8/10/2019 Ammonia Operation Monthly Report August-2014
1/18
GO GREEN, SAVE GREEN
MONTHLY
PRODUCTION REPORT
August, 2014NH3
PLANT
Prepared By: Saqib Raouf
8/10/2019 Ammonia Operation Monthly Report August-2014
2/18
Sr. No. Description Budgeted Actual
1 Production Target (MT) 40603 41915.94
2 Capacity Factor (%) 93 103.2
3 Service Factor (%) 94 91.2
4 Gross Energy Index (GCal / MT) 8.11 8.333
5 Net Energy Index (GCal / MT) 7.90 8.318
6 Cumulative Annual Production (MT)
Credit
305164 312981.9
(7818.9)
7 Daily Average production (MT) 1309.774 1352.127
8 Down Time (Hours) 48 65
9 Feed Gas (MMSCF) 1793 1849.34
10 Fuel Gas (MMSCF) 517 588.53
MONTHLY PRODUCTION HIGHLIGHTS
8/10/2019 Ammonia Operation Monthly Report August-2014
3/18
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%
0.00
200.00
400.00
600.00
800.00
1,000.00
1,200.00
1,400.00
1,600.00
1,
ug
02,
ug
03,
ug
04,
ug
05,
ug
06,
ug
07,
ug
08,
ug
09,
ug
10,
ug
11,
ug
12,
ug
13,
ug
14,
ug
15,
ug
16,
ug
17,
ug
18,
19,
20,
21,
ug
22,
ug
23,
ug
24,
ug
25,
26,
ug
27,
ug
28,
ug
29,
ug
30,
ug
31,
ug
Production
Date
Ammonia Production Profile
Ammonia Production Profile August-2014
Date Average Load Production Date Average Load Production
1,Aug 102.79% 1,487.00 16,Aug 100.01% 1,457.44
02,Aug 104.11% 1,507.30 17,Aug 100.75% 1,463.22
03,Aug 102.64% 1,490.10 18,Aug 103.80% 1,485.7704,Aug 102.32% 1,486.00 19,Aug 103.85% 1,476.68
05,Aug 102.54% 1,486.00 20,Aug 101.94% 1,486.90
06,Aug 103.12% 1,495.10 21,Aug 101.74% 1,479.27
07,Aug 103.29% 1,505.08 22,Aug 101.35% 1,487.56
08,Aug 101.83% 1,487.31 23,Aug 102.44% 1,482.80
09,Aug 102.01% 1,482.75 24,Aug 101.71% 1,483.45
10,Aug 102.02% 1,485.10 25,Aug 100.91% 1,492.08
11,Aug 102.03% 1,490.94 26,Aug 101.44% 1,482.98
12,Aug 101.87% 1,483.50 27,Aug 101.36% 1,491.4013,Aug 101.82% 1,488.15 28,Aug 99.91% 1,488.56
14,Aug 0.00% 1,466.22 29,Aug 68.56% 262.41
15,Aug 99.67% 1,465.76 30,Aug 56.80% 0.01
31,Aug 81.72% 89.10
8/10/2019 Ammonia Operation Monthly Report August-2014
4/18
Health,Safety&EnvironmentIncident# 1:At 1520hrs, area operator reported
heavy oil leakage from mechanical seal of lubeoil pump P-123-B of C-105.
Action Taken: Motor-driven standby pump
PM-123-A was immediately started and P-123-
B stopped/Isolated. Spilled oil cleaned and
pump handed over to machinery for repair.
Incident# 2:At 04:45 hrs during unloading of
CT-105 anti-surge valve FV-073A stuck at 40%
and machine tripped due to 3surges/5minsecurity.
Action Taken: CT-105 was tripped against 3surges/5min security.
Incident# 3: At 22:25 hrs, CT-105 actuator
position feedback ZI-105 started to fluctuate
and hunting observed in governor lift. Impact
kept on increasing and started to vary CT-105
speed due to severe hunting.
