCE
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
46
79. PROJECT ‘A’ - (2:28) HIGHWAY 2 & HIGHWAY 53 INTERCHANGE UPGRADE, PONOKAPROJECT ‘B’ - (2:28) HIGHWAY 2 & HIGHWAY 13 INTERCHANGE UPGRADE, WETASKIWIN
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration and Post Construction for Grading, Granular Base Course, Asphalt Concrete Pavement and OtherWork:
1. Al-Terra Engineering Ltd.2. Focus Corporation3. ISL Engineering and Land Services Ltd.
Proposals to be submitted by December 14, 2010
Consultant Selected - PROJECT ‘A’ - ISL ENGINEERING AND LAND SERVICES LTD.PROJECT ‘B’ - FOCUS CORPORATION
80. OWNER'S ENGINEER FOR HIGHWAY 63:12 REALIGNMENT - SYNCRUDE
List of Consultants invited to submit proposals:
1. AECOM Canada Ltd.2. Al-Terra Engineering Ltd.3. ARA Engineering Ltd.4. Associated Engineering Alberta Ltd.
Proposals to be submitted by December 21, 2010
Consultant Selected - AL-TERRA ENGINEERING LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
47
81. BF75380, CARRYING HWY. 682:02 OVER A TRIBUTARY TO HINES CREEK, NEAR FAIRVIEW (N.E. 35-81-5-6)
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration and Post Construction for Culvert Rehabilitation and Other Work:
1. ARA Engineering Ltd.2. Genivar Consultants LP3. ISL Engineering and Land Services Ltd.
Proposals to be submitted by December 22, 2010
Consultant Selected - GENIVAR CONSULTANTS LP
82. (508:02) JCT. HWY. 5 TO JCT. HWY. 4
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision, Contract Administration, Post Construction and Warranty Inspection for Asphalt Concrete Pavement (ACP) and OtherWork:
1. Associated Engineering Alberta Ltd.2. Eagle Engineering Corp.3. ISL Engineering and Land Services Ltd.
Proposals to be submitted by December 22, 2010
Consultant Selected - ISL ENGINEERING AND LAND SERVICES LTD.
Alberta Transportation March 16, 2011RFP_lst10.wpd
Table of Contents
48
83. 2011 AND 2012 PROVINCIAL HIGHWAY BRIDGE REHABILITATION PROGRAM - SOUTHERN REGION
List of Consultants invited to submit proposals for Preliminary Engineering, Detailed Design, Tender Package Preparation, ConstructionSupervision andContract Administration for Bridge Rehabilitation and Other Work:
1. CIMA+Partners In Excellence2. Most Engineering (2001) Ltd.3. Read Jones Christoffersen Ltd.
Proposals to be submitted by December 22, 2010
Consultant Selected - MOST ENGINEERING (2001) Ltd.