45
University of Dammam College of Engineering Dept. of Construction Engineering Summer Training 2013-2014/1434-1435 Project #1 & 2 Done by: Abdulrahman Al-Turkmani 2120007880 Mohammed Thabit 2111090057 Mohammed Awead 2111090057 Momen Abu-Shehadah 2120007861 Al-Nu’man Al-Farouqi 2120007940 Instructors Dr. Sami Abdalla Osman ENG. Hassan Bakri

All Reports

Embed Size (px)

Citation preview

Page 1: All Reports

University of Dammam

College of Engineering

Dept. of Construction Engineering

Summer Training 2013-2014/1434-1435

Project #1 & 2

Done by:

Abdulrahman Al-Turkmani 2120007880

Mohammed Thabit 2111090057

Mohammed Awead 2111090057

Momen Abu-Shehadah 2120007861

Al-Nu’man Al-Farouqi 2120007940

Instructors

Dr. Sami Abdalla Osman

ENG. Hassan Bakri

Page 2: All Reports

Page 2 of 45

Introduction:

A topographic map is a type of map characterized by large-scale detail

and quantitative representation of relief, usually using contour lines in

modern mapping, but historically using a variety of methods. A topographic

map is to show both natural and man-made features. A topographic map is

typically published as a map series, made up of two or more map sheets that

combine to form the whole map. [1]

Topographic maps are specifically purposed for elevation of the land area, as

well as outlining geographic locations, such as mountains. Topographic

maps are used by architects, geographic professionals, and by outdoor

recreations, primarily hikers. [2]

Uses of topographic map:

Topographic maps have multiple uses in the present day: any type of

geographic planning or large-scale architecture; earth sciences and many

other geographic disciplines; mining and other earth-based endeavors; and

recreational uses such as hiking or, in particular, orienteering, which uses

highly detailed maps in its standard requirements. [1]

Objectives:

The objective of this laboratory is to:

Identify the different ways to produce topographic maps that help in

the engineering design.

Identify the devices used and the methods used in practice

Learn how to draw topographic maps

Page 3: All Reports

Page 3 of 45

Tools:

Scope Of Study :

We start by using GPS device to measure the coordinate of control

pints after getting the data from GPS we start to work to produce a

topographic map to our project by using Total Station device. Our

project consist of three buildings which is ,( 900,700 and 80), four

green area, Roads, Parking, and sidewalks. After getting the data from

the program we establish the calculation passes through out a lot of

process to get the conclusion.

Figure1: Total Station Figure2: Prism

Figure4: Compass

Figure3: GPS

Figure 6: Tripod Figure 4: Steel Tape

Page 4: All Reports

Page 4 of 45

Procedures:

At least 5 control points (CP) with minimum length of 30 m have to

be established at proposed site. Then pegs are driven into the ground

at the CP for Permanent markings of the Area .

Conducting the traversing, levelling and tacheometry to get data for

producing the map

After all the data have been analyzed, draw the topographic map of

the site proposed.

Sketch of the plan:

BBM

40.422 m

102.657 m

? 173o 42’ 49 “

180o 6’ 5”

180o 19’ 36”

?

87o 34’ 53”

91o 22’ 33 “

E

A

D

F

G

H

C

133.963 m

140.934 m

131.45 m

92.152 m

?

Page 5: All Reports

Page 5 of 45

Observation and results:

Measured Data

Station Course Internal

Angle

Distance

(m)

Measured

Azimuth Latitude Departure

B

?? 2919184.704 418610.146

BC 133.963 80o00’00” (∆N)

50.506

E)(∆ 124.035

C

173o 42’ 49 “ 2919235.210 418734.181

CD 140.934 70o00’00” (∆N) 67.07

E)(∆ 123.89

D

91o 22’ 33 “ 2919302.280 418858.071

DE 102.657 340o00’00” (∆N)

91.263 E)(∆

-46.795

E

87o 34’ 53” 2919393.543 418811.276

EF 40.422 250o00’00” (∆N)

-19.952

E)(∆ -35.125

F

180o 6’ 5” 2919373.591 418776.151

FG 131.45 248o00’00” (∆N)

-64.776

E)(∆ -114.343

G

180o 19’ 36” 2919308.815 418661.808

GH 92.152 250o00’00” (∆N)

-44.869

E)(∆ -80.361

H

?? 2919263.946 418581.447

HB ?? ?? (∆N)

79.242

E)(∆ -28.699

Sum 158.484 -57.398

Page 6: All Reports

Page 6 of 45

Computing the Latitude, Departure & Angle for the missing Data:

∆NHB = + 79.242 , ∆E HB = -28.699

HB = ∆N 2 + ∆E ^2

HB = 79.242 2 + − 28.699 ^2 = 84.28 m

Tan ɵ = 79.242

28.699 = 70

o 5’ 28”

AZHB = Azimuth of BH-180

= ( 270 +70o 5’ 28” ) – 180 = 160

o5’28”

To finding the angles B & H, we follow this equation:

B = Azimuth of BC+ 19o54’31” = 80 +19

o54’31” = 99

o54’31”

H = Azimuth of HB - Azimuth of HG

= 160o5’28” – 70

o00’00” = 90

o5’28”

Angles correction:

The Summation of internal angles = 903o5’55”

T The Summation should be equal to :

(n-2)*180 = (7 -2)*180 = 900o00’00”

So The angular misclosure:

Σ measured angles - Σ internal angles = 903o5’55”- 900

o00’00” = 3° 5′55

We Should Subtract each angle by =3° 5′55"

7= 26’33.57”

Page 7: All Reports

Page 7 of 45

Angles correction:

Find the Difference Between Total Station and GPS :

∆NEF = 40.422 Cos(250o00’00” ) = -13.756m

∆EEF = 40.422 Sin ( 250o00’00” ) = -37.794m

Station Observed angles Correction Corrected angles

B 99o54’31” -26’33.57” 99027’57.43”