Action Taken: Isolated HP steam pressure
reduced to increase actuator AOM-1105
demand/lift opening and finally opened to
100%. Meanwhile Instrument team inspected
its JBs for suspected water ingress but no such
observation found. Now CT-105 speed control
on steam pressure and governor is not in control.
8/10/2019 Ammonia Operation Monthly Report August-2014
5/18
0
0.5
1
1.5
2
2.5
3
NMI PSI FAC Fire Equipment
Failure
Operational
Upset
Human
Error
Violation of
PSM
Incident Stats August-2014
Series1
0
20
40
60
80
100
Safety Observations Reported
Safety Observations Closed
% Close Out
Safety Observations Reported Safety Observations Closed % Close Out
Series1 29 29 100
Safety Observations Statistics
8/10/2019 Ammonia Operation Monthly Report August-2014
6/18
0
50
100
150
200
250
300
350
MSA Observations
Reported MSA Observations Closed% Close Out
MSA Observations Reported MSA Observations Closed % Close Out
Series1 316 316 100
MSA Statistics
00.10.20.30.40.50.60.70.80.9
1
Equipment Machinery Electrical Instrument Civil TSD HSE Operations
Series1 0 0 0 0 0 0 0 0
MSA Open Actions
8/10/2019 Ammonia Operation Monthly Report August-2014
7/18
0
20
40
60
80
100
Near Miss
Observations
ReportedNear Miss
Observations Closed % Close Out
Near Miss Observations Reported Near Miss Observations Closed % Close Out
Series1 0 0 100
NM Statistics
00.10.20.30.40.5
0.60.7
0.8
0.9
1
Equipment Machinery Electrical Instrument Civil TSD HSE Operations
Series1 0 0 0 0 0 0 0 0
NM Open Actions
8/10/2019 Ammonia Operation Monthly Report August-2014
8/18
0
200
400
600
CWP IssuedCWP Closed
CWP % Close OutHWP Issued
HWP ClosedHWP % Close
Out
561473
84.31%
64
58 90.625%
Overall Department-wise PTW Compliance
CWP Issued CWP Closed CWP % Close Out HWP Issued HWP Closed HWP % Close Out
Department CWP # HWP #
Equipment
CWP issued 310 HWP issued 55
CWP closed 280 HWP closed 50
CWP Closure % 90.3% HWP Closure % 90.9%
Machinery
CWP issued 117 HWP issued 4
CWP closed 105 HWP closed 4
CWP Closure % 89.7% HWP Closure % 100%
Electrical
CWP issued 19 HWP issued 1
CWP closed 16 HWP closed 1
CWP Closure % 84.2% HWP Closure % 100%
Inspection
CWP issued 9 HWP issued 01
CWP closed 6 HWP closed 01
CWP Closure % 66.6% HWP Closure % 100%
Civil
CWP issued 19 HWP issued 02
CWP closed 11 HWP closed 02
CWP Closure % 57.8% HWP Closure % 100%
Instrument
CWP issued 87 HWP issued 1
CWP closed 55 HWP closed 0
CWP Closure % 63.2% HWP Closure % 0%
PTW status Department wise
8/10/2019 Ammonia Operation Monthly Report August-2014
9/18
Operational Highlights
Working on alarm management system
Follow up for LTDS closure
Initiatives:
Audits carried by operation Safety equipment audit on daily basis
Safety observation audit on daily basis
Explosivity Audit on daily basis
Routine audit on daily basis
Housekeeping Audit
Safet cabinets/PSVs car-seal audit
D-level Talk/Emergency Talk
D-level talk conducted in night shifts
Emergency talk discussed in night shifts
CM-1151A L/O and process side Delta P started decreasing sharply, so immediatel
unloaded compressor to recover Delta P but in vain and compressor get tripped
Again tried to start but cannot be started due to PM-1151A low pressure problem.
