  • BSS Dimensioning Methods

    in B10

    Eugen Marza

    December 2008

  • Agenda

    1. Air Interface (Cell) Dimensioning

    2. Abis Interface Dimensioning

    3. BSC Dimensioning

    4. Ater CS Dimensioning

    5. Ater PS Dimensioning

    6. GPU/GP Dimensioning

    7. Gb Interface Dimensioning

    8. Location Area Dimensioning

  • 3 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Overview

    SGSN

    speech

    data

    A-ter mux

    Gb

    A

    CS

    CS+ PS

    PS

    CSA-bisAir

    TC

    MT120

    SMU TRCU TRCU

    TRCU

    MT120

    SMU TRCU

    TRCU

    TRCU

    TRX 2 M -EGC H link 1 PS

    traffic TRX 3 M -EGC H link 2

    M -EG CH link n

    BTS

    D ynam ic Abis

    allocation GCH Extra

    GCH Basic

    GCH Basic

    GCH Extra

    GCH Bonus

    T CH T CH TRX 1 CS

    traffic

    TRX n

    Assessment ofbasic and bonus Abis nibbles from

    TRX and BTS configuration

    Calculate the needed extra Abis TS for real traffic on Abis Itf and

    the number of needed Abis links

    Assessment ofCS and PS traffic

    over AterMux

    Calculate the total number of Ater

    channels and the required number of

    AterMux links Evaluate the

    required number of Gb 64K TS

    per GPU

    Check the traffic capacity limits basedon BSC configuration

    Calculate the needed radio TS for SDCCH,

    TCH and PDCH, then nb of TRXs

    Evaluate the required number

    of GPU/GP boards per BSC

    Assessment of traffic values for

    SDCCH, TCH and PDCH channels

    Check the load and conectivity on

    DSP and GPU boards of MFS

    MxBSC CCP board

    CCP board

    SSW board

    TP board

    LIU board

    LIU board

    MxMFS GP board

    DSP DSP DSP DSP

    GP board DSP DSP DSP DSP

  • 4 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    Air Interface (Cell)

    Dimensioning1

  • 5 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Target

    Find the needed number of RTCH and TRX for one Cell

    Input (counters values):

    CS Traffic

    PS Traffic

    SDCCH Traffic

    CS Congestion

    PS Congestion

    SDCCH Congestion

    Customer requirements for blocking probability

    Output:

    Nb of SDCCH channels

    Nb of TCH

    Nb of TRX

    Real blocking

  • 6 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for SDCCH:

    Erlang B

    Needed counters for SDCCH:

    MC400 or GSDTRT (SDCCH_occy_total)

    MC04 or GSDNACGN (SDCCH_assign_cong)

    MC148 or GSDNACAN (SDCCH_assign_allocated)

    Erlang B

    Required SDCCH Traffic

    GoS:

    % SDCCH blocking

    Nb of required SDCCH sub-channels

    / timeslots

    INPUT OUTPUTMETHOD

  • 7 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for SDCCH:

    3600400MCtraffic_SDCCH_Measured =

    %MCMC

    MCcong_SDCCH% 100

    1480404

    +

    =

    %) ,cong_SDCCH(%Mintraffic_SDCCH_Measuredtraffic_SDCCH_quiredRe

    301=

    ( )0.5% ic;DCCH_traffRequired_SangBInverseErlssubchannel SDCCH quiredRe of Nb =

    =

    8ssubchannel SDCCH_required_NbTSs_SDCCH_required_Nb

    For BCCH not-combined cell:

    For BCCH combined cell:

    =

    84ssubchannel SDCCH_required_NbTSs_SDCCH_required_Nb

  • 8 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for TCH and PDCH:

    Kaufmann-Roberts.

    Needed counters for TCH:

    MC380a, MC380b, MC703, MC812.

    Needed counters for PDCH:

    P451a, P451b,

    P38e, P39f,

    P14, P27,

    P62x (x=a-c),

    P438c, P507,

    P91x (x=a-f),

    P505.

    PS_DL service

    CS_FR service

    CS_HR service

    PS_UL service

    Required Traffic

    getMax

    Nb RTS needed for CS and PS traffic

    Kaufmann-Roberts

    Algorithm

  • 9 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for TCH and PDCH:

    Kaufmann-Roberts.

    Needed counters for TCH:

    MC380a or GTCTRFT (RTCH_full_occy_total)

    MC380b or GTCTRHT (RTCH_half_occy_total)

    MC703 or GTCNACAN (RTCH_assign_allocated)

    MC812 or GTCNACGN (RTCH_assign_cong)

  • 10 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for TCH

    703812 MCMCMC812

    Request_nRTCH_AssigCong_nRTCH_Assig

    ngCS_Real_Co+

    ==

    Real_Cong)_CS %,min(Cong_CS 30=

    Cong_CSbMCaMC

    aMCCong_FR +

    =

    380380380

    Cong_CSbMCaMC

    bMCCong_HR +

    =

    380380380

    )Cong_FR(aMC

    Cong_FRTraffic_Successful_FRTraffic_FR_quiredRe cell

    =

    =

    13600380

    1

    )Cong_HR(bMC

    Cong_HRTraffic_Successful_HRTraffic_HR_quiredRe cell

    =

    =

    13600380

    1

  • 11 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for TCH

    The Required traffic for FR and HR is used together with Required traffic for PS as input for Kaufmann-Roberts algorithm.

    The blocking probability used for CS services is 2%.

    Note:

    Required CS Bandwidth is:

    1 TS for FR

    0.5 TS for HR

  • 12 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for PDCH

    Needed counters for PDCH:

    P451a or GARPDCTUBUT (GPRS_PDCH_used_UL_TBF_overall_time)

    P451b or GARPDCTDBUT (GPRS_PDCH_used_DL_TBF_overall_time)

    P38e or GARPDCUDBUT (GPRS_PDCH_DL_traffic_time)

    P38f or GARPDCUUBUT (GPRS_PDCH_UL_traffic_time)

    P14 or GQRDTECGN (GPRS_DL_TBF_estab_fail_radio_cong)

    P27 or GQRUTECGN (GPRS_UL_TBF_estab_fail_radio_cong)

    P62a+P62b+P62c- P438c+ P507 or GTRUTERQN (GPRS_UL_TBF_request)

    P91a + P91b + P91c + P91d + P91e + P91f + P505 or GTRDTERQN

    (GPRS_DL_TBF_request)

  • 13 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for PDCH

    3600451bPtraffic_PS_DL_Measured =

    3600451aPtraffic_PS_UL_Measured =

    %PfPePdPcPbPaP

    Pcong_radio_TBF_DL% 100

    50591919191919114

    ++++++

    =

    %PcPcPbPaP

    Pcong_radio_TBF_UL% 100

    50743862626227

    +++

    =

    %) ,cong_radio_TBF(%Mintraffic_PS_Measuredtraffic_PS_quiredRe

    301=

    Final value for Required PS traffic is Max between required DL and UL PS traffic.

  • 14 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for PDCH

    Based on TBF usage:

    For calculation 98% quantile and 0.01s delay are used.

    Note:

    Required PS Bandwidth (minimum number of TS per a request on each direction) is coming from:

    Average Nb of DL TBF per PDCH = P451b/P38e

    Average Nb of UL TBF per PDCH = P451a/P38f

    If indicators are available, the required bandwidth is given by:

    GARPDCTDPIN = GPRS_DL_TBF_Pilled_avg

    GARPDCTUPIN = GPRS_UL_TBF_Pilled_avg

  • 15 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Final aggregation:

    Total nb of RTCH =

    = 1 TS for BCCH + 1 TS for CCCH (if case) +

    + Nb of Required SDCCH TSs +

    + Nb of Required TSs for FR, HR and PS,

    coming from Kaufmann-Roberts algorithm.

