Ammonia Operation Monthly Report August-2014

Embed Size (px)

Citation preview

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    1/18

    GO GREEN, SAVE GREEN

    MONTHLY

    PRODUCTION REPORT

    August, 2014NH3

    PLANT

    Prepared By: Saqib Raouf

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    2/18

    Sr. No. Description Budgeted Actual

    1 Production Target (MT) 40603 41915.94

    2 Capacity Factor (%) 93 103.2

    3 Service Factor (%) 94 91.2

    4 Gross Energy Index (GCal / MT) 8.11 8.333

    5 Net Energy Index (GCal / MT) 7.90 8.318

    6 Cumulative Annual Production (MT)

    Credit

    305164 312981.9

    (7818.9)

    7 Daily Average production (MT) 1309.774 1352.127

    8 Down Time (Hours) 48 65

    9 Feed Gas (MMSCF) 1793 1849.34

    10 Fuel Gas (MMSCF) 517 588.53

    MONTHLY PRODUCTION HIGHLIGHTS

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    3/18

    0.00%

    20.00%

    40.00%

    60.00%

    80.00%

    100.00%

    120.00%

    0.00

    200.00

    400.00

    600.00

    800.00

    1,000.00

    1,200.00

    1,400.00

    1,600.00

    1,

    ug

    02,

    ug

    03,

    ug

    04,

    ug

    05,

    ug

    06,

    ug

    07,

    ug

    08,

    ug

    09,

    ug

    10,

    ug

    11,

    ug

    12,

    ug

    13,

    ug

    14,

    ug

    15,

    ug

    16,

    ug

    17,

    ug

    18,

    19,

    20,

    21,

    ug

    22,

    ug

    23,

    ug

    24,

    ug

    25,

    26,

    ug

    27,

    ug

    28,

    ug

    29,

    ug

    30,

    ug

    31,

    ug

    Production

    Date

    Ammonia Production Profile

    Ammonia Production Profile August-2014

    Date Average Load Production Date Average Load Production

    1,Aug 102.79% 1,487.00 16,Aug 100.01% 1,457.44

    02,Aug 104.11% 1,507.30 17,Aug 100.75% 1,463.22

    03,Aug 102.64% 1,490.10 18,Aug 103.80% 1,485.7704,Aug 102.32% 1,486.00 19,Aug 103.85% 1,476.68

    05,Aug 102.54% 1,486.00 20,Aug 101.94% 1,486.90

    06,Aug 103.12% 1,495.10 21,Aug 101.74% 1,479.27

    07,Aug 103.29% 1,505.08 22,Aug 101.35% 1,487.56

    08,Aug 101.83% 1,487.31 23,Aug 102.44% 1,482.80

    09,Aug 102.01% 1,482.75 24,Aug 101.71% 1,483.45

    10,Aug 102.02% 1,485.10 25,Aug 100.91% 1,492.08

    11,Aug 102.03% 1,490.94 26,Aug 101.44% 1,482.98

    12,Aug 101.87% 1,483.50 27,Aug 101.36% 1,491.4013,Aug 101.82% 1,488.15 28,Aug 99.91% 1,488.56

    14,Aug 0.00% 1,466.22 29,Aug 68.56% 262.41

    15,Aug 99.67% 1,465.76 30,Aug 56.80% 0.01

    31,Aug 81.72% 89.10

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    4/18

    Health,Safety&EnvironmentIncident# 1:At 1520hrs, area operator reported

    heavy oil leakage from mechanical seal of lubeoil pump P-123-B of C-105.

    Action Taken: Motor-driven standby pump

    PM-123-A was immediately started and P-123-

    B stopped/Isolated. Spilled oil cleaned and

    pump handed over to machinery for repair.

    Incident# 2:At 04:45 hrs during unloading of

    CT-105 anti-surge valve FV-073A stuck at 40%

    and machine tripped due to 3surges/5minsecurity.

    Action Taken: CT-105 was tripped against 3surges/5min security.

