Allen Schmitgen Summary: I have successfully completed several on shore, Refinery and Offshore projects. I also have extensive Refinery Construction and operations experience. Over 28 years in the oil industry. I have demonstrated effective leadership in construction /commissioning of the projects, excelled at cutting costs by Streamlining operations and problem solving. As a dependable coordinator/supervisor, I bring management experience and a willingness to take on task responsibilities. Because I have had extensive experience I have held many titles: Construction Superintendent-State Service: Over saw the completion of Loading Docks which included Pipe/mechanical, hydraulics, instrumentation, Electrical, insulation, Fire safety walls, STOPAQ, system turnover packages, Commissioning, coatings, and scaffolding. Exposure to engineering development Knowledgeable in construction safety Certified Fall /Fire Protection Plan (FPP) Excellent with client relations Blueprint/P&ID interpretation expertise (red lines) Demonstrated computer skills Word, Excel and Power point. High-level oral and written communication skills. Employee scheduling consistently met and exceeded goals/milestones. Procurement Shipping/ receiving Verified Field measurement Mechanical Commissioning Lead Titan PSG: On the Engineering development team Authored and revised system commissioning Plans Executed SCP’s and Tracked progress. Experience completing Commissioning Tension leg platform- Olympus Topsides and drilling rig. Knowledge of Pipe/exchangers/valves/instrumentation and Equipment Maintenance. Check sheet tracking and systems completion. Staff training/development Excelled at problem solving Employee and Task Scheduling Unit Operator Tech 6- Valero: Responsible for the day to day safe operation and production of the power house and demineralizer units Extensive Knowledge of RO and DI water systems Cooling towers and associated equipment

Allen Schmitgen pushkar resume

Embed Size (px)

Citation preview

Page 1: Allen Schmitgen pushkar resume

Allen Schmitgen

Summary:I have successfully completed several on shore, Refinery and Offshore projects. I also have extensive RefineryConstruction and operations experience. Over 28 years in the oil industry.I have demonstrated effective leadership in construction /commissioning of the projects, excelled at cutting costs by Streamlining operations and problem solving.As a dependable coordinator/supervisor, I bring management experience and a willingness to take on task responsibilities. Because I have had extensive experience I have held many titles:

Construction Superintendent-State Service: Over saw the completion of Loading Docks which included Pipe/mechanical, hydraulics, instrumentation, Electrical,

insulation, Fire safety walls, STOPAQ, system turnover packages, Commissioning, coatings, and scaffolding. Exposure to engineering development Knowledgeable in construction safety Certified Fall /Fire Protection Plan (FPP) Excellent with client relations Blueprint/P&ID interpretation expertise (red lines) Demonstrated computer skills Word, Excel and Power point. High-level oral and written communication skills. Employee scheduling consistently met and exceeded goals/milestones. Procurement Shipping/ receiving Verified Field measurement

Mechanical Commissioning Lead Titan PSG: On the Engineering development team Authored and revised system commissioning Plans Executed SCP’s and Tracked progress. Experience completing Commissioning Tension leg platform- Olympus Topsides and drilling rig. Knowledge of Pipe/exchangers/valves/instrumentation and Equipment Maintenance. Check sheet tracking and systems completion. Staff training/development Excelled at problem solving Employee and Task Scheduling

Unit Operator Tech 6- Valero: Responsible for the day to day safe operation and production of the power house and demineralizer units Extensive Knowledge of RO and DI water systems Cooling towers and associated equipment Power generation Steam generation / boilers Steam Turbines/Air compressors and dryers Engineering development / And change orders Exceptional interpersonal communication Blueprint / ISO interpretation expertise Experience completing Turnarounds, Outages, Shut downs. Chemical Handling expertise Staff training/development Consistently meet goals expertise with creative problem solving Val star Safety Team member

Commissioning/ Pipefitter Foreman-Bay LTD: Experience completing projects on shore and offshore. Responsible for System Commissioning Plans written and executed.

Page 2: Allen Schmitgen pushkar resume

Knowledge of Towers/Piping/Heat exchangers/valves/instrumentation and Equipment Maintenance. Hand and power tool expertise Qualified Confined Space and breathing air supervisor Knowledgeable in construction safety Exposure to engineering development Exceptional interpersonal communication Blueprint interpretation expertise Employee scheduling Consistently met goals/milestones and schedules.

Pipefitter/ boilermaker Foreman- Bay LTD: Responsible for man power safety and production. Experience completing Turnarounds, Outages, Shut downs,

Expansions, TLP’s, Loading Docks, Refinery Units, Marine offshore, and new construction. Knowledge of Pipe/exchangers/valves/instrumentation Equipment Maintenance. Knowledgeable in construction/Refinery safety policies Exceptional interpersonal communication Blueprint interpretation expertise Employee scheduling Consistently met goals/milestones and schedules Boilermaker/pipe fitter Bay LTD Hands on piping and equipment removal and installation. All mechanical duties as directed by my foreman. Work History continued on next page.