    Total nb of TRX = Roundup [(Total nb of RTCH)/8]

  • 16 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for PS throughput

    Input (counters values):

    DL PS Traffic

    UL PS Traffic

    Output:

    DL PS Throughput

    UL PS Throughput

  • 17 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for PS throughput

    Needed counters for PDCH DL throughput:

    P38e or GARPDCUDBUT (GPRS_PDCH_DL_traffic_time)

    P20a or GQRPDDR1N (GPRS_DL_RLC_block_PDTCH_CS1_retransmissing_ack)

    P20b or GQRPDDR2N (GPRS_DL_RLC_block_PDTCH_CS2_retransmissing_ack)

    P20c or GQRPDDR3N (GPRS_DL_RLC_block_PDTCH_CS3_retransmissing_ack)

    P20d or GQRPDDR4N (GPRS_DL_RLC_block_PDTCH_CS4_retransmissing_ack)

    P20f+P20g+P20h+P20i+P20j+P20k+P20l+P20m+P20n or GQRPDDRMN

    (GPRS_DL_RLC_bytes_PDTCH_MCSx_retransmissing_ack from MCS1 to MSC9)(old P20e)

    P55x (x=a-d) or GTRPDDC1N to GTRPDDC4N (GPRS_DL_useful_RLC_blocks_CS1_ack to

    GPRS_DL_useful_RLC_blocks_CS4_ack)

    P55x (x=e-m) or GTRPDDM1N to GTRPDDM9N (GPRS_DL_useful_RLC_blocks_MCS1_ack to GPRS_DL_useful_RLC_blocks_MCS9_ack)

  • 18 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for PS throughput

    Needed counters for PDCH UL throughput:

    P38f or GARPDCUUBUT (GPRS_PDCH_UL_traffic_time)

    P21a or GQRPDUR1N (GPRS_UL_RLC_block_PDTCH_CS1_retransmissing_ack)

    P21b or GQRPDUR2N (GPRS_UL_RLC_block_PDTCH_CS2_retransmissing_ack)

    P21c or GQRPDUR3N (GPRS_UL_RLC_block_PDTCH_CS3_retransmissing_ack)

    P21d or GQRPDUR4N (GPRS_UL_RLC_block_PDTCH_CS4_retransmissing_ack)

    P21f+P21g+P21h+P21i+P21j+P21k+P21l+P21m+P21n or GQRPDURMN

    (GPRS_UL_RLC_bytes_PDTCH_MCSx_retransmissing_ack from MCS1 to MSC9)(old P21e)

    P57x (x=a-d) or GTRPDUC1N to GTRPDUC4N (GPRS_UL_useful_RLC_blocks_CS1_ack to

    GPRS_DL_useful_RLC_blocks_CS4_ack)

    P57x (x=e-m) or GTRPDUM1N to GTRPDUM9N (GPRS_UL_useful_RLC_blocks_MCS1_ack to GPRS_DL_useful_RLC_blocks_MCS9_ack)

  • 19 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Air Interface (Cell) Dimensioning

    Method for PS throughput

    DL and UL throughput:

    ==

    n_Time_DLTransmisioData_DL]kbps[d DL_PS

    ==

    UL_Time_nTransmisioUL_Data]kbps[d UL_PS

    eP

    PSize_Block_RLCPSize_Block_RLCPn

    fxx

    m

    axxx

    d

    axxx

    381000

    2055208

    ++

    =

    ===

    fP

    PSize_Block_RLCPSize_Block_RLCPn

    fxx

    m

    axxx

    d

    axxx

    381000

    2157218

    ++

    =

    ===

  • 20 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    Abis Interface

    Dimensioning2

  • 21 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    Target

    Find the required number of ExtraAbis TS

    Check RSL congestion

    Methods are applied at BTS level

    Based on Abis allocation priorities

    MAX_PDCH_High_Load Zone From MAX_PDCH_High_Load to MAX_PDCH

    Basic nibbles of cell

    Extra + Bonus nibbles of BTS

    Priority N1

    Priority N2

    Priority N3

  • 22 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    Method for ExtraAbis TS

    ErlangC

    Input (counters values):

    PS Traffic

    Extra-Bonus Traffic

    Available Extra-Bonus nibbles

    PS Congestion (Abis)

    Customer requirements for QoS (delay and quantile)

    Customer requirements for number of basic and bonus nibbles

    Output:

    Nb of extra Abis nibbles

    Nb of ExtraAbisTS

  • 23 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    Extra and Bonus Nibbles Method

    (Method 1)

    Erlang C

    Required extra & bonus Abis nibble Traffic

    GoS: % Quantile of x delay sec

    Nb of required extra & bonus Abis Nibbles

    INPUT OUTPUTMETHOD

    Nb of required extra Abis Nibbles

    Nb of bonus Abis Nibbles

  • 24 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    Extra and Bonus Nibbles Method

    Needed counters:

    P466 or GABGCHUSEBT (GPRS_transmission_GCH_use_bonus_and_extra_time),

    P105i or GQRDTECBN (GPRS_DL_TBF_estab_fail_abis_cong),

    P91a + P91b + P91c + P91d + P91e + P91f + P505 or GTRDTERQN

    (GPRS_DL_TBF_request)

    P105j or GQRUTECBN (GPRS_UL_TBF_estab_fail_abis_cong),

    P62a+P62b+P62c- P438c+ P507 or GTRUTERQN (GPRS_UL_TBF_request)

    Note:

    The counters retrieved at cell level must be aggregated per BTS.

  • 25 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    Extra and Bonus Nibbles Method

    3600466Ptraffic_Abis_bonus&extra_Measured =

    %PfPePdPcPbPaP

    iPcong_Abis_TBF_DL% 100

    505919191919191105

    ++++++

    =

    %PcPcPbPaP

    jPcong_Abis_TBF_UL% 100

    507438626262105

    +++

    =

    )cong_Abis_TBF_UL% ,cong_Abis_TBF_DL(%Maxcong_Abis_TBF% =

    %) ,cong_Abis_TBF(%Mintraffic_Abis_bonus&extra_Measuredtraffic_Abis_bonus&extra_quiredRe

    301=

  • 26 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    Extra and Bonus Nibbles Method

    =nibbles bonus&extra quiredRe of Nb

    ( )delay quantile; fic;bonus_traf&xtraRequired_eangCInverseErl=where quantile = 99% and delay = 0.01s

  • 27 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    Extra and Bonus Nibbles Method

    Number of required Extra Abis nibbles =

    = Number of required extra & bonus Abis nibbles Nb of bonus Abis nibbles,

    Note: Nb of bonus nibbles corresponds to Nb of BCCH and static SDCCH timeslots.

    and

    Number of required Extra Abis TS =

    = Roundup[(Number of required extra Abis nibbles)/4].

    Note: 1 Abis TS contains 4 Abis nibble

    This method is recommended in case of BTSs with 2 or more cells.

  • 28 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    GCH Method

    (Method 2)

    Erlang C

    Required Data Traffic on Abis

    GoS: % Quantile of x delay sec

    Nb of required Abis Nibbles

    INPUT OUTPUTMETHOD

    Nb of required extra Abis Nibbles

    Nb of basic & bonus Abis Nibbles

  • 29 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    GCH Method

    Needed counters for Data traffic:

    P100c or GAAGCHUST (GPRS_transmission_GCH_busy_time)

    Needed counters for Abis congestion:

    P105i or GQRDTECBN (GPRS_DL_TBF_estab_fail_abis_cong),

    P91a + P91b + P91c + P91d + P91e + P91f + P505 or GTRDTERQN

    (GPRS_DL_TBF_request)

    P105j or GQRUTECBN (GPRS_UL_TBF_estab_fail_abis_cong),

    P62a+P62b+P62c- P438c+ P507 or GTRUTERQN (GPRS_UL_TBF_request)

    Note:

    The counters retrieved at cell level must be aggregated per BTS.

  • 30 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    GCH Method

    Abis congestion:

    %PfPePdPcPbPaP

    iPcong_Abis_TBF_DL% 100

    505919191919191105

    ++++++

    =

    %PcPcPbPaP

    jPcong_Abis_TBF_UL% 100

    507438626262105

    +++

    =

    )cong_Abis_TBF_UL% ,cong_Abis_TBF_DL(%Maxcong_Abis_TBF% =

  • 31 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    GCH Method

    Measured traffic:

    Required traffic:

    Required Abis nibbles for PS:

    where quantile = 99% and delay = 0.01s

    3600100cPtraffic_GCH_Measured =

    %) ,cong_Abis_TBF(%Mintraffic_GCH_Measuredtraffic_GCH_quiredRe

    301=

    =nibbles Abis quiredRe of Nb

    ( )delay quantile; ;CH_trafficRequired_GangCInverseErl=

  • 32 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    GCH Method

    Number of required Extra Abis nibbles =

    = Number of required Abis nibbles Nb of basic and bonus Abis nibbles,

    Note: Nb of basic nibbles per cell = MAX_PDCH.

    Nb of bonus nibbles corresponds to Nb of BCCH and static SDCCH timeslots.

    and

    Number of required Extra Abis TS =

    = Roundup[(Number of required Extra Abis nibbles)/4].

    Note: 1 Abis TS contains 4 Abis nibble

    This method is recommended in case of BTSs with only 1 cell.

  • 33 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    Abis Dimensioning

    Finally, at BTS level for Abis dimensioning

    Total Number of Abis TS =

    = 2*Total nb of TRX +

    + Nb of TS for RSL and OML (depending on MCB type)

    + Nb of required Extra Abis TS,

    and

    Number of required Abis Links =

    = Roundup[(Total Number of Abis Ts)/31].

  • 34 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    Method for RSL

    LAPD efficiency (in DL):

    Needed counters

    Conter Type: 7

    Measured Object: LAPD

    Conter L1.1 (NB_LAPD_INFO_FRAME_SENT)

    Number of Information frames transmitted on the LapD link, excluding the re-transmissions.

    Conter L1.15 (NB_LAPD_INFO_FRAME_RESENT)

    Number of Information frames re-transmitted on the LapD link.