    Incident# 3: At 22:25 hrs, CT-105 actuator

    position feedback ZI-105 started to fluctuate

    and hunting observed in governor lift. Impact

    kept on increasing and started to vary CT-105

    speed due to severe hunting.

    Action Taken: Isolated HP steam pressure

    reduced to increase actuator AOM-1105

    demand/lift opening and finally opened to

    100%. Meanwhile Instrument team inspected

    its JBs for suspected water ingress but no such

    observation found. Now CT-105 speed control

    on steam pressure and governor is not in control.

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    5/18

    0

    0.5

    1

    1.5

    2

    2.5

    3

    NMI PSI FAC Fire Equipment

    Failure

    Operational

    Upset

    Human

    Error

    Violation of

    PSM

    Incident Stats August-2014

    Series1

    0

    20

    40

    60

    80

    100

    Safety Observations Reported

    Safety Observations Closed

    % Close Out

    Safety Observations Reported Safety Observations Closed % Close Out

    Series1 29 29 100

    Safety Observations Statistics

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    6/18

    0

    50

    100

    150

    200

    250

    300

    350

    MSA Observations

    Reported MSA Observations Closed% Close Out

    MSA Observations Reported MSA Observations Closed % Close Out

    Series1 316 316 100

    MSA Statistics

    00.10.20.30.40.50.60.70.80.9

    1

    Equipment Machinery Electrical Instrument Civil TSD HSE Operations

    Series1 0 0 0 0 0 0 0 0

    MSA Open Actions

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    7/18

    0

    20

    40

    60

    80

    100

    Near Miss

    Observations

    ReportedNear Miss

    Observations Closed % Close Out

    Near Miss Observations Reported Near Miss Observations Closed % Close Out

    Series1 0 0 100

    NM Statistics

    00.10.20.30.40.5

    0.60.7

    0.8

    0.9

    1

    Equipment Machinery Electrical Instrument Civil TSD HSE Operations

    Series1 0 0 0 0 0 0 0 0

    NM Open Actions

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    8/18

    0

    200

    400

    600

    CWP IssuedCWP Closed

    CWP % Close OutHWP Issued

    HWP ClosedHWP % Close

    Out

    561473

    84.31%

    64

    58 90.625%

    Overall Department-wise PTW Compliance

    CWP Issued CWP Closed CWP % Close Out HWP Issued HWP Closed HWP % Close Out

    Department CWP # HWP #

    Equipment

    CWP issued 310 HWP issued 55

    CWP closed 280 HWP closed 50

    CWP Closure % 90.3% HWP Closure % 90.9%

    Machinery

    CWP issued 117 HWP issued 4

    CWP closed 105 HWP closed 4

    CWP Closure % 89.7% HWP Closure % 100%

    Electrical

    CWP issued 19 HWP issued 1

    CWP closed 16 HWP closed 1

    CWP Closure % 84.2% HWP Closure % 100%

    Inspection

    CWP issued 9 HWP issued 01

    CWP closed 6 HWP closed 01

    CWP Closure % 66.6% HWP Closure % 100%

    Civil

    CWP issued 19 HWP issued 02

    CWP closed 11 HWP closed 02

    CWP Closure % 57.8% HWP Closure % 100%

    Instrument

    CWP issued 87 HWP issued 1

    CWP closed 55 HWP closed 0

    CWP Closure % 63.2% HWP Closure % 0%

    PTW status Department wise

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    9/18

    Operational Highlights

    Working on alarm management system

    Follow up for LTDS closure

    Initiatives:

    Audits carried by operation Safety equipment audit on daily basis

    Safety observation audit on daily basis

    Explosivity Audit on daily basis

    Routine audit on daily basis

    Housekeeping Audit

    Safet cabinets/PSVs car-seal audit

    D-level Talk/Emergency Talk

    D-level talk conducted in night shifts

    Emergency talk discussed in night shifts

    CM-1151A L/O and process side Delta P started decreasing sharply, so immediatel

    unloaded compressor to recover Delta P but in vain and compressor get tripped

    Again tried to start but cannot be started due to PM-1151A low pressure problem.

