Background
• $787 billion stimulus plan
• Signed into law on Feb. 17, 2009
• Purpose:
•Create and save jobs
• Jumpstart the economy
•Build foundation for long-term growth
ARRA
Presentation Outline
Team Reports:Team Reports:
GreenGreen
TransportationTransportation
HousingHousing
OtherOther
SummarySummary
Presentation Outline
Team Reports:Team Reports:
GreenGreen
TransportationTransportation
HousingHousing
OtherOther
SummarySummary
Green Team Report on Energy Efficiency &
Conservation Block Grant (EECBG) Update
Background
Award SpecificationsAward Specifications
$7,520,000$7,520,000 Awarded Sept. 15, 2009Awarded Sept. 15, 2009 3 year grant3 year grant
Purpose: Reduce fossil fuel Purpose: Reduce fossil fuel emissions and improve energy emissions and improve energy efficiency and create and retain efficiency and create and retain jobsjobs
Projects
Transportation ProjectsTransportation Projects
Energy Efficiency in County BuildingsEnergy Efficiency in County Buildings
Capture of MethaneCapture of Methane
Community ProjectsCommunity Projects
Transportation Projects
LED Traffic ($1M)LED Traffic ($1M)
• Moving forward with PurchasingMoving forward with Purchasing
Transportation Electrification Transportation Electrification ($50K)($50K)
• Retrofitted 2 hybrids to Retrofitted 2 hybrids to electric hybridelectric hybrid
• Beginning installation of Beginning installation of charging stations with charging stations with “Project Get Ready”“Project Get Ready”
Energy Efficiency Projects
OCCC Lighting retrofits ($1M)OCCC Lighting retrofits ($1M)• LED fixtures ordered, installation startingLED fixtures ordered, installation starting
FacilitiesFacilities – – ($1.8M) ($1.8M) • Lighting upgradeLighting upgrade• HVAC upgradeHVAC upgrade• Window filmWindow film• Solar water heatersSolar water heaters• Window replacementWindow replacement• Energy management softwareEnergy management software
Capture of Methane Project
Renewable Energy at South Water Renewable Energy at South Water Reclamation (Digester Cover) Reclamation (Digester Cover) $500,000$500,000
Pending negotiated agreement Pending negotiated agreement
Community Projects
Ball Field Lighting - Ball Field Lighting - $450,000$450,000
- Awaiting bids- Awaiting bids
Waste Reduction Plan - Waste Reduction Plan - $100,000$100,000
– – Class III & C&DClass III & C&D
- Proposals under review- Proposals under review
Community Projects
Solar at Sheriff Station - $400,000 Solar at Sheriff Station - $400,000 - Redesigning to meet - Redesigning to meet costcost
Science Center – energy efficient Science Center – energy efficient HVAC - $200,000 - HVAC - $200,000 - Completed!Completed!“The Science Center is
saving approx. 3,305 kWh per day with the new system. This is about a 24% reduction in energy consumption”
Community Projects
Master Plan for Pine Hills Master Plan for Pine Hills (($225,000)$225,000)
– Consultant on boardConsultant on board– First community meeting First community meeting
July 22July 22
School Education Program School Education Program ($99,000)($99,000)
– Finalizing contractFinalizing contract– Supported by Watershed Supported by Watershed
AtlasAtlas
Community Projects
Central FloridaCentral FloridaEnergy Efficiency AllianceEnergy Efficiency Alliance
Kilowatt CrackdownKilowatt Crackdown
- Signed up 1,380 Central Florida buildings- Signed up 1,380 Central Florida buildings
- Utilizing EPA’s ENERGY STAR Portfolio Manager- Utilizing EPA’s ENERGY STAR Portfolio Manager
Community Projects
• 6 Workshops6 Workshops
• 20 Energy Specialists now trained20 Energy Specialists now trained
-5 companies using Energy -5 companies using Energy SpecialistsSpecialists
-Fall – new training & recruitment-Fall – new training & recruitment
• Program RecognitionProgram Recognition
Orlando SentinelKicking kilowatts: Stimulus money helping business owners save energy
Community Projects
Orange County Homeowner Energy Orange County Homeowner Energy Efficiency ProgramEfficiency Program ($930,645)($930,645)
6 easy steps6 easy steps Up to $1000 per homeUp to $1000 per home Energy Raters - energy auditsEnergy Raters - energy audits Launched Earth Day (April) 2010Launched Earth Day (April) 2010
– 7 Workshops7 Workshops– 99 Applications99 Applications– First rebate came inFirst rebate came in
