Alcatel-Lucent GSM
Add BTS, New Cell(s)
BTS Document
Reconfiguration Method
Release B10
3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 2/40
Status RELEASED
Short title MPI84 / MDR1
All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel-Lucent.
BLANK PAGE BREAK
2 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 3/40
Contents
Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.1 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.2 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.3 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111.1.4 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.2.2 Site Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131.2.3 External Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 141.4 Telecom/Supervision Outage and Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 181.5 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
1.5.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
1.5.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 191.5.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
2 Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
2.1 Before Going Onsite . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 222.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 232.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
2.3 Scenario Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 242.3.1 Initial Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 242.3.2 Create Abis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 252.3.3 Create BTS(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 262.3.4 Modify Logical Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
2.3.5 Connect BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 312.3.6 Start Traffic on Added BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 322.3.7 Call Tests and Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 342.3.8 Create Adjacencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 352.3.9 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
2.4 Reverse Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 362.4.1 Lock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 362.4.2 Disconnect BTS(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 362.4.3 C2: Unlock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 372.4.4 Delete Adjacencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 372.4.5 Delete Cell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 372.4.6 Delete BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
2.4.7 Delete Abis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 382.4.8 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 392.4.9 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
3BK 17430 0841 RJZZA Ed.08 3 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 4/40
Contents
4 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 5/40
Preface
Preface
Purpose This document describes how to add a BTS.
It is applicable to BSS at technical release level B10.
What’s New In Edition 08
Improvements were made in section Connect BTS (Section 2.3.5)
In Edition 07
In the entire document “BTS Terminal” was replaced with “BTS NEM” exceptthe tasks referring to G2 BTS.
In Edition 06
Update in Create BTS(s) (Section 2.3.3)
Update with the new equipment naming.
In Edition 05
Restriction 3BKA20FBR230654 added in Create Adjacencies (Section 2.3.8).
In Edition 04
Updates were made in section Restrictions (Section 1.1.3).
In Edition 03
Delivered in release.The following sections have been updated due to system evolution:
Applicable Documents (Section 1.5.3)
Create BTS(s) (Section 2.3.3)
In Edition 02
Sections Create BTS(s) (Section 2.3.3)and Delete Abis (Section 2.4.7)wereupdated following system evolution changes.
3BK 17430 0841 RJZZA Ed.08 5 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 6/40
Preface
In Edition 01
Sections Connect BTS (Section 2.3.5) and Disconnect BTS(s) (Section 2.4.2)were updated following system evolution changes.
Overall document quality was improved following an editorial review.Improvements were made in the following sections due to system evolution:
Prerequisites (Section 1.2.1)
Check Working PRC ( Section 2.3.4.3 )
Connect BTS (Section 2.3.5)
Start Traffic on Added BTS (Section 2.3.6).The following sections were updated due to system evolution:
Create Abis (Section 2.3.2)
Create BTS(s) (Section 2.3.3)
Delete Abis (Section 2.4.7)
Delete BTS (Section 2.4.6).
The note regarding settings made in the Remote Settings panel was removedfrom Create BTS(s) (Section 2.3.3).
First official release of the document for B10.
6 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 7/40
Preface
Audience This document is intended for:
Field service technicians
Specialists
Project managers
Foremen.
Assumed Knowledge You must have a basic understanding of the following:
Planning:
Network architecture and reshuffling principles
Scheduling.
Implementation:
Alcatel-Lucent operations and maintenance concepts for BSS
9153 OMC-R operation
Equipment (BSC, BTS, MFS) hardware configurations
Windows environment.
3BK 17430 0841 RJZZA Ed.08 7 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 8/40
Preface
8 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 9/40
1 Overview
1 Overview
This Overview gives information needed by project managers and foremen, forpresentation to the customer and for site planning.
3BK 17430 0841 RJZZA Ed.08 9 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 10/40
1 Overview
1.1 Presentation
The logical configuration can be activated completely independently from thephysical connection of the BTS. Creating adjacencies and call tests must bedone after the BTS is functional and connected to the network.
Co-ordination is needed between the BTS and OMC-R sites to define the initialsettings. The Qmux address must always be set. For 9100/9110 Micro BTSs,the transmission mode is configured via OML.
G2 BTSs are supported by 9130 BSC Evolution only if they have a DRFU board.
G1 MKII BTSs and G2 BTSs are supported by 9120 BSC only if they have aDRFU board.
In order to create the required configuration, it is possible to add more than onenew BTS and more than one cell. In this case, modify all the logical parametersat the same time in the same PRC.
Manual Transmission Programming is recommended for multiple Abisoperations on 9120 BSC.
According to engineering rules:
It is not allowed to have a cross-connect on the secondary Abis
It is not allowed to attach a secondary Abis to a BTS that is in an Abis ring
It is not allowed to use a mixed configuration for the primary and secondary
Abis (terrestrial/satellite).