    Formula:

    LAPD efficiency [%] = L1.1/( L1.1+L1.15)*100

  • 35 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Abis Interface Dimensioning

    Method for RSL congestion

    LAPD congestion detection:

    Conter L1.18 (TIME_LAPD_CONG)

    Conter Type: 7

    Measured Object: LAPD

    Time in seconds during which the LapD link is congested in transmission in the BSC.

    In case LAPD congestion is present, the MCB load must be reduced:

    If the multiplexing rule is applied per BTS by changing at BTS level the signaling

    load from normal to high;

    If the load is already high by changing the multiplexing rule from per BTS to per

    Sector with the same load options normal or high.

    Note: These changes may impact the Abis TS usage.

  • 36 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSC

    Dimensioning3

  • 37 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Target

    Find the total CS traffic

    Find the related CS signaling traffic

    Decide what solution is required for signaling traffic: LSL or HSL

    Check the HDLC occupancy to decide what type of TP GSM board is required:

    TP GSM V1 or TP GSM STM1 (V3)

    Find the required number of AterMux CS links

    Find the total PS traffic

    Find the required number of AterMux PS links

    Find the required number of GPU/GP boards

  • 38 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Method for BSC Dimensioning

    ErlangB and ErlangC

    Input (counters values):

    CS Traffic

    SS7 Traffic

    PS Traffic

    AterMux PS congestion

    Customer requirements for CS and SS7 blocking and QoS for PS

    Output:

    Nb of TCH, CS dedicated links and real blocking

    Nb of SS7 connections, links and real blocking

    Nb of GCH

    Nb of GPU boards per BSC

    Nb of PS links per BSC and PS real quantile

  • 39 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Method for CS Traffic

    Needed counters for TCH:

    MC380a or GTCTRFT (RTCH_full_occy_total)

    MC380b or GTCTRHT (RTCH_half_occy_total)

    Needed counters for SCCP:

    MC01+MC02 or GSDNASUN (SDCCH_assign_success),

    MC10 or GSDHOSUN (SDCCH_HO_success)

    MC390 or GSDAHCAN (SDCCH_allocated),

    MC400 or GSDTRT (SDCCH_occy_total),

    MC380a+MC380b or GTCTRT (RTCH_occy_total)

    or GQSTRSCE (SCCP_Erlang_BH)

  • 40 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Method for CS Traffic

    Max CS Traffic (during BH)

    The required value of TCH traffic must be below the BSC Erlang capacity

    (depending on BSC configuration), else the BSC capacity must be extended if

    possible by adding one CCP board.

    3600380380 bMCaMCtraffic_TCH_Measured +=

    inargm%traffic_TCH_measuredtraffic_TCH_quiredRe 15+=

  • 41 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Method for CS Traffic

    Max SCCP Traffic (during BH)

    Measured SCCP Traffic = SCCP traffic in Erlang during Busy Hour =

    = ((MC400/MC390)*(MC01+MC02+MC10) + (MC380a+MC380b))/3600

    If the required number of SS7 TSs is below or equal to 16, the LSL solution

    may be used.

    If the required number of SS7 TSs is above 16, the HSL solution is mandatory.

    inargm%traffic_SCCP_measuredtraffic_SCCP_quiredRe 15+=

    ( )c;0.1%CCP_traffiRequired_SangBInverseErlsconnection SCCP quiredRe of Nb =

    =

    1037 channels_SCCP_required_NoTSs_SS_required_No

  • 42 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Method for HDLC occupancy

    Due to limited number of HDLC channels inside TP GSM board, it is important

    to check the number of HDLC channels in use.

    1090910staticMux{signallingLoadBts dummy}G62A12_3{ amecID 1, moiRdn 17}

    65056noMux{signallingLoadBts dummy}G62B091{ amecID 1, moiRdn 11}

    41101112statisticMux64{signallingLoadBts normal}G62B122{ amecID 1, moiRdn 134}

    14045statisticMux64{signallingLoadBts dummy}G62B271{ amecID 1, moiRdn 100}

    23034statisticMux64{signallingLoadBts high}G62B083{ amecID 1, moiRdn 10}

    60667statisticMux64{signallingLoadBts high}G62B011{ amecID 1, moiRdn 1}

    Total #

    HDLC

    Total #

    TRX FR

    Total #

    TRX DR

    Total #

    TRE

    Total #

    LAPDMuxRuleMuxRateUserLabel

    AlcatelBtsSiteManager

    InstanceIdentifier

    from AlcatelBtsSiteManager.csv from AlcatelBts_Sector.csv

    Apply MCB rule

  • 43 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Method for HDLC occupancy

    This check is important especially when the BSC must be extended by adding

    new cells.

    If the total required number of HDLC channels is below 441, the TP GSM V1

    board has enough capacity to be used.

    If the required number of HDLC channels is above 441, the multiplexing rule

    must be changed from noMux to statisticMux64.

    If the resulted number of HDLC channels is still above 441, the TP GSM V1

    board must be replaced by TP GSM STM1 (V3) board.

  • 44 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Method for PS Traffic

    Needed counters for GCH Traffic:

    P100c or GAAGCHUST (GPRS_transmission_GCH_busy_time),

    P383a or GQAGALCTT (GPRS_GPU_Ater_cong_time),

    P384 or GQRGPUCDT (GPRS_GPU_DSP_cong_time),

    Needed counters for GSL:

    P41 or GTALAPDLN (GPRS_LAPD_DL_traffic_sent_to_BSC),

    P42 or GTALAPULN (GPRS_LAPD_UL_traffic_received_from_BSC).

  • 45 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Method for PS Traffic

    Max GCH Traffic

    Number of required GCH per BSC

    3600100cPtraffic_GCH_Measured =

    %aPcong_Ater_GCH% 1003600383

    = %Pcong_GPU_GCH% 1003600

    384=

    )cong_GPU_GCH,%cong_Ater_GCH(%Maxcong_GCH% =

    %) ;cong_GCH(% Mintraffic_GCH_Measuredtraffic_GCH_quiredRe

    301=

    ( )delayquantile;;CH_trafficRequired_G angCInverseErlGCH quiredRe of Nb =where quantile = 99% and delay = 0.01s

  • 46 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Method for PS Traffic

    Number of GPU/GP boards per BSC

    GPU Capacity is of max 480 GCH.

    GP Capacity is of max 1560 GCH.

    N_ATER_TS_MARGIN_GPU resources must not be taken into account. So, the max

    number of GCH per GPU/GP is:

    480 N_ATER_TS_MARGIN_GPU*4 (for legacy MFS)

    1560 N_ATER_TS_MARGIN_GPU*4 (for Mx MFS)

    =

    Capacity GCH board GPU/GPGCH Required of Nbboard GPU/GP quiredRe of Nb

  • 47 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Method for PS Traffic

    Number of GSL links per BSC

    288004241 )P,P(Maxtraffic_GSL_Measured =

    inargm%traffic_GSL_Measuredtraffic_GSL_quiredRe 30+=

    ( )delayquantile;;SL_trafficRequired_G angCInverseErlGSL quiredRe of Nb =

    where quantile = 99% and delay = 0.01s

  • 48 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Method for PS Traffic

    Number of GPU boards per BSC

    At least 2 GSLs are recommended to be defined per GPU due to security reason.

    Up to 4 GSLs can be defined per GPU.

    Number of GP boards per BSC

    At least 2 GSLs are recommended to be defined per GP due to security reason.

    Up to 8 GSLs can be defined per GP.

    =

    8GSL Required of Nbboard GPU/GP quiredRe of Nb

    =

    4GSL Required of Nbboard GPU/GP quiredRe of Nb

  • 49 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    BSC Dimensioning

    Method for PS Traffic

    Number of GPU boards per BSC

    The final number of required GPU/GP boards per BSC is the maximum value

    between the number of boards needed for signaling traffic (GSL) and for user

    traffic (GCH).

  • 50 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    Ater CS

    Dimensioning4

  • 51 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater CS Dimensioning

    Target

    Find the required number of AterMux CS links

    Method: ErlangB

    Input (counters values):

    CS Traffic

    SS7 Traffic

    Customer requirements for CS and SS7 blocking and QoS for PS

    Output:

    Nb of SS7 connections, links and real blocking

    Nb of TCH, CS dedicated links and real blocking

  • 52 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater CS Dimensioning

    Method

    Find the max number of Ater CS links between TCH requirements and

    signaling requirements (SCCP)

    Erlang B

    GoS: % TCH blocking

    Nb of required SS7

    per BSC

    INPUT OUTPUTMETHOD

    Signalling Traffic

    User Traffic

    Required SDCCH Traffic

    Required TCH Traffic

    GoS: % SS7 blocking

    Erlang B

    Nb of required

    TCH per BSC

    Nb of required

    AterMUX-CS links per

    BSC

    Nb of required

    AterMUX-CS links per

    BSC

    Choose Maxvalue

    Final nb of required

    AterMUX-CS links per

    BSC

  • 53 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater CS Dimensioning

    CS Traffic

    Method for TCH

    The number of required AterMux CS links can be obtained by dividing the number of

    AterMux CS channels obtained from the dimensioning process by the AterMux CS link

    capacity.

