Call us for any missing or damaged parts.Do not return to the store.
CustomerService Hotline(800) 483-4674www.duramaxbp.com
• All Weather Durable PVC• High Head Room For Garden Implements• Won’t Dent, Rust, Rot or Mildew• Never Needs Painting• Wide Single Door• Easy Assembly• Pad Lock Ready (Lock not included)• Wooden or Cement Foundation Needed
Available Kits• Foundation Kit Available• Window Kits Available
Your Total Solution To Maintenance Free Storage Sheds.
Ver: 0.0
Building Dimensions :Approximate
SizeStorage Exterior Dimension Interior Dimension
4 Ft x 8 Ft 29 1/4 Sq. Ft 154 1/4 Cu.Ft
Roof Edge to EdgeBase Dimension Door Opening
1.2 m x 2.4 m 2.7 Sq.m 4.3 Cu.m
WidthDepthHeight
inch cm47 1/2 120.6
inch cm
94 1/4 239.348 121.9
95 1/8 241.673 185.4
inch cm45 1/2 115.5
inch cm
92 1/4 234.329 3/4 75.5
61 3/4 156.863 3/8 161
Wall to WallArea Volume
OWNER’S MANUAL / Instructions for Assembly ‘4 Ft SideMate’-V2Size 4 Ft x 8 Ft / 1.2 m x 2.4 m (Approx.)
Vinyl Garden ShedVinyl Garden ShedA Product of
TM
A L L P U R P O S E V I N Y L G A R D E N S H E D S
Patent #416.091
Duramax Garden ShedLimited Fifteen Year Warranty
U.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and or workmanship for a period of fifteen years from the date of purchase.
This warranty is extended only to the original purchaser. A purchase receipt or other proof of date of original purchase will be required before warranty service is rendered. In no event shall we pay the cost of flooring, labor, installation or any other costs related thereto.
This warranty only covers failures due to defects in material or workmanship which occurs during normal use and does not extend to color change arising due to normal weathering or to damage resulting from misuse or neglect, commercial use, failure to follow assembly instructions and the owner’s manual (including proper anchoring of the shed), painting, forces of nature and other causes which is beyond our control.
Claims under this warranty must be made within the warranty period by calling 1-800-483-4674 or mail in a dated sales slip and clear photograph of the part to:
U.S. Polymers, Inc.1057 S. Vail Ave Montebello, CA 90640.
We reserve the right to discontinue or change components. If a component has been discontinued or is not available,U.S. Polymers, Inc. reserves the right to substitute a component of equal quality as may be compatible.
Limits and Exclusions
There are no express warranties except as listed above. The warrantor shall not be liable for incidental or consequential damages resulting from the use of this product, or arising out of any breach of this warranty. All express warranties are limited to the warranty period set forth above. Some states do not allow the exclusion or limitation on how long an implied warranty lasts, so the above limitations may not apply to you.
This warranty gives you specific legal rights and you may also have other rights which vary from state to state or country to country.
Behind left Door Panel for Basic Shed.Location of Product Labels
1
2
SAFETY & PRECAUTIONS
Before You Begin...
1. Check your local building codes regarding footings, location, etc.
2. Select a site that allows enough working space around the shed.
3. Determine building foundation and anchor system.
4. Read and understand the Owner’s manual enclosed in the package.
5. Follow all directions and dimensions thoroughly.
6. Follow the steps given in the manual carefully for correct assembly.
7. Make sure all parts are present before you start assembling.
8. BE SAFE : Follow safety instructions and avoid injury. (See inside page).
9. GROUND MUST BE EVEN : Make sure the foundation frame lies flat on the ground. Ifthe earth bed is uneven, remove sod and other debris andlevel it with a flat shoval.
10. Separate contents of the carton by the part number and review the list. Be sure you have all the necessary parts for your shed.Refer Owner’s manual for part list.
CAUTIONSharp Edges
3
SAFETY & PRECAUTIONSFor your own safety, please read and follow these instructions during the shed assembly.
1. Always wear work gloves, long sleeves and eye protectionduring assembly of the shed. Some pieces of the shed contain sharp edges and can cause injury.
2. Be cautious with the tools used for the assembly ofthe shed.Familiarize yourself with the operation of allthe power tools.
3. Children and pets should be kept away from the assemblysite to avoid any distractions and accidents.
4. When using a step ladder, make sure it is on even ground and fully open with the safety latch in place. Never concentrate your fullweight on the roof or any part of the shed.
5. Do not attempt to assemble the shed on a windy day.Shed panels can be whipped across by the wind making theworksite difficult and dangerous.
4
IMPORTANTWear eye protection when using any form of power tools. Do not use voltage power tools in a wet or dampenviornment to avoid electric shock.
Do not use any part of the shed as a means of personal support while attaching componets during assembly.