Work history:

Site Construction Superintendent, 08/2015 to 3/7/2016State Services – Ingleside, TXDuties included: Achieved the day-to-day field activities to ensure that the project milestone dates and overall schedule completion

dates are met. Created short-interval look-ahead project schedules that make sure that upcoming events are communicated, tracked

and are being proactively attended to Created and maintained a culture that values safety, health and cleanliness (Goal Zero) Managed and coordinated the work to ensure that it is constructed in an orderly and deliberate manner that is

consistent with the standard-of-care set forth in the contract documents that is viewed by industry as an effort that is consistent with best-practices standards

Established and maintained all dimensional controls for the project to include the use of third party personnel. Verified that all work is installed in a workmanlike manner (i.e.: plumb, level, straight, insulation... etc...) Managed a look-ahead no less than three days to proactively identifying issues that could lead to problems and

facilitate solutions. Ensured all aspects of the project are compliant with all contract terms and legal requirements that govern the project

and the community in which the project(s) takes place Conducted and/or attended pre-construction, progress and other project and staff meetings Conducted and/or participated in regularly held meetings involving internal staff and external stake holders such as

owners, subcontractors, etc. Met with the project manager, engineers, night superintendent and the general superintendent on a regular basis to

discuss the status of projects, to proactively identify and resolve problems in a timely manner Managed changes in project scope to ensure that the most contemporary contract documents are being used at all

times to prevent avoidable rework. Managed the punch list and project closeout process to assure timely completion Maintained daily paperwork such a field reports, schedule updates and E-mail correspondence and communicate this

clearly to the management team and the night superintendent. Provided timely and cordial interaction with al supporting work groups. Directed and managed the work loads of supporting staff.

Mechanical Commissioning Lead, 04/2013 to 08/2015Titan PSG –New Orleans, LAAs a Mechanical Lead I lead a team that: Commissioned the Olympus Topsides, and Drilling Rig. Use of QEDI checks sheet system and progress. Partnered successfully with Construction and Operations to produce the Olympus Project installation and production.

Trained, coached and mentored team to ensure smooth startup of the facility. Worked directly with vendors, clients and Management to insure a flawless and ahead of schedule start date.

Page 3: Allen Schmitgen pushkar resume

Achieved the training of 18 members of staff. Controlled the supply costs by working closely with suppliers to ensure that all components met department quality

standards. Managed schematics, redlines and P&IDs for upcoming Drilling Rig. Interpreted drawing markups and implemented drawing revisions. Coordinated with vendors, sales reps and machine shops for aid in project completion. Installed and tested machinery, equipment and new and replacement parts. Lubricated shafts, bearings and machinery gears. Operated precision measuring instruments and electrical and electronic testing devices. Maintained all building systems to protect against inefficient operation and physical deterioration Pressure tested with water and nitrogen all piping systems. Flushed delicate systems to a NAS 6 particle count. Hydraulic testing and load verification/ certification. Frequently diagnosed mechanical problems and determined how to correct them. Inspected drives, motors and belts. Followed a routine maintenance checklist. Operated hand tools to adjust functional parts of devices and control instruments. Recorded type and cost of maintenance and repair work. Serviced systems for air handling, hydraulic, electrical, valves, circuits and pumps. Instructed team members on maintenance policies and procedures. Maintained shop, company equipment and inventory. Created a database of all equipment models and serial numbers. Followed up on all outstanding service requests. Oversaw implementation of approved changes and developments. Identified and corrected performance issues. Worked with product planners and industrial designers to conceptualize and refine product concepts. Promoted and implemented process improvements company-wide. Read and interpreted blueprints, technical drawings, schematics and computer-generated reports. Contributed to the Olympus Project which increased company revenue. Tested the feasibility, design, operation and performance of equipment, components and systems. Performed tolerance analysis to ensure success in high-volume production. Tested extensively to ensure products met every design intent. Ensured products met requirements for Design for Manufacturing (DFM). Worked independently with minimal direction. Provided technical guidance. Ensured compliance with product specifications and standards requirements. Collaborated with clients, architects, engineers, contractors and sub-consultants. Analyzed mechanical requirements to determine feasibility of design

Experience at DSI (Deepwater Specialists Inc. Construction / Commissioning Experience 8/1999 through 03/2013 While I was working at Valero Refinery / I also represented clients on behalf of DSI in supervising and coordinating

construction and commissioning activities for a smooth hand over of a completed project. The duration of each separate project (average of each project being 4-5 years).During this time, we achieved projects

such as Brutus, Dianna, Horn Mountain, Nakita and Thunder horse

Tech 6 Refinery Operator and Fire /Rescue and Medical, 08/1999 to 03/2013Valero Energy – Corpus Christi, Texas I operated a modern demineralizer surface water treatment plant. Producing 2,000,000 gallons per day of less than .05

micro ohms’ conductivity. Operated cooling towers 1- 8 cell and 2 - 3 cell and all associated equipment (in line chillers, pumps and filters) Operated 2 -30 megawatt turbo generators. Operated and commissioned steam boilers 200k at 600#and associated steam systems. Maintained adequate DI water storage tank levels and pressures to meet water demand. Measured and adjusted chemical feed rates. Operated large electric, diesel and steam turbine powered pumps.

