45
Page 2 Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study Faheem Merchant MPhil in Engineering for Sustainable Development August 2010 Supervisor: Dr. Heather Cruickshank Dissertation Submission to Department of Engineering University of Cambridge

Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Embed Size (px)

Citation preview

Page 1: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 2

Analyzing the sustainability of community driven development in

Afghanistan using the National Solidarity Program case study

Faheem Merchant MPhil in Engineering for Sustainable Development

August 2010

Supervisor: Dr. Heather Cruickshank

Dissertation Submission to Department of Engineering University of Cambridge

Page 2: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 3

Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Abstract

In the same way that microfinance initiatives provide resources to individuals and

allows them the decision making freedom for the best projects to pursue, community driven

development (CDD) provides small villages with funding to develop communities as free

decision making bodies responsible for their own development. The National Solidarity

Program (NSP) is Afghanistan‘s community driven development initiative. Although the NSP

is recognized as a successful programme, the long term sustainability of NSP has not been

understood and this research investigates the NSP using many different characteristics

including cost, time, funding, maintenance, lifespan and resiliency, insurgency attacks, skills

development, dependency on government, community skills development, transparency and

social cohesion. The sustainability of the NSP is a key focus of future World Bank

investment in Afghanistan and the results can potentially be used by other countries

considering their own CDD implementation in the future.

Page 3: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 4

Introduction

COMMUNITY DRIVEN DEVELOPMENT

Community driven development (CDD) is a development initiative that provides

control of the development process, resources and decision making authority directly to

community groups. The underlying assumption of CDD projects are that communities are the

best judges of how their lives and livelihoods can be improved and, if provided with adequate

resources and information, they can organize themselves to provide for their immediate

needs. Moreover, CDD programmes are motivated by their trust in people (Naidoo and Finn,

2001) and hence it advocates people changing their own environment as a powerful force for

development. By treating poor people as assets and partners in the development process,

previous studies have shown that CDD is responsive to local demands, inclusive, and more

cost-effective compared to centrally-led NGO-based programmes. CDD can also be

supported by strengthening and financing community groups, facilitating community access

to information, and promoting an enabling environment through policy and institutional

reform (Dongier, 2002). CDD projects work by providing poor communities with direct

funding for development with the communities then deciding how to spend the money.

Lastly, the community plans and builds the project and takes responsibility for monitoring its

progress.

Following from this description, field practitioners at the World Bank have denoted

five key characteristics of CDD projects.

1. A CDD operation primarily targets a community based organization or a

representative local council of a community. This community focus means that the

essential defining characteristic of a CDD project is that the beneficiaries or grantees

of implementations are agents of the community. Since the focus on small

communities is so large the CDD normally targets small scale subprojects in the

community.

2. In CDD operations, community or locally based representation is responsible for

designing and planning the subprojects in a participatory manner. Since the

concentration on participatory planning is considerable in CDD operations, often the

possible types of subproject investment options are very large with only a small list of

subprojects that cannot be carried out.

3. The defining characteristic of CDD projects is that a transfer of resources to the

community occurs and control of the resources is delegated to the community. The

amount of transfer and control of resources will depend on the CDD implementations.

Page 4: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 5

4. The community is directly involved in the implementation of the subproject. Often the

participation of the community comes directly in the form of labour or funds.

However, the community may also contribute to the subproject indirectly in the form

of management and supervision of contractors or the operation and maintenance of

the infrastructure when complete.

5. An element of community based monitoring and evaluation has become a

characteristic of CDD subprojects. Most often it is social accountability tools such as

participatory monitoring, community scorecards and grievance redress systems

which allow for the community to ensure accountability of the CDD implementation.

CDD vs. CBD

Community driven development is derived from community based development

(CBD) which can include a much broader range of

projects. For example, CBD projects can include

everything from simple information sharing to

social, economic and political empowerment of

community groups. However, CDD projects fit on

the empowerment end of CBD by actively

engaging beneficiaries in the design, management

and implementation of projects. The stress on actual control of decision making and project

resources at nearly all stages of a subproject cycle distinguishes CDD from the previous

generation of CBD projects. In this continuum of community participation covered by CBD,

new-generation CDD projects are located at the extreme right of the axis as shown in Figure

1 (Tanaka, 2006).

Since community driven development has only recently diverged from the broad

community based development there are a few contrasts visible in the five characteristics of

CDD programmes. In essence, all five properties of CDD projects exist together only in the

newer generation of CDD implementations. Nevertheless, the first attribute of community

focus would apply to all CDD projects and CBD projects. In contrast, the second

characteristic of participatory planning and design and the fourth property of community

involvement are often visible among all CDD projects but very rarely in CBD projects.

Moreover, community based monitoring and evaluation which is the fifth aspect of CDD

projects is only found in the some of the newer projects. The fifth characteristic is what

positions many of the newer CDD projects in the extreme right of the CDD cluster as

diagrammatically demonstrated in Figure 1. As mentioned above, the third characteristic of

Figure 1 – Community driven development is a subset of community based development.

Page 5: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 6

community control of resources seems to be the key factor to conceptually distinguish

between CDD and CBD projects. However, many of the early NGOs implementing CDD

projects did not always interpret this factor rigorously (Tanaka, 2006). Thus, the distinction

between CDD projects and CBD projects with CDD components was not always clear;

however, this would be expected since there was a gradual evolution of CDD out of CBD.