    The total capacity of n AterMUX CS links is:

    111TCH(link#1) + 111TCH(link#2) + 116TCH(link#3) + 116TCH(link#4) +

    116TCH(link#5) + 116TCH(link#6) + 115TCH(link#7) + 115TCH (link#8) + 116TCH(link

    #9) + 116TCH(link #10) + 116TCH(link #11)+ + 116TCH(link #N),

    where N =< MaxNbAterMuxCS.

    3600380380 bMCaMCtraffic_TCH_Measured +=

    inargm%traffic_TCH_measuredtraffic_TCH_quiredRe 15+=

    ( );0.1%CH_trafficRequired_TangBInverseErlchannels TCH quiredRe of Nb =

  • 54 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater CS Dimensioning

    CS Signaling Traffic

    Method for SCCP

    Measured SCCP Traffic = SCCP traffic in Erlang during Busy Hour =

    = ((MC400/MC390)*(MC01+MC02+MC10) + (MC380a+MC380b))/3600

    The result is obtained for 40% load at SS7 link level.

    The final number of required AterMux CS links is the maximum value between the

    number of links needed for signaling traffic (SS7) and for user traffic (TCH).

    inargm%traffic_SCCP_measuredtraffic_SCCP_quiredRe 15+=

    ( )c;0.1%CCP_traffiRequired_SangBInverseErlsconnection SCCP quiredRe of Nb =

    =

    1037 channels_SCCP_required_Nolinks_SS_required_No

  • 55 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater CS Dimensioning

    CS Signaling Traffic

    Method for SS7 based on volume of data transferred

    Counters for N7 at link level (Type 9):

    N3.1 (NB_N7_SIF_SIO_SENT)

    Number of octets of Signalling Information (SIF) and Service Information Octets (SIO) transmitted on the N7 SL.

    N3.3 (NB_N7_MSU_SENT)

    Number of Message Signalling Units (MSU) transmitted on the N7 SL.

    N3.4 (NB_N7_SIF_SIO_REC)

    Number of octets of Signalling Information Field (SIF) and Service Information Octets (SIO) received on the N7 SL.

    N3.5 (NB_N7_MSU_REC)

    Number of Message Signalling Units (MSU) received on the N7 SL.

    N3.10 (NB_N7_MSU_DISC_DUE_CONG)

    Number Message Signalling Units (MSU) discarded due to a message buffer overflow caused by an extended period of Signalling Link congestion.

  • 56 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater CS Dimensioning

    CS Signaling Traffic

    Method for SS7 based on volume of data transferred

    Traffic evaluation in UL

    Counter values must be aggregated for the link set

    28800000336137 .N*.Ntraffic_SS_Measured +=

    %) ;cong_SS(% Mintraffic_SS_Measuredtraffic_SS_quiredRe

    307177

    =

    %.N.N

    .Ncong_SS% 100

    103331037

    +=

    ( );0.1%S7_trafficRequired_S angBInverseErlTS SS7 quiredRe of Nb =

  • 57 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater CS Dimensioning

    CS Signaling Traffic

    Method for SS7 based on volume of data transferred

    Traffic evaluation in DL

    Counter values must be aggregated for the link set

    The final number of SS7 TSs (links) is the max value between the results for

    UL and DL.

    If this number is greater than 16, HSL usage is mandatory.

    28800000536437 .N*.Ntraffic_SS_Measured +=

    inargm%traffic_SS_Measuredtraffic_SS_quiredRe 1577 +=

    ( );0.1%S7_trafficRequired_S angBInverseErlTS SS7 quiredRe of Nb =

  • 58 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater CS Dimensioning

    CS Signaling Traffic

    Method for SS7 based on volume of data transferred

    N7 link efficiency based on couters (in UL):

    N3.3 (NB_N7_MSU_SENT)

    N3.10 (NB_N7_MSU_DISC_DUE_CONG)

    Formula:

    N7 efficiency [%] = N3.3/( N3.3+N3.10)*100

    N7 link congestion detection:

    N1.6 (NB_N7_LINK_FAIL_CONG)

    Number of N7 SL failures due to congestion during an extended period of time.

  • 59 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater CS Dimensioning

    CS Signaling Traffic

    Method for SS7 link load based on volume of data transferred

    LSL case

    %N7 Utilization in UL = (N3.1 + (6 * N3.3)) / (3600*8,000)

    %N7 Utilization in DL = (N3.4 + (6 * N3.5)) / (3600*8,000)

    Explanation:

    MSU contains 6 bytes (fix part) + SIF&SIO (variable part).

    SIF is between 2 and 34 bytes.

    SIO is 1 byte.

    Note:

    1 hour of usage of 1 E1 Time Slot (for N7) = 1hour * 64Kbps =

    = 3600s * 8000 bytes/s = 28,800 Kbytes/h

    Warning:

    The load on one N7 link shall not exceed 40% (recommended).

  • 60 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater CS Dimensioning

    CS Signaling Traffic

    Method for SS7 link load based on volume of data transferred

    HSL case

    In B10, if HSL is actived, N7 can have 2 different frame formats:

    Normal frame format

    Extended frame format

    Parameter: MTP_Sequence_Number_Format

    (MtpSequenceNumberFormat in ACIE AlcatelManagedElementComplex.csv)

    Range / default value: (0=Normal, 1=Extended) / 0

    Note:

    In case of Normal frame format

    MSU contains 6 bytes (fix part) + SIF&SIO (variable part).

    In case of Extended frame format

    MSU contains 9 bytes (fix part) + SIF&SIO (variable part).

  • 61 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater CS Dimensioning

    CS Signaling Traffic

    Method for SS7 link load based on volume of data transferred

    HSL case with Normal frame format

    %N7 Utilization in UL = (N3.1 + (6 * N3.3)) / (3600*8,000*31)

    %N7 Utilization in DL = (N3.4 + (6 * N3.5)) / (3600*8,000*31)

    Explanation:

    32 TSs of 64Kbps are available for one HSL link.

    Note:

    1 hour of usage of 1 E1 Time Slot (for N7) = 1hour * 64Kbps =

    = 3600s * 8000 bytes/s = 28,800 Kbytes/h

    For 32 TS per HSL link we get

    3600s * 8000 bytes/s * 31TS = 892,800 Kbytes/h

    Warning:

    The load on one N7 link shall not exceed 40% (recommended).

  • 62 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater CS Dimensioning

    CS Signaling Traffic

    Method for SS7 link load based on volume of data transferred

    HSL case with Extended frame format

    %N7 Utilization in UL = (N3.1 + (9 * N3.3)) / (3600*8,000*31)

    %N7 Utilization in DL = (N3.4 + (9 * N3.5)) / (3600*8,000*31)

    Explanation:

    32 TSs of 64Kbps are available for one HSL link.

    Note:

    1 hour of usage of 1 E1 Time Slot (for N7) = 1hour * 64Kbps =

    = 3600s * 8000 bytes/s = 28,800 Kbytes/h

    For 32 TS per HSL link we get

    3600s * 8000 bytes/s * 31TS = 892,800 Kbytes/h

    Warning:

    The load on one N7 link shall not exceed 40% (recommended).

  • 63 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    Ater PS

    Dimensioning5

  • 64 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater PS Dimensioning

    Target

    Find the required number of AterMux PS links

    Method: ErlangC

    Input (counters values):

    PS Traffic

    Number of Available GCH

    Number of Max Busy GCH

    AterMux PS congestion

    Customer requirements for PS QoS

    Output:

    Nb of GCH

    Nb of GSL links per BSC and PS real quantile

    Nb of PS links per BSC and PS real quantile

  • 65 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater PS Dimensioning

    Method

    Find the max number of Ater PS links between GCH requirements and

    signaling requirements (GSL)

    QoS: quantile delay

    INPUT OUTPUTMETHOD

    User Traffic

    Required GCH Traffic Erlang C

    Nb of required

    GCH per BSC

    Nb of required PS links per

    BSC

    QoS: quantile delay

    Signaling Traffic

    Required GSL Traffic Erlang C

    Nb of required

    GSL per BSC

    Nb of required PS links per

    BSC

    Choose Maxvalue

    Final nb of required

    AterMUX-PS links per

    BSC

  • 66 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater PS Dimensioning

    Method for Ater PS

    Needed counters for GCH:

    P100c or GAAGCHUST (GPRS_transmission_GCH_busy_time),

    P383a or GQAGALCTT (GPRS_GPU_Ater_cong_time),

    P384 or GQRGPUCDT (GPRS_GPU_DSP_cong_time),

    Needed counters for GSL:

    P41 or GTALAPDLN (GPRS_LAPD_DL_traffic_sent_to_BSC),

    P42 or GTALAPULN (GPRS_LAPD_UL_traffic_received_from_BSC).