The shed must be constructed on a solid base foundation. A concrete pad or a large size concrete patiostone squares is recommended for suitable floor base. Make sure it is firm and level and will allow drainageaway from the site. The base foundation should be at least 4 inches (100mm) larger than the shed dimensions.Please refer to the front page of your owner’s manual for the exterior dimensions of the shed. Manufacturer is not responsible for the choice and construction of the foundation.
For a concrete pad base, prepare a level bed for a firm footing layer of crushed stone. The concrete padshould then be poured to a thickness of 4 inches (100mm) to 5 inches (125mm). Allow to dry thoroughly for at least 48 hours
Your shed must be firmly anchored to the concrete pad or large concrete patio stone squares, to help protectagainst damage in high winds.
Care & MaintenanceAlthough this unit does not require any maintenance, care should be taken to prolong the life of your shed.
ROOF : Keep roof clean of leaves and snow with long handled, soft bristled broom. Heavy amountsof snow on the roof can damage the shed making it unsafe. Do not step on the roof.
WALLS : Do not rest any object against the wall panels of the shed.
DOORS : Keep doors closed to prevent wind damage.
FASTENERS : Regularly check your shed for loose screws, bolts, nuts, etc. And retighten them as necessary.
MOISTURE : With changing temperatures, condensation will accumulate inside the shed. Good ventilation will help in regulating and avoid moisture.
TIP : A noncorrosive caulking is helpful to seal the shed.
DO NOT store swimming pool chemicals in your building. Combustibles and corrosive must be stored in air tight containers
Parts List
Cordless Drill - Philips HeadHammer or Rubber malletCarpenters Square8’ Step LadderAdjustable pliers
Level - 3ft.Tape MeasureCaulk GunWaterproof Clear SiliconSealantHand Gloves
Tools You Will Need
Note Before starting installation, please refer Safety & Precautions.
5
CDLC CDRSCMB, CMS
CCS CCRS CCES
MJ,RS1S,RS3LS,RS3SS,RS3LQ,RS3SQ
B1LS, B1RS, B21Q, B22Q, B3S, B4LS, B4RS, B5S
COAS
RS14S,CB1S,CB2S,CB3S,CB4S,CB6S,CB2Q,Cb3Q
RS5S,RS6S DSHC
Note: Check all parts prior to installation.
PIN
FRLC RJ S3
LSH RSH
S1, S7
S2
FMCFCC
RS2BS,RS2FS, RS4S
CODE QTY
B1LS 1
B1RS 1
B21Q 1
B22Q 1
B3S 1
B4LS 1
B4RS 1
B5S 1
CB1S 1
CB2S 1
CB3S 1
CB2Q 2
CB3Q 1
CB4S 1
CB6S 1
DSHC 1
MJ 2
RS1S 2
RS2FS 1
RS2BS 1
RS4S 2
RS3LQ 1
RS3SQ 1
RS3LS 1
RS3SS 1
CODE QTY
RS9B 2
RS5S 1
RS6S 1
RS14S 3
CMB 3
CMS 2
CCS 2
CCRS 1
CCES 1
CDLC 1
CDRS 1
FSPC 2
SP 4
SPS 3
RPS 3
FPLC 1
FPRC 1
DR 1
ACCESSORIES
CODE QTY
FDCLS 2
FDCRS 2
FCC 2
FMC 5
FRLC 2
CCF 3
CMF 2
LSH 2
RSH 2
RJ 2
PPG 43
PWS 43
PIN 43
ST 1.57meter.
VC 2
VCP 4
S1 125
S2 7
S3 8
S7 11
PARTS
STPPG & PWS
CMFCCF
FDCLS
FDCRS VC VCP
For Right side door follow the page no. 8-30 & 54-57.
Option -1 Right Side Door
6
RS2BS
RS9B
RS1S
B21Q
B1LS
B1RS
B5S
B4LS
B22Q
CDRS
B3S
RS3LQ
RS3SQ
DSHC
MJ
CMS
CMB
CB3Q
CB2Q
FSPCCMB
CCES
SP
SP
SP
B4RS SPS
SPS
SPS
CB3S
CB2Q
CMS
SP
FRLC
RS9B
RS2FS
FPLC
FRLC
RS6S
RS5S
CMB
CB2S
CCS
CCRS
RS1S
FPRC
DR
CCS
FSPC
CB6S
CB4S
CB1S
CDLC
RS4S
RS14S
RS14S
RS14S
RS3LS
RS3SS
MJ
RPS
RPS
RPS
RS4S
For Left side door follow the page no. 8 & 31-57
Option -2 Left Side Door
7
RS2BS
RS9B
RS1S
B21Q
B1LSB1RS
B5S
B4RS
B22Q
CDRS
B3S
RS3LQ
RS3SQ
DSHC
MJ
CMS
CMB
CB2Q
CB3S
FSPC
CMB
CCES
SP
SP
SP
B4LS
SPS
SPS
SPS
CB2Q
CB3Q
CMS
SP
FRLC
RS9B
RS2FS
FRLC
RS6S
RS5S
CMB
CCS
CCRS
RS1S
DR
CCSFSPC
CB6S
CB4S
CB1SCDLC
MJ
RS3LS
RS3SS
RS14S
RS14S
RS14S
RS4S
CB2S
RPS
RPS
RPS
FPRC
FPLC
RS4S
A. Foundation
8
Use pressure treated 2” x 4” (50mm. x 88.9mm.)to build a foundation structure that has anoutside dimension of 48” x 96” (1219.2mm x 2438.4mm).