1.1.1 Cases
The following cases apply:
C1: BTS is installed on a new Abis link
C2: BTS is installed on an existing Abis link with downstream BTSs
C3: BTS is installed at the end of a non empty Abis chain (no downstream
BTSs)
C4: BTS has two Abis links.
1.1.2 Options
The method takes into account the following options:
O1: Configuring GPRS for the cells
O2: Abis connection via satellite
O3: Create cell(s) shared (applicable only to 9100 BTSs)
O4: Define BTS Extra Abis Timeslots
O5: Manual Transmission Programming
O6: Automatic Transmission Programming.
10 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 11/40
1 Overview
1.1.3 Restrictions
None.
1.1.4 Grouped Task Sequence
The following figure shows the grouped task sequence for this scenario.
MSC site OMC−R site
Initial Checks
BTS site
Create Abis
Modify Logical Parameters
Create BTS(s)
Call Tests and Checks
Connect BTS
Start Traffic on Added BTS
Final Checks
Create Adjancencies
3BK 17430 0841 RJZZA Ed.08 11 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 12/40
1 Overview
1.2 Preparation
1.2.1 Prerequisites
The following prerequisites apply:
BTS sites are clean, tidy, and easily reachable
The primary or/and secondary Abis links are installed and qualified
The BTS(s) is installed and commissioned
For C2, the jumper linking the upstream and downstream BTSs is installed.
This jumper is removed during the scenario.
For C4:
The added BTS must be an 9100 BTS equipped with a SUMA board or
an 9110-E Micro BTS equipped with a MSUMA board
If the primary Abis link is on satellite, the secondary Abis link mustalso be on satellite
The added BTS must be alone on a primary Abis, in the end of chain
position
The added BTS must not have any G3 TRE or 9110 Micro BTS on
second Abis
The BTS must not contain any G3 TREs for a configuration with more
than 12 TREs.
For O3, clock synchronization cable(s) must already be installed between
BTSs involved in shared cells
For O3, in a cell shared over two BTSs, only one sector (main or secondary)
must support GPRS traffic (not both)
BTS(s) must be configured with the correct initial settings
There are adequate resources to handle the new traffic channels and LAPD
All BTS software packages and OMU-CPF are loaded in the BSC memory.
12 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 13/40
1 Overview
1.2.2 Site Specific Information
You must have the following specific information to complete the scenario:
Identity of cases and options to perform
BTS site topology
For C1: the characteristics of the Abis (name, Qmux timeslot if BTS(s) to
add is G1/G2 BTS)
For C4: the name of the primary and secondary Abis link,
MAX_EXTRA_TS_PRIMARY
Characteristics of the BTS(s) (family, hardware generation, name, Qmux
address, number of sectors, type of transmission, antenna diversity, master
or slave, Qmux timeslot for G1/G2 BTS)
List of cells to create with parameter values (LAC, CI, frequency, timeslot
definition). The list must be exhaustive.
List of cells supporting GPRS and parameter values (Routing Area Code for
GPRS, Routing Area Color for GPRS, Min_Pdch, Max_Pdch_High_Load,
Max_Pdch, EN_EGPRS, Max_GPRS_CS, PS_PREF_BCCH_TRX,
TRX_Pref_Mark, MAX_ENGPRS_MCS)
List of adjacencies with parameters (list of impacted cells, direction of
the handover).
1.2.3 External Tasks
You must take the following external tasks into account:
All cells are declared at the MSC site
The MSC personnel must perform an MSC database update to take into
account the parameters for the new BTS
For O2, check and update, if needed, the CRC4 for the Abis at the BSC site
Update adjacencies on neighboring OMC-Rs, if necessary.
3BK 17430 0841 RJZZA Ed.08 13 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 14/40
1 Overview
1.3 Scheduling
Note: Time based on technical constraints
In the following table, the number of resources shown does not take intoaccount individual customer or safety requirements.
Grouped Task MSC TSC BSC BTS Imp.BTS
OMC-R Time/Task
Initial Checks. - - - - - 1 ope. Durations are:
for 9120 BSC:
25 min
for 9130 BSC
Evolution: 21
min + 3 sec/cell
Create Abis. - - - - - 1 ope.
C1,C4: 1 min.
O5:
for 9120 BSC,
2 min + 6 min./
Abis
for 9130 BSC
Evolution, 2 min
+ 1 min./ Abis
C1,C4: 1 min.
O5:
for 9120 BSC,
2 min + 6 min./
Abis
for 9130 BSC
Evolution, 2 min
+ 1 min./ Abis
14 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 15/40
1 Overview
Grouped Task MSC TSC BSC BTS Imp.BTS
OMC-R Time/Task
Create BTS(s). - - - - - 1 ope.
3 min + 1 min./ BTS
+ 6 min.xn / BTS for9120 BSC.
3 min + 1 min./ BTS + 1 min. / BTS for 9130 BSCEvolution.
C2, C3: +7 min.
C4: +5 min
O2: +3 min.