  • 67 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater PS Dimensioning

    Method for GCH

    The number of required GCH

    3600100cPtraffic_GCH_Measured =

    %aPcong_Ater_GCH% 1003600383

    =

    %Pcong_GPU_GCH% 1003600

    384=

    )cong_GPU_GCH,%cong_Ater_GCH(%Maxcong_GCH% =

    %) ;cong_GCH(% Mintraffic_GCH_Measuredtraffic_GCH_quiredRe

    301=

    ( )delayquantile;;CH_trafficRequired_G angCInverseErlGCH quiredRe of Nb =where quantile = 99% and delay = 0.01s

  • 68 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater PS Dimensioning

    Method for GCH

    The number of required AterMux PS TSs for user traffic

    The number of required AterMux PS links for user traffic

    =

    4GCH_required_NbTSs_AterPS_required_Nb

    =

    28TSs_AterPS_required_Nolinks_AterPS_required_Nb

  • 69 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Ater PS Dimensioning

    Method for GSL

    GSL load checking

    It is recommended to increase the number of GSL per GPU if GSL load is greater than

    80%.

    The final number of required AterMux PS links is the maximum value between

    the number of links needed for signaling traffic (GSL) and for user traffic (GCH).

    288004241 )P,P(Maxtraffic_GSL_Measured =

    inargm%traffic_GSL_Measuredtraffic_GSL_quiredRe 30+=

    ( )delayquantile;;SL_trafficRequired_G angCInverseErlGSL quiredRe of Nb =

    GSL required of Nbtraffic_GSL_MeasuredGSL_traffic_Measured =1

    %)Erlangs.(Capacity_GSLGSL_traffic_Measuredload_GSL 100

    7801

    =

    =

  • 70 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    GPU/GP

    Dimensioning6

  • 71 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Target

    Find the load and the required number of AterMux PS links per GPU/GP board

    Method: ErlangC

    Input (counters values):

    PS Traffic

    MS context average

    MS context max

    DSP congestion

    GSL traffic

    Average & Max CPU load

    BSS failures rate

    Output:

    Max DL GCH Capacity

    Max UL GCH Capacity

    Max DL PDCH Capacity

    Max UL PDCH Capacity

    GSL load

    MCS usage

  • 72 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    GPU/GP load

    Check if GPU/GP board is not overloaded

    QoS: quantile delay

    INPUTOUTPUT

    METHOD

    User Traffic

    Required GCH Traffic Erlang C Needed

    GCH

    GCH capacity of GPU

    +

    MS_context_handling (= 0/1)

    +

    Power_Limitation (= 0/1)

    Number of GPU boards

  • 73 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    GPU/GP load

    GPU/GP board limitation control

    Power Limitation Memory Limitation Power Limitation Memory Limitation

    Dimensioning indicators

    P76a P77a

    => P402 (thr )P392aP392b

    P201 (thr_1 )P202 (thr_2 ) P384

    QoS indicators

    (TBF establ)P105e P105f

    UL TBF estab BSS Failure

    P203P204

    P105cP105d

    GPU limitationPMU PTU

    PPC/CPU DSP

    MFS parameters:Thr = PMU_CPU_Overload (Default=95%)

    Thr_1 = DSP_Load_Thr_1 (Default=85%)

    Thr_2 = DSP_Load_Thr_2 (Default=95%)

    CPU Cong BSS Fail DSP Load DSP Cong

  • 74 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    GPU/GP load

    User traffic load (GCH)

    Needed counters:

    P100c or GAAGCHUST (GPRS_transmission_GCH_busy_time),

    P383a or GQAGALCTT (GPRS_GPU_Ater_cong_time),

    P384 or GQRGPUCDT (GPRS_GPU_DSP_cong_time),

    P201 or GTRGPULDLT (GPRS_DSP_CPU_load_time),

    P202 or GTRGPULDOLT (GPRS_DSP_CPU_overload_time),

    GQRDTELDR (GPRS_DL_TBF_estab_fail_dsp_load_rate)

    or P203 / (P91a + P91b + P91c + P91d + P91e + P91f + P505)

    GQRUTELDR (GPRS_UL_TBF_estab_fail_dsp_load_rate)

    or P204 / (P62a + P62b + P62c - P438c + P507)

  • 75 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    GPU/GP load

    Signaling load

    Needed counters:

    P392a or GTRGPUMCA (GPRS_MS_idle_context_avg),

    P392b or GTRGPUM (GPRS_MS_idle_context_max),

    P76a or GTRGPUPBA (GPRS_PMU_CPU_power_budget_avg),

    P77a or GTRGPUPBM (GPRS_PMU_CPU_power_budget_max),

    P402 or GTRGPUOT (GPRS_PMU_overload_time),

    GQRDTECCR (GPRS_DL_TBF_estab_fail_cpu_cong_rate)

    or P105e / (P91a + P91b + P91c + P91d + P91e + P91f + P505)

    GQRUTECCR (GPRS_UL_TBF_estab_fail_cpu_cong_rate),

    or P105f / (P62a + P62b + P62c - P438c + P507)

  • 76 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    GPU/GP load

    Required number of GPU/GP boards based on user traffic

    3600100cPtraffic_GCH_Measured =

    %aPcong_Ater_GCH% 1003600383

    = %P

    cong_DSP_GCH% 1003600

    384=

    %) ;cong_GCH(% Mintraffic_GCH_Measuredtraffic_GCH_quiredRe

    301=

    ( )delayquantile;;CH_trafficRequired_G angCInverseErlGCH quiredRe of Nb =

    %x)P,P(Maxload_DSP% 1003600

    202201= %xPoverload_CPU% 1003600

    402=

    )overload_CPU,%load_DSP,%cong_DSP,%cong_Ater(%Maxcong_GCH% =

    where quantile = 99% and delay = 0.01s

  • 77 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    GPU/GP load

    Required number of GPU/GP boards based on user traffic

    where the GPU board capacity is 480 GCH and the GP board capacity is 1560 GCH.

    The result must be compared with the existing number of GPU/GP boards per BSC.

    If the required number of GPU/GP boards is less than the existing one, there is no

    need for change.

    If the required number of GPU/GP boards is greater than the existing one, then the

    number of GPU/GP boards per BSC must be increased by one unit.

    For a BSC in multi GPU configuration, the method (GCH traffic) may be applied per

    each GPU/GP board separately to check the load on each board.

    =

    Capacity GCH board GPU/GPGCH Required of Nbboard GPU/GP quiredRe of Nb

  • 78 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    GPU/GP load

    Required number of GPU/GP boards

    GPU power limitation from PTU (DSP/CPU)

    If

    MAX(P201;P202)/3600 > 0.1% for at least 12% of the observation period

    and

    dsp_load_fail_rate = MAX(GQRDTELDR; GQRUTELDR) > 1%

    then PTU_Power_Limitation = 1

    else PTU_Power_Limitation = 0

  • 79 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    GPU/GP load

    Required number of GPU/GP boards

    GPU power limitation from PMU (CPU)

    If

    P402/3600 > 0.1% or P76a > 70% for at least 12% of the observation period

    and

    cpu_cong_fail_rate = MAX (GQRUTECCR; GQRDTECCR) > 1%

    then PMU_Power_Limitation = 1

    else PMU_Power_Limitation = 0

  • 80 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    GPU/GP load

    Required number of GPU/GP boards

    GPU memory limitation from PMU (CPU)

    If P392b = 1000 and P392a > 900 for at least 12% of the observation period

    for Legacy MFS

    or

    if P392b = 4000 and P392a > 3600 for at least 12% of the observation period

    for MxMFS

    then MS_context_handling = 1

    else MS_context_handling = 0

  • 81 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    GPU/GP load

    Final result

    The number of required GPU/GP boards =

    = Number of required GPU/GP board (from user traffic) +

    + MAX(PTU_Power_Limitation; PMU_Power_Limitation; MS_context_handling)

    Note:

    If the required number of GPU/GP boards is greater than the existing one, it

    is recommanded to add a single board at one time and redo the load

    assessment after it.

  • 82 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Number of AterMux PS links per GPU/GP board

    Check the number of links from GCH and GSL requirements

    QoS: quantile delay

    INPUT OUTPUTMETHOD

    User Traffic

    Required GCH Traffic Erlang C

    Nb of required

    GCH per BSC

    Nb of required

    GPU boards per BSC

    Nb of required PS links per GPU board

    QoS: quantile delay

    Signaling Traffic

    Required GSL Traffic Erlang C

    Nb of required

    GSL per BSC

    Nb of required PS links per GPU board

    Choose Maxvalue

    Final nb of required

    AterMUX-PS links per GPU

  • 83 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Number of AterMux PS links per GPU/GP board

    Based on total GCH load and final number of required GPU/GP bords, the

    number of Ater PS links per board is:

    =

    board GP/GPU_required_Nb/)GCH_required_Nb(GP/GPU_per_links_AterPS_required_Nb 112

  • 84 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Number of AterMux PS links per GPU/GP board

    Method based on total number of GSL links and final number of required

    GPU/GP bords

    OUTPUT

    Nb of required GSL links per GPU

    INPUT METHOD

    QoS: quantile delay

    Signaling Traffic

    Required GSL Traffic Erlang C

    Nb of required

    GSL per BSC

    Nb of required

    GPU boards per BSC

  • 85 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Number of AterMux PS links per GPU/GP board

    Assessment based on GSL bandwidth

    Needed counters:

    P41 or GTALAPDLN (GPRS_LAPD_DL_traffic_sent_to_BSC),

    P42 or GTALAPULN (GPRS_LAPD_UL_traffic_received_from_BSC).

