33
All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 1

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 1

Page 2: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 2

Our Sl ides Covered

• THE OBJECTIVES

• THE CHALLENGES

• THE SEAMLESS ELECTRONIC CARGO TRACKING SYSTEM

• HOW RECTS WORKS

• THE BENEFITS

Strictly private and confidential

Page 3: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 3

Overview of ECTS Project

Regional Electronic Cargo Tracking System (RECTS)

How RECTS will benefit RA

Short Term Long Term

Revenue Authorities (RA) Requirements

• To facilitate seamless flow of transit cargo in single view of cargo tracking along the gazetted route.

• To enable real time visibility

• To detect transit violation

• To integrated with customs systems and intelligent video analytical surveillance system

• Better Policies Formulation

• Improve Operation Efficiency & Productivity

• Enhanced Services Integrity

• Big Data Availability

• Enhanced inter-government coordination

Seamlessly monitoring of the movement of cargo using electronic means

• Increase Government Revenue• To curtail tax evasion, illegal dumping of goods

• Improved Transit Compliance • To monitor cargo and to provide cargo information on real

and relevant time basis

• To send real time alerts and the detail in the event of any

breach of the system operations and components.

• To prevent the loss of asset and human life due to

incidents that often occur from the theft of

goods/commodities.

• Reduce Transit Times• To prevent illegal stop

• To prevent transit delay by driver

• Improved Transparency• To record events and playback of such event information

for sharing with authorized stakeholders.

• To provide reports/information on the status of trucks

(tampered with or secure) on a real time basis.

Page 4: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 4

THE OBJECTIVES

Strictly private and confidential

Page 5: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 5

Project Objectives

Improve Support Operation

Improve Carrier Operation

Improve Security Operation

Improve Cargo Operation

Page 6: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 6

THE CHALLENGES

Strictly private and confidential

Page 7: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 7

THE FACTS

Multiple Countries Multiple Systems

Lack of Holistic Visibility Barrier to Cross Border Trade

Inconsistent with the Regional Integration Agenda of trade facilitation and ease of doing business.

Page 8: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 8

THEFT FRAUD ACCOUNTABILITY COMPLIANCE

EFFECTIVENESS GOVERNANCE TRANSPARENCY PLANNING

DATA GATHERING

FEEDBACK

THE CHALLENGES

Page 9: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 9

THE SEAMLESS REGIONAL ELECTREONIC CARGO TRACKING SYSTEM

Strictly private and confidential

Page 10: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 10

External IntegrationRapid Response Team

RECTS Cloud

GSM Network

Cargo In Transit Smart Gate & ANPR

DRC Site

Main Site

Command Control Centre

ICD

Custom Station

Smart Gate & ANPR

RECTS Overview

Page 11: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 11

Cloud RECTS with Local Disaster Recovery

Page 12: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 12

RECTS

Platform

Safety Mgmt

Security Mgmt

Compliance Mgmt

Consequence Mgmt

Preventive Mgmt

Operation Mgmt

Revenue Mgmt

Operational RECTS Platform

Page 13: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 13

Electronic Seal

Page 14: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 14

Electronic Fuel Sensor

Page 15: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 15

Electronic LOCK

Page 16: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 16

Intelligent Video Surveillance

Page 17: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 17

Centralized Monitoring Centre

Strictly private and confidential

Full HD

LED

Video Wall

Extended Video Wall

LCD Projector

On Writeable Wall

4 X LED Monitors

Workstation

with IP Telephony

Incident Level

Status

Display

Page 18: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 18

Maintenance Office

Strictly private and confidential

Maintenance

Station

Eelectronic

Workbench

Eelectronic

Test Equipment

QR Reader

Station

Page 19: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 19

Rapid Response Team

Page 20: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 20

Dedicate RECTS Stop Area

Page 21: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 21

Dedicate RECTS Compliance Lane

Page 22: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 22

HOW RECTS WORKS

Strictly private and confidential

Page 23: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 23

How EAC RECTS Work

Page 24: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 24

Transit Overview

Page 25: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 25

KPI

MIS

Operation

Visibility

Operation

Incident

Management

Operation

Efficiency

Operation

Performance

RECTSRoute, IDC, Vogan,

Container,

Rail Information

Cargo Status, Location,

Time, Speed, Visual

Monitoring

Process Automation,

Safety, Services

Punctuality, Idling, Transit

Compliance

Service Level

Revenue,

Cost

Alert,

Action,

Analysis

Reports

Corrective,

Preventive

Action

Tampering Prevention,

Services Punctuality,

Distance Travelled

Closer Look into Operation

Page 26: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 26

Monitoring

ResponseCommunicate

Analyze

Early Intruder Detection via Video Surveillance : Rapid Response Team Notified : 5 mins

Cable Vibration Detection due to Cable lifting : Rapid Response Team Standby : 15 mins

Power Disconnection due to Cable Cutting : Rapid Response Team Dispatched : 30 mins

Stolen Asset Tracking due to Geo-Fencing triggered : Rapid Response Team Tracking : 60mins

IT Infrastructure

24x7 Monitoring

Rapid Response TeamAuthority

Incident report and feedback analysis

with root cause analysis & Corrective as

well as Preventive action

1

2

4

Lack of real time integrated monitoring & coordination results in longer downtime & lost of revenue due to

theft. RECTS emphasize on these localized yet integrated 4 steps (continue improvement approach) the issue:

3

Page 27: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 27

THE BENEFITS

Strictly private and confidential

Page 28: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 28

Trade Facilitation Benefits

Strictly private and confidential

Page 29: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 29

Incidents 2017 Uganda: Revenue protected Kenya: Revenue Protected

TOTALS 153 USD5,084,594 135 USD 2,036,808

RECTS case study : Enhanced Cargo Security

Page 30: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 30

Average Transit time in days

Before Now

Mombasa - Malaba border 6 days 2 days, 5 hrs

Mombasa – Busia border 6 days 2 days, 1 hrs

Mombasa - Kampala 14 days 3 days, 14 hrs

Mombasa - Elegu 17 days 3 days, 13 hrs

Mombasa – Kigali 21 days 6 days, 1hrs

RECTS case study : Transit Time reduced by >50%

Page 31: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 31

2014 2015 2016 2017

5,500,320 7,579,440 8,452,640

53,127,800

Savings in Demurage/incidental Costs(Difference in daysx USD 400x No. of e-monitored cargo)

For every e-monitored consignment, waiting & escort costs are saved:

RECTS Case study : Reduced Cost of doing Business

Page 32: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 32

THANK YOU FOR YOUR ATTENTION

Strictly private and confidential

Page 33: All Rights Reserved © 2018. BSMART Technology Page 1

All Rights Reserved © 2018. BSMART Technology Page 33 Strictly private and confidential