11
Performance Review Institute (PRI) | 161 Thorn Hill Road | Warrendale, PA 15086-7527 Joseph G. Pinto Executive Vice President and Chief Operating Officer This certificate is granted and awarded by the authority of the Nadcap Management Council to: Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition of accreditation for specific services, as listed in www.eAuditNet.com on the Qualified Manufacturers List (QML), to the revision in effect at the time of the audit for: Aerospace Quality System (AC7004) Certificate Number: 3327165213 Expiration Date: 31 October 2019

Alloyweld Inspection Co. Inc. · 2020-05-05 · Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Alloyweld Inspection Co. Inc. · 2020-05-05 · Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition

Performance Review Institute (PRI) | 161 Thorn Hill Road | Warrendale, PA 15086-7527

Joseph G. PintoExecutive Vice President and Chief Operating Of� cerJoseph G. Pinto

This certificate is granted and awarded by the authority of the Nadcap Management Council to:

Alloyweld Inspection Co. Inc.

796 Maple Ln Bensenville, IL 60106

United States

This certificate demonstrates conformance and recognition of accreditation for specific services, aslisted in www.eAuditNet.com on the Qualified Manufacturers List (QML), to the revision in effect at the

time of the audit for:

Aerospace Quality System (AC7004)

Certificate Number: 3327165213Expiration Date: 31 October 2019

Page 2: Alloyweld Inspection Co. Inc. · 2020-05-05 · Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition

SCOPE OF COMPLIANCE

Aerospace Quality Systems

Alloyweld Inspection Co. Inc. 796 Maple Ln

Bensenville, IL 60106

This certificate expiration is updated based on periodic audits. The current expiration date and scopeof accreditation are listed at: www.eAuditNet.com - Online QML (Qualified Manufacturer Listing).

In recognition of the successful completion of the PRI evaluation process, accreditation is granted to

this facility to perform the following: AC7004 Rev E - Nadcap Audit Criteria for Quality Management System

t-frm-17 17-Jun-10

Page 3: Alloyweld Inspection Co. Inc. · 2020-05-05 · Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition

Performance Review Institute (PRI) | 161 Thorn Hill Road | Warrendale, PA 15086-7527

Joseph G. PintoExecutive Vice President and Chief Operating Of� cerJoseph G. Pinto

This certificate is granted and awarded by the authority of the Nadcap Management Council to:

Alloyweld Inspection Co. Inc.

796 Maple Ln Bensenville, IL 60106

United States

This certificate demonstrates conformance and recognition of accreditation for specific services, aslisted in www.eAuditNet.com on the Qualified Manufacturers List (QML), to the revision in effect at the

time of the audit for:

NonDestructive Testing

Certificate Number: 3327165212Expiration Date: 30 April 2018

Page 4: Alloyweld Inspection Co. Inc. · 2020-05-05 · Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition

SCOPE OF ACCREDITATION

NonDestructive Testing

Alloyweld Inspection Co. Inc. 796 Maple Ln

Bensenville, IL 60106

This certificate expiration is updated based on periodic audits. The current expiration date and scopeof accreditation are listed at: www.eAuditNet.com - Online QML (Qualified Manufacturer Listing).

In recognition of the successful completion of the PRI evaluation process, accreditation is granted to

this facility to perform the following: AC7114 Rev I - Nadcap Audit Criteria for NonDestructive Testing (NDT) SuppliersAccreditation AC7114S Rev K - Nadcap Supplemental Audit Criteria for NonDestructive Testing (NDT)Suppliers Accreditation Program S–U1 Honeywell S–U11 The Boeing Company S–U18 Hamilton Sundstrand S–U21 Eaton S–U4 Lockheed Martin S–U6 Rolls–Royce Corporation (refer to U3 Supplemental questions) AC7114/1 Rev I - Nadcap Audit Criteria for NonDestructive Testing Facility Penetrant Survey AC7114/1S Rev J - Nadcap Supplemental Audit Criteria for NonDestructive Testing (NDT)Suppliers Accreditation Program S–U1 Honeywell S–U11 The Boeing Company S–U18 Hamilton Sundstrand S–U21 Eaton S–U4 Lockheed Martin S–U6 Rolls–Royce Corporation (refer to U3 Supplemental questions) AC7114/2 Rev I - Nadcap Audit Criteria for NonDestructive Testing Magnetic Particle Survey

t-frm-17 17-Jun-10

Page 5: Alloyweld Inspection Co. Inc. · 2020-05-05 · Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition

