05/23/02 “The Force Behind the Force” “The Force Behind the Force” 1 of 17 Watercraft Storage Site located at YND, Japan APS4 Storage Site located at SGD, Japan American Cormorant Gopher State Strong Virginian AMC / USARPAC AWRP Execution Plan AMC / USARPAC AWRP Execution Plan Briefing Briefing 23 May 2002 23 May 2002

AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”1 of 17

Watercraft Storage Sitelocated at YND, Japan

APS4 Storage Sitelocated at SGD, Japan

American Cormorant

Gopher State

Strong Virginian

AMC / USARPAC AWRP Execution PlanAMC / USARPAC AWRP Execution PlanBriefingBriefing

23 May 200223 May 2002

Page 2: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”2 of 17

Agenda

• Yokohama North Dock Overview• Operations Event Timeline• Critical Events Timeline• Resource Update• Concept of Operation for SV & AC Download• Issues• Summary

Page 3: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”3 of 17

YOKOHAMA WAREHOUSE CO. AREA

S721

S642

S722

T643

S442437

S633

S637

S631

S603

S635

S630

S609S608

S610

S607

614S601

S600

200

S451

515

502500

H

206

S410

S420S509

S458S406460

403

N

S214S213

328

S301

347

331306

S305

S329

S313

S316

S325

S320

S324

S327

204

S201

S407

620

S216

S219

S349

North Dock

100134

100135

519 / 520

100137

247

503 507

S720

S513Nav

igat

ion

Can

al

224ft

HC

79.

8ft

(3.0

m)

)

13.8

ft(4

.2m

)

LCM-8Small Tug

BD/BG Barge

Berths J, K & L

Wet Storage Dry StorageBerth A: 2 - Large Tug (LT800) HC4: 1 BD Crane 8 - LCM-8 (MOD1 & MOD 2)Berths C, D & E : 10 - LCU 2000 HC4: 1 BG Barge 4 - Small Tug (ST900)(Temp mooring area) 187 - FEU MCS

5 - SLWTLarge Tug

SLWT

LCU 2000

1

2

16

38

27

49

510

2 3 4 5 6 7 81 2 3 4

12345

MCS and 20/40’Container Storage

1

Watercraft / Equipment (Interim Location’s)

SITE 1

SITE 2

SITE 3

SITE 4

Page 4: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”4 of 17

CENTCOM Site Survey

Operations Event Timeline

JAN FEB MAR APR MAY JUN JUL AUG SEP

DA OPLAN Published (Draft)20

Release American Cormorant2

YND Soil Analysis3

Embassy Approval

Decision Points Critical Events

Strong Virginian Contract Option Decision(Pending DA Msg release)

4

1 HQDA Implementation Msg

5 HQDA OPORD / Movements Directive (Still Pending)

6 DA Funding

16Target YND Site Established

9

SV D/L AC D/L

10 Hythe Branch Plan Trigger Point

Force Protection (Draft)

7

3

7

8 8

7YND Rock Drill

Page 5: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”5 of 17

AWRP Critical Events – 2QFY02

Critical Events

AWRP MASTER EVENTS CALENDAR

WEEK1 2 3 4 5 6 7 8 9 10 11 12 13

RESOURCES

FACILITIES

CONTRACTS

PEOPLE

EQUIPMENT

WATERCRAFT / GRD EQUIP TRANSFER

FORCE PROTECTION

PROCESSES & PROCEDURES

FY 2002JAN FEB MAR

FE Design

DA FundingFY02 Spend Plan

FE Design MIPR

ID FE Req

Contracting C2 Decision

Develop COSIS SOW

Submitt TDA

Develop PDs

ID EQUIP Req

EQUIP SPECs

DA / AMC / FORSCOMWatercraft Transfer MTG

AT / FPAssessment

ID MOA / ISSARequirements

Survey(s)- CCTV- Lighting- Barrier

ID Watercraft / Ground EQUIPStorage Locations

Draft MOA USARPAC / AMC

Page 6: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”6 of 17

AWRP Critical Events – 3QFY02

Critical Events

AWRP MASTER EVENTS CALENDAR

WEEK14 15 16 17 18 19 20 21 22 23 24 25 26

RESOURCES

FACILITIES

CONTRACTS

PEOPLE

EQUIPMENT

WATERCRAFT / GRD EQUIP TRANSFER

FORCE PROTECTION

PROCESSES & PROCEDURES

FY 2002APR MAY JUN

Publish Job Annoucements Submitt RPAs Selection Panels

EQUIPSPECs

Draft AMC / FORSCOM EQUIP Transfer MOA

ST 901 / 909

Develop COSIS SOW

Issue SynopsisIssue RFP

COSIS Solicitation Period

Bidder sitevisits-YND

USARJ / CEB-H MIPRs OSC MIPR (COSIS)

78th SIG BN MIPR

FE Design Submit FE PR&Cs FE Project Solicitation Period

Project Installation / Construction

LNO on-site Initiate Temp MLC Recruitment (10)

Temp MLC MIPR

Finalize CTA Procure CTA / GFP

Finalize GFP/CFP

IGCE

Draft MOA USARPAC / AMC

Draft ISSA 17th ASG / CEG-ADraft ISSA 78th SIG BN / CEB-H Final 78th SIG ISSA

Survey(s)- CCTV- Lighting- Barrier

Procure AT/FP EQUIP (Barriers, etc)

MLC Guard Recruitment (5)

