Saturday, 10 July 2004 FAIM 2004 1 An Activity Based Bill Of Material, An Activity Based Bill Of Material, A New Concept For Production A New Concept For Production Planning Planning FAIM 2004 FAIM 2004 Mehrdad Kazerooni Mehrdad Kazerooni K.N.Toosi University of Technology K.N.Toosi University of Technology

An Activity Based Bill Of Material, A New Concept For

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Saturday, 10 July 2004

1

Saturday, 10 July 2004FAIM 2004

1

An Activity Based Bill Of Material, An Activity Based Bill Of Material, A New Concept For Production A New Concept For Production

PlanningPlanningFAIM 2004FAIM 2004

Mehrdad KazerooniMehrdad KazerooniK.N.Toosi University of TechnologyK.N.Toosi University of Technology

Saturday, 10 July 2004

2

Saturday, 10 July 2004FAIM 2004

2

Bill of MaterialBill of Material

Part ListPart ListStructured tableStructured tableHierarchy FormatHierarchy Format

Saturday, 10 July 2004

3

Saturday, 10 July 2004FAIM 2004

3

Data structureData structure

ITEM_MASTER

ITEM_IDMEASURE_UNITPARENT_IDITEM_NAMEITEM_TITLE

GDS_GDS_FK

ITEM_MASTER

ITEM_IDMEASURE_UNITPARENT_IDITEM_NAMEITEM_TITLE

BOM

PARENT_GOODS_IDCHILD_GOODS_IDQTYACTIVITY_MODEPCT_WASTEACTIVITY_IDCHILD_TYPE

BOM_GDS_FK

BOM_GDS_FK_1

GDS_GDS_FK

Saturday, 10 July 2004

4

Saturday, 10 July 2004FAIM 2004

4

Bill of MaterialBill of Material

Design BOMDesign BOMProduction BOMProduction BOM

Saturday, 10 July 2004

5

Saturday, 10 July 2004FAIM 2004

5

Design BOMDesign BOM

ParentParentChildChildQuantityQuantityAlternative ChildAlternative Child

Saturday, 10 July 2004

6

Saturday, 10 July 2004FAIM 2004

6

Production BOMProduction BOM

A production BOM is a design BOM besides more information for planning and manufacturing purposes.

Saturday, 10 July 2004

7

Saturday, 10 July 2004FAIM 2004

7

Production BOMProduction BOM

ParentParentWork CenterWork CenterWarehouseWarehouse

ChildChildwaste percentagewaste percentageQuantityQuantityAlternative ChildAlternative ChildActivity (Process)Activity (Process)

Saturday, 10 July 2004

8

Saturday, 10 July 2004FAIM 2004

8

Production BOMProduction BOM

Saturday, 10 July 2004

9

Saturday, 10 July 2004FAIM 2004

9

Work Breakdown StructureWork Breakdown Structure

FWBS

FWBS_IDPARENT_IDNAMETITLEDESCRIPTIONLAST_NODEACTIVITY_MODE

FWB_FWB_FK

ACTIVITY

ACTIVITY_IDNAMEFWBS_IDITEM_IDACTIVITY_TYPEACTIVITY_MODETITLE

ITEM_MASTERS

ITEM_IDNAME

FWBS

FWBS_IDPARENT_IDNAMETITLEDESCRIPTIONLAST_NODEACTIVITY_MODE

ACT_PCB_FK

FWB_FWB_FK

ACT_FWB_FK

Saturday, 10 July 2004

10

Saturday, 10 July 2004FAIM 2004

10

FWBSFWBS

Saturday, 10 July 2004

11

Saturday, 10 July 2004FAIM 2004

11

Activity Based BOMActivity Based BOM

BOM

PARENT_GOODS_IDCHILD_GOODS_IDQTYACTIVITY_MODEPCT_WASTEACTIVITY_IDCHILD_TYPE

ACTIVITY

ACTIVITY_IDNAMEFWBS_IDITEM_IDACTIVITY_TYPEACTIVITY_MODETITLE

ITEMS

ITEM_IDNAME

FWBS

FWBS_IDPARENT_IDNAMETITLEDESCRIPTIONLAST_NODEACTIVITY_MODE

ACT_PCB_FK

ACT_FWB_FK

Saturday, 10 July 2004

12

Saturday, 10 July 2004FAIM 2004

12

Calling an existing BOMCalling an existing BOM

Saturday, 10 July 2004

13

Saturday, 10 July 2004FAIM 2004

13

Calling an existing BOMCalling an existing BOM

Saturday, 10 July 2004

14

Saturday, 10 July 2004FAIM 2004

14

Calling an existing BOMCalling an existing BOM

Saturday, 10 July 2004

15

Saturday, 10 July 2004FAIM 2004

15

Adding a new child to a parentAdding a new child to a parent

Saturday, 10 July 2004

16

Saturday, 10 July 2004FAIM 2004

16

Child QuantityChild Quantity

Saturday, 10 July 2004

17

Saturday, 10 July 2004FAIM 2004

17

Activity creationActivity creation

Saturday, 10 July 2004

18

Saturday, 10 July 2004FAIM 2004

18

Selecting a functionSelecting a function

Saturday, 10 July 2004

19

Saturday, 10 July 2004FAIM 2004

19

Assigning Activity to BOMAssigning Activity to BOM

Saturday, 10 July 2004

20

Saturday, 10 July 2004FAIM 2004

20

Assigning Activity to BOMAssigning Activity to BOM

Saturday, 10 July 2004

21

Saturday, 10 July 2004FAIM 2004

21

Assigning Activity to BOMAssigning Activity to BOM

Each

Saturday, 10 July 2004

22

Saturday, 10 July 2004FAIM 2004

22

ConclusionConclusionUsing the same information (BOM) both Using the same information (BOM) both material requirements and process material requirements and process planning can be accomplished.planning can be accomplished.An infrastructure information for An infrastructure information for concurrent engineering is established.concurrent engineering is established.The proposed BOM system provides a The proposed BOM system provides a base for online production control.base for online production control.

Saturday, 10 July 2004

23

Saturday, 10 July 2004FAIM 2004

23

Conclusion (Cont..)Conclusion (Cont..)The proposed BOM is very useful for The proposed BOM is very useful for manufacturing firms who produce a large manufacturing firms who produce a large number of products and semi finished items.number of products and semi finished items.It saves time, reduces the data complexity, It saves time, reduces the data complexity, makes data entry easy for engineers and makes data entry easy for engineers and increases the speed of data evaluation due to increases the speed of data evaluation due to simple data structure. simple data structure. This structure can be further used for activity This structure can be further used for activity based costing when the activities are assigned based costing when the activities are assigned to work centers. to work centers.