AC7114/2S Rev J - Nadcap Supplemental Audit Criteria for NonDestructive Testing MagneticParticle Survey S–U1 Honeywell S–U11 The Boeing Company S–U18 Hamilton Sundstrand S–U21 Eaton S–U4 Lockheed Martin S–U6 Rolls–Royce Corporation (refer to U3 Supplemental questions) AC7114/3 Rev J - Nadcap Audit Criteria for NonDestructive Testing Facility Ultrasonic Survey AC7114/3S Rev J - Nadcap Supplemental Audit Criteria for NonDestructive Testing FacilityUltrasonic Survey S–U11 The Boeing Company S–U18 Hamilton Sundstrand S–U4 Lockheed Martin S–U6 Rolls–Royce Corporation (refer to U3 Supplemental questions) AC7114/4 Rev I - Nadcap Audit Criteria for NonDestructive Testing Facility Film RadiographySurvey AC7114/4S Rev J - Nadcap Supplemental Audit Criteria for NonDestructive Testing FacilityFilm Radiography Survey S–U1 Honeywell S–U18 Hamilton Sundstrand S–U6 Rolls–Royce Corporation (refer to U3 Supplemental questions) AC7114/6 Rev C - Nadcap Audit Criteria For NonDestructive Testing Facility DigitalRadiography, Digital Detector Array (DDA) Survey AC7114/8 Rev B - Nadcap Audit Criteria for NonDestructive Testing Computed Radiology,Utilizing Photostimulable Luminescence (PSL)Survey

Alloyweld Inspection Co. Inc. #2Bensenville, IL

t-frm-17 17-Jun-10

Page 6: Alloyweld Inspection Co. Inc. · 2020-05-05 · Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition

Performance Review Institute (PRI) | 161 Thorn Hill Road | Warrendale, PA 15086-7527

Joseph G. PintoExecutive Vice President and Chief Operating Of� cerJoseph G. Pinto

This certificate is granted and awarded by the authority of the Nadcap Management Council to:

Alloyweld Inspection Co. Inc.

796 Maple Ln Bensenville, IL 60106

United States

This certificate demonstrates conformance and recognition of accreditation for specific services, aslisted in www.eAuditNet.com on the Qualified Manufacturers List (QML), to the revision in effect at the

time of the audit for:

Welding

Certificate Number: 3327170463Expiration Date: 31 October 2017

Page 7: Alloyweld Inspection Co. Inc. · 2020-05-05 · Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition

SCOPE OF ACCREDITATION

Welding

Alloyweld Inspection Co. Inc. 796 Maple Ln

Bensenville, IL 60106

This certificate expiration is updated based on periodic audits. The current expiration date and scopeof accreditation are listed at: www.eAuditNet.com - Online QML (Qualified Manufacturer Listing).

In recognition of the successful completion of the PRI evaluation process, accreditation is granted to

this facility to perform the following: AC7110 Rev E - Nadcap Audit Criteria for Welding/Brazing AC7110/1 Rev G - Nadcap Audit Criteria for Brazing (Torch/Induction) (to be used on auditsbefore 7 August 2016) Baseline (All audits) Supplement A – Torch (Additional requirements) Supplement E – GTA Tack Welding (Additional requirements) Supplement F – Stress Relieve (Additional requirements) Supplement G – Processes using gas (Additional requirements) Supplement H – Processes using Flux – (Additional requirements) AC7110/5 Rev H - Nadcap Audit Criteria for Fusion Welding Baseline (All audits) Supplement C – Automatic / Semi–automatic (Additional requirements) Supplement E – Foundry in–process completion / repair welding of castings (AdditionalRequirements) Supplement F – Filler Materials (Additional requirements) Supplement G – Processes using Gas (For example GTAW, PAW) (Additional requirements) Supplement H – Preheat / Interpass temperature control (Additional requirements) Supplement I – Stress Relieve (Additional requirements) Supplement J – Tack Welding (Additional requirements) AC7110/5S Rev D - Nadcap Supplemental Audit Criteria for Fusion Welding U00 None

t-frm-17 17-Jun-10

Page 8: Alloyweld Inspection Co. Inc. · 2020-05-05 · Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition

AC7110/12 Rev F - Nadcap Audit Criteria for Welder/Welding Operator Qualification (Thischecklist is required if the audit includes AC7110/3, /5 or /6) Baseline (All audits) Supplement A – Metallographic Evaluation of Qualification Welds (Additional requirements) AC7110/12S Rev G - Nadcap Supplemental Audit Criteria for Welder/Welding OperatorQualification (This checklist is required if the audit includes AC7110/3, /5 or /6) (to be used onaudits before 4 September, 2016) U00 None