    Required number of GSL links per BSC:

    288004241 )P,P(Maxtraffic_GSL_Measured =

    inargm%traffic_GSL_Measuredtraffic_GSL_quiredRe 30+=

    ( )delayquantile;;SL_trafficRequired_G angCInverseErlGSL quiredRe of Nb =

    where quantile = 99% and delay = 0.01s

  • 86 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Number of AterMux PS links per GPU/GP board

    Assessment based on GSL bandwidth

    Checking the GSL load:

    GSL link load is:

    Compare GSL_load with GSL_link_band_capacity

    where GSL_link_band_Capacity = 0.78 Erlang

    (corresponding to max rate of 50 Kbps in a 64 Kbps Time slot).

    GSL load on a given GPU/GP should not exceed 0.78 Erlang.

    It is recommended to increase the number of GSL per GPU/GP if GSL load is greater

    than 0.78 Erlang.

    links GSL required of Nbtraffic_GSL_Measuredload_GSL =

  • 87 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Number of AterMux PS links per GPU/GP board

    Assessment based on the number of GSL messages per second

    Number of GSL messages/s per GPU is calculated as a function of PS traffic (UL and

    DL TBF establish requests) and of the number of cells mapped to the GPU/GP.

    GSL_link_Max_capacity per GPU is defined as:

    K_GSL * (1000ms/GSL_round_trip_delay) * Nb of GSL links per GPU/GP, where

    K_GSL is the maximum number of outstanding I frames on a GSL link

    (Min = 1, Max = 32, Default = 7)

    For terrestrial links: GSL_round_trip_delay < 500ms

    (default value = 60ms)

    For satellite links: GSL_round_trip_delay > 500ms

    (default value = 500ms)

    BSC

    GPU

    K_GSL

    GSL messages buffer

    GSL_round_trip_delay

    A message is kept in the buffer during GSL_round_trip_delay

  • 88 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Number of AterMux PS links per GPU/GP board

    Assessment based on the number of GSL messages per second

    How to estimate the number of GSL messages per second:

    Msg on GSL due to RAE4 mechanism 0.3 Msg/s x Nb_cell

    Msg on GSL due to PS traffic

    Msg on GSL due to PS/CS paging: Nb_PS_paging/s+ Nb_CS_paging/s

    Msg on GSL due to PS data traffic (TBF requests):

    TBF (UL & DL) corresponding to RA update 1.7 x Nb_TBF_Sig_req/s

    TBF (UL & DL) corresponding to PS data (3 cases)

    Low GSL usage (eg. Ping 5 s) 2.5

    Medium GSL usage 3.5 x Nb_TBF_Data_req/s

    High GSL usage (worst case) 5

    The Sum of all rates above gives the Total Nb of Msg/s.

  • 89 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Number of AterMux PS links per GPU/GP board

    Assessment based on the number of GSL messages per second

    The GSL usage condition can be defined through the following table:

    The values provided in the table above are relibale if T_GCH_INACTIVITY = 3s and

    T_GCH_INACTIVITY_LAST = 20s (default setting).

    Otherwise (I.e. T_GCH_INACTIVITY = 2s and T_GCH_INACTIVITY_LAST = 6s) GSL load will be

    greater due to the consequent increase of deallocation/allocation messages.

    3.52.5Low

    53.5HighAvailable

    GCH

    LowHigh

    PS traffic

    (TBF req)Nb of Msg on GSL

    per TBF_data_req

    If #TBF req /s < 20 TBF/s

    If Ater congestion observed

  • 90 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Number of AterMux PS links per GPU/GP board

    Assessment based on the number of GSL messages per second

    Nb_cell: number of cell (at BSC level or managed by the GPU, depending if the

    method is applied at BSC or GPU level)

    Nb_PS_paging: number of processed PS paging requests/s is measured by

    P391a/3600

    Nb_CS_paging: number of processed CS paging requests/s is measured by P391b/3600

    Nb_UL_TBF_req: the total number of UL TBF requests/s

    (P62a+P62b+P62c-P438c+P507)/3600

    Nb_DL_TBF_req: the total number of DL TBF requests/s

    (P91a+P91b+P91c+P91d+P91e+P91f+P505)/3600

    Nb_UL_TBF_req_noGSL: number of UL TBF requests/s which will not generate any

    message on the GSL is counted by P62b.

  • 91 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Number of AterMux PS links per GPU/GP board

    Assessment based on the number of GSL messages per second

    Nb_TBF_Sig_req: the number of TBF (UL and DL)/s which correspond to signalling

    traffic. The part of DL TBF signalling requests is estimated with %_DL_TBF_Sig_req =

    P160 / Nb_DL_TBF_succ.

    where P160 = NB_DL_TBF_1_succ (Number of DL TBF establishment requests

    requesting 1 slot which are satisfied) and

    Nb_DL_TBF_succ = P90a+P90b+P90c+P90d+P90e+P90f+P506. So,

    Nb_TBF_Sig_req = %_DL_TBF_Sig_req x (Nb_UL_TBF_req - Nb_UL_TBF_req_noGSL +

    Nb_DL_TBF_req)

    Nb_TBF_Data_req: the number of TBF (UL and DL)/s which correspond to data

    traffic.

    Nb_TBF_Data_req = Nb_UL_TBF_req + Nb_DL_TBF_req - Nb_UL_TBF_req_noGSL -

    Nb_TBF_Sig_req

  • 92 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Number of AterMux PS links per GPU/GP board

    Assessment based on the number of GSL messages per second

    GSL load (in terms of treated messages)

    GSL load in terms of treated messages per second on a given GPU/GP should not

    exceed 75%

    It is recommended to increase the number of GSL per GPU/GP if GSL load is greater

    than 75%.

    %Capacity_Max_Link_GSL

    sec_per_messages_GSL_Nbload_GSL 100=

  • 93 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    GPU/GP Dimensioning

    Number of AterMux PS links per GPU/GP board

    Based on total GSL load and final number of required GPU/GP bords, the

    number of GSL links per board is:

    If the result is greater than 4 (8), we must increase the number of GPU (GP)

    boards with 1, and redo the calculations.

    The final number of required AterMux PS links per GPU/GP boards is the

    maximum value between the number of links needed for signaling traffic

    (GSL) and for user traffic (GCH).

    =

    board GPU/GP quiredRe of NbBSC per GSL Required of Nb

    GPU/GP per GSL quiredRe of Nb

  • 94 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    Gb Interface

    Dimensioning7

  • 95 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Gb Interface Dimensioning

    Gb over Frame Relay

    Target

    Find the required number of Gb TS

    Input (counters values):

    PVC downlink Traffic

    PVC uplink Traffic

    PVC downlink average throughput

    PVC uplink average throughput

    Customer requirements for QoS (delay and quantile)

    Output:

    Nb of Gb TS

  • 96 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Gb Interface Dimensioning

    Gb over Frame Relay

    Method: ErlangC

    Needed counters:

    P45 or GTGPVCDLN (GPRS_PVC_DL_traffic_from_SGSN),

    P46 or GTGPVCULN (GPRS_PVC_UL_traffic_to_SGSN).

    Erlang C

    Required Gb Traffic

    QoS: % Quantile of x delay sec

    Nb of required Gb Timeslot per

    link

    INPUT OUTPUTMETHOD

  • 97 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Gb Interface Dimensioning

    Gb over Frame Relay

    The required Gb traffic is:

    The required number of Gb TS is:

    The maximum number of Gb links from one GPU/GP board to the SGSN is 8.

    Maximum 31 Gb TS (TS no. 1 to 31) can be configured per one Gb link.