C 173o 42’ 49 “ -26’33.57” 173o16’15.43”

D 91o 22’ 33 “ -26’33.57” 90o55’59.43”

E 87o 34’ 53” -26’33.57” 87o8’19.43”

F 180o 6’ 5” -26’33.57” 179o39’31.43”

G 180o 19’ 36” -26’33.57” 179o53’2.43”

H 90o5’28” -26’33.57” 89o38’54.43”

Total 903o5’55” 900o00’00”

B

102.657 m

84.28 m

173o16’15.43”

179o39’31.43”

179o53’2.43”

89o38’54.43”

99027’57.43”

90o55’59.43”

E

A

DG

H

C

133.963 m

140.934 m

40.422 m

131.45 m

92.152 m

87o8’19.43”

FN

N

N

N

N

N

N

Page 8: All Reports

Page 8 of 45

Producing topographic map :

Line Calculated

Azimuth

GPS Total Station

∆N E∆ ∆N ∆E

BC 78o39’25.71” 50.506 124.035 26.348 131.346

CD 71o55’41.14” 67.07 123.89 43.719 133.981

DE 342o51’40.57” 91.263 -46.795 98.098 -30.252

EF 250o00’00” -19.952 -35.125 -13.825 -37.984

FG 249o39’31.42” -64.776 -114.343 -45.710 -123.246

GH 249o32’33.85” -44.869 -80.361 -32.208 -86.340

HB 159o11’28.28” 79.242 -28.699 78.783 -29.941

Topographic Map using Sokkia Program

Page 9: All Reports

Page 9 of 45

Discussions and Conclusion:

We Use GPS to measure locations for Control points , B through H , and

re-survey the topographic profile line using the total station . To see the

difference Between GPS and Total Station we remeasured the locations for

control points using Total station and we find slight difference between

them. This slight difference may happen because of misreading of data

because the measurements was in the night so it is difficult to make the

target in the correct station . Another reason was referred to the position of

the Prism that was not exactly vertical as required when we take the

readings.

This is the difference between the GPS & Total station for my point( EF):

z Calculated

Azimuth

Distance GPS Total Station

∆N ∆E ∆N ∆E

EF 250o00’00” 40.422 -19.952 -35.125 -13.825 -37.984

Topographic Map using AutoCad

See Last page for more details

Page 10: All Reports

Page 10 of 45

Recommendation:

Check the bubble position every time you take the angle.

Take the distance and the angles twice from different direction

and then take the average.

Make sure that the instruments you use are running properly.

Take the data carefully from the device.

Work at appropriate weather

Do not work when you are Exhaust.

References:

http://en.wikipedia.org/wiki/Topographic_map

http://www.ehow.com/how_4576327_make-topographic-maps.html

http://www.surveyequipment.com/images/flexline_ts06.jpg

http://image.made-in-china.com/2f0j00peBQijCcLvlZ/Surveying-

Prism-Group-FDC14WA-.jpg

http://www.geologysuperstore.com/images/products/300x300/geos

urveyor-008-surveying-compass-clinometer-3941.jpg

Page 11: All Reports

Page 11 of 45

University of Dammam

College of Engineering

Dept. of Construction Engineering

Summer Training 2013-2014/1434-1435

Project #3

Done by:

Abdulrahman Al-Turkmani 2120007880

Mohammed Thabit 2111090057

Mohammed Awead 2111090057

Momen Abu-Shehadah 2120007861

Al-Nu’man Al-Farouqi 2120007940

Instructors

Dr. Sami Abdalla Osman

ENG. Hassan Bakri

Page 12: All Reports

Page 12 of 45

Introduction:

A contour is a line joining points of equal altitude. The vertical distance between successive

contours is known as vertical interval and the value depends on the scale of the plan and the use

to which the plan is being placed. Contour line must make a close circuit though it may not be

within the area covered by the plan. The value enables an assessment to be made of the

topography for preparation of layouts. A contour must be drawn to show the profile of the site

location based on the reduced level obtain from the detail to show the profile of the site

location based on the reduced level obtain from the detail points.

In this project we will produce a contour map in the site which is Al-Rakha Street behind the

sport city as shown as in the figure:

Our Site

Page 13: All Reports

Page 13 of 45

Objective :

1- Indentify the equipment and the methods used in practice.

2- Knowledge of the preparation of contour map.

3- How to use contour maps in the design projects.

Scope Of Study :

In this project we used a Leveling device to collect the required data to produce a

contour map which is represented by series of lines that has the same elevation that we

can produce it by using a specific programs that gives you the exact geometry of the

surveyed area such as (surfer program).

Procedures:

4- Divide the outer frame every 10m and install peg to each point with the taking of

natural water streams and hills in the account that does not exceed the accuracy of

horizontal scale 1:5000

5- Setting out cross-sections at each sector 10m.

6- Work outside the framework of the leveling that the error does not exceed 10* the

square root of the distance in Km.

7- Along the line connecting BM to BS, set a chaining pin every 10 m and name them (

A,B,C….).

8- Work of leveling for the inner sectors with precision that does not exceed 25* the

square root of the distance in Km, make all necessary corrections.