On 01-08-14 PM-121A started on low lube oil pressure logic, when checked from field
PT-121B was found de-latched, after cleaning of latching lever started again.
Cold-box bad mode problem faced on 28/08/14 so after discussion back-end outag
was planned for 60 hrs for full de-riming of cold box as well as to attend some
important jobs
Plant Start-up Activities
CT-105 drain valve steam leakage problem was rectified at 2200 hrs. After turbin
heating compressor train was rolled in first attempt at 2340 hrs.
Dryer took online at 0130 hrs (31st
Aug, 2014).Cold box pressurized and which its coo
down started at 0200 hrs.
C-101 started at 0117 hrs and lined up with system at 0230 hrs after which plant fron
end load increased to 75%.
C-104 startup preparations completed and compressor train rolled at 0345 hrs
Currently machine is at 2200 rpm and will be hold here for 30~45 min. Further startu
sequence will continue afterwards.
Production resumed on 31-08-14 at around 2130 hrs
http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=RKSfWg3U69w89M&tbnid=q8DURi7cJVV1DM:&ved=0CAUQjRw&url=http://stock.imagerion.com/image/open-or-close-the-gas-oil-valve/&ei=pVoMVOiKLYblau7jgtAO&psig=AFQjCNG3Ce4evBsS9gI16pby0qy_AzcQew&ust=1410182136786707http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=RKSfWg3U69w89M&tbnid=q8DURi7cJVV1DM:&ved=0CAUQjRw&url=http://stock.imagerion.com/image/open-or-close-the-gas-oil-valve/&ei=pVoMVOiKLYblau7jgtAO&psig=AFQjCNG3Ce4evBsS9gI16pby0qy_AzcQew&ust=1410182136786707http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=RKSfWg3U69w89M&tbnid=q8DURi7cJVV1DM:&ved=0CAUQjRw&url=http://stock.imagerion.com/image/open-or-close-the-gas-oil-valve/&ei=pVoMVOiKLYblau7jgtAO&psig=AFQjCNG3Ce4evBsS9gI16pby0qy_AzcQew&ust=1410182136786707http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=RKSfWg3U69w89M&tbnid=q8DURi7cJVV1DM:&ved=0CAUQjRw&url=http://stock.imagerion.com/image/open-or-close-the-gas-oil-valve/&ei=pVoMVOiKLYblau7jgtAO&psig=AFQjCNG3Ce4evBsS9gI16pby0qy_AzcQew&ust=1410182136786707http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=RKSfWg3U69w89M&tbnid=q8DURi7cJVV1DM:&ved=0CAUQjRw&url=http://stock.imagerion.com/image/open-or-close-the-gas-oil-valve/&ei=pVoMVOiKLYblau7jgtAO&psig=AFQjCNG3Ce4evBsS9gI16pby0qy_AzcQew&ust=1410182136786707http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=txzWRq38k_peXM&tbnid=LTPZothl3ZzwaM:&ved=0CAUQjRw&url=http://www.dreamstime.com/illustration/audit.html&ei=5lkMVKChIMreauGfgogK&psig=AFQjCNGkHDSLjKgr6tn643BCH9NmlrGUpg&ust=1410181712119263http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=4GFYQC-fWJTOKM&tbnid=b-wO4MG2WTP4iM:&ved=0CAUQjRw&url=http://www.megandredge.com/does-your-initiative-button-work/&ei=wVcMVJn3LNDdaODJgOgJ&bvm=bv.74649129,d.d2s&psig=AFQjCNGOj3GqJ-lBwtMT10JrP4SGSqEQNg&ust=14101813739822448/10/2019 Ammonia Operation Monthly Report August-2014