    On 01-08-14 PM-121A started on low lube oil pressure logic, when checked from field

    PT-121B was found de-latched, after cleaning of latching lever started again.

    Cold-box bad mode problem faced on 28/08/14 so after discussion back-end outag

    was planned for 60 hrs for full de-riming of cold box as well as to attend some

    important jobs

    Plant Start-up Activities

    CT-105 drain valve steam leakage problem was rectified at 2200 hrs. After turbin

    heating compressor train was rolled in first attempt at 2340 hrs.

    Dryer took online at 0130 hrs (31st

    Aug, 2014).Cold box pressurized and which its coo

    down started at 0200 hrs.

    C-101 started at 0117 hrs and lined up with system at 0230 hrs after which plant fron

    end load increased to 75%.

    C-104 startup preparations completed and compressor train rolled at 0345 hrs

    Currently machine is at 2200 rpm and will be hold here for 30~45 min. Further startu

    sequence will continue afterwards.

    Production resumed on 31-08-14 at around 2130 hrs

    http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=RKSfWg3U69w89M&tbnid=q8DURi7cJVV1DM:&ved=0CAUQjRw&url=http://stock.imagerion.com/image/open-or-close-the-gas-oil-valve/&ei=pVoMVOiKLYblau7jgtAO&psig=AFQjCNG3Ce4evBsS9gI16pby0qy_AzcQew&ust=1410182136786707http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=RKSfWg3U69w89M&tbnid=q8DURi7cJVV1DM:&ved=0CAUQjRw&url=http://stock.imagerion.com/image/open-or-close-the-gas-oil-valve/&ei=pVoMVOiKLYblau7jgtAO&psig=AFQjCNG3Ce4evBsS9gI16pby0qy_AzcQew&ust=1410182136786707http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=RKSfWg3U69w89M&tbnid=q8DURi7cJVV1DM:&ved=0CAUQjRw&url=http://stock.imagerion.com/image/open-or-close-the-gas-oil-valve/&ei=pVoMVOiKLYblau7jgtAO&psig=AFQjCNG3Ce4evBsS9gI16pby0qy_AzcQew&ust=1410182136786707http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=RKSfWg3U69w89M&tbnid=q8DURi7cJVV1DM:&ved=0CAUQjRw&url=http://stock.imagerion.com/image/open-or-close-the-gas-oil-valve/&ei=pVoMVOiKLYblau7jgtAO&psig=AFQjCNG3Ce4evBsS9gI16pby0qy_AzcQew&ust=1410182136786707http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=RKSfWg3U69w89M&tbnid=q8DURi7cJVV1DM:&ved=0CAUQjRw&url=http://stock.imagerion.com/image/open-or-close-the-gas-oil-valve/&ei=pVoMVOiKLYblau7jgtAO&psig=AFQjCNG3Ce4evBsS9gI16pby0qy_AzcQew&ust=1410182136786707http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=txzWRq38k_peXM&tbnid=LTPZothl3ZzwaM:&ved=0CAUQjRw&url=http://www.dreamstime.com/illustration/audit.html&ei=5lkMVKChIMreauGfgogK&psig=AFQjCNGkHDSLjKgr6tn643BCH9NmlrGUpg&ust=1410181712119263http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=4GFYQC-fWJTOKM&tbnid=b-wO4MG2WTP4iM:&ved=0CAUQjRw&url=http://www.megandredge.com/does-your-initiative-button-work/&ei=wVcMVJn3LNDdaODJgOgJ&bvm=bv.74649129,d.d2s&psig=AFQjCNGOj3GqJ-lBwtMT10JrP4SGSqEQNg&ust=1410181373982244
  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    10/18

