LOT Analysis Work Procedure
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 2/23
© Samsung Electronics. All Rights Reserved. Confdential and 2
LOT Analysis Work Procedure
ontents
I. Actix KPI Report generation procedure
II. KPI PASS CASE ork procedure
III.KPI !AIL CASE ork procedure
I".Analysis ork procedure #or eac$ Layer
". Appendix
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 3/23
© Samsung Electronics. All Rights Reserved. Confdential and 3
LOT Analysis Work Procedure
Actix Report generation process
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 4/23
© Samsung Electronics. All Rights Reserved. Confdential and 4
LOT Analysis Work Procedure
ActixOne Report C$eck
No
Owner JobCategory
Job Title Description Tool Output Next StepReferenceMaterial
%Coordinator
Check DTinformation
Check og !ile Count
- his stage is can !e apply
"P# Pass case only- #$ "P# $ail case% go to ne&t
slide
Check Dri"e Test Date #Duration
- 'rive start and end date
&
Analy(er
Coordinator
Report
$eneration
Compare og %le count- Compare )og fle counts *ith
+,S and processed logs inActi&
- Acti
&
- #$ mismatch log fle count*ith Acti& processed and+,S% re-uest to roupload missing logs to+,S
' $enerate Report- Chec/ *hether the "P#
results are properly visi!le ornot
- #$ generated "P# report ishaving pro!lems% re-uestto 0E1 team to f& thepro!lems
( Analy(er&reparation
&reparation for createanalysis Report
Acti&1ne report generation methods
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 5/23
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 6/23
© Samsung Electronics. All Rights Reserved. Confdential and 7
LOT Analysis Work Procedure
KPI PASS ASE ork procedure
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 7/23© Samsung Electronics. All Rights Reserved. Confdential and 8
LOT Analysis Work Procedure
Work Procedure #or KPI All pass case
No
Owner
JobCategory
Job Title Description Tool Output Next StepReferenceMaterial
% Analy(er
Check +&, Result
- his stage is can !e apply
"P# Pass case only- #$ "P# $ail case% go to ne&t
slide
&
Analy(er
&reparation forReport
Create -.Cap input (ata - 0eed to create 9Cap input
data through the CellRe$ - E&cel
,acro
9Cap input fle E&cel5 E&cel tool $or createinput data andchec/ !asicin$ormation'
Create 'nyplan input(ata
- 0eed to create Anyplaninput data through theCellRe$
Anyplan #nput fleCS:5
(
Analy(er
Check&oints
&C, Obser"e(
- Chec/ *hether the PC#s inthe cluster is detected all ornot. #$ not must !e descri!e*hy can;t detected
- AnyPlan
- #$ not o!serve onairsite PC#s% must !ere-uest to additionaldrive $or that missedPC#s coverage
PC# 1!served chec/method
) Sector Swap - #$ o!served sector s*ap%
re-uest to f& it to circle - AnyPlan
Sector s*ap chec/method
* Stationary Test- 0eed to chec/ ho* long
time stationary test. #$ morethan 2< min% 'rive Re=ect.
- 9Cap- E&cel
,acro
- Chec/ Result- Re=ect Report
Stationary test chec/ method
+ og %les Re.use( - #$ there have log fles are reused case% 'rive Re=ect
-Acti&Report - Re=ect Report
, Missing route check
- Compare *ith actual driveand planned drive route. #$less than ><? coveredplanned ' route% 'riveRe=ect.
- 9Cap- ,apin$o
- Compare Result- Re=ect Report
' Route calculationmethod
-ReportSubmit
Submit +&, &'SS reportto Site!orge
- #$ have no any issues thata!ove mentioned issues%than upload "P# PASS report
to Site+orge.
- E&cel,acro
C@ otal scope Planned sites B Actual 1nair5 sites B 1!served PC#5 #$ mismatch count *ith Actual and o!served PC# cell% then must !e include =ustifcation reportC2 Planned 'R ",) +ormat5C3 Actual ' route #$ Actual ' covered is less than ><?% then must !e include =ustifcation report5C4 ' Se-uence and ' cycle.