10/18
0%
20%
40%
60%
80%
100%
Shift Group A Shift Group B Shift Group C Shift Group D
75% 75% 88% 100%
Saftey Observation Audit Complaiance
0%
20%
40%
60%
80%
100%
Shift Group A Shift Group B Shift Group C Shift Group D
100% 100% 100% 100%
Explosivity Audit Compliance
0%
20%
40%
60%
80%
100%
Shift Group A Shift Group B Shift Group C Shift Group D
100% 100% 100% 100%
Routine Audit Compliance
8/10/2019 Ammonia Operation Monthly Report August-2014
11/18
0
10
20
3040
50
60
70
80
90
100
Planned Skills Actual Skills Done % Compliance
Series1 1 1 100
NH3 Plant Cross Training Status Till Aug-2014
Series1
Skill Status 2013 2014Cumulative
2013
Cumulative
2014
1 One Post 27 23 38 39
2 Two Post 6 9 11 16
3 Three Post 2 4 5 7
4 Four Post 3 3 3 3
5 Five Post 0 0 0 0
6 Six Post 0 0 0 0
7 Seven Post 0 0 0 0
8 Eight Post 0 0 0 0
Ammonia Plant Multi Skill Status-2014 (To Date)
8/10/2019 Ammonia Operation Monthly Report August-2014
12/18
0
20
40
60
80
100
120
140
160
Total No. of
Standing
Alarms
No. of
Standing ESD
Alarms
No. of
Standing
DCS Alarms
No. of
Standing
DCS Alarms
Issues
Resolved
No. of
Standing ESD
Alarms
Issues
Resolved
% of
Standing
Alarms
Issues
Resolved
Series1 142 17 133 85 0 60
Ammonia Standing Alarms Statistics
01020
30405060
7080
90100
Incidents
Reported
Recommendations
Marked to
Operation
Operation
Recommendation
Closure
Compliance
Overall Closure
Compliance
Series1 3 0 100 100
Incidents Recommendation Closure Compliance
8/10/2019 Ammonia Operation Monthly Report August-2014
13/18
0
20
40
60
80
100
Shift Group A
Shift Group B
Shift Group CShift Group D
Shift Group A Shift Group B Shift Group C Shift Group D
Series1 100 100 100 100
Emergency Talk Compliance
0
50
100
Shift Group AShift Group B
Shift Group C
Shift Group D
Shift Group A Shift Group B Shift Group C Shift Group D
Series1 100 100 100 100
D-Level Talk Compliance
8/10/2019 Ammonia Operation Monthly Report August-2014
14/18
DESCRIPTION UM JulyDesign
Consumption
Cumulative
2013
Cumulative
2014
Catacarb WBU
(Polyglycol)Litre 40 22.5 315 168
Catacarb 400 DM 3 1 30 37
Catacarb 72-S Litre 0 As Required 113 0
Catacarb 922
(V2O5)m3 0 0.225 10 11
Potassium
Carbonate
(K2CO3)
MT 03 1.85 21.075 26
Bulab-9564
(Na3PO4)Kg 50 86.6 575 275
Hydrazine
(N2H4)Liter 75 52.7
Oil Drums
Turbo-32DM 0 As Required
Oil Drums
Turbo T-32DM 14 As Required
Oil Drums
Tellus + ClavusDM 0.5 As Required
Oil &Chemical Consum tion
8/10/2019 Ammonia Operation Monthly Report August-2014
15/18
Maintenance Highlights
E-108 GLG leakage rectified by replacing its glass.
E-145A3 old bundle hydro-jetting/Hydro-testing and
chemical cleaning done.