Using exterior grade CDX 3/4” (19 mm) plywood, cut and fit together the sheets to form solid plywood floor as shown. Foundation must be square and level.
The shed must be constructed on a solid base foundation. A concrete pad or a large size concrete patio stone squares is recommended for suitable floor base. Make sure it is firm and level and will allow drainage away from the site. The base foundation should be at least 4 inches(100mm)larger than the shed dimensions. Please refer to the front page of your owner’s manual for the exterior dimensions of the shed. Manufacturer is not responsible for the choice and construction of the foundation.
Concrete Platform
Note
The following are a list of lumber and sizes you will need.Wooden Platform (Not Included)
Pressure Treated-Wood Studs: Exterior Grade (CDX):3ea 2”x 4”x 89” (50 x 88.9 x 2260.6mm) 3/4”(19mm) plywood
2ea 2”x 4”x 48” (50 x 88.9 x 1219.2mm) 1ea 3/4”x 48”x 96”
(19 x 1219.2 x 2438.4mm)
L-Brackets: 4ea
If the shed is assembled with wooden foundation on soil, usethe soil anchor kit.
Note
DuraMax must be installed on a level wooden platformor a level concrete foundation.
Note : Do not follow this Foundation instructions , if you have DURAMAX Foundation
L- BRACKET
L- BRACKET
L- BRACKET
L- BRACKET
24” (609.6mm)
96” (2438.4mm)
48” (1219.2mm)
24” (609.6mm)
96” (2438.4mm)
48” (1219.2mm)
1
2
Lay 2 x 4(Actual size 2”x 3 1/2”, 50mm x 88.9mm)
Note
2” (50 mm)
3 1/2” (88.9 mm)
L- BRACKET
For a concrete pad base, prepare a level bed for afirm footing layer of crushed stone. The concretepad should then be poured to a thickness of 4inches (100mm) to 5 inches (125mm). Allow to drythoroughly for at least 48 hours.
9
B. Base channel.
Note 1. It is important that these instructions are followed step by step.2. All parts are clearly marked and care should be taken to use correct one.3. Don’t install under windy condition. 4. If iyou are building the shed against a wall, build it 2.5 ft. away then slide it in.
OPTION -1 RIGHT SIDE DOOR.
Using a carpenter square, line up corners. Align base bars, mark the concrete at the holes in the base and drill concrete with suitable concrete bit to accept 1/4” x 1 1/2” (M6 x 40mm) anchor bolts. (Qty - 24Nos. not provided).
Assembly on concrete foundation
M6 Anchor Bolt
Base ‘U’ Channel
Concrete
Parts Needed:CODE QTY
B1LS 1
B1RS 1
B21Q 1
B22Q 1
B3S 1
CODE QTY
B4LS 1
B4RS 1
B5S 1
S1 24
Fig.1
1
Front
Right
Left
Back
B5S
B4LS
B22Q
S1
92 1/4” (2343mm)
92 1/4” (2343mm)
45 5/8” (1158mm)
45 5/8” (1158mm)
B1LS
B1RS
B4RS
B21Q
B3S
DOOR OPENING
30 1/4” (767mm)
S1
B3SB22Q
Inside Shed
B5S
Fig.2
1
2
Note Measure in all direction as shown in figure to make the base channel assembly in a perfect.
OutsideInside
10
B1LS
CDLC
S1
B1LS
CDLC
Fig.1
Fig.2
Fig.3
Front
B1LS
CDLC
Left
1
2&3
D. Walls & Columns
All panels are clearly marked and care should be taken to use the correct one.Note
Back
1
CDLC
Parts Needed:
CODE QTY
CB1S 1
CB2Q 2
CB3Q 1
CB2S 1
CB3S 1
CB4S 1
CB6S 1
CCF 3
CMF 2
FCC 2
FMC 3
FDCLS 2
FDCRS 1
CODE QTY
CMB 3
CMS 2
CCS 2
CCRS 1
CCES 1
CDLC 1
CDRS 1
FSPC 2
SP 4
SPS 3
S1 47
S2 5
Right
11
Fig.1
B1LS
FSPC CDLC
Fig.2
S1
Left
Fig.1 Fig.2
Fig.3
FSPC
Front
Front
Front
Check the stamped label on inside top of all panels.