To alleviate the earlier problems of overreliance on central governments as the main

service provider, CDD programs were launched by the World Bank to improve the

accountability and services in key areas. However, NGOs quickly learned that well designed

and implemented CDD programmes had ripple effects of promoting equity and

inclusiveness, efficiency and good governance. By effectively targeting and including the

vulnerable and excluded groups, as well as allowing communities to manage and control

resources directly it was evident that CDD programs could allow poverty reduction projects

to scale up quickly. Efficiency is gained through demand responsive allocation of resources,

reduced corruption and misuse of resources, lower costs and better cost recovery, better

quality and maintenance, greater utilization of resources, and the community‘s willingness to

pay for goods and services. Good governance is promoted by greater transparency,

accountability in allocation and use of resources because the community participates in

project decision-making processes. Some of the principles of CDD—such as participation,

empowerment, accountability, and nondiscrimination—are also worthy ends in themselves

(Asian Development Bank, 2008).

It was as early as 1881 when T.H. Green who wrote about the maximum power for all

members of human society alike to make the best of themselves (Zakaria, 1999). However,

it was not until the 1970s with John Rawls’ book ―A Theory of Justice‖ and in the 1990s with

Amartya Sen‘s book ―Development as Freedom‖ where the notions of substantive freedom

and the multidimensional nature of poverty were made explicit to the multilateral

development banks. This recognition of the multidimensional nature of poverty as well as the

combined failures of both markets and governments and the socio-political complexity of

ground level realities has made it clear that relying on traditional top-down, state-led, ―big

development‖ strategies would not be effective to combat poverty. Moreover this resurgence

in participatory development and bottom up approaches in the NGO and development sector

has come in only the last two decades as explained above.

EXPANSION OF COMMUNITY DRIVEN DEVELOPMENT

Page 6: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 7

Since the mid-1990s, community driven development has emerged as one of the

fastest growing investments by NGOs, aid organizations and multilateral developments

banks. This continued investment in CDD has been driven mostly by a demand from donor

agencies and developing countries for large-scale, bottom-up and demand-driven, poverty

reduction subprojects that can increase the institutional capacity of small communities for

self-development. The success and scale of some CDD projects in the World Bank are

especially notable. The World Bank supported approximately 190 lending projects

amounting to $9.3 billion in 2000–2005 (Tanaka, 2006). Initiated by the International

Development Association (IDA) at the World Bank, CDD projects have been instrumental in

harnessing the energy and capacity of communities for poverty reduction. Since the start of

this decade, IDA lending for CDD has averaged annually just over 50 operations, for an

average total of US$1.3 billion per year (International Development Association, 2009).

Even the Asian Development Bank (ADB) has funded 57 projects worth about $2.5

billion between 2001-2007 that included community driven development approaches to

enhance deliver of inputs and beneficiary participation. They constituted 14% of the total

loans approved by the Asian Development Bank during this period. Over one-third of the

projects were in the agriculture and natural resources sector, followed by a smaller

proportion of water supply and sanitation, waste management, education and health

projects. The projects were primarily in Southeast Asia, South Asia, and Central and West

Asia, where the developing country governments were investing in rural development

programs (Asian Development Bank, 2008)

In the last few years the International Fund for Agricultural Development has been

working with the Agence Française de Dévelopement (AFD), the African Development Bank

(AfDB), the European Union (EU), the Food and Agriculture Organization of the United

Nations (FAO), the UN Capital Development Fund (UNCDF) and the World Bank to create a

platform for learning and sharing knowledge on community driven development

(International Fund for Agricultural Development, 2010). Intensive forms of community

participation have been attempted in projects of several donors for many years. Bilateral

donors, such as the Department for International Development (DFID) of the United

Kingdom and the Canadian International Development Agency (CIDA), have used CDD-type

approaches for a long time as part of their sustainable livelihoods and integrated basic

needs development assistance in developing countries. The Swedish International

Development Agency (SIDA) and Danish International Development Agency have used CDD

principles in the mandate of a rights-based approach to the development projects they fund

(FAO, 2010).

Page 7: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 8

As described earlier, most of the multilateral development banks have large

community driven development programs, however, this paper will focus on the World Bank

CDD programs. More than 80 countries have now implemented CDD projects. The breadth

and activities funded by the CDD programs at the World Bank can be explained by providing

a brief overview of a few of them.

The Second National Fadama Development Project II (NFDP-II) targets the

development of small scale irrigation, especially in the low-lying alluvial floodplains or

"Fadama‖. NFDP-II increased the productivity, living standards and development capacity of

the economically active rural communities while increasing the efficiency in delivering

implementation services to an estimated four million rural beneficiary households and raising

the real incomes of households by 45 percent (African Development Bank, 2003). The Social

Fund for Development in Yemen provided support 7 million people of which 49 percent were

female and generated 8,000 permanent jobs. It also increased the number of girls‘ schools

from 502 to 554 and basic education enrollment rates from 63 percent to 68 percent. The

program focuses on helping the poor to help themselves through providing income-

generating activities and building community infrastructure rather than making cash transfers

(El-Gammal, 2004). The Social Investment Fund Project V in Honduras benefited 2.5 million

people with the implementation of 2,888 projects (1,446 rehabilitated schools, about 700

new schools, 163 new health centers, 347 small water/sanitation systems, and 461 latrines)

resulting in all children in the targeted areas attending primary school. In addition the project

communities were provided with better access to health care assistance and access to

running water (Perez de Castillo, 1998). The Andhra Pradesh Rural Poverty Reduction

Project (APRPRP) in India has help to organize 10.1 million rural poor women into

community based organizations that collectively save over US$770 million and leverage

credit over $2.7 billion from commercial banks (World Bank, 2003). The Kecamatan

Development Program (KDP) in Indonesia which is what the National Solidarity Program in

Afghanistan is based on has benefitted 18 million people by providing better services which

include more than 37,000 kilometers of local roads and 8,500 bridges, 9,200 clean water

supply units, and 3,000 new or improved health posts. In addition, more than 1.3 million

people obtained loans to start or complement local businesses through micro-financing

(Guggenheim, 2004). Lastly, the National Solidarity Programme (NSP) in Afghanistan will be

the focus of this research. In this implementation elected village-level community

development councils, which include women, use grants and local labor to rebuild bridges

and roads, fix schools and install water pumps to benefit 13 million people across

Afghanistan thereby building state credibility and strengthening local democracy.

