Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
1
AMS Monthly Management Report to the IETF Q3 2011
Table of Contents
Site Selection Status 2011 - 2015 2
Registration Report – IETF 82, Taipei, TAIWAN
3
IETF Document Management Report • New Internet Drafts • Revised or Updated Internet Drafts • IESG Last Call Internet Draft Activity • Approved Internet Draft Activity
4
IETF Ticket Management 5 - 6
Intellectual Property Disclosures 7 – 8
Working Group Activity 9
IT Development Items 10
IETF Mail List Stats 11 - 12
IETF Website Stats • Ietf.org • Iab.org • Iaoc.ietf.org • trustee.ietf.org
Available online at: URL/usagedata
4
IETF Document Management Report Q3 2011
“New” refers to Internet Drafts presented for the first time “Revised or Updated” refers to Internet Drafts that were modified in some way, possibly more than once “Last Call” refers to the announcement to the community that the Internet Draft is about to be closed for comment “Approved” refers to Internet Drafts that are finished with the IESG Evaluation and have been passed to the RFC Editor for publication
5
IETF Ticket Management (ALL TICKETS) Q3 2011
Registrar – registration assistance; Action – technical issues; General – general IETF information; IESG – IESG support; Liaisons – Liaison submissions; IPR – IPR submissions; Meeting – request a meeting session; Mgmt – Mgmt Queue for Ray/Russ; Webex – Webex Requests; List-Manager – list management support
7
3rd Party IPR Disclosures
Date Discloser Possible Patent Owner Relevant IETF document or RFC
Research Status Verified
May 25, 2010
Yaron Sheffer
AT&T Bell Laboratories (possibly
Alcatel-Lucent)
draft-sheffer-ipsecme-hus-00
Awaiting Response. No
May 28, 2010
Martin Stiemerling
Telefonaktiebolaget LM Ericsson
draft-lindquist-sip-rtsp-01 Awaiting Response ED emailed 9/13/10
& 12/21/10 No
June 02, 2010
Priya Rajagopal
General Instrument Corporation
draft-lindquist-sip-rtsp-01 ED contacted counsel. Specific IPR
Disclosure filed August 2010
Yes
June 17, 2010
Martin Stiemerling
Telefonaktiebolaget LM Ericsson
draft-lindquist-sip-rtsp-02 ED contacted Ericsson general
counsel. Waiting on response.
No
July 12, 2010
Rene Struik Certicom Corporation draft-struik-ecc-efficiences-00
Specific Disclosure Filed Yes
July 12, 2010
Rene Struik Certicom Corporation draft-ietf-roll-rpl-10 Specific Disclosure Filed Yes
August 23, 2010
Tim Polk Huawei Symantec draft-dong-savi-cga-header-03
ED sent email to Huawei Symantec general counsel.
9/13/10, 12/21/10,
12/22/10. Waiting for response
No
September 8, 2010
David Harrington
Enterasys Networks draft-ietf-geopriv-arch-02 ED contacted relevant patent attorneys.
Under Review. Last contact 12/21/10
Under Review
December 1, 2010
Rene Struik Certicom Corp
draft-igoe-secsh-x509v3-06
VERIFIED. See http://datatracker.iet
f.org/ipr/1468 Yes
December 9, 2010
Adrian Farrel
Nortel Networks draft-bhh-mpls-tp-oam-y1731-06
Response from Nortel: Due to limited resources during the current creditor protection and restructuring environment, Nortel is no longer able to maintain a department that can assist you with your inquiry.
Unable to Verify
December 9, 2010
Adrian Farrel
Cisco Systems draft-bhh-mpls-tp-oam-y1731-06
Dan Ling confirmed that "Cisco is not aware of any claims of any Cisco patents or
No relevant IPR
8
applications that are necessary for practicing this IETF document."
December 9, 2010
Adrian Farrel
ECI Telecom Ltd. draft-bhh-mpls-tp-oam-y1731-06
Awaiting Response Emailed 12/21/10 No
March 25, 2011
Sean Turner
Certicom Corp draft-herzog-static-ecdh-06
Verified and posted Yes
August 3, 2011
Rene Struik Certicom Corp RFC 6189 Awaiting Response Emailed 9/21/11
and 9/22/11 No
August 22, 2011
David Harrington
Enterasys Networks, Inc.
Geopriv Specific Disclosure Filed Yes
9
Working Group Activity Q3 2011
New Working Groups July Home Networking (homenet) August NONE September Javascript Object Signing and Encryption (jose) Concluded Working Groups
July Long-Term Archive and Notary Services (ltans) August IP over DVB (ipdvb) Integrated Security Model for SNMP (isms) Site Multihoming by IPv6 Intermediation (shim6) Performance Metrics for Other Layers (pmol) September Centralized Conferencing (xcon) Domain Keys Identified Mail (dkim)
10
IT Items In Progress or Complete
Additional Technical Tasks performed in Q3 2011 IAB Website Assist with movement of IAB website to AMS servers (14 hours) COMPLETED
Registration System
New Check-in Script for Registration System (9.5 hours) COMPLETED
Host Wiki Set up IETF Host Wiki (13 hours) COMPLETED
IETF82 Registration
IETF82 Registration Deployment (21 hours) COMPLETED
IETF82 Registration
Set up IETF82 Social Ticket Purchase System (8.5 hours) COMPLETED
HomeNet Interim Meeting
Set up HomeNet Interim Meeting Registration System (17 hours) COMPLETED
Nudge Tracker Compiled Nudge Report for July, August, September (27 hours) COMPLETED
Mailing List Management
Created -rse-search, nomcom11, iola-conversion-tool, iola-wgcharter-tool, yaco-community, tool, opsarea-chairs, sami, iola-statesync-tool, nvo3, dcon Migrated (16 hours) -homenet, jose (migrated from [email protected]), radext (migrated from [email protected]) Closed - fun, homegate
COMPLETED
Audio File Processing Script for past meetings
Installation and configuration of mp3split to allow the ability to split audio files from past meetings (8 hours)
ONGOING