Man(atory up(ate items before submit Site!orge
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 8/23
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 9/23@3 © Samsung Electronics
'nalysis DT/ +&, &ass rate
lan for Circle issue 0,nformation mismatch with 'ctual an( Site!orge1
Not properly implemente( on the %el( base on optimi)er recommen(e( parameters2
3 SO&'R 43 NO&T 4
Change &56&ara2 On site
3 Circle Team4
Recommen(ation
Site!orgeSuggestion
%el(
Region Coor(i2
3 SMR4
SMR *ngineer
Physical parameter change !y S1)PAR according to site$orge suggestion value
R! ea(+eed!ac/ updated value
Change re-uest EiltB0R through Fira
Provide changed EiltB0R value through Fira
#n$orm Changed value to 01P Region Coordi +ill in value atrecommend sheet $eed!ac/ G Remar/ column5
#nput Actual value into site$orge
@
2
@,ost o$ nono!servant step is here
2 Analy(er do not /no* *hether the a(imuth andtilt properly change or not until chec/ relatedphotos
Anytime can request If analyzer neededrelated photos that antenna azimuth andtilt
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 10/23© Samsung Electronics. All Rights Reserved. Confdential and @<
LOT Analysis Work Procedure
C$eck points Case o# detail points Conclusion
ecisions #or next step /KPI PASS Case0
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 11/23© Samsung Electronics. All Rights Reserved. Confdential and @@
LOT Analysis Work Procedure
KPI !AIL ASE ork procedure
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 12/23© Samsung Electronics. All Rights Reserved. Confdential and @2
LOT Analysis Work Procedure
Work Procedure #or KPI !ail case
No
Owner JobCategory
Job Title Description Tool Output Next StepReferenceMaterial
%
Analy(er B)S,Engineer
,nformation'c7uisition
Re7uest SM,nformation
- Alarm History
- 0eigh!or )ist- Ping est Result- ) #nter$erence- :SDR- RE Status- P"6 #n$ormation- 6olden
Parameter- 6P )oss
& Analy(er
Check
antennaparameter
Compare with suggeste(
physical antennaparameter an( R*TStatus
- Should !e chec/ *hether the
physical antenna parametersare applied on the feld ornot
- )S, #n$o - Compare Result
- #n case o$ notproperly applied
Physical antennaparameters on thefeld% drive re=ect
'Analy(er
CompareDT Route
Missing Route Check
- Compare *ith actual driveand planned drive route. #$less than ><? coveredplanned ' route% 'riveRe=ect.
- ,ap#n$o- 9Cap
- Compare Result- Re=ect Report
' Route calculation ,ethods
(Analy(er
Checkpoints
Stationary test- 0eed to chec/ ho* long time
stationary test. #$ more than2< min% 'rive Re=ect.
- 9Cap- E&cel ,acro
- Chec/ Result- Re=ect Report
Stationary test chec/ ,ethods
og %le Re.8se( - #$ there have log fles are re
used case% 'rive Re=ect - Acti& Report - Re=ect Report
)Analy(er
'nalysis +&, !ail analysis
-#n case o$ included )@ $ail%per$orm to Anyplan analysis
- #n case o$ *ithout )@ $ail%per$orm to 9Cap analysis
- AnyPlan- 9Cap- ,apin$o
- 6lo!al,apper
- E&cel ,acro- )S, #n$o
- Analysis Result- Recommendatio
n
)@ Analysis ,ethods)2 Analysis ,ethods)3 Analysis ,ethods
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 13/23© Samsung Electronics. All Rights Reserved. Confdential and @3
LOT Analysis Work Procedure
KPI !AIL ase ork procedure
Circle !MS 'ctixOne Coor(inator 'naly)er SM Description
"P#ResultChec/
Re-uest )S,#n$ormation
- Alarm History- 0eigh!or )ist- Ping est Result- ) #nter$erence- :SDR- RE Status- P"6 #n$ormation- 6olden Parameter- 6P )oss
Check se"eral
points- PC# 1!served- Sector s*ap- Stationary
test- )og fle Re
used- Site Alarms- ,issing route
chec/
Additional drive is !elo* 2 cases only0ot o!served PC# B #$ !et*een ><? and ? 'Covered:erifcation test
a$ter f& sectors*ap issue
Additional 'rive
Dhole Re'rive
- elo* ><? covered 'rout
- 1!served Stationarytest
-1!served )og fle Resed
Re=ect report
"P# Analysis Report
Re-uest to :alidate
Share *ith Circle team
9Cap Analysis
Anyplan Analysis
Chec/ *hether the
any reason o$ impactto "P# results are thereor not- Sector S*ap- sed *rong +P
server- ,issing drive $or
ma=or road
Chec/ ' Route
elo* than ><?
et*een ><? and ?
