Upload
alex-matovic
View
107
Download
2
Tags:
Embed Size (px)
Citation preview
Alex Matovic
Sample of WorksGrimshaw 2000 - 2013
Project “Blue Ocean” - Changi Airport new Landside/Airside Centre BidClient: LendleaseRole: Project Director
Project: Brisbane Airport Landside and Stage 1 MasterplanClient: Brisbane AirportRole: Grimshaw team lead
0m 1000m
1:25,000 @ A3
500m
Opportunity for expansion of road network, linking Pandanus Ave to airport north precinct
Future expansion of logistics and charter facility with airside access
Future expansion of Domestic Terminal operations
High amenity landscaped waterway corridor incorporating pedestrian and cycle paths
Expansion of logistics and frieght operations within airport east
New charter facility
Consolidated business and community hub linking International Terminal and new development precinct with entertainment and educational space
Future sub-precinct development parcels set within high amenity landscape
Central gateway precinct with new rail station, stadium and entertainment facilities
Future expansion of rail network through airport south to Pinkenba village
Precinct community hub with future rail station
1
3
2
4
56
7
8
9
10
11
53
Precincts
Airport Central
Airport North
Airport East
Airport South
Airport West
Precincts
Airport Central
Airport North
Airport East
Airport South
Airport West
Project: Doherty InstituteClient: University of MelbourneRole: Project Director
Project: Earthpark MalaysiaClient: Government of MalaysiaRole: Concept lead
Project: Maribyrnong Defence Site RedevelopmentClient: Places VictoriaRole: Project team lead
Project: Southern Cross StationClient: Leighton ContractorsRole: Package Architect - roof geometry, pods, metalwork, north facade and concourse
Project: Rolls Royce ProjectClient: BMWRole: Zone Architect - pavilion and link buildings
Project: Sheraton Mirage Gold Coast RedevelopmentClient: Raptis GroupRole: Team lead
Building Layers
Page 31 November 2012
SSD APPLICATIONUNSW
Figure 4.13 Exploded diagram of components through the office zone
Figure 4.12 - The blades will have a range of surface finishes from rough to smoothFigure 4.11 - External blades plan
Project: Materials Sciences New BuildingClient: UNSWRole: Project Director