    0%

    20%

    40%

    60%

    80%

    100%

    Shift Group A Shift Group B Shift Group C Shift Group D

    75% 75% 88% 100%

    Saftey Observation Audit Complaiance

    0%

    20%

    40%

    60%

    80%

    100%

    Shift Group A Shift Group B Shift Group C Shift Group D

    100% 100% 100% 100%

    Explosivity Audit Compliance

    0%

    20%

    40%

    60%

    80%

    100%

    Shift Group A Shift Group B Shift Group C Shift Group D

    100% 100% 100% 100%

    Routine Audit Compliance

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    11/18

    0

    10

    20

    3040

    50

    60

    70

    80

    90

    100

    Planned Skills Actual Skills Done % Compliance

    Series1 1 1 100

    NH3 Plant Cross Training Status Till Aug-2014

    Series1

    Skill Status 2013 2014Cumulative

    2013

    Cumulative

    2014

    1 One Post 27 23 38 39

    2 Two Post 6 9 11 16

    3 Three Post 2 4 5 7

    4 Four Post 3 3 3 3

    5 Five Post 0 0 0 0

    6 Six Post 0 0 0 0

    7 Seven Post 0 0 0 0

    8 Eight Post 0 0 0 0

    Ammonia Plant Multi Skill Status-2014 (To Date)

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    12/18

    0

    20

    40

    60

    80

    100

    120

    140

    160

    Total No. of

    Standing

    Alarms

    No. of

    Standing ESD

    Alarms

    No. of

    Standing

    DCS Alarms

    No. of

    Standing

    DCS Alarms

    Issues

    Resolved

    No. of

    Standing ESD

    Alarms

    Issues

    Resolved

    % of

    Standing

    Alarms

    Issues

    Resolved

    Series1 142 17 133 85 0 60

    Ammonia Standing Alarms Statistics

    01020

    30405060

    7080

    90100

    Incidents

    Reported

    Recommendations

    Marked to

    Operation

    Operation

    Recommendation

    Closure

    Compliance

    Overall Closure

    Compliance

    Series1 3 0 100 100

    Incidents Recommendation Closure Compliance

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    13/18

    0

    20

    40

    60

    80

    100

    Shift Group A

    Shift Group B

    Shift Group CShift Group D

    Shift Group A Shift Group B Shift Group C Shift Group D

    Series1 100 100 100 100

    Emergency Talk Compliance

    0

    50

    100

    Shift Group AShift Group B

    Shift Group C

    Shift Group D

    Shift Group A Shift Group B Shift Group C Shift Group D

    Series1 100 100 100 100

    D-Level Talk Compliance

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    14/18

    DESCRIPTION UM JulyDesign

    Consumption

    Cumulative

    2013

    Cumulative

    2014

    Catacarb WBU

    (Polyglycol)Litre 40 22.5 315 168

    Catacarb 400 DM 3 1 30 37

    Catacarb 72-S Litre 0 As Required 113 0

    Catacarb 922

    (V2O5)m3 0 0.225 10 11

    Potassium

    Carbonate

    (K2CO3)

    MT 03 1.85 21.075 26

    Bulab-9564

    (Na3PO4)Kg 50 86.6 575 275

    Hydrazine

    (N2H4)Liter 75 52.7

    Oil Drums

    Turbo-32DM 0 As Required

    Oil Drums

    Turbo T-32DM 14 As Required

    Oil Drums

    Tellus + ClavusDM 0.5 As Required

    Oil &Chemical Consum tion

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    15/18

    Maintenance Highlights

    E-108 GLG leakage rectified by replacing its glass.

    E-145A3 old bundle hydro-jetting/Hydro-testing and

    chemical cleaning done.