Page 8: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 9

Literature Review of CDD Sustainability

While success stories are mounting, there are limitations, challenges, and risks that

need to be considered carefully when developing and implementing CDD projects. Despite

the success of CDD programs and rapid increases in support, the approach still has critics.

A recent evaluation of community-based development (CBD) and CDD in the World Bank

was particularly critical about the shortcomings of these approaches. Some of the main

criticisms were that CBD and CDD projects undertaken by the World Bank lack

sustainability, are prone to elite capture, create parallel institutional structures, require

special guidance on fiduciary and safeguard compliance, lack effective evaluation of poverty

impact, and are costly to prepare (World Bank, 2005).

Another major criticism of CDD projects has been the scalability aspect of the

program. For example Indonesia‘s Kecamatan Development Program (KDP) encountered

difficulties scaling up transparency, accountability and participation (Gillespie, 2004). In

Indonesia, the KDP encountered several challenges when attempting to scale up

empowerment and sustainability (Biswanger, 2003). Moreover scaling coverage and scaling

organizations have been major concerns and discussed widely in the literature, but the

sustainability of coverage and sustainability of organizations has not been addressed

(Gillespie, 2004).

It is amply clear that there are many issues with the current models of CDD instituted

by the World Bank as described above. However, this paper will be focused on the

sustainability aspects of CDD. It will concentrate on the sustainable development of CDD

once the program has been implemented. There are currently various definitions of

sustainable development, however, this paper will utilize the widely accepted definition of

―sustainable development‖ put forward by the World Commission on Environment and

Development (WCED) which is as follows: ―Sustainable development is development that

meets the needs of the present without compromising the ability of future generations to

meet their own needs‖ (WCED, 1987).

Although this definition would suffice for a general understanding of sustainable

development, the question still outstanding is: what does sustainable development mean in

the context of community driven development. Recent interviews conducted with staff at the

World Bank revealed a wildly different understanding of sustainability in the context of CBD

and CDD. For some it implies sustainability of community processes, for others CBD/CDD is

simply a means to an end, and sustainability is related to infrastructure investments. For still

Page 9: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 10

others, it is related to the overall resource allocation, including support for decentralization

(World Bank, 2005).

Although this paper will look at sustainability from several perspectives, it will first

outline the current research conducted and conclusions drawn regarding sustainability of

CDD in governance, resources, social cohesion, maintenance and infrastructure. It will then

go on to outline the gaps in sustainability research which have not been explored at all such

as funding, time, disaster resiliency, insurgency and community pride. This paper will then

classify the research papers that it will leverage and the objectives this research will

accomplish. It will then conclude with a justification of why this work is an essential

component of research in the field.

SUSTAINABILITY OF LOCAL GOVERNANCE

There have been several qualitative studies indicating that CDD initiatives are

dependent on the accountability of local leaders to their community and success of projects

is dependent on agents and facilitators. Although the community development councils play

a major role in the local governance process, there is still no consensus on how they might

relate in the long term to the constitutionally-mandated local representative structures.

Research also claims that councils remain very dependent on their NGO partners. Moreover,

the work conducted on understanding the council and local governance structures in

Afghanistan proves that state buildingis quite extensively analyzed as well as demand driven

governance and governance in post-conflict situations (World Bank, 2005).

In addition, there has been some research conducted on the sustainability of

community development councils (Brick, 2008). From a local governance perspective of

sustainability, this paper will focus on how community development councils can evolve to

be self sustaining bodies with governmental functions. Although there has been some

research on initiating participatory development and sustainability, this paper will mostly be

focused on ensuring that the existing structure and processes can be sustained in the long

run.

SUSTAINABILITY OF RESOURCES

In terms of the sustaining the resources that are available for community based

projects several studies have shown that unless there is a continued lobbying effort by the

community they will suffer from neglect by the local government. This is in spite of the fact

Page 10: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 11

that community driven projects are considered more sustainable that top down projects.

Since many communities are able to extract resources by depending on government

support, investment for the inputs, maintenance and training of staff to sustain the project

falters (Frances, 1999). Moreover the poor are not able to fund their own teachers, doctors,

desks and medicine to sustain the initial benefits of the project (Kleeimer, 2000). To

accommodate for this dependence, this paper will also analyze the ability to secure

resources for the sustainability of CDD projects.

SUSTAINABILITY OF SOCIAL COHESION

Current research shows that the sustainability of projects is expected to improve by

enhancing community cohesion or social capital. However, the actual intensity of social

bonding and community effectiveness is not clear (World Bank, 2006). It is likely that CDD

projects are more effective in a socially cohesive community with better networking and

education, therefore benefiting the community. However, there is clearly no reliable evidence

on community participation projects actually increasing a community‘s cohesiveness. This

paper will seek to validate whether CDD projects improve the long term social cohesiveness

of a community using perspectives of NGOs who work with communities implementing CDD.

SUSTAINABILITY OF MAINTENANCE

In a recent study conducted on sustainability 37 percent claimed it was unlikely and

more than 30 percent rated it as non-evaluable or uncertain. The more interesting scenario

of those that rate projects sustainable have raised concerns about maintenance not being

sustainable (World Bank, 2005). One reason for this is that poor communities often find it

hard to raise funds for continuous maintenance of projects (Mansuri and Rao, 2003) In fact,

not only are communities unable to raise funds for maintenance they are also dependent on

external agencies for maintenance of community infrastructure (World Bank, 2006).

