ALTERNATIVA 02 Y 01 DEL PIP MEJORAMIENTO DE LA INFRAESTRUCTURA PORTUARIA DEL E ITEM DESCRIPCION 01.00.00 ZONA DE EMBARQUE 02.00.00 DEFENSA RIBEREÑA EN QUEBRADA 03.00.00 DEFENSA RIBEREÑA EN RIO 04.00.00 ESCALINATA 05.00.00 RAMPA VEHICULAR 06.00.00 LOSA DE ESTACIONAMIENTO 07.00.00 CANAL DE EVACUACION DE AGUAS PLUVIALES 08.00.00 IMPACTO AMBIENTAL CD COSTO DIRECTO GG GASTOS GENERALES (13.35 % CD) UT UTILIDAD (5.00 % CD) ST SUBTOTAL IGV IGV (19.00 %) CIO COSTO DE INVERSION DE OBRA LQ LIQUIDACION DE OBRA (3.00 % CD) SP SUPERVISION DE OBRA (5.00 % CD) ET EXPEDIENTE TECNICO (5.00 % CD) PT PRESUPUESTO TOTAL

Alternativa 01 y 02 Embarcadero Tambopata

Embed Size (px)

Citation preview

Page 1: Alternativa 01 y 02 Embarcadero Tambopata

ALTERNATIVA 02 Y 01 DEL PIP

MEJORAMIENTO DE LA INFRAESTRUCTURA PORTUARIA DEL EMBARCADERO TAMBOPATA

ITEM DESCRIPCION

01.00.00 ZONA DE EMBARQUE 285,253.93

02.00.00 DEFENSA RIBEREÑA EN QUEBRADA 1,136,039.42

03.00.00 DEFENSA RIBEREÑA EN RIO 497,664.34

04.00.00 ESCALINATA 87,892.39

05.00.00 RAMPA VEHICULAR 819,830.20

06.00.00 LOSA DE ESTACIONAMIENTO 33,959.01

07.00.00 CANAL DE EVACUACION DE AGUAS PLUVIALES 39,360.73

08.00.00 IMPACTO AMBIENTAL 73,932.92

CD COSTO DIRECTO 2,973,932.94

GG GASTOS GENERALES (13.35 % CD) 397,020.05

UT UTILIDAD (5.00 % CD) 148,696.65

ST SUBTOTAL 3,519,649.64

IGV IGV (19.00 %) 565,047.26

CIO COSTO DE INVERSION DE OBRA 4,084,696.90

LQ LIQUIDACION DE OBRA (3.00 % CD) 89,217.99

SP SUPERVISION DE OBRA (5.00 % CD) 148,696.65

ET EXPEDIENTE TECNICO (5.00 % CD) 148,696.65

PT PRESUPUESTO TOTAL 4,471,308.19

MONTO EN ALTERNATIVA 02

(CAISSON FDPL 2013)

Page 2: Alternativa 01 y 02 Embarcadero Tambopata

ALTERNATIVA 02 Y 01 DEL PIP

MEJORAMIENTO DE LA INFRAESTRUCTURA PORTUARIA DEL EMBARCADERO TAMBOPATA2 1 OK 1 OK

285,253.93 212,396.03 212,396.03945,231.19 799,658.89 322,739.17497,664.34 339,033.66 339,033.66242,586.38 208,528.48 68,040.31726,067.87 605,415.37 592,396.4633,959.01 26,582.02 26,582.0239,360.73 32,650.44 32,650.4473,932.92 45,691.36 45,691.36

2,844,056.37 2,269,956.25 1,639,529.45379,681.53 303,039.16 218,877.18142,202.82 113,497.81 81,976.47

3,365,940.72 2,686,493.22 1,940,383.10540,370.71 431,291.69 311,510.60

3,906,311.43 3,117,784.91 2,251,893.7085,321.69 68,098.69 49,185.88

142,202.82 113,497.81 81,976.47

142,202.82 113,497.81 81,976.47

4,276,038.76 3,412,879.22 2,465,032.53 2,521,829.15

3,204,542.29 3,278,377.90

S10 3,200,161.37 3,276,550.97

4,380.92 1,826.92

MONTO EN ALTERNATIVA 01 (PILOTES FDPL 2013)

MONTO EN ALTERNATIVA 01

(PILOTES RNCR 2010)MONTO EN ALTERNATIVA 01 (PILOTES RNCR 2010)

MONTO EN ALTERNATIVA 01 (PILOTES RNCR 2010)

Page 3: Alternativa 01 y 02 Embarcadero Tambopata

ALTERNATIVADEL PIP

MEJORAMIENTO DE LA INFRAESTRUCTURA PORTUARIA DEL EMBARCADERO TAMBOPATA###

ITEM DESCRIPCION

01.00.00 ZONA DE EMBARQUE 505,374.81

02.00.00 DEFENSA RIBEREÑA EN QUEBRADA 343,844.64

03.00.00 DEFENSA RIBEREÑA EN RIO 252,589.47

04.00.00 ESCALINATA 237,884.10

05.00.00 RAMPA VEHICULAR 723,617.55

06.00.00 LOSA DE ESTACIONAMIENTO 22,923.37

07.00.00 CANAL DE EVACUACION DE AGUAS PLUVIALES 39,078.81

08.00.00 IMPACTO AMBIENTAL 53,969.56

CD COSTO DIRECTO 2,179,282.31

GG GASTOS GENERALES (13.35 % CD) 290,934.19

UT UTILIDAD (5.00 % CD) 108,964.12

ST SUBTOTAL 2,579,180.61

IGV IGV (19.00 %) 414,063.64

CIO COSTO DE INVERSION DE OBRA 2,993,244.26

LQ LIQUIDACION DE OBRA (3.00 % CD) 65,378.47

SP SUPERVISION DE OBRA (5.00 % CD) 108,964.12

ET EXPEDIENTE TECNICO (5.00 % CD) 108,964.12

PT PRESUPUESTO TOTAL 3,276,550.97

MONTO EN ALTERNATIVA 01 (PILOTES FDPL 2013)