FSPC
Note
Do not tighten the screw.Leave it loose.Note
3
2
4
2
1
B1LS
2&3
1
CCS
B1LSB1RS
FSPCCDLC
CCS
FSPC
CCS
B1RSB1LS
CCS
CDLC
FSPC
S2
CCS
CCF
12
FrontS1
CB1S
CDLCFig.3
6
5
7
CB1S
S1
CB1S
CCF
Fig.2
CB1S
CCF
Fig.1
1&2
3
1
2
CB4S
S1
Fig.2
CB4SCDLC
CB4S
B1LS
Fig.1
S1
1
2
CMB
SPCMB
S1
B4LS
SP
Fig.1 Fig.2
FSPC
CCS
CDLC
13
SP
CCS
B3S
S1CCS
9 9
8
10
CMB
S1
B22Q
Fig.2
B22Q
B3S
CCS
CB2Q
CCF
Fig.1S1
CB2Q
CCF
Fig.2
CB2Q
S1
CMB
Fig.3
3&4
2
CMBSP
CB2Q
1
CMB
CB2Q
CMF
Fig.3S2
CMB
CMF
Fig.4
CB2Q
S1
SPCCS
2&3
1
Fig.1
Fig.2 Fig.3
CMB
CB2Q
Fig.1
CMB
3
1&2
14
FSPC
12
11
13
B3S
S1
CMB
Fig.1 Fig.2
CCS
1&2
CB3Q
CMF
Fig.1
CB3Q
CMF
S1
Fig.2
FSPC
CMB
1
2
CB3Q
1,2&3
CCS
Fig.3
S2
CCSCCF
Fig.1
CCS
CCF
CB3Q
Fig.2
S1
CB3QCCF
CB3Q
15
S1
CCRS
CCES
Fig.1 Fig.2
15
14
16
CB2S
SP
1&2
3
CMB
SPFSPC
B21Q B3S CCRS
2
1
CB2S
CCF
Fig.1S1
CB2S
CCF
Fig.2
CB2S
S1
CMB
Fig.3
CCES
16
18
17
19
CMS
SPS
CMS
S1
B21Q
1
1&2
Fig.1
S2
CCRSCCF
Fig.1
CCRS
CCF
CB2S
Fig.2
S1
CB2SCCF
CB2S
17
21
20
22
SPS
CMS
SPS
CDRS
CB2Q
1&2
2
1
CB2Q
CCF
Fig.1S1
CB2Q
CCF
Fig.2
CB2Q
S1
CMS
Fig.3
3
CMS
S1
B4RS
Fig.2
CMS
CB2Q
CMF
Fig.3S2
CMS
CMF
Fig.4
CB2Q
S1
1
3&4
B5S
CDRS
S1Fig.1 2&3
4CB3S
CB2Q
Fig.1
CMS
CB3S
CMF
Fig.2
CB3S
CMF
S1
Fig.3
SPS
Fig.4
CB3S
S1
CDRS
18
1&2
Fig.1 Fig.2
CMB
FMC
FMC
S1
CMB
CCS
FCC
CCS
FCC
S1Fig.1 Fig.2
FCC
CCS
Fig.3
23
24
1&2
FCC
CCS
S1Fig.4
Fig.4
FDCLS
CDLC
S1
3&4
3&4
1&2
Fig.3
CDLC
FDCLS
Back
1&2
19
25
1
2
Fig.3 Fig.4
CMS
FMC
FMC
S1
CMS
3&4
3&4
CDRS
S1
FDCRS
Fig.1
CDRS
CMS
CMS
CCES
Fig.2
S1FDCLS
CCES
C. Roof Structure
20
Parts Needed:
CODE QTY
RS1S 2
RS2FS 1
RS2BS 1
RS4S 2
RS3LQ 1
RS3SQ 1
RS3LS 1
RS3SS 1
RS14S 3
CODE QTY
RS5S 1
RS6S 1
RS9B 2
DSHC 1
FRLC 2
MJ 2
RJ 2
S1 54
S7 11
S2 2
RS9B
FRLC
RS9B
FRLC
MJ
RS1S
RS5S
RS6S
RS1SRS14S
RS3LS
RS3SSMJ
RS2FS
RS2BS
RS4S
RS14S
RS14S
RS3LQ
RS3SQ
RS4S
21
Make sure these holes up
S1
RS9B
RS1S
RS1S
FRLC
1
2
Front roof structure assembly
S1
3
RS9B
RS2FS
RS1S
S1
22
Make sure these holes up
RS9B
RS1S
RS1S
FRLC
S1
4 Back roof structure assembly
5
6
S1
RS9B
RS2BS
RS1S
S1
23
RJ
RJ
RJ
RS3LQ
RS3SQ
RJ
S1
S1
RS6S
RS5S
3
1&2
Fig.2
Fig.3
Fig.1
RS3SS
RS3LS
8
7
9
RS3LQRJ
S1
RS3SQ
RS3LQ
1
2
S1RS3SS
RS3LS
MJ
Fig.2
S1RS3SQ
RS3LQ
MJ
Fig.1
RS3SQ
RS3LQ
24
11
10
12
1&2
FDCRS
CDRS
Fig.1
RS3LS
S1
FDCRS
RS3LS
Fig.2
Fig.4
FMC
CMSS1
RS3LS
4
3
1
2
4
3
S1
RS1S
FMC
Fig.3
FRLC CCES
S1
Fig.4
CDRS
Fig.2
S1
FRLC
Fig.1
S1
FDCLS