    288004645 )P,Pmax(traffic_Gb_Measured =

    inargm%traffic_Gb_Measuredtraffic_Gb_quiredRe 15+=

    )delay;quantile;traffic_Gb_quired(Re ErlangClink_per_TS_Gb_No =

    where quantile = 99% and delay = 0.01s

  • 98 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Gb Interface Dimensioning

    Gb over Frame Relay

    The Gb over FR configuration

    Parameters:

    Tc (Measurement interval) = 1s

    CBS (Committed Burst Size)

    CIR (Committed Information Rate)

    CIR = (CBS*8)/Tc

    NIR (Normal Information Rate)

    NIR CIR

    EBS (Excess Burst Size)

    EIR (Excess Information Rate)

    EIR = CIR+EBS*8/Tc

    AC (Access Rate Bearer Channel)

    AC CIR(1+EBS/CBS)

    NbGbTS = AC/64kbps

    Tc

    EBS

    CBS

    Bit rate

    time

    EIR

    CIRNIR

    ACCESS_RATE_BC

  • 99 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Gb Interface Dimensioning

    Gb over Frame Relay

    The Gb over FR configuration

    Rules if no direct access is used between MFS and SGSN:

    CIR NIR CIR x (1 + EBS/CBS) ACCESS_RATE_BC

    Example:

    number16NbGbTS

    kbps 1008AC

    kbps1008EIR

    kbyte2EBS

    kbps 992NIR

    kbps992CIR

    kbyte124CBS

    s1Tc

    unitvalueParameter

  • 100 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Gb Interface Dimensioning

    Gb over Frame Relay

    The Gb over FR configuration

    Rules if direct access is used between MFS and SGSN:

    CIR = 0 CBS = 0 => EBS > 0 (mandatory)

    NIR = 0 (recommanded)

    EBS = ACCESS_RATE_BC (expressed in kbit/s)/8, if CIR = 0 (recommanded)

    Example:

    For CBS = 0; CIR = 0 and NIR = 0:

    number20NbGbTS

    kbps1280EIR

    kbps 1280AC

    kbyte160EBS

    s1Tc

    unitvalueParameter

  • 101 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Gb Interface Dimensioning

    Gb over IP

    Using Gigabit Ethernet link to the aggregation Router, the max load is:

    For MxMFS: 1560 GCHperGP * 16 Kbps = 24.96 Mbps

    Assuming all this traffic coming from SGSN for one MxMFS with 21 GP boards we get:

    21 boards*24.96 Mbps = 524.16 Mbps Half of the GigaEthernet link capacity

    For Legacy MFS: 480 GCHperGPU * 16 Kbps = 7.68 Mbps

    Assuming all this traffic coming from SGSN for one MFS DS10 with 30 GPU boards we

    get:

    30 boards*7.68 Mbps = 230.4 Mbps Quarter of the GigaEthernet link capacity

    Congestion is not expected at the level of the link to the aggregation router.Any Congestion seen afterwards is dependent on bandwidth management of the core IP network.

  • 102 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Gb Interface Dimensioning

    Gb over IP

    Target

    Find the DL and UL traffic during BH

    Input (counters values):

    Ip Endpoint downlink data volume

    Ip Endpoint uplink data volume

    Output:

    DL and UL data rate

    Counters in the MFS

    New counters per IP Endpoint are defined in case of GboIP:

    P34a (TIME_SGSN_IP_ENDPOINT_NOT_AVAIL_GBIP),

    P45a (NB_KBYTES_RECEIVED_FROM_SGSN_GBIP),

    P46a (NB_KBYTES_SENT_TO_SGSN_GBIP).

  • 103 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Gb Interface Dimensioning

    Gb over IP

    Data rate calculation in DL (SGSN to MFS) and in UL (MFS to SGSN)

    Data rate DL/UL, at IP Endpoint level or aggregated at GP or MFS level:

    DL Data rate [Kbps] = 1.233*(P45a*8 )/(3600-P34a)

    UL Data rate [Kbps] = 1.233*(P46a*8)/(3600-P34a)

    Explanation:

    Assuming LLC PDU and BSSGP payload are 300 bytes, NS, UDP, IP and Fast Ethernet

    overhead are 70 bytes (i.e. 4+28+38),

    SNS layer (where Kbytes counts is done) overhead ratio at this layer is 0.23% (i.e.

    70/300).

  • 104 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Gb Interface Dimensioning

    Gb over IP

    GboIP traffic estimation based on actual GboFR traffic

    Estimated Traffic:

    Estimated DL IP Data rate [Kbps] = (370/306)*(P45*8)/(3600-P34)

    Estimated UL IP Data rate [Kbps] = (370/306)*(P46*8)/(3600-P34)

    Explanation:

    Assuming LLC PDU and BSSGP payload are 300 bytes, NS, UDP, IP and Fast Ethernet

    overhead are 70 bytes (i.e. 4+28+38), NS and FR overhead are 6 bytes (i.e. 4+2).

    Packet size increase ratio = Total IP packet (i.e. 370) / Total FR packet (i.e. 306)

  • 105 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    Location Area

    Dimensioning8

  • 106 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Location Area definition

    Set of cells which are paged each time one Terminating Call is initiated

    Specified with a unique Location Area Code (LAC)

    Position of each MS in a specific Location Area stored in HLR / VLR

    MS tells mobile network (using SDCCH resources)

    when it moves from one LAC to another (Location Update)

    periodically its current LAC position (Periodical LU)

    Location Area size

    Trade off between

    Signalling load in cells located at LAC border

    SDCCH resources in each cell has to be sized accordingly

    Number of simultaneous pagings in each cell of the LAC

    All MS in LAC and in MT call are paged simultaneously

  • 107 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    CCCH Sharing

    Air interface

    Pagings sent in DL on CCCH

    Sharing between PCH & AGCH within one CCCH M-51 frame (235 mS duration)

    CCCH_CONF

    Combined mode 3 blocks

    Non combined mode 9 blocks

    Nb of AGCH blocks = BS_AG_BLKS_RES

    Nb of PCH blocks = Nb of total CCCH blocks - BS_AG_BLKS_RES

    6 CCCH blocks are available for the PCHReserved for AGCH

    CCCH 8CCCH 7CCCH 6CCCH 5CCCH 4 CCCH 3CCCH 2CCCH 1CCCH 0

    Example of AGCH and PCH organisation when BS_AG_BLKS_RES = 3 (Non combined mode)

  • 108 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    PCH content

    Air interface

    Nb of pagings per CCCH block, depends on

    Paging request type

    Subscribers behavior (mobile often on/off)

    Paging efficiency

    between 1.5 3

    2.5 pagings / PCH block considered usually in dimensioning

    TYPE 1 TYPE 2 TYPE 3 - IMSI - (P)TMSI - IMSI,IMSI - IMSI, (P)TMSI - (P)TMSI, (P)TMSI

    - (P)TMSI, (P)TMSI, (P)TMSI - (P)TMSI, (P)TMSI,IMSI

    - (P)TMSI, (P)TMSI, (P)TMSI, (P)TMSI

  • 109 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    PCH content

    BTS

    BSCCellMS

    GPUMFS

    TC MSC

    SGSN

    AbisAterMUX-PS

    AterMUX-CS

    Gb

    APaging request message

    (type 1, 2 or 3)Paging command

    Message (RSL)

    Paging commandor

    Immediate assign command message

    (RSL)

    PCH blockson CCCH

    CS Paging(SS7)

    (GSL)PS/CS Paging

    orChannel assignment downlink message

    Paging request or

    Packet downlink assignment

    message

    Gs

  • 110 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    PCH capacity

    Non-Combined cell

    BS_AG_BLKS_RES = 4 (AGCH blocks) 9 - 4 = 5 PCH blocks (default configuration)

    5 PCH blocks/Multiframe * (3600s / 235 ms) =

    76 594 PCH blocks/ hour

    2.5 paging / Block x 76 594 Blocks =

    191 485 paging/hour at 100% load

    If 60 % engineering limit applied: 114 891 paging/hour

    31.91 paging/s

  • 111 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    PCH capacity

    Combined cell

    BS_AG_BLKS_RES = 1 3 - 1 = 2 PCH blocks

    2 PCH blocks/Multiframe x (3600s / 235 ms) =

    30 638 PCH blocks/ hour

    2.5 paging / Block x 30 638 Blocks =

    76 595 paging/hour at 100% load

    If 60 % engineering limit applied: 45 957 paging/hour

    12.76 paging/s

  • 112 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    AGCH content

    BTS

    BSCCellMS

    GPUMFS

    AbisAterMUX-PS

    Access grant message

    (IA, IAE or IAR)Immediate assign

    command message(RSL)

    Immediate assign command message

    (RSL)

    AGCH blockson CCCH

    Immediate assignment orImmediate assignment reject message

    Access grant message

    (PUA, PDA or IAR)(GSL)

    Channel assignment uplink (EGPRS Uplink assign.),Channel assignment downlink(Downlink assign.)orChannel assignment uplink message (Assign. reject)

    Note: IA= Immediate Assign; IAE=Immediate Assign Extended; IAR= Immediate Assign Reject;

    PUA= Packet Uplink Assignment; PDA= Packet Downlink Assignment.

  • 113 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    AGCH capacity

    Non-Combined cell

    BS_AG_BLKS_RES = 4

    4 AGCH blocks/Multiframe x (3600s / 235 ms) =

    61 272 AGCH blocks/ hour

    1 Immediate Assign message / Block x 61 272 Blocks =

    61 272 paging/hour at 100% load

    If 60 % engineering limit applied: 36 763 IA message/hour

    10.21 IA message/s

    AGCH efficiency: between 1 2 (2 if Immediate Assign Extended)

    1 Immediate Assign message / AGCH block used usually in dimensioning

  • 114 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    AGCH capacity

    Combined cell

    BS_AG_BLKS_RES = 1

    1 AGCH block/Multiframe x (3600s / 235 ms) =

    15 318 AGCH blocks/ hour

    1 Immediate Assign message / Block x 15 318 Blocks =

    15 318 paging/hour at 100% load

    If 60 % engineering limit applied: 9 180 IA message/hour

    2.55 IA message/s

  • 115 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    AGCH and PCH capacity

    Non-Combined cell

    PCH blocks

    AGCH blocks

    Paging Request/s (PCH blocks/s)

    Access Grant msgs/s (AGCH blocks/s)

    Paging msgs/s at 60% limit

    ImmAs msgs/s at 60% limit

    PCH msgs/h at 60% limit

    ImmAs msgs/h at 60% limit

    Total # msgs sent/h at 60% limit

    6 3 25.53 12.75 38.29 7.65 137851 27540 165391 5* 4 21.27 17.02 31.91 10.21 114893 36763 151656 4** 5 17.02 21.27 25.53 12.76 91908 45936 137844

    Notes: * Alcatel recommended default configuration.