P-420 suction strainer cleaned
E-222 and its associated piping painting done
P-110A discharge valve gland leakage rectified
Insulation provision at MS-116 inlet line and E-093
associated lines done
Insulation provision at E-118 and associated line done
FH-051 isolation valve handle provided
D-143 inlet/outlet lines thickness monitoring done
PM of safety showers carried out
Cold insulation provided at PM-1101A/B/C associated lines
E-228/229/123/130 painting job done
Platform provision at E-240A/B unapproachable valves
D-208/E-114/116/216 associated insulation removal and
thickness monitoring done
FIL-103B/D/E cleaning done
FM#04 nozzle free problem rectified
Pin-hole leakage rectified at Rota-meter of PT-104
D-132 both man-ways removal and blinds installation for
charge replacement
New windsocks installed at TK-102/1101
Tie-ins were taken for CT-105 gland condenser
New tie-ins for CWS/CWR taken for E-145
FIL-104A/B cleaning done
E-182A/B and E-151 cleaning and hydro-testing done
http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=2HEjoPzgJOQi1M&tbnid=TcF_synl8yDptM:&ved=0CAUQjRw&url=http://www.sentios.co.uk/kiosk-maintenance/&ei=9nEMVKb2I8XKaJjjgRg&bvm=bv.74649129,d.d2s&psig=AFQjCNG7tFzVq1BewuhRgSxA1hChKCOIkw&ust=1410188111568357http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=VqzELeR-NQJC_M&tbnid=S-kqztXL_E5JoM:&ved=0CAUQjRw&url=http://www.firesafetycork.ie/&ei=s3MMVNioAtDhasP_gZgG&psig=AFQjCNHEeVrbfHT9P1Nx-dBKk8f6OX8jaA&ust=1410188585192974http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=2HEjoPzgJOQi1M&tbnid=TcF_synl8yDptM:&ved=0CAUQjRw&url=http://www.sentios.co.uk/kiosk-maintenance/&ei=9nEMVKb2I8XKaJjjgRg&bvm=bv.74649129,d.d2s&psig=AFQjCNG7tFzVq1BewuhRgSxA1hChKCOIkw&ust=14101881115683578/10/2019 Ammonia Operation Monthly Report August-2014
16/18
Machinery Highlights
PM-1151A low pressure problem rectification remained
I/P
PT-1501B CW jacket get de-blocked
General oil make up and area surveillance
P-1504B gland leakage rectified
C-102 breathers cleaning done
PM-9345A/B suction strainers cleaning done
TK-115 portable centrifuges cleaning done
P-118 anti-foam pump diaphragm replaced for low
pressure problem leakage rectification
FIL-102 primary/secondary filters cleaning done
C-104 LPC to turbine side oil leakage rectification done
C-105 I/B and O/B bearings inspection done
C-104 control oil filters cleaning done
C-106 portable centrifuge cleaning done
BT-201 lube oil filters cleaning done
PT-101B seal leakage rectified
CGT-102 ventilation fan filters cleaning done
P-145B seal leakage rectification
8/10/2019 Ammonia Operation Monthly Report August-2014
17/18
Electrical & Instrumentation Highligh
PDC-1182 inspection done and declared ok
Conductivity analyzer CI-103 calibration done
FI-042 LP leg replaced, found blocked
ZI-1180 IOP problem rectified
TE-397 replaced with new one at E-182A/B O/L
C-105 O/B AP-014 fluctuation observed, health foundok
PT-022 calibration as per PM plan
PT-478/480A calibration done
FI-158/159/005 calibration done
MOV-058 limit switches adjusted
Fused lights replaced due to low light issue
Motors greasing done
PSL-135A/B/C calibration done
Natural gas latest composition incorporated in DCS
PSL-134/76B/87C calibration done as per PM plan
FV-063 glands repacking done
FV-932 flow limitation problem rectification done
MOV-150/151 limit switches adjustment done
D-118 sam le oint tubin re laced
8/10/2019 Ammonia Operation Monthly Report August-2014
18/18
Position Available Approved
Unit Manager 1 1
Day Engineer 1 1
Shift In-charge 4 5
Area Engineer 3 5
Back End Board Man 2+3(Sub-Engineers) 5
Front End Board Man 3+1 5
Operators (Permanent) 31 32
Apprentice Operators 6
Annual Contract 1 Annual Contract
Helpers 8 Annual Contract