Page 14: All Reports

Page 14 of 45

Equipments

Figure 4: Steel Tape

Figure2: Leveling Staff

Figure 1: Automatic Level

Figure3: Chaining Pins

Figure 5: Ranging Poles Figure 6: Tripod

Figure7 : GPS

Page 15: All Reports

Page 15 of 45

Observation and Results :

Data Measured :

Point BS IS FS HPC RL Corr. Corr. RL

BM 1.45 19.047 17.597 - 17.597

a1 1.958 17.089 0.0015 17.0905

a2 1.841 17.206 0.0015 17.2075

a3 1.965 17.082 0.0015 17.0835

a4 2 17.047 0.0015 17.0485

a5 2.057 16.99 0.0015 16.9915

a6 1.986 17.061 0.0015 17.0625

a7 1.684 17.363 0.0015 17.3645

a8 1.672 17.375 0.0015 17.3765

a9 1.768 17.279 0.0015 17.2805

a10 1.779 17.268 0.0015 17.2695

a11 1.861 17.186 0.0015 17.1875

a12 1.81 17.237 0.0015 17.2385

a13 1.808 17.239 0.0015 17.2405

a14 1.622 17.425 0.0015 17.4265

a15 1.559 17.488 0.0015 17.4895

a16 1.629 17.418 0.0015 17.4195

b1 2.043 17.004 0.0015 17.0055

b2 1.998 17.049 0.0015 17.0505

b3 2 17.047 0.0015 17.0485

b4 2.036 17.011 0.0015 17.0125

b5 2.012 17.035 0.0015 17.0365

b6 1.83 17.217 0.0015 17.2185

b7 1.777 17.27 0.0015 17.2715

b8 1.769 17.278 0.0015 17.2795

b9 1.734 17.313 0.0015 17.3145

b10 1.757 17.29 0.0015 17.2915

b11 1.695 17.352 0.0015 17.3535

b12 1.751 17.296 0.0015 17.2975

b13 1.475 17.572 0.0015 17.5735

b14 1.379 17.668 0.0015 17.6695

b15 1.292 17.755 0.0015 17.7565

b16 1.339 17.708 0.0015 17.7095

c1 1.952 17.095 0.0015 17.0965

c2 1.988 17.059 0.0015 17.0605

c3 2.028 17.019 0.0015 17.0205

c4 2.054 16.993 0.0015 16.9945

Page 16: All Reports

Page 16 of 45

c5 1.859 17.188 0.0015 17.1895

c6 1.627 17.42 0.0015 17.4215

c7 1.669 17.378 0.0015 17.3795

c8 1.485 17.562 0.0015 17.5635

c9 1.346 17.701 0.0015 17.7025

c10 1.318 17.729 0.0015 17.7305

c11 1.323 17.724 0.0015 17.7255

c12 1.591 17.456 0.0015 17.4575

c13 1.71 17.337 0.0015 17.3385

c14 1.422 17.625 0.0015 17.6265

c15 1.315 17.732 0.0015 17.7335

c16 1.201 17.846 0.0015 17.8475

d1 1.961 17.086 0.0015 17.0875

d2 1.977 17.07 0.0015 17.0715

d3 1.995 17.052 0.0015 17.0535

d4 1.98 17.067 0.0015 17.0685

d5 1.811 17.236 0.0015 17.2375

d6 1.559 17.488 0.0015 17.4895

d7 1.301 17.746 0.0015 17.7475

d8 1.442 17.605 0.0015 17.6065

d9 1.421 17.626 0.0015 17.6275

d10 1.151 17.896 0.0015 17.8975

d11 1.331 17.716 0.0015 17.7175

d12 1.602 17.445 0.0015 17.4465

d13 1.442 17.605 0.0015 17.6065

d14 1.489 17.558 0.0015 17.5595

d15 0.992 18.055 0.0015 18.0565

d16 1.195 17.852 0.0015 17.8535

e1 2.045 17.002 0.0015 17.0035

e2 2.136 16.911 0.0015 16.9125

e3 2.112 16.935 0.0015 16.9365

e4 1.94 17.107 0.0015 17.1085

e5 1.768 17.279 0.0015 17.2805

e6 1.508 17.539 0.0015 17.5405

e7 1.556 17.491 0.0015 17.4925

e8 1.4 17.647 0.0015 17.6485

e9 1.629 17.418 0.0015 17.4195

e10 1.675 17.372 0.0015 17.3735

e11 1.71 17.337 0.0015 17.3385

e12 1.715 17.332 0.0015 17.3335

e13 1.61 17.437 0.0015 17.4385

e14 1.288 17.759 0.0015 17.7605

e15 1.46 17.587 0.0015 17.5885

e16 1.53 17.517 0.0015 17.5185

f1 1.956 17.091 0.0015 17.0925

f2 1.97 17.077 0.0015 17.0785

f3 2.019 17.028 0.0015 17.0295

Page 17: All Reports

Page 17 of 45

f4 1.91 17.137 0.0015 17.1385

f5 1.74 17.307 0.0015 17.3085

f6 1.63 17.417 0.0015 17.4185

f7 1.622 17.425 0.0015 17.4265

f8 1.752 17.295 0.0015 17.2965

f9 1.805 17.242 0.0015 17.2435

f10 1.858 17.189 0.0015 17.1905

f11 1.872 17.175 0.0015 17.1765

f12 1.715 17.332 0.0015 17.3335

f13 1.427 17.62 0.0015 17.6215

f14 1.44 17.607 0.0015 17.6085

f15 1.692 17.355 0.0015 17.3565

f16 1.745 17.302 0.0015 17.3035

g1 2.293 16.754 0.0015 16.7555

g2 2.228 16.819 0.0015 16.8205

g3 2.085 16.962 0.0015 16.9635

g4 1.965 17.082 0.0015 17.0835

g5 1.98 17.067 0.0015 17.0685

g6 1.85 17.197 0.0015 17.1985

g7 1.82 17.227 0.0015 17.2285

g8 1.755 17.292 0.0015 17.2935

g9 1.885 17.162 0.0015 17.1635

g10 1.978 17.069 0.0015 17.0705

g11 1.96 17.087 0.0015 17.0885

g12 1.856 17.191 0.0015 17.1925

g13 1.752 17.295 0.0015 17.2965

g14 1.82 17.227 0.0015 17.2285

g15 1.745 17.302 0.0015 17.3035

g16 1.735 17.312 0.0015 17.3135

h2 2.46 16.587 0.0015 16.5885

h3 2.285 16.762 0.0015 16.7635

h4 2.17 16.877 0.0015 16.8785

h5 2.15 16.897 0.0015 16.8985

h6 2.055 16.992 0.0015 16.9935

h7 2.055 16.992 0.0015 16.9935

h8 2.035 17.012 0.0015 17.0135

h9 2.022 17.025 0.0015 17.0265

h10 2.07 16.977 0.0015 16.9785

h11 2.042 17.005 0.0015 17.0065