However, these are not conclusive results. There has been evidence to suggest that projects

managed by communities are more sustainable than those managed by local governments

(Asim Ijaz, 2001). Moreover, multiple researchers have also found a strong association

between the participation of community members and long term sustainability of projects

(Katz and Sara, 1997). In another study on community investments conducted by the World

Bank, the impact evidence showed that ―the majority of infrastructure appeared to be well

constructed and operating adequately and levels of maintenance were equivalent or better

than comparators.‖ (Rawlings, 2004). This paper will leverage these results and analyze the

Page 11: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 12

long term maintenance of infrastructure projects and whether the maintenance of CDD

projects in the Afghanistan is sustainable.

INFRASTRUCTURE SUSTAINABILITY

Additional studies conducted of CDD projects such as schools and health centres at

the community level in many countries has found that it is often difficult to sustain the

interventions beyond the initial work conducted by the Bank. Although ―the communities are

initially successful at creating the project, they lack the material resources to sustain their

building efforts‖ (Mansuri and Rao, 2003). Another question that has arisen is whether

community participation actually improves the sustainable of infrastructure projects. This has

not been fully answered since many evaluations have been conducted in the first three years

of the infrastructure building and it is ―difficult to find a comparable counterfactual for them, it

is difficult to tell if facilities assisted by the social fund‖ do produce more sustainable

infrastructure (Ana Ibanez, 2002). This paper will also investigate the sustainability of

infrastructure projects in the context of CDD as it appears that their sustainability has not

been the subject of much analysis (CIDA, 2007). In fact the evaluation of infrastructure

interventions has not been considered in most monitoring and evaluations (World Bank

Annual Report, 2009).

RESEARCH FOCUS

The above literature review makes it abundantly clear that the analysis of CDD

projects with respect to sustainability has been concentrated on local governance,

community development councils, resources, social cohesion, maintenance and

infrastructure. However, other aspects of sustainability such as funding, time, disaster

resiliency, insurgency and community pride have not been explored as extensively. In a

development context it is evident that ―advances in one sector cannot be sustained in the

absence of progress across society‖ (Centre for Policy and Human Development, 2007). To

provide this holistic evaluation of sustainability in the CDD context this paper will focus on

investigating all the factors which require a long term commitment. This paper will therefore

build on the work of Mansuri and Rao (2004), Wassenich and Whiteside (2004) and the

Effectiveness of CDD evaluation conducted by the World Bank (2005). Although this paper

will draw on the conclusions of the various CDD implementations across the world, the data

and analysis presented will be in the setting of the National Solidarity Program in

Afghanistan.

Page 12: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 13

In terms of sustainability there have been several studies evaluating the quality of

infrastructure projects in the ―Bolivia Social Investment Fund (SIF), Honduras Social

Investment Fund 2 (FHIS2) and Panama Rural Poverty & National Resources Project

(RPNRP). With reports due out on the Pakistan National Rural Support Program (NRSP) –

DEC study, Senegal National Rural Infrastructure Project (PNIR), Benin Social Fund

(AGeFIB), Cambodia Rural Investment & Local Governance Project (RILG), India Andhra

Pradesh District Poverty Initiatives Project (APDPIP), Indonesia Support for Conflict-Ridden

Areas Project (SCRAP) and Malawi Social Action Fund (MASAF)‖ (World Bank, 2005).

However, not much work has been conducted in terms of sustainability with infrastructure

projects in the Afghanistan context, hence the need for this research.

Once complete this research will have two main objectives. Firstly, it will outline the

sustainability of each of the different aspects of the National Solidarity Program. By looking

at a wide set of variables this will allow for a more holistic evaluation of CDD sustainability in

Afghanistan. Secondly, this paper will be able to produce a complete set of variables which

could be utilized to evaluate the sustainability of future CDD programs in other countries.

This set of variables will be essential for the monitoring and evaluation of CDD both at a

local and national level of a country. The primary focus of this research therefore, is to

evaluate the contributions of the National Solidarity Program on sustainable development.

Page 13: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 14

Methodology

This research will be concentrated on the sustainability of the National Solidarity

Program in Afghanistan. This research distinguishes between the national sustainability of

provinces and the local sustainability of communities.

NATIONAL SUSTAINABILITY

The national sustainability research will be focused on the sustainable of scaling up the NSP

in the 34 Afghan provinces using the eight criteria below.

1. Number of field staff deployed

2. Number of communities facilitating partners are contracted in

3. Number of communities mobilized

4. Number of community development councils elected

5. Number of community development plans completed

6. Number of sub project proposals submitted

7. Number of sub project proposal accepted

8. Number of sub project proposals completed

The vast majority of the data used to analyze the national sustainability of scaling up

the NSP is secondary data which has been sourced from the Ministry of Rural Rehabilitation

and Development (MRRD) in Afghanistan. The MRRD is a core structure of ―nearly 600

national staff and two international staff in its headquarters, its six regional and 34 provincial

management units‖ that are responsible for the implementation of the NSP. (World Bank

Annual Report, 2009). This secondary data is referred to as the monthly status reports by

the MRRD. This research uses the monthly status reports of the NSP expansion by

provinces between January 2008 and September 2009. Although the MRRD data reports on

the expansion by district, this research will aggregate the data by provinces and regions to

avoid data overload and to minimize the individual fluctuations across districts in a province.