Alloyweld Inspection Co. Inc. #2Bensenville, IL

t-frm-17 17-Jun-10

Page 9: Alloyweld Inspection Co. Inc. · 2020-05-05 · Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition

Performance Review Institute (PRI) | 161 Thorn Hill Road | Warrendale, PA 15086-7527

Joseph G. PintoExecutive Vice President and Chief Operating Of� cerJoseph G. Pinto

This certificate is granted and awarded by the authority of the Nadcap Management Council to:

Alloyweld Inspection Co. Inc.

796 Maple Ln Bensenville, IL 60106

United States

This certificate demonstrates conformance and recognition of accreditation for specific services, aslisted in www.eAuditNet.com on the Qualified Manufacturers List (QML), to the revision in effect at the

time of the audit for:

Chemical Processing

Certificate Number: 3327173093Expiration Date: 31 January 2018

Page 10: Alloyweld Inspection Co. Inc. · 2020-05-05 · Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition

SCOPE OF ACCREDITATION

Chemical Processing

Alloyweld Inspection Co. Inc. 796 Maple Ln

Bensenville, IL 60106

This certificate expiration is updated based on periodic audits. The current expiration date and scopeof accreditation are listed at: www.eAuditNet.com - Online QML (Qualified Manufacturer Listing).

In recognition of the successful completion of the PRI evaluation process, accreditation is granted to

this facility to perform the following: AC7108 Rev H - Nadcap Audit Criteria for Chemical Processing (to be used on audits on/after5 June 2016) Acid Cleaning, Descaling, Passivation and Electropolishing – AC7108/12 must also be selected Conversion Coating – AC7108/11 must also be selected Etch Inspection – AC7108/2 must also be selected General Cleaning and Pre–Cleaning Alkaline Cleaning (If Titanium Alkaline Cleaning is also carried out then please check ChemicalCleaning – Titanium Cleaning – Alkaline” also) Titanium Cleaning – Alkaline Ovens Used for Thermal Treatments at a Set Point above 250°F Ovens for Thermal Treatments with a set point at or below 250ºF (121ºC) or for MiscellaneousHeating Processes, e.g. Part Drying. Pre–Penetrant Etch – AC7108/15 must also be selected Solution Analysis and Testing – AC7108/4 must also be selected AC7108/2 Rev F - Nadcap Audit Criteria for Etch Inspection Processes (Anodic Etch, BlueEtch, Anodize, Local, Macrostructure, Nital/Temper) Etching and Etch Inspection Nital/Temper Etch Solution Analysis Performed On Site in Support of Etch Processes (Not required if audit scopeincludes AC7108) AC7108/4 Rev B - Nadcap Audit Criteria for Solution Analysis and Testing in Support ofChemical Processing to AC7108 (To Be Used On Audits Conducted On Or After June 5, 2016) Solution Analysis In Support of AC7108

t-frm-17 17-Jun-10

Page 11: Alloyweld Inspection Co. Inc. · 2020-05-05 · Alloyweld Inspection Co. Inc. 796 Maple Ln Bensenville, IL 60106 United States This certificate demonstrates conformance and recognition

Testing Performed Internally In Support of the Chemical Process Accreditation B05 – Salt Spray Testing In Support of AC7108 B06 – Water Immersion / Humidity Testing In Support of AC7108 B10 – Adhesion Testing (Adhesion Tape Testing) In Support of AC7108 AC7108/11 - Nadcap Audit Criteria for Conversion Coating (to be used on audits on/after 5June 2016) Aluminum AC7108/12 - Nadcap Audit Criteria for Acid Cleaning, Descaling, Passivation andElectropolishing (to be used on audits on/after 5 June 2016) Acid Cleaning (If Titanium Acid Cleaning is also carried out then please check “Chemical Cleaning –Titanium Cleaning – Acid” also) Passivation Titanium Cleaning – Acid (This process also requires “Chemical Cleaning – Titanium Cleaning –Alkaline” to also be checked unless customer specifications permit otherwise) Other Titanium Cleaning Acid AC7108/15 - Nadcap Audit Criteria for Pre-Penetrant Etch Immersion Pre penetrant Etch

Alloyweld Inspection Co. Inc. #2Bensenville, IL

t-frm-17 17-Jun-10