3 min +1 min/BTS
C2, C3:
7 min. for 9120
BSC
3 min. for 9130
BSC Evolution
C4 :
5 min. for 9120
BSC
1 min. for 9130
BSC EvolutionO5 :
1 min. + 6
min/BIU for 9120
BSC
1 min. + 15
sec/BTS for
9130 BSC
Evolution
O6 :6 min/BTS for
9120 BSC
1 min./BTS
for 9130 BSC
Evolution
O2: +3 min.
Modify LogicalConfiguration.
- - - - - 1 ope.
6 min + 10.5 min./
cell + 1.5 min./ TRX+ 2 min/BTS.
O1: +7 min./ cell
O3: +3 min./ cell
6 min + 10.5 min./ cell + 1.5 min./ TRX
+ 2 min./BTSO1: +7 min./ cell
O3: +3 min./ cell
3BK 17430 0841 RJZZA Ed.08 15 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 16/40
1 Overview
Grouped Task MSC TSC BSC BTS Imp.BTS
OMC-R Time/Task
Connect BTS. - - - 1 com
C1, C4: 5
min./ Abis
C2:11min.
C3: 1 min.
- 1 ope.
6 min./ BTS
C2: + 1 min. + 5min./ cell + 2 min./ BTS*
7 min./ BTS
C1, C4: +5 min./
Abis
C2: +12 min. + 5min./ cell + 2 min./ BTS*
C3: + 1 min.
Start Traffic onAdded BTS
- - - - - 1 ope.
6 min. / cell + 1min.
C1, C2: + 1 min.
6 min./ cell + 1 min.
C1, C2, C4: + 1min.
O1 + 1 min./cell
Call Tests andChecks.
- - - 1 com
5 min./ cell
- 1 ope.
5 min.
C4:+10 min
5 min. + 5 min./ cell
C4:+10 min
CreateAdjacencies.
- - - - - 1 ope.
9 min./ cell
9 min./ cell
16 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 17/40
1 Overview
Grouped Task MSC TSC BSC BTS Imp.BTS
OMC-R Time/Task
Final Checks. - - - 1 com - 1 ope.
20 min.
15 min.
TOTAL TIME Durations are:
For 9120 BSC:55 min. + 10 min./ BTS + 30.5 min./cell + 1.5 min./ TRXC1: + 2 min. + 5 min./ AbisC2: + 20 min. + 2 min./ BTS* + 5 min./ cellC3: + 7 min. + 1 min./ BTSC4: + 17 min. + 5 min./ AbisO1: + 8 min./ cellO2: + 3 min.O3: + 3 min./ cell (shared)
O5:3 min + 6 min/Abis + 6 min/BIU
O6:+ 6 min/BTS
For 9130 BSC Evolution.51 min. + 10 min./ BTS + 30.5 min./cell + 1.5 min./ TRXC1: + 2 min. + 5 min./ AbisC2: + 16 min. + 2 min./ BTS* + 5 min./ cellC3: + 3 min. + 1 min./ BTS
C4: + 17 min. + 5 min./ AbisO1: + 8 min./ cellO2: + 3 min.O3: + 3 min./ cell (shared)O5: + 3 min. + 1 min/Abis + 15sec/BTSO6: + 1 min./ BTS
ope. : OMC-R Operator
BTS : for added BTS
BTS* : for downstream BTS
n : the number of impacted TSUs
3BK 17430 0841 RJZZA Ed.08 17 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 18/40
1 Overview
1.4 Telecom/Supervision Outage and Operating Impact
The following table describes the traffic outage and loss of supervision causedby each grouped task.
Out.Ref. Grouped Task
Tel Out/GPRS Out. Tel Red Sup Out
OMOut Impacts...
- Initial Checks. - - - - None.
- Create Abis(C1, C4).
- - - - None.
- Create BTS(s). - - - - None.
- Modify LogicalParameters.
- - - - None.
1 Connect BTS. C2: 2 min./ BTS* + 5min./ cell +11 min.
- C2: 11 min.+ 2 min./ BTS*
- For C2, supervision outage,telecom and GPRS outage fordownstream BTSs.
- Start Traffic onAdded BTS
- - 1.5 min - Sup. out. 1.5 min. during thePRC activation.
- Call Tests andChecks.
- - - - None.
- CreateAdjacencies.
- - - - None.
- Final Checks. - - - - None.
- TOTAL C2: 2 min./ BTS* + 5min./ cell +11 min.
- C2: 11 min.+ 2 min./ BTS*
- C2: 2 min./ BTS* + 5 min./ cell+ 11 min. GPRS + telecomoutage.
During the activation,supervision outage: 1.5min.
BTS : for added BTS.
BTS* : for downstream BTS.
18 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 19/40
1 Overview
1.5 Resources
1.5.1 Tools
The following tables describe the necessary hardware tools, software tools,
and forms.
1.5.1.1 Hardware Tools
Item Part Number Use at ...
