Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
03/000
15th International Laser Ranging Workshop 15th – 20th October2006
Canberra
Australian Government
Geoscience Australia
An Optimised Global SLR Network for Terrestrial Reference Frame Definition
Ramesh GOVIND
Overview• Introduction • Baseline Data and Solution • Simulated Data Set• COM Results• Simulation Study Summary• Global Simulation• Optimised Network Approach
Introduction
• Study to evaluate the contribution of an additional SLR station in northern Australia
• Measure: Earth Centre of Mass – a primary SLR product
• Site chosen: Tennant Creek– Same number of cloud free days as Yaragadee– Site options further north are limited by weather
Baseline Data and Solution
• 2005 Lageos-1, Lageos-2 • 52 Weekly arcs• Subset of the original 14-year solution from
Lageos-1 and Lageos-2 combination
Simulated Data Set
• Tennant Creek [S19º39’19.5”; E134º11’32.6”; 410.7m]
• Data simulated from the final orbits of the baseline solution for each respective week
• Noise added to the “perfect” data – 10 mm seed – same as the orbit fits for the baseline solution
• Data volume controlled to be within the weekly data from Yaragadee and Stromlo
Simulated Data Set
• Data Volume– 5-day week– Night operations only– 8-hour shift– Data losses due to weather not accounted
• Combined the 2 data sets for each weekly solution
Simulated Data Set
Lageos-1 No. of Observations
050
100150200250300350400450
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49
Week Number 2005
No
of N
orm
al P
oint
s
Moblas-5 Stromlo Tennant Crk
Simulated Data Set
Lageos-2 No. of Obseravtions
0
100
200
300
400
500
6001 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46
Week Number 2005
No
of N
orm
al P
oint
s
Moblas-5 Stromlo Tennant Crk
CoM Results
X-CoM Tennant Creek Simulated
-0.04
-0.03
-0.02
-0.01
0
0.01
53300 53400 53500 53600 53700 53800
MJD -- Weekly Arcs 2005
X-C
oM --
met
res
SLR Data SLR Data + Tck Sim
CoM Results
Y-CoM Tennant Creek Simulated
-0.02
-0.01
0
0.01
0.02
0.03
53350 53400 53450 53500 53550 53600 53650 53700 53750
MJD -- Weekly Arcs 2005
Y-C
oM --
met
res
SLR Data SLR Data + Tck Sim
CoM Results
Z-CoM Tennant Creek Simulated
-0.08
-0.06
-0.04
-0.02
0
0.02
53350 53400 53450 53500 53550 53600 53650 53700 53750
MJD -- Weekly Arcs 2005
Z-C
oM --
met
res
SLR Data SLR Data + Tck Sim
CoM Results
0 (2)0 (1)0 (2)Simulated-10 (10)2 (6)-1 (6)Baseline
Z-CoM-Mean(RMS); mm
Y-CoM-Mean(RMS); mm
X-CoM-Mean
(RMS); mm
Solution
•No “truth” to compare with•Mean and RMS of the 2 solutions compared
Simulation Study Summary
• additional SLR station in Australia (in the vicinity of Tennant Creek) and,
• operating at the same levels of productivity and precision as Mount Stromlo and Moblas-5)
• change in the determination of the Earth’s CoM by 7mm, -3mm 13mm in the X, Y, and Z components and, more importantly,
• showing a week-to-week consistency in the estimates.
Global Simulation
• New Approach for an optimised global network
• Structured
• Rational
Lageos-1 Observations Week 060702
15 observing stations
Lageos-1 Observations Week 060917
22 observing stations
Optimised Network Approach
• Lack of continuous tracking
• Stability of Geometry -- Changing network
Simulated Sites -- Distribution
22 observing stations
Optimised Network
• Current status– Simulated Lageos-1, Lageos-2 data for 11 stations
for all of 2005– First priorities in the study – Hawaii and Bangalore– Computations being done– Results pending