The assumption placed on this secondary data is that it is objective factual information

reported by the MRRD to external donors. In addition, this research is constrained by the 21

months of data that has been provided by the MRRD and the research will be drawing

conclusions based on information which is nine months old as of this writing in June 2010.

To be able to normalize the above data, it is also necessary to use the population

and area of each of the provinces in Afghanistan. This information has been retrieved from

Page 14: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 15

the MRRD‘s National Area-Based Development Program. This information will be included in

the Annex.

LOCAL SUSTAINABILITY

The local sustainability of communities will also be analyzed as part of this research

to provide a holistic analysis of CDD sustainability in Afghanistan. Ideally, this analysis would

be conducted by speaking to community development councils and local members to identify

the individual factors affecting the NSP sustainability in the communities. However, since this

was not possible under the circumstances due to security and sanctioning of travel to

individual CDCs, this research instead surveyed the facilitating partners remotely. It is

understandable that there are bound to be differences between the conclusions drawn from

CDC responses versus facilitating partners, however, every effort has been taken to keep

this to a minimum. It is already known that ―beneficiaries and facilitators have an incentive to

present the impression of a successful project to outsiders and may collude for this purpose.

NGOs often avoid working in difficult communities, where quick results may be harder to

demonstrate.‖ Hence to avoid a false impression of successful projects, interviews were not

only conducted with current facilitating partner employees but also past employees

implementing the NSP in Afghanistan. This provided a measure to control for inflated

accounts of NSP implementations. Moreover, responses were sourced from all 34 provinces

to avoid NGOs not providing data for the difficult provinces. Responses from the MRRD as

well as the World Bank employees were also obtained to provide a legitimate picture from

the central authorities managing the NSP.

As mentioned previously, this analysis used primary data which was collected by

surveying employees at several facilitating partners based out of Afghanistan. Facilitating

partners completed the surveys and provided phone interviews during the months of May

and June 2010. Although there are only 29 facilitating partners contracted by the MRRD for

the NSP in Afghanistan, it is possible for a single province to have several facilitating

partners contracted in that province. This means that there are a total of 91 possible

facilitating partner province combinations and each of the 91 possible facilitating partner

provinces was approached for this survey. For example, three different provincial

representatives for the facilitating partner Afghan Development Association (ADA) were

contacted because the ADA is contracted by the MRRD in Oruzgan, Takhar and Zabul

provinces. Of the 91 possible contacts, 60 have completed and submitted the survey which

translates into a response rate of roughly 66%. The 60 completed surveys provide diversity

in responses from the provinces, facilitating partners and employee positions.

Page 15: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 16

The survey to collect primary data was focused on comparing the current community

driven development approach versus the traditional NGO using such measures as costs for

project, budget expectations, funding from the ministry, community skills development,

maintenance of buildings, infrastructure lifespan, disaster resiliency, insurgency attacks,

community pride, transparency of accounts and social cohesion. The CDD implementation

was compared to traditional NGO projects because a baseline was required for comparison

of the implementation. The majority of facilitating partners have already implemented

traditional NGO projects either in Afghanistan or in other countries.

Page 16: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 17

Case Study

NSP Background

In 2001, after gaining power, Ashraf Ghani had envisioned the creation of several

national development projects which would create public trust in governance. These

programs included a National Emergency Employment Program to provide jobs across the

country, a National Health and Education Program to get basic health packages to citizens

and get children back in school, a National Transportation Program to make Afghanistan a

land bridge for South and Central Asia and the Gulf, a National Telecommunications

Program to set up a cell phone network across the country and attract private investment

and a National Accountability Program to build good financial management (Ghani and

Lockart, 2008) After the Taliban were ousted from power in Afghanistan, the transitional

power also realized that for the people to support the state, the most crucial national

development project had to be visible to the 80% of the population in the rural areas. In order

to interact with these people, engage them in development, include them in the

reconstruction process and provide a uniform approach across Afghanistan, the National

Solidarity Program (NSP) was launched.

As one of the Afghan government‘s National Priority Programs the NSP has been

publicized as one of the most successful CDD programmes in the world to date. As a large

scale rural reconstruction and development programme, the NSP had two primary goals: to

strengthen local governance to foster rule of law and to lay the foundations of community

managed sub-projects comprising reconstruction and development. The reconstruction

efforts would be aimed at improving access of rural communities to social and productive

infrastructure and services. Launched in 2003, the program was instrumental in generating

employment and initiating the rehabilitation of rural infrastructure devastated by severe

drought and two decades of conflict. The president of the World Bank estimates the

economic rate of return on the NSP to be almost 20 percent (Zoellick, 2008).

The NSP is funded by the International Development Association at the World Bank

and the Afghanistan Reconstruction Trust Fund. Implemented by the Ministry of Rural

Rehabilitation and Development (MRRD) and funded by the World Bank, the UK Department

for International Development (DFID), the Danish International Development and Assistance

Agency (DANIDA), the Canadian International Development Agency (CIDA) and the US

Agency for International Development (USAID), the NSP is the Afghan government‘s

flagship programme. Acting as the oversight consultants and responsible for strengthening

Page 17: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 18

local capacity and programme management at the ministry are the consulting firms GTZ and

DAI.

Implementing the NSP

NGOs act as facilitating partners contracted by the MRRD to initiate the NSP and

provide technical and capacity building support to the communities. The MRRD has

developed an operational manual and facilitating partners that are contracted utilize it for

community implementation. The facilitating partners serve many different roles in NSP

implementations including training social community organizers tasked with educating the

community about NSP, engaging community facilitators, providing technical assistance in

designing and building infrastructure, providing election experts to implement CDC elections

and assisting with the monitoring and evaluation of projects.