BTS NEM (PC with CD-ROM drive and cables). - BTS
Wiring tools to disconnect and reconnect PCM. - BTS
Mobiles for call testing. - BTS
1.5.1.2 Software Tools
Item Part Number Use at ...
BTS Terminal B10 software for G1/ G2 BTS, BTSNEM B10 software for 9100 / 9110 BTS.
- BTS
LMT-CT (Craft Terminal) software at technicalrelease B10.
- BSC
Customer Documentation CD with the versionassociated with the current document edition.
Remember that the document you are readingcannot be used as a paper version. It is onlinedocumentation using hypertext links which takeyou to other parts of a document on the sameCD-ROM. All words in italics are hypertext links.
- BTS, BSC, OMC-R
1.5.1.3 Forms
None.
1.5.2 Supplies
The following table describes necessary the supplies.
Item Part Number Use at ...
Topology regarding operation. - BTS
3BK 17430 0841 RJZZA Ed.08 19 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 20/40
1 Overview
1.5.3 Applicable Documents
You must have the following documents or have electronic access to thefollowing documents:
B10 BSS Methods Handbook
BSS Configuration Handbook
BSS Surveillance Handbook
Network Reconfiguration Recommendations
BTS NEM User Guide
Transmission Terminal User Guide
Synchronize BTS Master/Slave Site
20 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 21/40
2 Scenario
2 Scenario
This Scenario presents all checks needed before beginning the scenario, andall detailed tasks to be performed on each site.
3BK 17430 0841 RJZZA Ed.08 21 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 22/40
2 Scenario
2.1 Before Going Onsite
Before going onsite, you must check that the following information and suppliesare available:
All Prerequisites (Section 1.2.1) are met
The customer has been informed of the:
Date and time
Site name and address
Purpose of operation.
Personnel are available (refer to Scheduling (Section 1.3))
Site Specific Information (Section 1.2.2) is available
Tools (Section 1.5.1) are available and ready for operation
Supplies (Section 1.5.2) are available and ready for operationApplicable Documents (Section 1.5.3) are available.
Ensure that the technical release level of the delivered board is in accordancewith the BSS hardware technical release document.
Ensure that the method used at the BSS site is at the same level as at theOMC-R.
22 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 23/40
2 Scenario
2.2 Before You Start
2.2.1 Checks
Perform the following operations:
Check that all Prerequisites (Section 1.2.1) are met
Check the availability of all necessary Tools (Section 1.5.1) and Supplies
( Section 1.5.2)
Inform the operator.
Among the cases described in Cases (Section 1.1.1) and the options describedin Options (Section 1.1.2), identify which cases and options apply to you.
2.2.2 Required KnowledgeYou must be familiar with the following:
Safety Rules and Precautions
Telecom/Supervision Outage and Operating Impact (Section 1.4)
Reverse Procedure
Grouped Task Sequence (Section 1.1.4)
Operating Hints
How to document Faults and Anomalies .
3BK 17430 0841 RJZZA Ed.08 23 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 24/40
2 Scenario
2.3 Scenario Description
This section describes how to add a BTS.
Note: Case-specific tasks are indicated by C1, C2, C3, or C4 in the Note column.Detailed tasks that do not have C1, C2, C3, or C4 in the Note column are
common to all four cases and must always be performed.Options are marked with O1, O2, O3, or O4 in the Note column. Detailed tasksthat have O1, O2, O3, or O4are applied only if that option is chosen.
2.3.1 Initial Checks
Note Task Description Site To Do Outage
- Perform an Audit Alarm State on the BSS. OMC-R 10 min. None.
- View Status of Managed Objects and Alarms :
For 9120 BSC, on all the BTSs of the
impacted TSU and for the impacted Abis (if
necessary).
For the 9130 BSC Evolution, on all impacted
BTSs and Abis.
Note:For impacted Abis, only apply the ’ShowAlarms’ task (in View Status of Managed Objects and Alarms , at the Abis section, afteropening the "Abis Topology View" window atStep 1, select the desired Abis, then jump
directly to Step 5).Print the reports and close the windows.
OMC-R 10 min. None.
- To ensure that the final configuration issupported, check for sufficient resources, using:
Display free TSU resources for 9120 BSC
or Display CCP Resources Usage and
Display Abis Resources Usage for an 9130
BSC Evolution.
OMC-R 5 min for9120 BSC
50 sec + 3sec/cell for9130 BSCEvolution
None
24 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 25/40
2 Scenario
2.3.2 Create Abis
Note Task Description Site To Do Outage
O5 Suspend Automatic Transmission Programming OMC-R 2 min None
OMC-R 1 min + 6min./ Abisfor 9120BSC.
1 min+1 min./ Abis for9130 BSCEvolution.
None.C1
C4
O6
Create Abis Chain/Ring .
Note:Create the primary or/and
secondary Abis link, if necessaryWait for the transmission programmingflag to change from ’Busy’ to ’Idle’.
OMC-R 1 min. None.C1
C4
O5
Create Abis Chain/Ring .
