49
An der Schraube 21 D - 03238 FINSTERWALDE phone.: +49 (3531) 50 12 24 fax: +49 (3531) 50 78 39 mobil: +49 (172) 79 48 710 e-mail: [email protected] homepage: www.ferrotrade.de or www.foundplan .de from

An der Schraube 21 D - 03238 FINSTERWALDE

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

An der Schraube 21

D - 03238 FINSTERWALDE

phone.: +49 (3531) 50 12 24

fax: +49 (3531) 50 78 39

mobil: +49 (172) 79 48 710

e-mail: [email protected]

homepage: www.ferrotrade.de or www.foundplan .de

from

A modern enterprise is increasingly an information-processing system.

Joint utilization of available, central data is modern company management.

This information concept is based on Production Planning Software (PPS). It is a revolutionary

concept for the organization and control of operational processes.

from incorporating

product-, pattern/model-, tool data and work schedule,

to

offers, calculations, incoming orders,

scheduling, planning, control,

materials management,

quality control, laboratory,

to

invoicing and creating delivery notes,

with many helpful, practical functions.

fulfils all requirements

has a modular design and is available in seven versions,

for:

FoundPlan - Sand casting SMALL version STANDARD version BIG version

FoundPlan - Permanent-mold casting-/die casting foundries FoundPlan - Centrifugal casting foundries TradePlan - Cast trading SmithPlan – Blacksmith enterprises MachinPlan – Treadment enterprises PlastPlan - Plastic technology enterprises

Always with or without subsequent mechanical processing

is build up from modules and can therefore be adapted effortlessly to particular operational structures.

is particularly suited to foundry-specific requirements.

works with optimized data quantities, and is characterized by its practical software structure

comes with suitable interfaces in order to communicate with other software programs (FIBU; BDE; scale; laboratory).

» Intel Pentium III or higher

» Min. 3 GB RAM

» Min. 1 GB Hard Drive

» Windows Server 2003

» Windows Terminal Service

Hardware - requirements

1. Increased capacity up to 15 percent by optimizing loads of

machines and other plant

2. Improved delivery reliability by meeting delivery deadlines

3. Reduced personnel cost up to 50 percent in administration

4. Lowered reject costs by 1 percent, through effective quality

management

5. Improved traceability of customer orders

provides the followings advantages

multilingual module

A special language module allows rapid assimilation of FoundPlan PPS software into other languages.

FoundPlan can be introduced rapidly and predictably due to its modular system architecture, thus requiring only a minimum of

administrative outlay.

base data

master data

order administration

production

optional merchandise management

stock management

optional quality management

delivery note/invoice

statistics

help data

FoundPlan menu structure

article data

work schedule

optional pressing tool only at pressure die-casting optional filling chamber only at pressure die-casting material

raw material

document archives

optional merchandise

base data menu structure

searching and filter functions

index cards with all relevant data

button for help forms

prints of reports table with all articles

base data article

article data

pattern data

piece list

surcharges

core work schedule

moulding work schedule

grinding/processing

offers

index cards with all relevant data

base data article

assignment of more patterns or tools to an article

pattern status and availability

pattern plate-code

base data article * pattern data

create cores

assigning machines

create work schedules to the machines

base data article * core data

pattern with code

assigning machines

create work schedules to the machines

base data article * moulding data

Recording of the material data

Depositing of recipe no. for an

electronic material

component composition

base data material

Material component composition, in which is the circulation material as a difference on 1,000 kg

per melt, for until 4 recipe can be classed as.

Calculation of the chemical analysis

base data material * components calculation

Calculation material price increase surcharge by the current commodity prices for recipe 2

base data material * MPIS calculation

customers

suppliers

phone-no/standard letter

machine data

document archive customer

optional agent/commissions

master data menu structure

prints of reports

index cards with all relevant data

table with all customers

master data customer data

customers data

shipping address

contacts

customer - article

offer - order

delievery - invoice

Change of price

surcharge

index cards with all relevant data

empties

master data customer data

Index card with customer - article relation

customer – article price

master data combination customer - article

offer with calculation

order backlog

incoming orders

order administration menu structure

Search and filter functions

index cards with all relevant data

table with all offers

order administration offers

Search and filter functions

index cards with all relevant data

table with all orders

order administration incoming order

Assigning the articles of the customer to the order

order administration order * laying out article

Create delivery dates and quantity for the article

order administration order * laying out article

Calculation of the output

Calculation from start of production of every operation/machine

order administration calculation * start of production

Order data

All operations

Status moulding shop

Delivery notes

Invoives

The order status at a glance

order administration order status

optional CORE - planning

optional CORE - accounting

MOULDING - planning

MOULDING - accounting

optional TREADMENT- planning

optional TREADMENT- accounting

optional outsourcing

Production status

SMALL-version cleaning accounting

production menu structure

Production day schedule with filter and sorting possibility to machine and material

production time period

molding box details

pattern combinations in the box

production moulding * planning

Order backlog with the production beginning already calculated for every operation/machine