An NSP project cycle for a community is broken down into 5 steps and usually takes

2 years to complete. First the NSP facilitating partner is assigned to the province by

contracting through the MRRD. The facilitating partner then contacts the community to

inform them of the NSP and commence the community mobilization process. In the second

step, the facilitating partner is responsible for initiating a fair and transparent election

process to elect members of the locally governing community development council (CDC).

The CDCs are elected through a process of identifying the eligible voters in a community,

creating a cluster of approximately 25 families and ensuring at least 80% of the cluster votes

for representatives. The elected CDC members then decide on the CDC president, deputy,

secretary and treasurer. Thirdly, the newly elected CDCs consult directly with members of

the community to reach a consensus list of subproject ideas. This list called the community

development plan (CDP) comprises of projects which can be carried out with funds from the

NSP and independent of outside support. The subprojects which require NSP funding are

then submitted by the CDC to the MRRD and the Oversight Consultant in a proposal. The

facilitating partner is responsible for training the CDC members in project proposal writing,

accounting and procurement. In the fourth step, if the proposal is approved, NSP block

grants are disbursed to cover the purchase of materials. Arriving in installments the funds

are also used for subproject implementation. The CDC continues to report to MRRD and to

the community about the project‘s implementation process and budget. Lastly, the facilitating

partners and CDCs undertake an evaluation of the technical quality of completed

subprojects and documents the lessons learned.

NSP Expansion

Page 18: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 19

Since there is no formal census data available about Afghanistan it is hard to

accurately identify the number of villages. Previously, it was estimated that approximately

20000 rural settlements or villages existed, however this was markedly increased to 42000

villages. Since field coordinators have reported that several of the villages comprise of less

than the minimum of 25 families required to initiate a CDC, it is estimated by the MRRD that

around 28500 NSP communities would be a reasonable equivalent to rural settlements

estimate. This approximation thus average 1 NSP community = 1.474 rural settlements.

However the current average used is 1 NSP community = 1.583 rural settlements. (National

Solidarity Program Website, 2010).

Once fully implemented the MRRD expects to reach all the communities across

Afghanistan through the NSP. The NSP community expansion across Afghanistan has been

divided into several phases. In Phase 1 which commenced in May 2003, 3 districts in each

province were targeted in the first year reaching 6000 communities. In the second year this

target was expanded reaching 4500 more communities which translated into half of

Afghanistan being included in the program. In 2005 or the third year of the NSP an additional

6000 communities were targeted. The NSP Phase 1 concluded in March 2007 reaching

approximately 17300 communities. In Phase 2 which ran from April 2007 until March 2010

the World Bank proposed covering an additional 4300 new communities bringing the total to

21600. This coverage meant that approximately 80-90% of Afghanistan had CDCs. On June

27, 2010 the World Bank announced that it had approved a $40 million USD grant to support

Phase 3 of the NSP. The third phase will build on the achievements of the first two phases of

the NSP and complete the expansion of CDCs to all the rural communities in Afghanistan. In

Phase 3, the Afghan government has introduced several innovations to institute the CDCs

as lasting sustainable bodies of local governance. The expansion will also support the

disbursement of block grants to the remaining 10320 communities for full NSP coverage

across Afghanistan. In addition, to supporting the initial development needs, a second round

of grants will be provided to 17,400 CDCs that have successfully used their initial grant. Most

importantly, NSP III will focus on improving the institutional quality, sustainability and

governance of CDCs and enhance their ability to engage with other institutions. The

sustainability aspect of the NSP will be the focus of this research.

Page 19: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 20

Analysis and Discussion

The national sustainability will be based on the secondary data received from the

MRRD. It will concentrate on measuring the sustainability of the five phases of the NSP as

mentioned previously: community mobilization, CDC elections, preparing community

development plans, submitting proposals and implementing subprojects.

REGIONAL SUSTAINABILITY

Prior to comparing the scalability of the NSP across provinces it would be valuable to

examine the regional differences across Afghanistan. Comparing the population, number of

CDCs, number of proposals submitted and number of subprojects completed across UN

designated regions it is problematic to draw definite conclusions. By separating Afghanistan

into the seven UN regions, the provinces making progress are split between many different

regions. In Figure 2, the regional percentage of population, CDCs, proposals and

subprojects is displayed. For example, the graph shows that although the East has only

about 11% of the Afghanistan‘s population it has 12% of the CDCs, 14.5% of the proposals

submitted and 14% of the total NSP subprojects completed. The West, however, has more

that 20% of the Afghanistan‘s population but accounts for only 14% of all completed NSP

subprojects.

Figure 2 – NSP expansion across UN designated regions of Afghanistan

However, from a development perspective and a security standpoint, the World Bank

and NGOs have remarked that the northern and western regions have made more progress

than the east and south of Afghanistan. This draws doubt to the conclusions above that the

eastern region is developing faster than the western region of Afghanistan. One of the main

reasons for this contradiction is the geography of Afghanistan. The United Nations

Department of Safety and Security maps split Afghanistan into three main groups. By

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

Popuation density

Councils formed

Proposals Submitted

Subprojects Completed

Page 20: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 21

drawing a belt from the southwest of Afghanistan to the northeast, two main regions are

created, the Pashtuns in the south and the Tajik, Hazara and Uzbeki in the north. The

diagonal belt running across the country is the third region with pockets of both development

and safety. By splitting Afghanistan into seven UN regions the major development efforts of

the North and West are diluted by the central provinces showing only a marginal

development effort in the north and the west. Likewise, the provinces located in the middle of

the belt reduce their NSP development achievements by getting grouped with the provinces

in the insecure south.