CDLC
RS1S
3
RS3LQ
RS3SQ
RJ
RS1S
RS2FS
RJRS1S
RS2FS
S1
RS3SQ
Fig.1Fig.2
Fig.3
RS2BS
Do not fix screw here
1&2
RS3LS
RS3SS
S1
Fig.3
CCES
FDCLS
RS3SS
25
3
14
13
15
S1
RS2FSRS3LQ
Fig.2
S2
Fig.1
RS3LQRJ
Fig.4
S1
RS3SQ
RS2BS
Fig.3
RJ
RS3SQ
S2
RS2BS
1
2
Fig.1
RS3LQ
S1
FMC
Fig.2
RS3LQ
RS3SQ
S1
FMC
MJ
1
2
Fig.1
RS3LSS1
RS2FS
S1
Fig.2
RS3SS
RS2BS
1&2
3&4
RS3LQ
RS3SQ
RS3LQ
RS3SQ
RS3LS
RS3SS
2226
17
16
18
1
2
RS5S
S1RS9B
RS2FS
Fig.1 Fig.2
S1
RS6SRS9B
RS2BS
Fig.1
RS3LS
RS4S
S1
Fig.3
RS4SRS5S
S7
RS5S
RS6S
Fig.2
RS14S
S7
RS3LQ
RS14S
S7
RS5S
Fig.3
RS3LS
RS14S
S7
Fig.1
Do not fix this hole
Fig.4
RS3LQ
RS4S
S1
RS4S
3
2
1
RS4S
4
Fig.2
RS3LQ
RS4SS1
RS3SQ
1
2
3
RS14S
RS14S
RS14S
27
20
19
Front
Fig.2
DSHC
RS9B
S1S1
Fig.1
DSHC
RS1S
1
2
DSHC
S1
CDLC
CB6S
Fig.1
S1
RS1S
CB6S
Fig.2
2
1
CB6S
CDLC
Silicone
28
FPRC
PPGPIN
1 2
PPG
Apply silicone around the roof plugs. This is optional and should be done for heavy rain areas if needed.
NoteUse a Screw driver to align the holes.Insert roof plugs & pins into roof panels only indicated.
Note
E. Roof panels
FPRC
Back
Front
PPG
3 4
Parts Needed:
CODE QTY
RPS 3
FPLC 1
FPRC 1
DS 1
RSH 2
CODE QTY
PPG 43
PWS 43
PIN 43
S3 8
ST 1.57 meter
PIN
PIN
Front
FPLC
PPGPIN
RPSRPS
This is optional and should be done for heavy rain areas if needed.
Apply silicone into the holes before inserting the pins.Note
29
5 Roof Panel installation by usingladder from inside at missingPanels.
Note
7
5 6
8
PPG
PPG
DS
ST
PIN
PIN
Back
12
12DS
DS
S3
RSH
DS
Fig.1
RSH
S3
CDRS
Fig.2
DS
DS
RPS
RPS
CDRS
CDRS
ST
30
Apply silicone around the perimeter of the base ‘U’ channel. Seal the corners, joints and base of door column. This is optional and should be done for heavy rain areas ifneeded.
Note
Base ‘U’channel
Silicone
Column
Fig.1
Silicone
Base ‘U’channel
Fig.2
1
2
Note
Door Assembly
For heavy rain areas, if a duramax foundation kit is not being used, you can fix a weather strip at the bottom of the door. This is optional and the part is not included.
Weather Strip Seal
31
B. Base channel. Parts Needed:
Note 1. It is important that these instructions are followed step by step.2. All parts are clearly marked and care should be taken to use correct one.3. Don’t install under windy condition. 4. If iyou are building the shed against a wall, build it 2.5 ft. away then slide it in.
OPTION -2 LEFT SIDE DOOR.