Note:Create the primary or/andsecondary Abis link, if necessary.
3BK 17430 0841 RJZZA Ed.08 25 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 26/40
2 Scenario
2.3.3 Create BTS(s)
In order to create a required configuration, it is possible to add more thanone new BTS.
Note Task Description Site To Do Outage
C2
C3
If the BTS(s) to add is G1 or G2, check if the Abis isset with a timeslot for Qmux. If not, reserve one Qmuxtimeslot, using Modify Abis Chain/Ring Characteristics .
OMC-R 2 min. None.
C2
C3
C4
Check for Sufficient Resources on Abis , check on primaryand / or secondary Abis link.
OMC-R 5 minfor 9120BSC
1 min.for 9130
BSCEvolution
None.
OMC-R 2 min. +6 min.
/ BTSfor 9120BSC
2 min. +1 min.
/ BTSfor 9130
BSCEvolution
None.-
O6
Create BTS . Always set the Qmux address.
Wait for the "Information" confirming the creation of thenew BTS, and click on [ Ok ].
Wait for the transmission programming flag to changefrom ’Busy’ to ’Idle’.
Note:For:
C4, declare the secondary
Abis for the added BTS. Set
the appropriate values for
’MAX_FR_TRE_PRIMARY’
and
’MAX_DR_TRE_PRIMARY’.
O3, declare the new BTSas slave and select the
concerned Master BTS
name, if necessary. In
shared cells, only one
sector (main or secondary)
must support GPRS traffic
(not both).
O4, set the appropriate
’NExtraAbisTS’.
26 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 27/40
2 Scenario
Note Task Description Site To Do Outage
OMC-R 2 min. None-
O5
Create BTS . Always set the Qmux address.
Wait for the Information Window confirming the creationof the new BTS, and click on [ Ok ].
Note:
For C4, declare the secondary
Abis for the added BTS. Set
the appropriate values for
’MAX_FR_TRE_PRIMARY’ and
’MAX_DR_TRE_PRIMARY’.
For O3, declare the new BTS as
slave and select the concerned
Master BTS name, if necessary. In
cell shared only one sector (main
or secondary) must support GPRS
traffic (not both).
For O4: set the appropriate
’NExtraAbisTS’.
O5 Resume Automatic Transmission Programming OMC-R 1 min + 6min./BIUfor 9120BSC
1 min+ 15sec./BTS
for 9130BSCEvolution
None
O5 Automatic Hardware and Alarm Audits are launched forthe BSC. Wait for them to finish.
OMC-R 1-20 min None
EXCH Verify with the BTS site that the initial settings are correct.If they are not correct, change the Q1address (see Edit Q1 Address ) at the BTS site for each new BTS.
OMC-R / BTS 1 min./ BTS
None.
O2 If the Abis is connected via satellite, Check Cyclic
Redundancy at the BSC side using the LMT-CT, and ifneeded, Modify Ater CRC4 Value .
OMC-R / BSC 3 min. None.
- Check that the newly created BTS(s) appear in thehierarchy view of the Radio Configuration Browser (SC).
OMC-R 1 min. None.
3BK 17430 0841 RJZZA Ed.08 27 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 28/40
2 Scenario
2.3.4 Modify Logical Parameters
In order to create a required configuration, it is possible to create more thanone cell. In this case, modify all the logical parameters at the same timein the same PRC.
2.3.4.1 Create Working PRC
Note Task Description Site To Do Outage
- Create PRC (Working PRC).
The PRC opens automatically.
OMC-R 1 min. None.
- Copy BTS to PRC to copy the new BTSs fromthe SC to the Working PRC.
OMC-R 2 min./ BTS
None.
O3 Copy OMC Cells to PRC (the cell(s) whichbecome shared with the new BTS), if necessary.
OMC-R 2 min./ cell None.
2.3.4.2 Configure Cells in Working PRC
Note Task Description Site To Do Outage
OMC-R 1 min./ cell None.O3 Link Cell to a Secondary BTS Sector .
Note: For each cell which becomesshared.
- Create Provisioning Cell or Duplicate Cell .
The cell is created/duplicated in Working PRCand is in a locked state. Create one cell for eachsector, if necessary.
OMC-R 2 min./ cell None.
OMC-R 2 min./ cell None.- Set Cell Telecom Parameters .
For GPRS on an extended cell:
MAX_PDCH, MAX_PDCH_HIGH_LOAD
and MIN_PDCH must have even values
NB_TS_MPDCH must be set to 0 when thecell type is extended inner/outer
MAX_EGPRS_MCS is MCS4
EN_NACC, EN_PSI_STATUS and
EN_STREAMING are disabled
Note:Set Max_PDCH >0 to have GPRSor LCS on a cell
Also set the followingparameters: EN_EGPRS,Max_GPRS_CS,PS_PREF_BCCH_TRX,MAX_EGPRS_MCS, if necessary.
- Create Radio Frequency OMC-R 0.5 min./ cell
None.