New Grant Opportunity
PV at Cooperative Extension PV at Cooperative Extension (~$237,875)(~$237,875)
New funding received $300,000 New funding received $300,000 – determining project– determining project
Solar Grants from DOESolar Grants from DOE
Presentation Outline
Team Reports:Team Reports:
GreenGreen
TransportationTransportation
HousingHousing
OtherOther
SummarySummary
Transportation
FDOT Projects in OrangeFDOT Projects in Orange• West SR 50West SR 50
(Avalon Road to SR 429)(Avalon Road to SR 429)– Widen to 6-lanesWiden to 6-lanes– Construction started:Construction started:
October 16, 2009October 16, 2009– Anticipated completion:Anticipated completion:
December 2011December 2011– State Flexible ARRA funds State Flexible ARRA funds
$18,558,978 $18,558,978
Transportation
State Projects in OrangeState Projects in Orange• Silver Star Road StreetscapeSilver Star Road Streetscape
(Pine Hills Road to Willow Bend (Pine Hills Road to Willow Bend Boulevard)Boulevard)
– NTP issued 4/12/2010NTP issued 4/12/2010– 35% complete35% complete– Final completion 9/8/2010Final completion 9/8/2010– ARRA Enhancement funding ARRA Enhancement funding
$366,132$366,132
Transportation
Orange Resurfacing ProjectsOrange Resurfacing Projects• Lake Underhill RoadLake Underhill Road
(Conway Road to Rouse Road)(Conway Road to Rouse Road)– Paving began on 6/1/2010Paving began on 6/1/2010– 35% complete35% complete– Final completion 11/28/2010Final completion 11/28/2010– ARRA funding $2,334,323ARRA funding $2,334,323
Transportation
Orange Resurfacing ProjectsOrange Resurfacing Projects• Dean RoadDean Road
(SR 50 to University Boulevard)(SR 50 to University Boulevard)– Paving began 4/5/2010Paving began 4/5/2010– 50% complete50% complete– Final completion 9/2/2010Final completion 9/2/2010– ARRA funding $1,186,807ARRA funding $1,186,807
Transportation
Orange Resurfacing ProjectsOrange Resurfacing Projects• General Rees AvenueGeneral Rees Avenue
(Corrine Drive to Glenridge Way)(Corrine Drive to Glenridge Way)– Paving began 4/12/2010Paving began 4/12/2010– 21% complete21% complete– Final completion 12/8/2010Final completion 12/8/2010– ARRA funding $975,019ARRA funding $975,019
Transportation
Orange Resurfacing ProjectsOrange Resurfacing Projects• Kaley StreetKaley Street
(I-4 Ramp to Pine Bluff Avenue)(I-4 Ramp to Pine Bluff Avenue)– Paving began 4/5/2010Paving began 4/5/2010– 29% complete29% complete– Final completion 9/2/2010Final completion 9/2/2010– ARRA funding $396,048ARRA funding $396,048
Transportation
Orange Bridge ProjectsOrange Bridge Projects• Taylor Creek Road BridgeTaylor Creek Road Bridge
(Over Tootoosahatchee Creek)(Over Tootoosahatchee Creek)– NTP issued June 1, 2010NTP issued June 1, 2010– 1% complete1% complete– Final completion 2/25/2011Final completion 2/25/2011– ARRA funding $2,750,000ARRA funding $2,750,000
Transportation
Orange Bridge ProjectsOrange Bridge Projects• Harrell Road BridgeHarrell Road Bridge
(Over Orange County Canal)(Over Orange County Canal)– NTP issued April 5, 2010NTP issued April 5, 2010– 28% complete28% complete– Final completion 10/31/2010Final completion 10/31/2010– ARRA funding $642,520 ARRA funding $642,520
Transportation
Orange Bridge ProjectsOrange Bridge Projects• Thorpe Road BridgeThorpe Road Bridge
(Over Ross-Goodman Canal)(Over Ross-Goodman Canal)– NTP issued May 10, 2010NTP issued May 10, 2010– 13% complete13% complete– Final completion 11/5/2010Final completion 11/5/2010– ARRA funding $412,423ARRA funding $412,423
Transportation
Orange Bridge ProjectsOrange Bridge Projects• Campo Way BridgeCampo Way Bridge
(Over Little Wekiva River)(Over Little Wekiva River)– NTP issued April 12, 2010NTP issued April 12, 2010– 29% complete29% complete– Final completion 10/8/2010Final completion 10/8/2010– ARRA funding $378,044ARRA funding $378,044
Transportation
Orange Intersection ProjectOrange Intersection Project• Waterford Chase Parkway at Waterford Chase Parkway at
Avalon Park BoulevardAvalon Park Boulevard– Round B fundingRound B funding– Add turn lanesAdd turn lanes– Estimated NTP September Estimated NTP September
20102010– Estimated final completion Estimated final completion
February 2011February 2011– ARRA funding $517,871ARRA funding $517,871