CODE QTY
B1LS 1
B1RS 1
B21Q 1
B22Q 1
B3S 1
CODE QTY
B4LS 1
B4RS 1
B5S 1
S1 24
S1
B3CB22
Fig.2
1
Front
Right
Left
Back
B1LS
B4LS
B22Q
S1
45 5/8” (1158mm)
B1RS
B5S
B4RS
B21Q
B3S
1
2
Note Measure in all direction as shown in figure to make the base channel assembly in a perfect.
45 5/8” (1158mm)
92 1/4” (2343mm)
DOOR OPENING
30 1/4” (767mm)
Fig.1
Inside Shed
Using a carpenter square, line up corners. Align base bars, mark the concrete at the holes in the base and drill concrete with suitable concrete bit to accept 1/4” x 1 1/2” (M6 x 40mm) anchor bolts. (Qty - 24Nos. not provided).
Assembly on concrete foundation
M6 Anchor Bolt
Base ‘U’ Channel
Concrete
InsideOutside
C. Walls & Columns
All panels are clearly marked and care should be taken to use the correct one.Note
Fig.3S1
B1RS
CDLC
Fig.1
B1RS
CDLC
Fig.2
Front2&3
1
Left
Right
Back
1
32
CDLC
B1RS
CDLC
Parts Needed:
CODE QTY
CB1S 1
CB2Q 2
CB3Q 1
CB2S 1
CB3S 1
CB4S 1
CB6S 1
CCF 3
CMF 2
FCC 2
FMC 3
FDCLS 1
FDCRS 2
CODE QTY
CMB 3
CMS 2
CCS 2
CCRS 1
CCES 1
CDLC 1
CDRS 1
FSPC 2
SP 4
SPS 3
S1 47
S2 5
33
Check the stamped label on inside top of all panels.
FSPC
B1RS
FSPC
CDLC
Fig.1
Fig.1
Fig.2
CCS
B1RS B1LS
B1LS
CCS
B1RS
Front
Fig.3
3
Fig.2
4
Note
S1
CDLCFSPC
Front Right
FSP
Front
CDLC
B1RS
3
4
CCS
CCS
CCF
2
1
2
1
2&3
CCS
FSPC
FSPC
FSPC
S2
CCS
CCF
34
Front
7
6
5
7
CB1S
S1
CB1S
CCF
Fig.2
CB1S
CCF
Fig.1
S1CB1S
CDLC
Fig.3
1
2
CB4S
S1
Fig.2
CB4SCDLC
CB4S
B1RS
Fig.1
S1
1
2
CMB
SP
CMB
S1
B4RS
Fig.2
SP
Fig.1
FSPC
CCS
2
1
35
8
9 9
8
10
S1
CB2Q
CCF
Fig.2
CB2Q
CCF
Fig.1
CB2Q
S1
CMB
Fig.3
1
3&4
2
CMB SP
CB2Q
CMB
S1
B21Q
Fig.2
CMB
CMF
Fig.4
CB2Q
S1CMB
CB2Q
CMF
Fig.3S2
SPCCS
2&3
1
Fig.1
SP
CCS
B3S
S1CCS
Fig.3
B21Q
B3S
CCS
Fig.2
CMB
CB2Q
Fig.1
CMB
3
1&2
3 6 S1
B3S
CMB
FSPC
SP
12
11
13
Fig.1
Fig.2
CCS
1&2
CB3Q
CMF
S1
Fig.2
CB3Q
CMF
Fig.1
CB3Q
1,2&3
CCS
Fig.3S2
CCSCCF
Fig.2
S1
CB3Q
CCF
Fig.1
CCS
CCF
CB3Q
FSPC
1
2
CMB
CB3Q
15
14
16
CCRS
COAS
3 7
SP
CMB
FSPC
Remove CCES from COAS.Note Remove COAS
from CCRS .