- Create Frequency Hopping System , if FrequencyHopping is used.
OMC-R 1.5 min./ cell
None.
28 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 29/40
2 Scenario
Note Task Description Site To Do Outage
OMC-R 0.5 min./ TRX
None.- Create TRX
Note: For O3, select the TRX in[Secondary] TRX on a shared BTS sector,if necessary.
- Configure Logical Channels OMC-R 1 min./ cell None.
- Configure TRX Channel Hopping Law to’hopping’ or ’no hopping’.
OMC-R 1.5 min./ cell
None.
- Configure TRX OMC-R 0.5min./TRX
None.
- Specify TRX Preference OMC-R 0.5 min./
TRX
None.
OMC-R 5 min./ cell None.O1 Set BSS/BSC Telecom Parameters in theWorking PRC to update GPRS parameters, ifneeded. This task includes the modification ofCAE data specific to the MFS.
Note:The duration depends on thenumber of parameters to modify. Thecurrent example uses 10 parameters indifferent windows.
OMC-R 2 min./ cell None.O1 If GPRS parameters have to be updated oncell(s) then, Edit n Cells in the PRC.
Modify the following parameters:
Min_Pdch and Max_Pdch_High_Load
Max_Pdch
Routing Area Code
Routing Area Color.
Note:To have GPRS on the cell, theTRX_PREF_MARK must be 0. To modifyit, use the Set/Update Circuit/Packet Mark Configuration Using Script .
To modify only one cell, use the edit
cell command (see Set Cell Telecom Parameters ).
- Click on [ Apply and check ] in the "Edit Cell"window to save cell modifications in the WorkingPRC.
Wait for the No error or warning message
and click on [ Ok ].If the check produces error messages, correctthe configuration as required and re-attempt thecheck. Continue corrections and checks until noerror messages occur.
OMC-R 0.5 min./ cell
None.
- Click on [ Close ] to exit the "Edit Cell" window. OMC-R 0.5 min./ cell
None.
3BK 17430 0841 RJZZA Ed.08 29 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 30/40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 31/40
2 Scenario
2.3.5 Connect BTS
To minimize traffic outage, you must keep the time between lock and unlockcells to a minimum.
For O3: clock synchronization cable(s) must already be installed betweenthe BTSs involved in the shared cell. If the cables are not installed, performthis installation using Install Synchronization Cables from Synchronize BTS Master / Slave Site .
Note Task Description Site To Do Outage
C1
C4
If not done previously, the BTS must be physicallyconnected to the new Abis link(s) (Connect BTS ).
BTS 5 min./ Abis None.
C2
C3
EXCH
Inform the OMC-R that you are ready to insert theBTS into the Abis link.
BTS/ OMC-R
1 min. None.
C2
EXCH
In the ’Abis Interface View’ window, select the Abischain/ring where you inserted the new BTS.
Write down the BTSs that are downstream fromthe new BTS. Go to the SC and lock the cells ofthese downstream BTSs, using Shut Down Cell (WTC=3 min.).
Inform the BTS site when the cells are locked.
OMC-R 4 min./ cell START1,starttelecom+ GPRSoutage fordownstreamBTSs.
C2 Select the Abis where the BTS will be inserted, andon upstream BTS TP, Inhibit Alarm Reporting on Abis TP (select ’Inhibit Alarm Reporting on TP Up’).
OMC-R 1 min. Outage1
C2 Lock BTS O&M Capability of the downstreamBTSs.
OMC-R 1 min./ BTS* Outage1
C2 Disconnect Jumper BTS 5 min. Outage1
C2 Connect BTS BTS 5 min. Outage1
3BK 17430 0841 RJZZA Ed.08 31 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 32/40
2 Scenario
Note Task Description Site To Do Outage
OMC-R 1 min. Outage1- Remap BTS on the CCP board(s).(only in case of9130 BSC Evolution)
Note:The calls can be lost during BTSremapping.
Note:The remap is performed only whensome CCPs are much more overloadedthan the others. The BSC tries to mapas much as possible all TREs of a BTSon the same CCP and balance the loadacross the CCPs if necessary. Theoverload situation is decided by a system
algorithm.
C2 Unlock BTS O&M Capability of the downstreamBTSs.
OMC-R 1 min./ BTS* Outage1
C2 Use Lock/Unlock Cell Traffic to unlock the cells ofthe downstream BTSs.
OMC-R 1 min./ cell END1
- When connected, the new BTS enables its OMLlink.
Unlock BTS O&M Capability of the added BTSs.
OMC-R 1 min./ BTS None.
- The download for each new BTS startsautomatically. After a period of time, the OMC-Rautomatically triggers a hardware and alarm auditfor each new BTS.
All the boards of the BTS must appear in theOMC-R BSS Equipment View.
Wait for the end of the BTS(s) audit.
OMC-R 6 min./ BTS None.