To make the differences between regions more visible, the same data can be

analyzed using only five regions. In Figure 3 below the differences between regions are

much starker. Since Kabul is an anomaly because it has a very high population density it has

been separated out into the central region. It is also known that since Kabul does not have

many CDCs and since it is already developing rapidly, it does not depend only on the NSP

for funding infrastructure and development projects. The graph shows that the North, West

and East have embraced the community development council election process. Although the

North has only 27% of Afghanistan‘s population, it has more than 35% of the Afghanistan‘s

CDCs. Similarly the Western and Eastern regions each have only 15% of the population but

approximately 20% of the CDCs. The expansion of CDCs in the Southern region has been

problematic; however, Nimroz is the sole oddity. All other provinces in the South: Ghazni,

Zabul, Helmand, Kandahar, Uruzgan, Farah and Herat have fewer CDCs than their share of

the population.

Figure 3 – NSP expansion across four regions and Kabul in Central region

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

Central East North South West

Popuation density

Councils formed

Proposals Submitted

Subprojects Completed

Page 21: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 22

Although the East, North and West have all embraced the CDC election process

there are difference in the actual implementation abilities of these CDCs. The West is able to

leverage the abilities of the CDCs to submit many more development proposals than the

North and the East. On average each CDC in the West has submitted over 3 proposals

whereas the North and East have submitted 2.26 and 2.05 proposals per CDC. When

analyzing the implementation abilities of CDCs, submitting proposals are the first step to

completing the subprojects. To ensure the long term sustainability of scaling up in NSP

phase 3, the MRRD and NSP face several challenges in the East and South. The first is to

ensure that CDCs are being installed in the provinces and districts of the East and South

that lack them. For example the South and North have approximately the same population,

but the South has half the number of CDCs implemented. This means that the South would

have to add more than 3000 new CDC just to match the number of CDCs in the equally

populated North.

The security situation should be accounted for when pursuing expansion of CDCs

into these regions, however, CDCs that have already been implemented in the South have

shown remarkable progress. When comparing the ability of CDCs to translate an approved

proposal from the MRRD into a completed project, the South is just as good at as the North.

In both the North and South about 66% of projects that were approved by the MRRD were

completed by the CDC. This alone is not proof of a stabilizing situation in the South and

reason for CDC expansion but it does prove that the safer districts in the South can make

significant progress if given the opportunity.

The second issue is with sustaining the already implemented projects. The Western

region has completed 10,101 of the 11,270 approved projects, translating to a completion

rate of almost 90%. This shows that many districts in the Western region where significant

progress has been achieved need funding to continue the development of additional

projects. The recently announced $40 million dollar grant from the World Bank for the

execution of NSP phase 3 is a first step. In the future, as funding for the NSP phases dries

up as donor money is no longer the major source for funding the NSP, the provinces and

districts will need to seek a more stable funding source to continue the development initiated

by the World Bank.

The third issue for the long term sustainability of the NSP regionally is to ensure that

the money already invested in empowering the community and setting up CDCs are being

used effectively. As already mentioned the CDCs in the South and East have not been as

productive in submitting proposals as CDCs in the West and North. However, the issue is

Page 22: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 23

much more fundamental. In the West, every elected CDC has already completed a

community development plan (CDP), which is the first step to submitting proposals to the

MRRD but there are still about 130 districts in the South and East which have not yet

completed a CDP. This must be pursued by the MRRD and the facilitating partners.

For the regional stability of the NSP, the three issues of increasing CDCs, sustaining

funding for existing CDCs and empowering the underutilized CDCs must be actively

managed by the MRRD and the provincial facilitating partners.

PROVINCIAL SUSTAINABILITY

Although the regional data provides a good basis for understanding the overall

progress of the NSP across Afghanistan, the provincial data is useful to highlight provinces

that do not follow their regional norms. The provincial data is also useful for implementing

organizations as the facilitating partners are divided into provinces for executing the NSP.

The analysis of provinces will compare the density of the provinces to the density of

the CDCs. In theory, there should be a correlation between the number of people in a

province and the number of members per CDC in that province.

Page 23: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 2

Figure 4 - Comparing population density versus CDC density across Afghanistan's provinces.

0

1000

2000

3000

4000

5000

6000

0

100

200

300

400

500

600

700

800

mem/cdc

density

Po

pu

lati

on

Den

sity

Mem

ber

s p

er C

DC

Page 24: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 2

As apparent from Figure 4, when the population per square kilometer decreases the

population per CDC does not necessarily decrease. Although, it should be noted that there

will be an absolute minimum number of people per CDC because a CDC must include 25

families and based on the average of 8 members per family in Afghanistan the population

per CDC will never go below 200. It should also be noted that there are no provinces that

encounter this situation.

The anomaly of Figure 4 is easily visible when comparing the provinces of Kapisa

and Paktya. Kapisa has a population density of 194 and Paktya has a population density of

65 but they both have 619 people per CDC in their respective provinces. Although Kapisa is

three times denser in population than Paktya they both have the same number of people per

CDC. The limited expansion of CDCs in Paktya might be explained due to the security

situation, however, this is not the case for the relative peaceful province of Balkh. Balkh, like

Paktya is also limited in the number of CDCs that it should have relative to its population

size. However, this is not all bad. Mazar-e-Sharif in Balkh has made significant progress

even though there has been some resistance to CDCs which can be partially attributed to

the province‘s confidence in the governor, Atta Muhammad Noor (Gall, 2010). There is little

doubt that the governor has managed to bring development and security to Balkh province

with strong public support. This is even more astounding because the province is divided by

ethnic and political rivalries. Moreover, the support of Western donors to Mr. Noor‘s

governing may also undermine some of the efforts of the NSP expansion in Balkh.