Page 4: Allen Schmitgen pushkar resume

Retained tank levels and flow rates to meet boiler feed water demand. Performed minor mechanical work and routine equipment maintenance. Implemented process changes. Made appropriate repair recommendations for malfunctioning equipment. Recorded inside and outside process readings on daily log sheets. Directly supervised all deliveries. Identification and recording names of visitors. Procured materials and supplies to complete daily tasks. Retrieved and performed required tests for quality and integrity on product samples. Adjusted pumping systems, chemical feeders, auxiliary equipment, control systems storage tank levels and pump

stations indicators. Monitored flows, pressures, chemical feeds levels and water quality indicators. Conducted safety inspections and followed safety rules and procedures. Executed field service work with little to no supervision, including water main and hydrant repairs, valve Maintenance and water meter change-outs. Handled preventive and corrective maintenance to maintain proper equipment safety and functionality. Evaluated procedures and results for accuracy and to determine appropriate next steps. Oversaw each treatment unit process in the plant. Developed deep understanding of regulatory requirements concerning quality, reporting standards, Emergency notifications permit renewals and inspections. Qualified hazmat tech, h2s, chlorine, ammonia Accurately read, understood, and carried out written instructions. Used hand tools to complete tasks. Used hoists and cranes to lift work pieces to machine. Used precision measuring instruments, templates, and fixtures to measure dimensions of finished work pieces. Used schematic diagrams to plan work. Followed standards and procedures to maintain safe work environment. Informed supervisors when machines needed major service. Val star Team Member (emergency response fire rescue and medical) Medical professional first responder Qualified professional first responder Performed basic patient assessments. Responded to dispatched emergency assignments quickly and safely. Assessed patient condition through physical and verbal exams and by collecting information from others at the scene. Promoted team effort when working with dispatch center, external public safety agencies and health care providers.

Bay LTD/ Bay Inc. / Bay offshore – Corpus Christi, TXSupervisor and foreman /Commissioning and Construction Supervisor On and offshore. 01/1991 to 08/1999 Partnered successfully with engineers, construction, maintenance, and clients to complete projects/Turnarounds

expansions and shutdowns on and ahead of schedule. Worked in the refineries Turn around, shut downs, startups, high hazard, new projects and expansions. Permit acquired, LOTO, job scope, job schedule, confined space, safety, breathing air firefighting and rescue. Spearheaded a multifunction team to supply the offshore oil industry a skilled labor force specializing in piping and

commissioning support. Exceeded company objectives in work performance, schedule, and safety. Hired and trained 130 members of the skilled labor team. Followed established job site safety regulations and maintained a safe and clean work area. Pressure testing hydro testing / nitrogen testing. Completed and coordinated with several clients (Shell, Exxon, BP) on off shore projects such as Mars TLP, Ram

Powell, Urea, Brutus and several others. Completed the Champlain BTX expansion, Valero HOC regenerator project and Alky turn around etc. several other

turn around/outages projects back to back. Planned and executed work with the proper tools and materials to maximize efficiency. Facilitated harmonious working relationships with crew members to prevent problems and conflicts. Planned projects by identifying necessary equipment, tools needed, accurate take offs and required assistance. Monitored tool and equipment condition and arranged for repairs when needed. Developed deep understanding of regulatory requirements concerning quality, reporting standards, emergency

notifications, permit renewals and inspections.

Page 5: Allen Schmitgen pushkar resume

Represented the Client in Commissioning Mars A, Ram Powell, Urea, Horn Mountain, Brutus, and many more. (References upon request).

Pipe/ Boilermaker Foreman, 03/1989 to 03/1990Belmont – Corpus Christi, TX Trained, coached and mentored personnel to complete the Project, Oversaw progress Planned work activities Kept up with progress reports Developed and led safety meetings Worked with environmental groups

Pipe fitter, Boilermaker, rigger, scaffold builder, mechanic, 07/1987 to 09/1987Brown and Root – Corpus Christi, TX Worked directly with operations, maintenance, and management to achieve a successful project and led safety

meetings and training to increase employee loyalty and reduce rework.