    P-420 suction strainer cleaned

    E-222 and its associated piping painting done

    P-110A discharge valve gland leakage rectified

    Insulation provision at MS-116 inlet line and E-093

    associated lines done

    Insulation provision at E-118 and associated line done

    FH-051 isolation valve handle provided

    D-143 inlet/outlet lines thickness monitoring done

    PM of safety showers carried out

    Cold insulation provided at PM-1101A/B/C associated lines

    E-228/229/123/130 painting job done

    Platform provision at E-240A/B unapproachable valves

    D-208/E-114/116/216 associated insulation removal and

    thickness monitoring done

    FIL-103B/D/E cleaning done

    FM#04 nozzle free problem rectified

    Pin-hole leakage rectified at Rota-meter of PT-104

    D-132 both man-ways removal and blinds installation for

    charge replacement

    New windsocks installed at TK-102/1101

    Tie-ins were taken for CT-105 gland condenser

    New tie-ins for CWS/CWR taken for E-145

    FIL-104A/B cleaning done

    E-182A/B and E-151 cleaning and hydro-testing done

    http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=2HEjoPzgJOQi1M&tbnid=TcF_synl8yDptM:&ved=0CAUQjRw&url=http://www.sentios.co.uk/kiosk-maintenance/&ei=9nEMVKb2I8XKaJjjgRg&bvm=bv.74649129,d.d2s&psig=AFQjCNG7tFzVq1BewuhRgSxA1hChKCOIkw&ust=1410188111568357http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=VqzELeR-NQJC_M&tbnid=S-kqztXL_E5JoM:&ved=0CAUQjRw&url=http://www.firesafetycork.ie/&ei=s3MMVNioAtDhasP_gZgG&psig=AFQjCNHEeVrbfHT9P1Nx-dBKk8f6OX8jaA&ust=1410188585192974http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&docid=2HEjoPzgJOQi1M&tbnid=TcF_synl8yDptM:&ved=0CAUQjRw&url=http://www.sentios.co.uk/kiosk-maintenance/&ei=9nEMVKb2I8XKaJjjgRg&bvm=bv.74649129,d.d2s&psig=AFQjCNG7tFzVq1BewuhRgSxA1hChKCOIkw&ust=1410188111568357
  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    16/18

    Machinery Highlights

    PM-1151A low pressure problem rectification remained

    I/P

    PT-1501B CW jacket get de-blocked

    General oil make up and area surveillance

    P-1504B gland leakage rectified

    C-102 breathers cleaning done

    PM-9345A/B suction strainers cleaning done

    TK-115 portable centrifuges cleaning done

    P-118 anti-foam pump diaphragm replaced for low

    pressure problem leakage rectification

    FIL-102 primary/secondary filters cleaning done

    C-104 LPC to turbine side oil leakage rectification done

    C-105 I/B and O/B bearings inspection done

    C-104 control oil filters cleaning done

    C-106 portable centrifuge cleaning done

    BT-201 lube oil filters cleaning done

    PT-101B seal leakage rectified

    CGT-102 ventilation fan filters cleaning done

    P-145B seal leakage rectification

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    17/18

    Electrical & Instrumentation Highligh

    PDC-1182 inspection done and declared ok

    Conductivity analyzer CI-103 calibration done

    FI-042 LP leg replaced, found blocked

    ZI-1180 IOP problem rectified

    TE-397 replaced with new one at E-182A/B O/L

    C-105 O/B AP-014 fluctuation observed, health foundok

    PT-022 calibration as per PM plan

    PT-478/480A calibration done

    FI-158/159/005 calibration done

    MOV-058 limit switches adjusted

    Fused lights replaced due to low light issue

    Motors greasing done

    PSL-135A/B/C calibration done

    Natural gas latest composition incorporated in DCS

    PSL-134/76B/87C calibration done as per PM plan

    FV-063 glands repacking done

    FV-932 flow limitation problem rectification done

    MOV-150/151 limit switches adjustment done

    D-118 sam le oint tubin re laced

  • 8/10/2019 Ammonia Operation Monthly Report August-2014

    18/18

    Position Available Approved

    Unit Manager 1 1

    Day Engineer 1 1

    Shift In-charge 4 5

    Area Engineer 3 5

    Back End Board Man 2+3(Sub-Engineers) 5

    Front End Board Man 3+1 5

    Operators (Permanent) 31 32

    Apprentice Operators 6

    Annual Contract 1 Annual Contract

    Helpers 8 Annual Contract