h12 2.143 16.904 0.0015 16.9055

h13 2.008 17.039 0.0015 17.0405

h14 1.962 17.085 0.0015 17.0865

h15 1.938 17.109 0.0015 17.1105

h16 2.05 16.997 0.0015 16.9985

h1 2.015 2.568 18.494 16.479 0.0015 16.4805

i1 1.722 16.772 0.003 16.775

i2 1.81 16.684 0.003 16.687

Page 18: All Reports

Page 18 of 45

i3 1.823 16.671 0.003 16.674

i4 1.905 16.589 0.003 16.592

i5 1.869 16.625 0.003 16.628

i6 2.002 16.492 0.003 16.495

i7 1.908 16.586 0.003 16.589

i8 1.818 16.676 0.003 16.679

i9 1.76 16.734 0.003 16.737

i10 1.539 16.955 0.003 16.958

i11 1.559 16.935 0.003 16.938

i12 1.56 16.934 0.003 16.937

i13 1.643 16.851 0.003 16.854

i14 1.509 16.985 0.003 16.988

i15 1.652 16.842 0.003 16.845

i16 1.72 16.774 0.003 16.777

j1 1.982 16.512 0.003 16.515

j2 1.898 16.596 0.003 16.599

j3 1.948 16.546 0.003 16.549

j4 2.015 16.479 0.003 16.482

j5 2.028 16.466 0.003 16.469

j6 2.078 16.416 0.003 16.419

j7 2.019 16.475 0.003 16.478

j8 1.905 16.589 0.003 16.592

j9 1.665 16.829 0.003 16.832

j10 1.662 16.832 0.003 16.835

j11 1.52 16.974 0.003 16.977

j12 1.58 16.914 0.003 16.917

j13 1.628 16.866 0.003 16.869

j14 1.623 16.871 0.003 16.874

j15 1.915 16.579 0.003 16.582

j16 1.885 16.609 0.003 16.612

k1 2.08 16.414 0.003 16.417

k2 2.062 16.432 0.003 16.435

k3 2.032 16.462 0.003 16.465

k4 1.932 16.562 0.003 16.565

k5 1.93 16.564 0.003 16.567

k6 1.725 16.769 0.003 16.772

k7 1.642 16.852 0.003 16.855

k8 1.55 16.944 0.003 16.947

k9 1.503 16.991 0.003 16.994

k10 1.41 17.084 0.003 17.087

k11 1.6 16.894 0.003 16.897

k12 1.722 16.772 0.003 16.775

k13 1.08 17.414 0.003 17.417

k14 1.833 16.661 0.003 16.664

k15 2.015 16.479 0.003 16.482

k16 2.02 16.474 0.003 16.477

L1 1.98 16.514 0.003 16.517

Page 19: All Reports

Page 19 of 45

L2 2 16.494 0.003 16.497

L3 2.082 16.412 0.003 16.415

L4 1.875 16.619 0.003 16.622

L5 1.675 16.819 0.003 16.822

L6 1.542 16.952 0.003 16.955

L7 1.402 17.092 0.003 17.095

L8 1.308 17.186 0.003 17.189

L9 1.178 17.316 0.003 17.319

L10 1.592 16.902 0.003 16.905

L11 1.75 16.744 0.003 16.747

L12 1.85 16.644 0.003 16.647

L13 1.915 16.579 0.003 16.582

L14 2.08 16.414 0.003 16.417

L15 2.155 16.339 0.003 16.342

L16 2.232 16.262 0.003 16.265

M1 2.235 16.259 0.003 16.262

M2 1.995 16.499 0.003 16.502

M3 1.93 16.564 0.003 16.567

M4 1.728 16.766 0.003 16.769

M5 1.628 16.866 0.003 16.869

M6 1.55 16.944 0.003 16.947

M7 1.395 17.099 0.003 17.102

M8 1.36 17.134 0.003 17.137

M9 1.655 16.839 0.003 16.842

M10 1.615 16.879 0.003 16.882

M11 1.98 16.514 0.003 16.517

M12 2 16.494 0.003 16.497

M13 2.1 16.394 0.003 16.397

M14 2.252 16.242 0.003 16.245

M15 2.25 16.244 0.003 16.247

M16 2.42 16.074 0.003 16.077

N1 2.295 16.199 0.003 16.202

N2 2.345 16.149 0.003 16.152

N3 2.23 16.264 0.003 16.267

N4 2.22 16.274 0.003 16.277

N5 2.05 16.444 0.003 16.447

N6 2.035 16.459 0.003 16.462

N7 2.01 16.484 0.003 16.487

N8 2.108 16.386 0.003 16.389

N9 2.22 16.274 0.003 16.277

N10 2.27 16.224 0.003 16.227

N11 2.285 16.209 0.003 16.212

N12 2.272 16.222 0.003 16.225

N13 2.42 16.074 0.003 16.077

N14 2.565 15.929 0.003 15.932

N15 2.495 15.999 0.003 16.002

N16 2.575 15.919 0.003 15.922

Page 20: All Reports

Page 20 of 45

O1 2.335 16.159 0.003 16.162

O2 2.448 16.046 0.003 16.049

O3 2.072 16.422 0.003 16.425

O4 2.442 16.052 0.003 16.055

O5 2.368 16.126 0.003 16.129

O6 2.285 16.209 0.003 16.212

O7 2.328 16.166 0.003 16.169

O8 2.375 16.119 0.003 16.122

O9 2.655 15.839 0.003 15.842

O10 2.628 15.866 0.003 15.869

O11 2.635 15.859 0.003 15.862

O12 2.732 15.762 0.003 15.765

O13 2.71 15.784 0.003 15.787

O14 2.718 15.776 0.003 15.779

O15 2.648 15.846 0.003 15.849

O16 2.625 15.869 0.003 15.872

P1 2.755 15.739 0.003 15.742

P2 2.732 15.762 0.003 15.765

P3 2.66 15.834 0.003 15.837

P4 2.595 15.899 0.003 15.902

P5 2.658 15.836 0.003 15.839

P6 2.78 15.714 0.003 15.717

P7 2.67 15.824 0.003 15.827

P8 2.72 15.774 0.003 15.777

P9 2.708 15.786 0.003 15.789

P10 2.665 15.829 0.003 15.832

P11 2.702 15.792 0.003 15.795

P12 2.705 15.789 0.003 15.792

P13 2.702 15.792 0.003 15.795

P14 2.603 15.891 0.003 15.894

P15 2.55 15.944 0.003 15.947

P16 2.548 15.946 0.003 15.949

BM 0.9 17.594 0.003 17.597

Total Σ BS= 3.465

Σ IS= 487.957

Σ FS= 3.468

ΣRL(except first one)

= 4332.317

Page 21: All Reports

Page 21 of 45