Page 7: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”7 of 17

AWRP Critical Events – 4QFY02

Critical Events

AWRP MASTER EVENTS CALENDAR

WEEK27 28 29 30 31 32 33 34 35 36 37 38 39

RESOURCES

FACILITIES

CONTRACTS

PEOPLE

EQUIPMENT

WATERCRAFT / GRD EQUIP TRANSFER

FORCE PROTECTION

PROCESSES & PROCEDURES

FY 2002JUL AUG SEP

3 x DACs on-site YND

LCU 2013 / 2016LCM 8585 / 8610

Proposals Due

COSIS Contract Evaluations

COSIS Contract Award

Contractor on-site

Project Installation / Construction

SV Download

AC Download

AC Download

YND Site Ready

TEMP MLC SelectionPanels Temp MLCs on-site YND

Procure CTA / GFP

Install EQUIP

Final MOA USARPAC / AMC

Final 17th ASG ISSA

MLC Guard Recruit(5)

MLCs Guards on-site YND

Page 8: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”8 of 17

JUN JUL AUG SEPREQ Plan Actual Plan Actual Plan Plan Plan Plan Plan Actual Delta

CEB Hythe 844.0 107.0 91.3 35.1 28.0 78.8 364.8 119.0 84.3 142.1 119.3 22.8

OSC 2955.5 18.4 18.4 10.0 0.0 2840.0 0.0 0.0 28.4 18.4 10.0

USARJ 4108.0 0.0 52.8 1097.0 593.5 1872.7 594.1 357.1 187.1 1097.0 646.3 450.7

TOTAL 7907.5 125.4 162.5 1142.1 621.5 1951.5 3798.9 476.1 271.4 1267.5 784.0 483.5

AWRP FY02 Spend Plan Roll-UpAPR MAY CUMULATIVE TOTAL THRU MAY

AWRP Funding Update – Roll up

Page 9: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”9 of 17

Verify YND environmental impact study3

YND LOAD Bearing Study2

MOA / ISSA (USARPAC and AMC)1

STATUSISSUE#

Issues / Concerns

LEGEND

• Will not meet the final objective

• May miss intermediate objective / event but will meet final objective

• Will meet final objective

RED

AMBER

GREEN

AMBER

AMBER

AMBER

Page 10: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”10 of 17

SV / AC DownloadConcept of the Operation

Page 11: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”11 of 17

Mission

CEB-H downloads MV Strong Virginian from 20-26 Aug 02 and the MV American Cormorant from 10-11 SEP 02 and forward stores watercraft and equipment at Yokohama North Dock and Sagami Army Depot in support of the Army Watercraft Restructure Plan.

Endstate

YND and Sagami Army Depot support forward stored watercraft and equipment, COSIS contractor on-site, and processes and procedures established to support handoff of equipment to the warfighter during exercises and contingency operations.

Concept of OperationSV & AC Download

(1 of 6)

Page 12: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”12 of 17

Concept of OperationSV & AC Download

(2 of 6)

• HQDA• G4

• AMC• OSC / FSC• CEG-A• CEB-H• CEB-NEA

• DA Contractor(s)

• USARPAC• USARJ• 17th ASG• 35 S&S BN

• FORSCOM• 7th TC GRP

• MSC• MTMC

• 836th TC BN

Task Organization

Page 13: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”13 of 17

Concept of OperationSV & AC Download

(3 of 6)

Commander’s Intent• Conduct a Rock Drill at YND with all organizations to synchronize

actions required to execute SV & AC downloads

• Deploy the Off Load Preparation Party (augmented)

• Direct a combined force of US Army military, DOD civilian, contractor, and local national personnel to download watercraft and equipment at YND and follow-on movement of assets to Sagami Army Depot

• Transition to COSIS contract support operations

• Accomplish the mission safely, within budget, and on schedule

Page 14: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”14 of 17

Concept of OperationSV & AC Download

(4 of 6)

Concept of Operation

This is a 4 phase operation:

• Phase 1 – Establish YND site• Began with the YND site survey in 4QFY01 and ends with actions complete to receive watercraft UICs on 16 AUG 02

• Phase 2 – SV download• Begins with the departure of the SV from CEB-H in JUL 02 and ends when all equipment is offloaded and positioned at YND and SagamiArmy Depot in SEP 02

• Phase 3 – AC download• Begins with the departure of the AC from DG enroute to YND and ends when all equipment is offloaded and positioned at YND and Sagami Army Depot in SEP 02

• Phase 4 – Transition to COSIS• Begins with the DL of the SV and ends when all equipment is stored in final locations; DH equipment is installed; COSIS contractor is on-site

Page 15: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”15 of 17

Concept of OperationSV & AC Download

(5 of 6)

Potential AC DL anchorage

(70/80ft depth)

YND

SV & AC DownloadAORN

3.5 nautical miles

SV DL pier side

Page 16: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”16 of 17

Concept of OperationSV & AC Download

(6 of 6)

Critical Events Timeline

• 26 JUN-2 JUL Upload SV RO/RO and watercraft at CEB-H

• 2 JUL-20 AUG SV enroute to YND

• 20 – 26 AUG SV DL at YND

• 18 AUG AC enroute to YND

• 5 SEP AC arrives YND

• 10-11 SEP AC DL at YND

• 13-15 SEP Land cradle dry stored vessels (LCMs, STs, SLWTs)

• 16-30 SEP Prepare vessels for long term storage and transition

to COSIS contract support

• SV DL NLT 28 AUG 02• AC DL NLT 20 SEP 02

Page 17: AMC / USARPAC AWRP Execution Plan Briefing 23 May 2002€¦ · 2 of 17 Agenda • Yokohama North Dock Overview • Operations Event Timeline • Critical Events Timeline • Resource

05/23/02

“The Force Behind the Force”“The Force Behind the Force”17 of 17

Questions?

GOOD NEWS STORY Considerable effort to meet end state objectives by all