Capacitive exploitation of the machine pattern repair status

Box combination pattern combinations in the box

and change on another machine

production moulding * fine planning

Report production schedule molding separated to molding lines/machines

production moulding * planning

Report production order with all technological details and manufacturing times

Run card to every order with photos

production moulding * planning

Box details with srap recording

Melt following

Accounting of the manufactured molding boxes

production moulding * accounting

STOCK - cast

STOCK - shipment

STOCK - overstocks

Optional STOCK - KANBAN

Optional STOCK - KONSI

Optional STOCK - processing

warehouse management menu structure

Table with articles which have a stock level.

Stock level with entrances and departures Assessment of the stock level

warehouse management shipment stock

Release/scrap

Article statistic

Scrap quota

Pattern status

Laboratory/analysis

Preparing testimonial

testimonial archive

QC – help data

quality control menu structure

quality control QC * release

Table with articles with sorting and filter

function

Table with all scrap to the current article with sorting and filter function to the fault ways

scrap evaluation to time period

quality control scrap * article statistics

Melts

Analysis values to the melt

Mechanical values to the melt

quality control melt * analysis

Compiling the test certificate

quality control compile test certificate

Delivery note

Invoice

Booking order up

Data export FIBU in finance accounting

delivery note and invoice menu structure

Table with all orders prepared to deliver

Delivery note details with order quantity, quantity which is delivered already and still open

delivery note and invoice create delivery

Table with all customers with delivery notes already issued.

Invoices can delivery note details to the be prepared.

Calculation of the invoice amounts

delivery note and invoice create invoice

• Innovation consultation • Consulting • Planning, project planning

o Process optimization o Project management o Factory planning o Rationalization solutions o Technology consultation

• Consultation from the prototype up to the series supplying • Resource efficiency consultation • Weak point analysis/cost reduction • Quality management/scrap analysis • Management and strategy • Economic analysis and financing

OUR PORTFOLIO:

These are our most important fields of activity for foundries, metal treatment and plastic technology:

Deutschland

FerroTrade

An der Schraube 21

D – 03238 FINSTERWALDE

Contact:

Dipl.-Ing. Ulrich Wackernagel

phone: +49 (0) 35 31 50 12 24 fax: +49 (0) 35 31 50 78 39

mobile: +49 (0) 172 794 87 10

e-mail: [email protected]

home: www.ferrotrade.de

Italien

B4 Labs Srl

Via Palmanova 30

I – 20132 MILANO

Contact:

Ing. Marko Cicala

phone: +39 (02) 261 113 07

fax: +39 (02) 283 403 80

mobil: +39 (335) 838 48 60

e-mail: [email protected]

home: www.b4labs.com

Güvenal Yön. Dan. Hiz. LTD ŞTİ

Akpınar Ma. 412.Sk. 2/C Akpınar Sitesi Evleri - 1. Etap E Block D:13

TR - OSMANGAZI, BURSA

Contact:

Yasin Güvenal

Managing Director

phone: +90 224 453 52 18

fax: +90 224 453 52 16

mobil: +90 532 726 93 68

e-mail: [email protected]

Tschechien & Slowakei

Václav Engler

Pod ohradou 922

CZ - 33703 ROKYCANY

Contact:

Václav Engler

phone: +420 (373) 541 428

e-mail: [email protected]

Kroatien

Con Global d.o.o.

Dr. T. Bratkovica 1

HR - 400000 CAKOVEC

Contact: Herr Harald Steuff

phone: +385 40 386177 e-mail: [email protected]

home: www.con-global.com

Saint-Petersburg Institute of Mechanical Engineerin

Russia, Saint-Petersburg

Contact:

phd, Associate Professor Evgeniy Olkhovik

phone: +7 (921) 952-12-30 e-mail: [email protected] e-mail: [email protected]

If you are interested please contact our agents or directly Ferro Trade.