Simple Calculation Check:

Σ FS - Σ BS = first RL - Last RL

3.468 - 3.465= 17.597- 17.594

0.002= 0.002

Full Calculation Check:

IS + FS + (RLs except first) = (each HPC x number of applications)

(487.957) + (3.468) + (4332.317) = (19.047 *128) + (129*18.494)

4823.742 = 4823.742

A = 7.597 7.594 = . 3

Allowable misclosure = ± 5 √ mm = ± 5√2 =7.00 mm

Where n is the number of change of level so n it will be equal to 2.

So the actual misclosure is LESS than the allowable misclosure 3.0 mm < 7.0 mm

There are 2 back sights, so we set up the instrument 2 times We divide 3mm between 2 like this:

1.5 mm , 1.5 .

Using surfer program to plot the contour map:

We select all types of map in the program:

1. Contour map:

Page 22: All Reports

Page 22 of 45

2. This map show how the water flow in the site:

3. This map shows the contour as three dimension :

Page 23: All Reports

Page 23 of 45

Surfer program analysis

At the end of this report we get a Grid Data Report from

the surfer program as following:

—————————— Gridding Report —————————— Wed Jun 18 04:45:59 2014 Elasped time for gridding: 4.10 seconds

Data Source Source Data File Name: C:\Users\Medo\Desktop\second report\sufer1.xls X Column: A Y Column: B Z Column: C

Data Counts Active Data: 256 Original Data: 256 Excluded Data: 0 Deleted Duplicates: 0 Retained Duplicates: 0 Artificial Data: 0 Superseded Data: 0

Univariate Statistics ———————————————————————————————————————————— X Y Z ———————————————————————————————————————————— Minimum: 0 0 15.717 25%-tile: 40 40 16.482 Median: 80 80 16.9635 75%-tile: 120 120 17.2795 Maximum: 150 150 18.0565 Midrange: 75 75 16.88675

Page 24: All Reports

Page 24 of 45

Range: 150 150 2.3395 Interquartile Range: 80 80 0.7975 Median Abs. Deviation: 40 40 0.375 Mean: 75 75 16.85663671875 Trim Mean (10%): 75 75 16.863935344828 Standard Deviation: 46.097722286464 46.097722286464 0.54492836833889 Variance: 2125 2125 0.29694692662048 Coef. of Variation: 0.032327229768958 Coef. of Skewness: -0.34835587033183 ————————————————————————————————————————————

Inter-Variable Correlation ———————————————————————————— X Y Z ———————————————————————————— X: 1.000 0.000 -0.850 Y: 1.000 0.135 Z: 1.000 ————————————————————————————

Inter-Variable Covariance ———————————————————————————————— X Y Z ———————————————————————————————— X: 2125 0 -21.35763671875 Y: 2125 3.39306640625 Z: 0.29694692662048 ————————————————————————————————

Planar Regression: Z = AX+BY+C Fitted Parameters ———————————————————————————————————————————— A B C ———————————————————————————————————————————— Parameter Value: -0.010050652573529 0.0015967371323529 17.490680376838 Standard Error: 0.0003781301172563 0.0003781301172563 0.043730874757802 ———————————————————————————————————————————— Inter-Parameter Correlations ———————————————————————————— A B C ———————————————————————————— A: 1.000 0.000 -0.649 B: 1.000 0.649 C: 1.000

Page 25: All Reports

Page 25 of 45

———————————————————————————— ANOVA Table ———————————————————————————————————————————— Source df Sum of Squares Mean Square F ———————————————————————————————————————————— Regression: 2 56.339461523225 28.169730761612 362.16 Residual: 253 19.678951691632 0.077782417753488 Total: 255 76.018413214857 ———————————————————————————————————————————— Coefficient of Multiple Determination (R^2): 0.74112914411917

Nearest Neighbor Statistics ————————————————————————————————— Separation |Delta Z| ————————————————————————————————— Minimum: 10 0 25%-tile: 10 0.035 Median: 10 0.082000000000001 75%-tile: 10 0.152 Maximum: 10 0.833 Midrange: 10 0.4165 Range: 0 0.833 Interquartile Range: 0 0.117 Median Abs. Deviation: 0 0.056000000000001 Mean: 10 0.111080078125 Trim Mean (10%): 10 0.097769396551724 Standard Deviation: 0 0.11560600533842 Variance: 0 0.013364748470306 Coef. of Variation: 0 1.0407447247951 Coef. of Skewness: 0 2.634338964429 Root Mean Square: 10 0.16032321175227 Mean Square: 100 0.025703532226563 ————————————————————————————————— Complete Spatial Randomness Lambda: 0.011377777777778 Clark and Evans: 2.1333333333333 Skellam: 1830.1103657392

Page 26: All Reports

Page 26 of 45

Exclusion Filtering Exclusion Filter String: Not In Use

Duplicate Filtering Duplicate Points to Keep: First X Duplicate Tolerance: 1.7E-005 Y Duplicate Tolerance: 1.7E-005 No duplicate data were found.