SP
17
CCRS
COAS
CCES
Note
CB2S
1&2
3S1CB2S
CCF
Fig.2
CB2S
CCF
Fig.1
CB2S
S1
CMB
Fig.3
3 8
CCES
Fig.1
B3S
S1
CCRS
B22Q
Fig.2
18 19
20
COAS
CCES
COAS
CCRS
CCRS
CCESCCRS
CCRS
1
CCRS
2
39
22
21
23
S1
B22Q
CMS
SPS
CMS
1&2
S2
CCRSCCF
Fig.2
S1
CB2S
CCF
Fig.1
CCRS
CCF
CB2S
CCRS
CB2S
CCRS
1740
25
24
26
CMS SPS
CB2Q
1&2
3
S1
CB2Q
CCF
Fig.2
CB2Q
CCF
Fig.1
CB2Q
S1
CMS
Fig.3
CCRS
CMS
2
1
3&4
CMS
S1
B4LS
Fig.2
CMS
CMF
Fig.4
CB2Q
S1CMS
CB2Q
CMF
Fig.3S2
1
2&3
4
CDRS
SPS
CB3S
B5S
CDRS
S1Fig.1
CCRS
Fig.1
CMS
CB3S
CMF
Fig.2
CMS
CB3S
CMF
S1
Fig.3
CMS
SPS
Fig.4
CB3S
S1
CDRS
41
27
28
CMB
S1
FMC
Fig.2
FMC
CMBFig.1
3&4
1&2
CCS
FCC
S1Fig.2
CCS
FCC
Fig.1
FCC
CCS
S1Fig.4
FCC
CCS
Fig.3
Fig.4
FDCRS
CDLC
S1
Fig.3
CDLC
FDCRS
Back
1&2
1&2
1&2
3&4
4 2
29
30
1
2
3&4
3&4
Fig.4
FMC
S1
CMS
Fig.3CMS
FMCCDRS
CMS
CMS
CCES
CDRS
S1
FDCLS
Fig.1 Fig.2
S1
FDCRS
CCES
C. Roof Structure
43
Parts Needed:CODE QTY
RS1S 2
RS2FS 1
RS2BS 1
RS4S 2
RS3LQ 1
RS3SQ 1
RS3LS 1
RS3SS 1
RS14S 3
CODE QTY
RS5S 1
RS6S 1
RS9B 2
DSHC 1
FRLC 2
MJ 2
RJ 2
S1 54
S7 11
S2 2
FRLC
RS9B
RS1S
RS2BS
RS14S
RS14S
RS14S
RS4S
RS6S
RS5S
RS1S
RS9B
RS2FSFRLC
MJ
MJ
RS3LQ
RS3SQ
RS3LS
RS3SS
RS4S
44
1
2
S1
S1
Make sure these holes up
RS9B
RS1S
FRLC
RS1S
Front roof structure assembly
1
3
RS9B
RS2BS
S1
45
4
RS9B
RS1S
RS1S
FRLC
Make sure these holes up
Back roof structure assembly
RS9B
RS2FS
S1
5
6
S1
S1
S1RS6S
RS5S
RJ
RS3LQ
RJ RS3LQ
S1RJ
RS3SQ
S1
Fig.1 Fig.2
Fig.3
46
8
7
9
MJ
Fig.1
RS3LQ
RS3SQ
S1
MJ
MJ
Fig.2
RS3LS
RS3SS
S1
RS3SSRS3LQ
RS3SQ
1
2
RS3LS
RS3SS
RJ
1&2
RS3LQ
RS3SQ
RJ3
47
111
10
12
S1
FDCLS
RS3LS
Fig.2
FDCLS
CDRS
Fig.1
RS3LS
Fig.4
FMC
CMSS1
RS3LS
1&2
4
3
1
2
4
3
CDRS
Fig.2
S1
FRLC
Fig.1
S1
FDCRS
CDLC
RS1S
FRLC
CCESS1
Fig.4
RJ
RS1S
RS2BS
Fig.2RJ
RS1S
RS2BS
Fig.1
CDRS
CMS
CMS
CDRS
CDLC
CCES
CMB
S1RS1S
FMC
Fig.3
CMB
Do not fix screw here
3
1&2
S1
RS3SQ
Fig.3
RS2FS
RS2FS
RS2BSRS3LQ
RS3SQ
S1
Fig.3
CCES
RS3SS
FDCRS
RS3SS
RS3LS
CCES
48
14
13
15
S1
RS2BS
RS3LQ
Fig.2
RS2BSS2
Fig.1
RS3LQRJ
Fig.4
S1
RS3SQ
RS2FS
Fig.3
RJRS3SQ
S2
RS2FS
1&2
1&2
1
2
Fig.2
RS3LQ
RS3SQ
S1
FMC
MJ
Fig.1
RS3LQ
S1
FMC
RS3LQ
RS3SQ
1
2
S1
Fig.2
RS3SS
RS2FS
Fig.1
RS3LSS1
RS2BS
RS3LQ
RS3SQ
RS3LS
RS3SS
RS2BS
RS2FS
49
17
16
18
1
2
RS5S
RS6S
RS14S
S7
RS6S
Fig.3
RS5SRS9B
RS2FS
S1
Fig.2
RS6S
S1 RS9B
RS2BS
Fig.1
Fig.2
RS3LQ
RS4S S1
Fig.3
RS4S RS6S
S7
Fig.1RS3LS
RS4S
S1
Do not fix this hole
Fig.4
Fig.2
RS14S
S7
RS3LQ
RS3LS
RS14S
S7
Fig.1
2
3
1
RS4S
RS3LQ
RS3SQ
RS3SS
RS3LSRS4S
4
RS3SQ
RS3LQ
S1
RS4S
RS3LQ
RS3SQ
RS3SS
RS3LS RS14S
RS14S
3
1
2
RS14S
19
Front 1
2
DSHCFig.2
DSHC
RS9B
S1S1Fig.1
DSHC
RS1S
20
S1
RS1S
CB6S
Fig.2
S1
CDLC
CB6S
Fig.1
1
2
CB6S
CDLC
50
Silicone
51
E. Roof panels
FPRC
PPGPIN
3
RPS
4
PPG
1
Apply silicone around the roof plugs. This is optional and should be done for heavy rain areas if needed.