    ** Recommended for 16 TRX cells with CS only.

  • 116 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    B9 limitations

    Abis interface limitation

    max paging load of 33 paging commands per second = 118 800 paging/hour

    G2 BSC limitation

    max paging load of 70 paging commands per second = 252 000 paging/hour

    MxBSC limitation

    max paging load of 95 paging commands per second = 342 000 paging/hour

  • 117 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Location Area dimensioning in B9

    G2 BSC:

    MxBSC:

    2 Location Areas with an average of 132 cells per LA

    3 Location Areas with an average of 88 cells per LA

    G2 BSC

    (max 264 cells)

    AAbis

    70 paging/s33 paging/s

    LA

    LA

    Mx BSC

    (max 264 cells)

    AAbis

    95 paging/s33 paging/s

    LA

    LA

    LA

  • 118 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    B10 limitations

    Abis interface limitation

    max paging load of 33 paging commands/second 118 800 paging/hour

    max paging load of 66 paging commands/second 237 600 paging/hour with mCCCH

    G2 BSC limitation

    max paging load of 70 paging commands/second = 252 000 paging/hour

    MxBSC limitation

    max paging load of 120 paging commands/second= 432 000 paging/h

    (expected in B10)

  • 119 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    B10 limitations

    CCCH capacity in B10 with mCCCH

    (rounded figures)

    Nb CCCH TS BS_AG_BLKS_RES

    PCH blocks AGCH blocks Max paging/s at 60% load

    Max assign/s at 60% load

    1 3 6 3 38 7 1 4 5 4 32 10 1 5 4 5 25 12 2 3 12 6 76 15 2 4 10 8 63 20 2 5 8 10 51 25 2 6 6 12 38 31

  • 120 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Location Area dimensioning in B10

    G2 BSC without mCCCH:

    1 Location Area with up to 264 cells per LA

    G2 BSC with mCCCH:

    G2 BSC

    (max 264 cells)

    AAbis

    70 paging/s33 paging/s

    LA

    LA2 Location Areas with an average of 132 cells per LA

    G2 BSC

    (max 264 cells)

    AAbis

    70 paging/s66 paging/s

    LA

  • 121 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Location Area dimensioning in B10

    MxBSC without mCCCH:

    4 Location Areas with an average of 125 cells per LA

    2 Location Areas with an average of 250 cells per LA

    Mx BSC

    (max 500 cells)

    AAbis

    120 paging/s2 CCCH 66 paging/s

    LA

    LA

    Mx BSC

    (max 500 cells)

    AAbis

    120 paging/s1 CCCH 33 paging/s

    LA

    LA

    LA

    LA

    MxBSC with mCCCH:

  • 122 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Location Area dimensioning in B10

    There is no relationship between the BSC paging mechanism and CCCH

    configuration.

    The BSC has just the task of broadcasting paging messages per LAC.

    If paging coming from MSC has a high rate, the BSC will send on Abis paging

    commands at high speed, ignoring the fact that some cells are not able to

    send it.

    As a consequence, some paging commands shall be discarded by cells with

    less radio capacity compared with BSC capacity for sending paging on Abis.

  • 123 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Location Area dimensioning in B10

    The Paging load must be assessed during busy hour.

    If the paging rate on Abis doesnt exceed 33 paging/s, cells with 1 CCCH TS

    may be used without loses.

    If the paging rate is higher (up to 66 paging/s), all the cells in LAC should be

    configured with 2 CCCH TS, to avoid paging messages to be discarded.

    If the paging rate per LAC is higher than 66 paging/s, the LAC should be split.

  • 124 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Dimensioning Target

    Verify if the Location Area size is OK

    Method:

    Check the BSC and Abis limits

    Check the related parameters

    Check the load on CCCH (PCH, AGCH, RACH)

    Input (counter values):

    Paging rate, Nb of paging messages discarded, PS Paging rate, AGCH load, Nb of IA

    messages discarded

    Output

    Location area load

  • 125 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Method for Location area:

    Needed telecom parameters:

    BS_AG_BLKS_RES

    CCCH_CONF

    Needed counters for PCH and AGCH:

    MC8a = NB_CELL_PAGING_CMD

    MC8b = NB_CELL_IMM_ASS_CMD

    MC8d = NB_CELL_IMM_ASS_REJ

    P49 = NB_IMM_ASS_AGCH

    MC27 = CCCH_TS_Cell_available

  • 126 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Method for Location area:

    New counters for CCCH in B10:

    MC925a = NB_AGCH_USEFUL_BLOCKS_SENT

    MC925b = NB_PCH_USEFUL_BLOCKS_SENT

    MC925c = NB_BUSY_RACH_SLOTS

    MC925d = NB_CHANNEL_RQ_RADIO

    MC925e = NB_ASSIGN_CMD_RECEIVED_ABIS

    MC925f = NB_ASSIGN_CMD_DISCARDED

    MC925g = NB_PAGING_CMD_RECEIVED_ABIS

    MC925h = NB_PAGING_CMD_DISCARDED

    MC930 = NB_ABIS_PAGING_MESSAGE_RECEIVED

  • 127 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Method for Location area:

    B9 Method

    Total MC8a > 252000(Total for all LA in the BSC)

    Re-Design LA, and/orReduce nb of LA per BSC

    All Cells in a LA are non-combined

    MC8a > 57,446 MC8a >114,891

    Yes

    No

    No

    No

    NoYes Yes

    Yes

    OK OK Re-Design LAChange to non-combined Re-Design LA

    Check BSC Limitation

    Check Um Limitation

    This value represents G2 BSC limit.

    For MX BSC the limit is 342 000.

    This value represents 60% of PCH channel capacity.

  • 128 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Method for Location area:

    B10 Method

    Total MC8a > 252000(Total for all LA in the BSC)

    Re-Design LA, and/orReduce nb of LA per BSC

    All Cells in a LA are non-combined

    MC8a > 57,446 MC8a >114,891

    Yes

    No

    No

    No

    NoYes Yes

    Yes

    OK OK Re-Design LAChange to non-combined Re-Design LA

    Check BSC Limitation

    Check Um Limitation

    This value represents G2 BSC limit.

    For MX BSC the limit is 432 000.

    This value represents 60% of PCH channel capacity.

    This value must be double in case of 2 CCCH TS.

  • 129 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Method for Location area (and Routing Area):

    Abis approach

    If (CS+PS) Paging load is less than 60% of PCH channel capacity:

    The LA size is OK (no overload)

    It is possible to keep RA size = LA size

    LA RA

    Note: Total PCH channel capacity is 191 485 paging/hour for 1 CCCH TS and

    382 970 paging/hour for 2 CCCH TSs (for BS_AG_BLKS_RES = 4).

    (CS+PS) Paging load = MC8a

    60% represents engineering limit

  • 130 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Method for Location area (and Routing Area):

    Abis approach

    If (CS+PS) Paging load is greater than 60% of PCH channel capacity and if

    PS Paging load/(CS+PS) Paging load is greater than 20% then:

    Is necessary to have RA size < LA size, so LA must be splitted in two or more RAs.

    Note: (CS+PS) Paging load = MC8aPS Paging load = P53a

    LA

    RA1RA2

    RA

  • 131 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Method for Location area (and Routing Area):

    Abis approach

    If (CS+PS) Paging load is still greater than 60% of PCH channel capacity after

    PS Paging load/(CS+PS) Paging load has been changed to be under 20%, then:

    Is necessary to splitt the initial LA in two or more LAs.

    LA LA1

    LA2

  • 132 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    BSS Dimensioning Methods in B10

    Location Area Dimensioning

    Method for Location area (and Routing Area):

    CCCH frame tuning at cell level

    Checking during busy hour

    Check BS_AG_BLKS_RES value

    Check AGCH load (MC925e/AGCH capacity) and congestion (MC925f/ MC925e)

    Check PCH load (MC925g/PCH capacity) and congestion (MC925h/ MC925g)

    Tuning

    If PCH load is below 60% and no congestion but AGCH load is above 60% and with

    congestion => BS_AG_BLKS_RES may be increased by 1.

    If PCH load is above 60% and with congestion but AGCH load is below 60% and without

    congestion => BS_AG_BLKS_RES may be decreased by 1.

  • 133 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX

    www.alcatel-lucent.comwww.alcatel-lucent.com