Breakline Filtering Breakline Filtering: Not In Use

Gridding Rules Gridding Method: Kriging Kriging Type: Point Polynomial Drift Order: 0 Kriging std. deviation grid: no Semi-Variogram Model Component Type: Linear Anisotropy Angle: 0 Anisotropy Ratio: 1 Variogram Slope: 1 Search Parameters Search Ellipse Radius #1: 106 Search Ellipse Radius #2: 106 Search Ellipse Angle: 0 Number of Search Sectors: 4 Maximum Data Per Sector: 16 Maximum Empty Sectors: 3 Minimum Data: 8 Maximum Data: 64

Page 27: All Reports

Page 27 of 45

Output Grid Grid File Name: C:\Users\Medo\Desktop\second report\sufer1.grd Grid Size: 100 rows x 100 columns Total Nodes: 10000 Filled Nodes: 10000 Blanked Nodes: 0 Grid Geometry X Minimum: 0 X Maximum: 150 X Spacing: 1.5151515151515 Y Minimum: 0 Y Maximum: 150 Y Spacing: 1.5151515151515 Grid Statistics Z Minimum: 15.717000006178 Z 25%-tile: 16.517792363488 Z Median: 16.962881480832 Z 75%-tile: 17.269280688075 Z Maximum: 18.024594929417 Z Midrange: 16.870797467798 Z Range: 2.3075949232393 Z Interquartile Range: 0.75148832458735 Z Median Abs. Deviation: 0.36253185656782 Z Mean: 16.883118368665 Z Trim Mean (10%): 16.893540805041 Z Standard Deviation: 0.51620721502927 Z Variance: 0.26646988884827 Z Coef. of Variation: 0.030575347738327 Z Coef. of Skewness: -0.36206280024517 Z Root Mean Square: 16.891008132708 Z Mean Square: 285.3061557392

Page 28: All Reports

Page 28 of 45

Discussion and Conclusion:

Our aim in this project is to produce Contour map for Area of 22,500 m2 . We divide this Area to

Squares each one has an Area of 100 m2 . We made the grid of this Area and After that we

measure the elevation for corner of the squares. We analysis the elevation and we find a slight

error (0.003 mm) in the full check of Elevations and this is may happen because of the Existence

of obstacles in the surface of the ground and Also the existence of light wind. Finally, We insert

the Elevation data to Surfer Program to draw the Contour map of our site.

Recommendation :

1. Use whatever mean of protection and comfort since it is summer and you are working

during the day.

2. The field has a non-uniform shape so be careful while using the tape to take the right

measurement.

3. Let all the team members work together so you get a really nice work and finish in no

time.

4. While reading the levels of the points, be sure to read until 3-degits after the comma.

References:

1. http://www.thefreedictionary.com/contour+map

2. http://en.wikipedia.org/wiki/Contour_line

3. http://en.wikipedia.org/wiki/File:Contour3D.jpg

Page 29: All Reports

Page 29 of 45

University of Dammam

College of Engineering

Dept. of Construction Engineering

Summer Training 2013-2014/1434-1435

Project #4

Setting out Highway route or Drainage.

Done by:

Abdulrahman Al-Turkmani 2120007880

Mohammed Thabit 2111090057

Mohammed Awead 2111090058

Momen Abu-Shehadah 2120007861

Al-Nu’man Al-Farouqi 2120007940

Instructors

Dr. Sami Abdalla Osman

ENG. Hassan Bakri

Page 30: All Reports

Page 30 of 45

Introduction:

Setting out highway route or drainage is the selecting the good

path to the route or the drainage. This process comes inside the

engineering surveying. We are in our major as construction and

environmental engineers concerned with highway and drainage design.

So in our project, we are setting out highway route in curvatures. There

are some curves such as shown in figure below:

We applied the simple curve in our project which is circular arc

connecting two tangents and it is most common.

We do this project in the campus. As shown as in the figure:

Site

Main

gate

of UD.

Page 31: All Reports

Page 31 of 45

Objectives:

Identify the equipment used in the field of setting-out road or

drainage and methods used in practice.

Knowledge of drawing longitudinal and cross section lay out

plan.

Knowledge of calculating earthwork quantities.

To obtain setting out points for a simple circular curve by pre-

computation and hence execute the fieldwork based on the

data computed.

Tools:

Figure 1: Total Station Figure 3: Prism

Figure 5: Tripod Figure 4: Steel Tape Figure 6: Leveling Staff

Figure 2: Automatic level

Page 32: All Reports

Page 32 of 45

Scope Of Study :

In this project we used two devices to collect the

required data for setting out the project. first of all, used

the TOTAL STATION to set out the curve of the road

which identified by eight points on the ground. Then, we

used the LEVEL to identify the reduce level for each

point to set out the longitudinal & cross section of the

road.

Procedures:

Mark the tangent points (T & U) on the ground from the

intersection point (IP), based on tangent length and the

total deflection angle (θ).

setting up theodolite or to total station at T and conduct

the temporary adjustment.

set reading 0°00’ on theodolite, and shoot the

telescope at IP as reference station.

