An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by : Hibs Alhaj Hala Mahmoud Sabreen Hashesh Safa Qasem Supervisor : Eng. Hussein Abu Znt

An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

Embed Size (px)

Citation preview

Page 1: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

An-Najah national university

Civil engineering department

Graduation project (part 1)

Construction project management

Prepared by :Hibs Alhaj

Hala Mahmoud Sabreen Hashesh

Safa Qasem

Supervisor :Eng. Hussein Abu Znt

Page 2: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

What is the Project Management?

Project Management is the sum of all activities such as Planning, organising, implementing and controlling a project in order to meet the client’s expectation from start to finish within the planned period, budget and quality.

Page 3: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

What is the “Project?”A temporary endeavor undertaken to create a unique product or service

processes are guided through five stages:

initiation Planning Executing Controlling and closing

Page 4: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

A project manager goals and objectives project components quality control

Who is the project Manager?

Page 5: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

Case study

Al_Itiman company leads the taxes departments at Nablus_Mall At Rafidya.

Architectural design was assigned according to the needs of taxes departments. the cost of the project is estimated about 800 thousand shekels.

The budgeted cost is about 700 shekels.

In the sense that there is a deficit at around 100 thousand shekels.

Page 6: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

Objective of the project

value engineering works to reduce costs, this research

deals with the procedures that reduce the cost of the

project.

The cost reduction enables the manager or the

stakeholders to construct the needed project.

Page 7: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

The project assumptionThe following assumptions are presented bellow for the project: 1. Value engineering should leads to minimize the budget cost

2. Other action also should lowering the cost of the project such as ; cost analysis , quantity analysis, and area reduction

Page 8: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

8

Constraints of the project

Page 9: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

Process of solving our problem

• We are going to solve this problem using cost management and the study of value engineering.

Page 10: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

Project methodology The main objective to enlighten the action how to reduce the budget cost.

There are many methods to reduce the project cost .

First to repeat the calculation of the project quantities.

Second to substitute the specifications which called value engineering.

Third cost analysis could make reduction to the cost .

Forth area reduction for not necessary area.

Page 11: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

Project methodology

The proposed methodology that should be implied on the research is presented as follows:

Scope Management time Management Cost Management Quality Management Communications Management Risk Management Integration Management Procurement Management Human resource management Value engineering (VA)

Page 12: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

Value Engineering

Examination of function

product Services

By using

Systematic method

To improve

Valu

e En

gine

erin

g

Page 13: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

____Quality

CostValue=

Value can therefore be increased by either improving the function ( performance , quality ) or reducing the cost

By using VE we have a powerful proven methodology to:

- Solve problems.- Reduce costs.- Improve quality.- Improve performance.-Maintain intended functions.

so

Page 14: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

Cost management

The budget

Planning Controlling

O f

Is process

Page 15: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

Project cost management (PCM)

It is a method which uses technology to measure cost and productivity through the full life cycle of enterprise level projects.

In general, the steps of project cost management can consider as:

• Resource Planning.• Cost Estimating.• Cost Budgeting.• Cost Control.

Page 16: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

WHEN WE HAVE PRPBLEM WE HAVE TOW TYPE OF COST:PREVINISION COSTAPPRASIOAL COST(THE BEST TYPE)

Page 17: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

Discussion and conclusion

We know that our graduation project have two parts Part 1 is project of studying basic and main principle of project management that means this part is aproject of information about our case study or engineering problem that is budget control (reducing the estimated cost )

Page 18: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud

part 2 is project of application for all we studied in part 1 Apply the overall cost management methods and tools to ensure minimizing the cost as possible. And Use project management software (like primavera project planner or Ms-project software) as a tool- not as a substitute for effective planning or interpersonal skills.

Page 19: An-Najah national university Civil engineering department Graduation project (part 1) Construction project management Prepared by: Hibs Alhaj Hala Mahmoud