Transportation
Orange Bridge ProjectsOrange Bridge Projects• Boggy Creek Road BridgeBoggy Creek Road Bridge
(Over Boggy Creek Tributary)(Over Boggy Creek Tributary)– Round B fundingRound B funding– Estimated NTP October 2010Estimated NTP October 2010– Estimated completion August Estimated completion August
20112011– ARRA funding $1,310,776ARRA funding $1,310,776– *County funding $737,803*County funding $737,803– Project cost $2,048,579Project cost $2,048,579
**Additional ARRA funding may be availableAdditional ARRA funding may be available
Transportation
Orange Technology ProjectOrange Technology Project• ITS Fiber-Optic InterconnectsITS Fiber-Optic Interconnects
– Round B fundingRound B funding– Edgewater Drive and Edgewater Drive and
Goldenrod RoadGoldenrod Road– Estimated NTP August 2010Estimated NTP August 2010– Estimated completion August Estimated completion August
20112011– ARRA funding $460,000ARRA funding $460,000– *County funding $74,984*County funding $74,984– Project cost $534,984Project cost $534,984
**Additional ARRA funding may be availableAdditional ARRA funding may be available
Transportation
ARRA Infrastructure Funding SummaryARRA Infrastructure Funding Summary In MillionsIn Millions
State ProjectsState Projects $ 18.9 ARRA Funds$ 18.9 ARRA Funds
County ProjectsCounty Projects $ 10.1 ARRA Funds$ 10.1 ARRA Funds
$ 0.8 County $ 0.8 County FundsFunds
GRAND TOTALGRAND TOTAL $ 29.8$ 29.8
Transportation
Summary of Jobs Created or SavedSummary of Jobs Created or Saved
ResurfacingResurfacing 132132 Round A Round A FundingFunding
BridgesBridges 143143 Round A Round A FundingFunding
IntersectionIntersection 15* 15* Round B Round B FundingFunding
BridgeBridge 37* 37* Round B FundingRound B Funding
Fiber-OpticFiber-Optic 13* 13* Round B FundingRound B Funding
TotalTotal 340*340*
*Estimated Jobs Created or Saved*Estimated Jobs Created or Saved
Presentation Outline
Team Reports:Team Reports:
GreenGreen
TransportationTransportation
HousingHousing
OtherOther
SummarySummary
Housing Update
Homeless Prevention and Homeless Prevention and Rapid Re-housing Program Rapid Re-housing Program (HPRP)(HPRP)
Weatherization (WAP)Weatherization (WAP)
Community Development Block Community Development Block Grant Recovery (CDBG-R)Grant Recovery (CDBG-R)
Neighborhood Stabilization Neighborhood Stabilization Program (NSP-1)Program (NSP-1)
Homeless Prevention and Rapid Re-housing Program (HPRP)
Orange County received $2.5 million Orange County received $2.5 million to provide financial assistance and to provide financial assistance and housing stabilization serviceshousing stabilization services
Funding for two major activities:Funding for two major activities:
Financial assistance for households Financial assistance for households at risk of being homelessat risk of being homeless
Housing relocation and stabilization Housing relocation and stabilization servicesservices
Homeless Prevention and Rapid Re-housing Program (HPRP)
Current Status:Current Status: Program began November 1, 2009Program began November 1, 2009 Administered by United WayAdministered by United Way Five full time case management Five full time case management
positions created (for up to 24 months)positions created (for up to 24 months) 280 households are receiving financial 280 households are receiving financial
assistance (900 individuals served)assistance (900 individuals served) $1.3 million expended to date$1.3 million expended to date
Weatherization Assistance Program (WAP)
Orange County received Orange County received $1.1 million in the first $1.1 million in the first phase fundingphase funding
Funds are for energy Funds are for energy saving measures and saving measures and repairs in homes repairs in homes occupied by very low-occupied by very low-income familiesincome families
Weatherization Assistance Program (WAP)
Partnership agreement with Senior Partnership agreement with Senior First, Inc. approved by the BCC on First, Inc. approved by the BCC on April 6, 2010April 6, 2010
Term contracts issued to 4 vendorsTerm contracts issued to 4 vendors
38 homes completed through June38 homes completed through June
$208,000 expended to date$208,000 expended to date
Community Development Block Grant Recovery Program (CDBG-R)