After that, we rotated theodolite based on the first

deflection angle and chord length from pre-computation

data and mark the point on the ground.

repeat the same procedure for the second deflection

angle and chord length until reach the tangent point U.

Page 33: All Reports

Page 33 of 45

Observation and results:

Calculation Before Going to the Site:

Points Chainage Chord length Deflection angle Cumulative Def.angle

T 0 0 0 0

1 10 10 1718.9*(10/80)=

214.86=3o34’51.6" 3o34’51.6”

2 20 10 214.86 7o9’43.2”

3 30 10 214.86 10o44’34.8”

4 40 10 214.86 14o19’26.4”

5 50 10 214.86 17o54’18”

6 60 10 214.86 21o29’9.6”

U 69.813 9.813 1718.9*(9.813/80)= 210.84=3o30’50.4”

25o00’00”

In this project we take the radius R=80m, and the deflection angle θ=50°,

so the tangent length& Curve Length are:

= 2⁄ = 8 5

2⁄ = 37.3 .

= = 8 ( 5

8 ) = 69.8 3

Page 34: All Reports

Page 34 of 45

Measured Data

Points BS IS FS HPC RL Corr.(-) Corr.RL

BM 1.56

10.56 9

9

A

1.512

9.048 0.002 9.046

AR1

1.555

9.005 0.002 9.003

AR2

1.572

8.988 0.002 8.986

AR3

1.592

8.968 0.002 8.966

AL1

1.502

9.058 0.002 9.056

AL2

1.518

9.042 0.002 9.04

AL3

1.535

9.025 0.002 9.023

B

1.538

9.022 0.002 9.02

BR1

1.558

9.002 0.002 9

BR2

1.585

8.975 0.002 8.973

BR3

1.608

8.952 0.002 8.95

BL1

1.525

9.035 0.002 9.033

BL2

1.522

9.038 0.002 9.036

BL3

1.535

9.025 0.002 9.023

C

1.535

9.025 0.002 9.023

CR1

1.549

9.011 0.002 9.009

CR2

1.588

8.972 0.002 8.97

CR3

1.591

8.969 0.002 8.967

CL1

1.519

9.041 0.002 9.039

CL2

1.505

9.055 0.002 9.053

CL3

1.51

9.05 0.002 9.048

D

1.558

9.002 0.002 9

DR1

1.585

8.975 0.002 8.973

DR2

1.598

8.962 0.002 8.96

DR3

1.605

8.955 0.002 8.953

DL1

1.551

9.009 0.002 9.007

DL2

1.532

9.028 0.002 9.026

DL3

1.518

9.042 0.002 9.04

E

1.574

8.986 0.002 8.984

ER1

1.565

8.995 0.002 8.993

ER2

1.583

8.977 0.002 8.975

ER3

1.605

8.955 0.002 8.953

EL1

1.573

8.987 0.002 8.985

EL2

1.558

9.002 0.002 9

EL3

1.553

9.007 0.002 9.005

Page 35: All Reports

Page 35 of 45

F

1.524

9.036 0.002 9.034

FR1

1.551

9.009 0.002 9.007

FR2

1.555

9.005 0.002 9.003

FR3

1.571

8.989 0.002 8.987

FL1

1.534

9.026 0.002 9.024

FL2

1.539

9.021 0.002 9.019

FL3

1.549

9.011 0.002 9.009

G

1.531

9.029 0.002 9.027

GR1

1.536

9.024 0.002 9.022

GR2

1.55

9.01 0.002 9.008

GR3

1.523

9.037 0.002 9.035

GL1

1.551

9.009 0.002 9.007

GL2

1.57

8.99 0.002 8.988

GL3 1.555

1.553 10.562 9.007 0.002 9.005

H

1.579

8.983 0.004 8.979

HR1

1.588

8.974 0.004 8.97

HR2

1.58

8.982 0.004 8.978

HR3

1.575

8.987 0.004 8.983

HL1

1.575

8.987 0.004 8.983

HL2

1.572

8.99 0.004 8.986

HL3

1.576

8.986 0.004 8.982

BM

1.558

9.004 0.004 9

Page 36: All Reports

Page 36 of 45

Computing the Latitude, Departure & Angle for the missing Data:

A = 9. 9. 4 = − . 4

Simple Calculation Check:

Σ FS - Σ BS = first RL - Last RL

3.111 - 3.115= 9- 9.004

0.004= 0.004

Full Calculation Check:

IS + FS + (RLs except first) = (each HPC x number of

applications)

(85.541) + (3.111) + (513.284) = (10.56 *49) + (10.562*8)

601.936 = 601.936

Allowable misclosure = ± 5 √ mm

= ± 5√2 = 7.00 mm

Where n is the number of change of level so n it will be equal

to 2.

So the actual misclosure is LESS than the allowable

misclosure

4.0mm < 7.0mm

There are 2 backsights, so we set up the instrument 2 times

We divide 4 between 2 like this: 2 2

Page 37: All Reports

Page 37 of 45

8.92

8.94

8.96

8.98

9

9.02

9.04

9.06

C CR1 CR2 CR3 CL1 CL2 CL3

RL

Points

Cross Section (C)

Longitudinal and Cross Section Graph :

8.94

8.96

8.98

9

9.02

9.04

9.06

A B C D E F G H

RL

Points

Longtidunal Section

8.92

8.94

8.96

8.98

9

9.02

9.04

9.06

9.08

A AR1 AR2 AR3 AL1 AL2 AL3

RL

Points

Cross Section (A)

8.9

8.92

8.94

8.96

8.98

9

9.02

9.04

9.06

B BR1 BR2 BR3 BL1 BL2 BL3

RL

Points

Cross Section (B)

8.9

8.92

8.94

8.96

8.98

9

9.02

9.04

9.06

D DR1 DR2 DR3 DL1 DL2 DL3

RL

Points

Cross Section (D)