BTS* : for downstream BTS
2.3.6 Start Traffic on Added BTS
Note Task Description Site To do Outage
OMC-R 5 min./ cell None.- Activate PRC (Working PRC) in queuedmode, with cell clean-up, without forcing celladministrative state.
Display Pending Activations List to see whenthe activation is finished.
The activation time depends on the number ofcells activated.
During the activation, supervision outage: 1.5 min.
- Close PRC (Working PRC). OMC-R 1 min. None.
32 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 33/40
2 Scenario
Note Task Description Site To do Outage
C1
C2
For added BTS, on the upstream BTS TPAllow Alarm Reporting on Abis TP (select ’AllowAlarm Reporting on TP Up’ and then ’AllowAlarm Reporting on TP Down’).
OMC-R 1 min. None.
C4 Allow Alarm Reporting on Abis TP (select’Allow Alarm Reporting on TP Up’) if the Abis isnewly created, for both primary and secondaryAbis, if necessary.
OMC-R 1 min. None.
O1 Unlock GPRS Traffic on Cell
Unlock GPRS for the cells of the new BTS(s).
OMC-R 1 min./cell None
- Unlock Cell
Unlock the cells of the new BTS(s).
OMC-R 1 min./ cell None.
3BK 17430 0841 RJZZA Ed.08 33 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 34/40
2 Scenario
2.3.7 Call Tests and Checks
Note Task Description Site To Do Outage
OMC-R 10 min None.C4 View Status of Managed Objects and Alarms for the impactedBTS. Note:If there is degradation of the HSDS at the cell level, the
following alarm is displayed: Extra TS Not Fully Usable.
To discover the problem, Display cell HSDS configuration synthesis .
Ask TAC to solve the problem. If the problem remains,perform Reverse Procedure (Section 2.4).
BTS 5 min./ cell None.- Perform Call Test for each newcell.
This task must be done in parallel with the next task.
’Unlock Cell’ from Call Test is not necessary.
Perform call tests for all impacted cells and for cells ondownstream BTSs (C2).
OMC-R 5 min. None.CHECK Display USD Detailed Cell Information .
Check that GSM and GPRScalls are made on impactedBTS(s). If calls fail, perform theReverse Procedure (Section 2.4).
34 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 35/40
2 Scenario
2.3.8 Create Adjacencies
RESTRICTION3BKA20FBR230654
When creating adjacencies, make sure to take into account that for one BSConly a maximum of 64 HOs are allowed.
Note Task Description Site To Do Outage
- Create Adjacency for the new cell,using notes taken during Initial Checks ( Section 2.3.1) (assuming that there areadjacencies towards new internal cellsand adjacencies towards new externalcells).
OMC-R 5 min./ newcell(s)
None.
- For each cell on the same OMC-R thatmust be adjacent to the new ones, Modify
Adjacency to include the new cells.
OMC-R 2 min./ cell None.
- For each cell on the neighboring OMC-Rsthat must be adjacent to the new cells,Modify Adjacency on neighboringOMC-Rs to include the new cells.
neighboringOMC-R
2 min./ cell None.
2.3.9 Final Checks
Note Task Description Site To Do Outage
- Perform an Audit Alarm State on BSS. OMC-R 10 min. None.
CHECK View Status of Managed Objects and Alarms :
For 9120 BSC on all the BTSs of the impacted
TSU and for the impacted Abis (if necessary).
For 9130 BSC Evolution on all impacted BTSs
and Abis.
Note:For impacted Abis, only apply the ’ShowAlarms’ task (in View Status of Managed Objects
and Alarms , in the Abis section, after opening the"Abis Topology View" window in Step 1, select thedesired Abis, then jump directly to Step 5).
Compare with reports from Initial Checks (Section 2.3.1).
OMC-R 5 min. None.
3BK 17430 0841 RJZZA Ed.08 35 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 36/40
2 Scenario
2.4 Reverse Procedure
Use this procedure to restore the initial configuration.
2.4.1 Lock Cells
Note Task Description Site To Do Outage
- In the SC, use Lock Cell to lock all the cellsthat correspond to the added BTSs.
OMC-R 1 min./ cell -
C2 In the SC, use Shut Down Cell for each cellof the downstream BTSs (WTC=3 min.).
The GSM and GPRS traffic stops.
OMC-R 4 min./ cell -
2.4.2 Disconnect BTS(s)
Note Task Description Site To Do Outage
C2 Inhibit Alarm Reporting on Abis TP (select’Inhibit Alarm Reporting on TP Down’).
OMC-R 1 min. -
C2 Lock BTS O&M Capability for alldownstream BTSs.
OMC-R 1 min./ BTS* -
- Lock BTS O&M Capability of the addedBTS(s).
OMC-R 1 min. -
- Disconnect BTS (for each added BTS). BTS 5 min. -
C2 Connect Jumper. BTS 5 min. -
C2 Unlock BTS O&M Capability of thedownstream BTSs.
OMC-R 1 min./ BTS* -
C2 Allow Alarm Reporting on Abis TP (select’Allow Alarm Reporting on TP Down’).