Orange County received $1.6 million Orange County received $1.6 million
Funds intended to modernize Funds intended to modernize infrastructure and improve energy infrastructure and improve energy efficiency to public facilities in low efficiency to public facilities in low income neighborhoodsincome neighborhoods
Project 1 - Pine Castle Area Sidewalks Project 1 - Pine Castle Area Sidewalks and Drainage Improvementsand Drainage Improvements
Project 2 - Energy Efficient Project 2 - Energy Efficient Improvements to Community CentersImprovements to Community Centers
Community Development Block Grant Recovery Program (CDBG-R)
Project #1: Pine Castle Sidewalks Project #1: Pine Castle Sidewalks
• Project cost is $1 millionProject cost is $1 million
• Project under constructionProject under construction
• 28 jobs retained, 5 created28 jobs retained, 5 created
• $270,000 expended to date$270,000 expended to date
Community Development Block Grant Recovery Program (CDBG-R)
• Energy improvements include Energy improvements include upgrades to lighting, installation of upgrades to lighting, installation of occupancy sensors, and repair or occupancy sensors, and repair or replacementreplacement of air conditioning of air conditioning and water heating systems.and water heating systems.
• Total project cost is $590,000Total project cost is $590,000
CDBG-R Project #2: Energy Efficient CDBG-R Project #2: Energy Efficient Improvements to Community CentersImprovements to Community Centers
Community Development Block Grant Recovery Program (CDBG-R)
CDBG-R Project #2: Community CentersCDBG-R Project #2: Community Centers
• Contracts have been awarded to two Contracts have been awarded to two vendorsvendors
• Project under wayProject under way
Neighborhood Stabilization Program (NSP-1)
NSP-1 was created to respond to rising NSP-1 was created to respond to rising residential foreclosures and property residential foreclosures and property abandonmentabandonment
Orange County awarded $27.9 millionOrange County awarded $27.9 million
Primary goals were:Primary goals were:
Rapidly reduce vacant and Rapidly reduce vacant and abandoned homes in target areasabandoned homes in target areas
Stabilize neighborhoods impacted by Stabilize neighborhoods impacted by foreclosuresforeclosures
Neighborhood Stabilization Program (NSP-1)
NSP-1 Activities:NSP-1 Activities:• Acquisition, rehabilitation, sale Acquisition, rehabilitation, sale
of foreclosed homesof foreclosed homes• Acquisition, rehabilitation of Acquisition, rehabilitation of
foreclosed rental properties foreclosed rental properties • Demolition of abandoned, Demolition of abandoned,
blighted propertiesblighted properties• Downpayment assistance for Downpayment assistance for
HomebuyersHomebuyers
NSP-1 PerformanceAcquisition and Demolition
Properties acquired Option A 111
Properties acquired Option B 91
Properties under contract 6
Total number of homes 208
Rental units under contract 264
Demolition of blighted units 8
NSP-1 Performance Rehabilitation
Properties Completed 23
Under Construction 20
Out To Bid 11
Total Homes 54
NSP-1 Performance Sales
Homes available for sale 3
Homes sold 15
Homes under contract 6
NSP-1 SummaryPerformance Review
Obligation Deadline: September 3, 2010
Grant Amount $27,900,000
Obligations $27,200,000
Remaining Balance $ 700,000
Presentation Outline
Team Reports:Team Reports:
GreenGreen
TransportationTransportation
HousingHousing
OtherOther
SummarySummary
• Public Safety – $7.1 million
• Sheriff radios
• Adult Drug Court Expansion Program
• Community Services Block Grant – $1.3 million
• Job training and development
• Head Start - $793K
• Various
Public Safety
Presentation Outline
Team Reports:Team Reports:
GreenGreen
TransportationTransportation
HousingHousing
OtherOther
SummarySummary
Summary
• County has been awarded County has been awarded approximately $35 million in approximately $35 million in formula/entitlement grants to dateformula/entitlement grants to date
• ARRA funding and project status ARRA funding and project status updates on county’s website: updates on county’s website: Recovery.OrangeCountyFL.netRecovery.OrangeCountyFL.net
American Recovery and Reinvestment Act
of 2009 - “ARRA”
July 21, 2010