NoteUse a Screw driver to align the holes.Insert roof plugs & roof pins into roof panels only indicated.
Note
Back
2
BackFront
PPG
FPLCFPRC
PPGPIN
PIN
PIN
RPS
Parts Needed:
CODE QTY
RPS 3
FPLC 1
FPRC 1
DS 1
LSH 2
CODE QTY
PPG 43
PWS 43
PIN 43
S3 8
ST 1.57 meter
This is optional and should be done for heavy rain areas if needed.
Apply silicone into the holes before inserting the pins.Note
52
Roof Panel installation by using ladder from inside at missing Panels.
Note
DS
S3
LSHLSH
S3
CDRS
Fig.1 Fig.2
DS
CDRS
DS
7
5
8
6
DS
ST
PINPPG
1 2
1 2
DS
DS
ST
RPSRPS
CDRS
53
Note
1
Fig.1
Silicone
Base ‘U’channel
Fig.2
2
Base ‘U’channel
Column
Apply silicone around the perimeter of the base ‘U’ channel. Seal the corners, joints and base of door column. This is optional and should be done for heavy rain areas ifneeded.
Silicone
For heavy rain areas, if a duramax foundation kit is not being used, you can fix a weather strip at the bottom of the door. This is optional and the part is not included.
Note
Door Assembly
Weather Strip Seal
F. Ventilation Kit
Parts Needed:
Optional ventilation kits can be installed on any of the wall panels. However, we recomend mounting them on the top of the shed’s back wall.
SP
Outside
Note
SP
SP
54
1 2 3
4 5 6
VC
SP
Outside
5mm.(3/16”)
12.5mm.(1/2”)
SP
VCP
VC
CODE QTY
VC 2
VCP 4
TOOLS YOU WILL NEED
Power DrillDia 3/16” (5mm) drill bitDia 1/2” (12.5mm) drill bit
SP
VC VCP
Note: To ensure that your shed withstands high winds,you will need the following reinforcement.
High wind area installation instructions
Parts needed (not included) :CODE DESCRIPTION QTY
S4 Dia. 4.2 x 16mm. (5/32” x 5/8”)Sheet Metal Screw 30
S5 M6 x 40mm. (1/4” x 1 1/2”)Anchor Bolt 24
Attach each side panel (SP ) on the bottom to the Base U-channel. Using a dia. 3mm (1/8”) drillwith a power drill, make two equal distance holeson the Base U-channel through the Side Panel.Drive a self tapping screw (S4) through the BaseU-channel to the Side Panel. Repeat this for every Side Panel. See blowup.
55
1
2
Base U-channel
3.0mm.(1/8”)
SP
S4
Using a carpenter square, line up corners. Align base bars, mark the concrete at the holes in the base and drill concrete with suitable concrete bit to accept 1/4” x 1 1/2” (M6 x 40mm) anchor bolts.
M6 Anchor Bolt
Base ‘U’ Channel
Concrete
InsideOutside
Attach each Side Panel (SP ) on top to the Roof Structure (RS3LH , RS3H). Use a dia. 3mm (1/8”) drill with a power drill, make two equal distance holes on the Side Panel through the Roof Structure. Drive a self tapping screw (S4) through the Side Panel to the Roof Structure. Repeat this for every Side Panel. See blowup.
The ‘DURAMAX’ shed has been tested and passed wind loads of up to 115 mph in a controlled laboratory environment. Natural high wind areas create wind at unpredictable speeds that are very difficult to capture accurately by location. As such we cannot guarantee the performance of the shed in these extreme situations.
Important Warranty Information
“We recommend to clear snow from the Roof top after each Snowfall.”56
3
S4
SP
RS3LH
SP
3.0mm.(1/8”)RS3LH
Side Panel
Roof Structures
Base U-channel
S4
S4
57
ADDITIONAL ACCESSORIES AVAILABLEThese accessories are required in case of heavy snow or high wind areas. Please choose relevant accessories according to your needs.
ANCHOR KIT (Soil)
Wire rope with twist augers for sheds installed with foundation (Wood / Metal) on soil.For heavy wind area.
ANCHOR KIT (Concrete)Eye bolt with wire rope for sheds installed with foundation (Wood / Metal) on concrete.For heavy wind area.
ANCHOR KIT (Foundation)Strap clamping for shed assembly with foundation(Wood / Metal) on concrete.To prevent shed from displacement.
SHELF KITEasy mounting system on the middle column. 6 inch wide reinforced PVC shelf with end caps.