Page 38: All Reports

Page 38 of 45

8.92

8.93

8.94

8.95

8.96

8.97

8.98

8.99

9

9.01

E ER1 ER2 ER3 EL1 EL2 EL3

RL

Points

Cross Section (E)

8.96

8.97

8.98

8.99

9

9.01

9.02

9.03

9.04

F FR1 FR2 FR3 FL1 FL2 FL3

RL

Points

Cross Setion (F)

8.96

8.97

8.98

8.99

9

9.01

9.02

9.03

9.04

G GR1 GR2 GR3 GL1 GL2 GL3

RL

Points

Cross Section (G)

8.96

8.965

8.97

8.975

8.98

8.985

8.99

H HR1 HR2 HR3 HL1 HL2 HL3

RL

Points

Cross Section (H)

Page 39: All Reports

Page 39 of 45

Discussions and Conclusion:

This project was about making road connecting two existing roads

together by using the longitudinal and sectional line method. In order to

make this road we had to make a line and for every specific distance we

had to mark a point and measure the level of this point. Furthermore,

for each one of these points we made a sectional line with a specific

length divided to six points three from each side of the main (middle)

point and also measure the level of these points. This way we can be

sure that the road we are planning to make have a uniform shape and

the level of the beginning of this road has the same level as the first

road and the end of this road has the same level of the second road. We

had some problems and difficulties while applying this project. For

example, the ground wasn’t uniform and had a lot of desert grass on it

that what made it difficult to measure the distance by using the tape,

and the hot weather.

Recommendation:

1. Use whatever mean of protection and comfort working on the

project.

2. Keep in your mind the defects of working during the day time and be

ready for any difficulties you may in counter with the weather.

3. Since it is summer and you are working during the day try to be done

early before it’s getting too hot.

4. Arrange the work among the team members efficiently to help

moving the work smoothly and finish early.

5. If it possible to get rid of anything laying on field that may cause a

problem applying the project.

Page 40: All Reports

Page 40 of 45

University of Dammam

College of Engineering

Dept. of Construction Engineering

Summer Training 2013-2014/1434-1435

Project #5

Setting out a project.

Done by:

Abdulrahman Al-Turkmani 2120007880

Mohammed Thabit 2111090057

Mohammed Awead 2111090058

Momen Abu-Shehadah 2120007861

Al-Nu’man Al-Farouqi 2120007940

Instructor

Dr. Sami Abdalla Osman

ENG. Hassan Bakri

Page 41: All Reports

Page 41 of 45

Introduction:

The first task in setting out building is to locate it properly at the correct

lot by making measurement from the property lines. Most cities have an

ordinance establishing setback lines from the street between houses to

improve appearance and provide fire protection. Pegs are set initially at the

exact building corners as visual check on the positioning of the structure. As

shown as in the following figure:

The location of the building points can be established from the control

point by using radiation method, which can reduce the number of

instrument set up. The angles and distance of the lines are computed

before the building can be set out. The position is located on plan and

the bearings and distance of the building points are determined

based on the scale of the detail location plan and the points are

computed.

We do this project in the campus. As shown as in the figure:

Site

Main

gate

of UD.

Page 42: All Reports

Page 42 of 45

Objectives:

Obtain setting out points for a building based on the control points

observed by pre-computation and hence stake the building points.

Tools:

Figure 1: Total Station Figure 2 : Prism

Figure 4: Tripod Figure 3: Steel Tape

Page 43: All Reports

Page 43 of 45

Scope Of Study :

First of all we take the plan and then go to site we have done the building throughout process that we are going to mention them:

1. Doing some calculation for dimensions that are not clear. 2. Setting out the profile borders (out of building by 2 meters) to give

you the exact dimension of your building. 3. Using total station to make sure the angles are perpendicular to

each other. 4. Using a tape in some places where you can control the distance. 5. We make sure again that all the points of the buildings are in them

place.

Procedures:

1. Study the design drawing of a project on map according to the map

scale. 2. The location of the building is established on the location plan

based on the detail site plan plotted from the previous project to scale.

3. Based on the points marked on the plan, the bearing and the distance from the at least to control point to the rectangular building points are measured using a scale ruler and a protractor. The readings are then recorded on the site location plan.

4. The instrument is then set up at the first control point based on the plan evaluated for the marking of the building points. The instrument is temporary adjusted leveled and orientated to give an accurate position of the building based on the plan.

5. The four corners of the building are then located based on the bearings and distance from the location plan and then marked with offset pegs.

6. The instrument is then transferred to the second point and is temporary adjusted, leveled and orientated the building point are evaluated by sighting all the corners using bearings and distance, which must be similar to the values obtained on the location plan.

7. Strings are attached to each corners and the length of the building corners are determined based on the building measurements. The diagonals are evaluated to determine the position of the building whether at is truly rectangular or uneven.

Page 44: All Reports

Page 44 of 45

Observation and results:

Our Plan of Site:

Page 45: All Reports

Page 45 of 45

Discussions and Conclusion:

In the end of the project we learned how to set out a real building

from the plan drawing to the site which was a great experiment

especially for us as construction engineering, but during the work we

faced some of obstacles which delay our work, one of these obstacles

the dimensions on the plan were not all clear so we lost a lot of time to

get the missed dimension.

Recommendation:

6. Use whatever mean of protection and comfort working on the project.

7. Arrange the work among the team members efficiently to help moving

the work smoothly and finish early.

8. If it possible to get rid of anything laying on field that may cause a

problem applying the project.

9. Keep in your mind the defects of working during the day time and be

ready for any difficulties you may in counter with the weather.

10. Since it is summer and you are working during the day try to be done

early before it’s getting too hot.

11. If it possible to get rid of anything laying on field that may cause a

problem applying the project.