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 14/23© Samsung Electronics. All Rights Reserved. Confdential and @4
LOT Analysis Work Procedure
C$eck points Case o# detail points Conclusion
ecisions #or next step /KPI !ail Case0
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 15/23© Samsung Electronics. All Rights Reserved. Confdential and @
LOT Analysis Work Procedure
nalysis ork procedure #or eac$ Laye
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 16/23
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 17/23© Samsung Electronics. All Rights Reserved. Confdential and @8
LOT Analysis Work Procedure
Exceptional case detai l process
Circle 'naly)er '(nan> Siksha RJ,
C)1 $ail reason analysis
!actor of *xceptional
nsta!le terrainHighRise !uilding !loc/Heavy visitation locationScattered Clutters
Possi!le to improve via 1P
Preparation $or e&ceptionalReport
Study
Suggest physical antenna parameter
'iscuss *ith RF#) $or e&ceptional case
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 18/23© Samsung Electronics. All Rights Reserved. Confdential and @>
LOT Analysis Work Procedure
RSRP K PI #a i l 1 antenna para2eter c$eck
Circle Coor(inator 'naly)er Description
Complete '@ 'rive testChec/ "P#
Result
Plot RSRP "P# on ,ap
#$ RSRP"P# is $ail and N <?
Chec/areas o$
very poorRSRP
#$ the very poor RSRP area are suspectedthat particular sites antenna status is not
properly implement on the feld such as*rong a(imuth% and tilt settingRe-uest to veri$y
antenna parameters tocircle team
0eed to ta/e photos o$antenna and provide tooptimi(ation engineer
+allo* normal analysisprocess
Currently a large num!er o$ clots are $ailing due to only RSRP "P# $ailing.
1n o$ the reasons $or this "P# $ailing% is that antenna para2eters on
#ield are not 2atc$ing cellre#
So the suggestion is that% every time $or a clot% RSRP "P# is $ailantennaparameter recommendations should !e verifed as le$t process
1nly once antenna parameter values are match *ith CellRe$ then proceed normal analysis process
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 19/23© Samsung Electronics. All Rights Reserved. Confdential and @
LOT Analysis Work Procedure
L& !AIL Analysis ork procedure
Coor(inator 'naly)er SM N*O Team
Re$er to )@ analysisprocess
Chec/ "P#+ail items
'efne lo* throughputarea
9CAP Analysis
1ther #ssue
+P #ssue
ac/haul #ssuesHigh ) #nter$erence
RSS#5
Handover #ssues
E #ssues
Site Alarms
R+ #ssue
Create "P# AnalysisReport
Re-uest to :alidate
Share *ith circleteam
1vershooting
Poor Coverage
Shado* area
S1)PAR #ssues
PC# Collusion
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 20/23© Samsung Electronics. All Rights Reserved. Confdential and 2<
LOT Analysis Work Procedure
L' !AIL Analysis ork procedure
Coor(inator 'naly)er N*O S, Team
Re$er to )@ analysisprocess
Chec/ "P#+ail items
'efne )3 +ail )ocation
9CAP Analysis
R! ,ssue
Create "P# AnalysisReport
Re-uest to :alidate
Share *ith circle
team
1vershooting
Poor Coverage
Shado* area
S, ,ssue
Other ,ssue
E Confguration Error
High ) #nter$erence
74OA, 1C0S )oading
Site Alarm
High 6P )oss
+or all o$ third party issue cases are
must !e in$orm to S# team to analysis*ith S# rac/er
S1)PAR #ssues
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 21/23© Samsung Electronics. All Rights Reserved. Confdential and 2@
LOT Analysis Work Procedure
Appendix
8/16/2019 Analysis Work Procedure_V1.0.2
http://slidepdf.com/reader/full/analysis-work-procedurev102 22/23
© Samsung Electronics. All Rights Reserved. Confdential and 22
LOT Analysis Work Procedure
Any case o$ antennaoptimi(ation
0eed tochec/
other !andclusterstatus
"P# All passed0ot start C)11ptimi(ation
#nProgress C)11ptimi(ation
Should !e same physical antenna parameters *ithconfguration o$ other !and settings
Physical antennaparameter
Recommendation