OMC-R 1 min. -
OMC-R 1 min. -- Remap BTS on the CCP board(s).(only incase of 9130 BSC Evolution)
Note:The remap is performed only whensome CCPs are much more overloaded thanthe others. The BSC tries to map as muchas possible all TREs of a BTS on the sameCCP and balance the load across the CCPs ifnecessary. The overload situation is decidedby a system algorithm.
BTS* : for downstream BTS
36 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 37/40
2 Scenario
2.4.3 C2: Unlock Cells
Note Task Description Site To Do Outage
C2 In the SC, use Unlock Cell to unlock all cells of the
downstream BTSs.Traffic restarts on the cells of the downstreamBTSs.
OMC-R 1 min. -
2.4.4 Delete Adjacencies
Note Task Description Site To Do Outage
- Delete Adjacency in order to delete alladjacencies on the created cell(s).
OMC-R 1 min./cell -
2.4.5 Delete Cell
Note Task Description Site To Do Outage
- Open PRC (Working PRC). OMC-R 1 min. -
O3 Unlink Cell from a Secondary BTS Sector to unlink the cell(s) shared with the added
BTS(s).
OMC-R 1 min./ cell -
O3 Delete TRX to delete all TRXs for thesecondary sector.
OMC-R 1 min./ cell -
O3 Delete Radio Frequency to delete allfrequencies for the secondary sector.
OMC-R 1 min./ cell -
- Delete OMC Cell from PRC to delete all thecell(s) from the added BTS(s).
OMC-R 1 min./ cell -
- Activate PRC (Working PRC) without cellcleanup and in queued mode.
The activation time depends on the numberof cells activated.
Display Pending Activations List to seewhen the activation is finished.
OMC-R 5 min./ cell -
- Optionally, View Last PRC log Activation . OMC-R 1 min. -
- Close PRC (Working PRC). OMC-R 1 min. -
- Delete PRC (Working PRC). OMC-R 2 min. -
EXCH Ask MSC personnel to update theparameters in the MSC database.
MSC 3 min. -
3BK 17430 0841 RJZZA Ed.08 37 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 38/40
2 Scenario
2.4.6 Delete BTS
Note Task Description Site To Do Outage
O5 Suspend Automatic Transmission Programming OMC-R 2 min None
-
O6
Delete BTS from OMC-R .
Wait for the transmission programming flag tochange from ’Busy’ to ’Idle’.
OMC-R 30 sec + 6 min. / BTS for 9120BSC.
2 min. + 1 min. / BTS for 9130BSC Evolution.
-
-
O5
Delete BTS from OMC-R . OMC-R 30 sec. -
2.4.7 Delete Abis
Note Task Description Site To Do Outage
C1
C4
O6
Delete Abis Chain / Ring , if necessary. Waitfor the transmission programming flag tochange from’Busy’ to ’Idle’.
OMC-R 30 sec + 6min./ Abis for9120 BSC.
30 sec. + 1min./ Abis for9130 BSC
Evolution.
-
C1
C4
O5
Delete Abis Chain / Ring , if necessary. OMC-R 30 sec. -
O5 Resume Automatic Transmission Programming
OMC-R 1 min + 6min./BIU for9120 BSC
1 min +15sec./BTS for
9130 BSCEvolution.
None
O5 Automatic Hardware and Alarm Audits arelaunched for the BSC. Wait for them to finish.
OMC-R 1-20 min None
38 / 40 3BK 17430 0841 RJZZA Ed.08
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 39/40
2 Scenario
2.4.8 Call Tests
Note Task Description Site To Do Outage
BTS 5 min./ cell None.- Call Test
Check that the downstream BTSs are in traffic. This task must be done in parallel with thenext task.
’Unlock Cell’ from Call Test is notnecessary.
Perform call tests for all impacted cellsand for cells on downstream BTSs (C2).
CHECK Display USD Detailed Cell Information. OMC-R 5 min./ cell -
2.4.9 Final Checks
Note Task Description Site To Do Outage
- Perform an Audit Alarm State on the BSS. OMC-R 10 min. -
CHECK View Status of Managed Objects and Alarms :
For 9120 BSC, on all the BTSs of the impacted
TSU and for the impacted Abis (if necessary).
For 9130 BSC Evolution on all impacted BTSs
and Abis.
Note:For impacted Abis, only apply the ’ShowAlarms’ task (in View Status of Managed Objects and Alarms , in the Abis section, after opening the"Abis Topology View" window in Step 1, select thedesired Abis, then jump directly to Step 5).
Compare with reports from Initial Checks (Section 2.3.1).
OMC-R 5 min. -
3BK 17430 0841 RJZZA Ed.08 39 / 40
8/11/2019 Alu-Add Bts & New Cells-b10
http://slidepdf.com/reader/full/alu-add-bts-new-cells-b10 40/40
2 Scenario
BLANK PAGE BREAK