Nevertheless, there have been issues in two districts of the province where insurgents

remain active. However, this city in Balkh has become an investment haven so large that

even the Finance Ministry categorizes it as the largest source of revenue for the country.

Hence, the graph shows that for the majority of cases where correlation does not occur

between the population density and members per CDC, in some cases there is still progress

being made.

As expected, towards the right of the graph are the majority of the provinces in

southern Afghanistan. Herat, Helmand, Paktika, Farah and Zabul are all provinces where

CDCs expansions have not made major inroads. There are still some outliers such as

Nangarhar which has become safer, increased development and reduced narcotics under

the leadership of Gul Agha Sherzai (Sandstrom, 2003).

Once the CDCs are implemented it is useful to compare how diligent the CDCs are at

completing proposals and following up on project proposals which are returned to the CDC

or proposals which have been outright rejected by the MRRD. The MRRD does not provide

Page 25: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 3

information on the number of subprojects that have been changed by the CDC, the number

of subprojects that have failed implementation or where the proposal has been returned or

rejected. The worst case scenario would be a subproject failure where the proposal is

approved by the MRRD and the funds disbursed but the community discards the subproject

after some or all of the funds have been utilized.

However, using the numbers provided by the MRRD some conclusions can be drawn

on the subproject proposals which have been returned and those that are rejected.

January 2008 September 2009

Province Approval Rate Completion Rate Approval Rate Completion Rate

Day Kundi 100% 47% 100% 64%

Hirat 98% 51% 100% 61%

Farah 100% 68% 100% 92%

Nuristan 95% 31% 100% 46%

Wardak 97% 45% 100% 74%

Balkh 98% 47% 100% 85%

Parwan 96% 49% 100% 77%

Ghazni 99% 70% 100% 69%

Zabul 100% 30% 99% 44%

Takhar 95% 40% 99% 62%

Samangan 99% 54% 99% 80%

Badghis 95% 47% 99% 81%

Kandahar 96% 59% 99% 70%

Faryab 96% 23% 99% 57%

Kapisa 100% 67% 99% 78%

Panjshir 99% 51% 99% 78%

Paktika 100% 78% 99% 82%

Kabul 98% 66% 99% 85%

Sari Pul 95% 27% 98% 69%

Laghman 97% 51% 98% 63%

Baghlan 89% 38% 98% 77%

Jawzjan 100% 45% 98% 83%

Khost 95% 59% 98% 59%

Bamyan 95% 56% 98% 80%

Kunduz 96% 48% 98% 78%

Hilmand 100% 36% 97% 48%

Ghor 96% 47% 97% 61%

Paktya 95% 55% 97% 70%

Nimroz 94% 62% 97% 82%

Badakhshan 96% 25% 97% 48%

Kunar 98% 44% 97% 50%

Nangarhar 95% 42% 96% 53%

Logar 92% 52% 95% 57%

Uruzgan 100% 54% 93% 18% Table 1 – Approval and completion rate of NSP subprojects across Afghanistan's provinces.

Page 26: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 4

The MRRD reports the number of proposals submitted, approved and completed.

The approval rate is derived from the number of submitted proposals and those that are

approved. In addition, the completion rate is simply the percentage of approved projects that

have been completed. On average in January 2008, 96.8% of the projects submitted by

CDCs across Afghanistan were approved by the MRRD, this number jumps slightly to 98.2%

in September 2009. In January 2008, Baghlan was the only province that had less than 90%

of its projects approved. However, Baghlan is a textbook example of figuring out what will

and will not get approved. Between January 2008 and September 2009, Baghlan had a 10%

jump in proposal approval rate. It is obvious from glancing at the approvals above that the

majority of the projects submitted do get approved. The Deputy Director of Programs for the

International Rescue Committee explains this increase using two main reasons. Firstly, the

MRRD has turned into a very slick machine in the last two years, and Kabul has become

very responsive to subproject proposals. Secondly, the facilitating partners have a much

better understanding of what will get approved. For example, in the past solar projects used

to be allowed but because they are easy to implement without the community driven process

and that parts of solar panels might be used by insurgents they no longer are approved.

Large micro hydro projects which are too big for NSP funding tend to seek funding using a

different route. Facilitating partners are more attuned to these changes and are much

quicker at adapting to these situations. In addition, it shows that there are very few projects

that will not get approved.

In terms of completion rates there are provinces that may show problems but that

can be explained using district level data. For example, Table 1 presents Uruzgan province

with a completion rate of 54% in 2008 and 18% in 2009. In 2009, the province with the

second lowest completion rate is Zabul at 44%, more than double Uruzgan‘s subproject

completion rate. To comprehend this large discrepancy for Uruzgan, its districts need to be

analyzed further. When comparing the approval rates of the individual districts, Tirin Kot and

Khas Uruzgan both have approval rates of 100%. Dihrawud had 106 of its 129 projects

approved and Chora had 66 of its 73 projects approved. Comparing the completion rates for

these two districts not a single project has been completed in either of these two districts

lowering the overall completion rate of the province of Uruzgan. The fact that the majority of

these projects in Chora and Dihrawud were only approved in June 2009 explains why the

completion rate is so low for these two districts. However, it does not explain why these two

districts were such late arrivals to the NSP development process. Dihrawud district has been

a key district linking the North-South and East-West routes of Uruzgan (Ariana, 2010). This

district borders the volatile Helmand province and it symbolic for the Taliban. It is here that

the Taliban leader Mullah Omar had strong family ties before their ouster. This can explain

Page 27: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 5

why some volatile districts are only now receiving approvals for NSP subprojects. It is also a

concrete example of security deliberately slowing down development in Afghanistan.

Looking at the data more widely it is clear that the fate of Uruzgan is shared by several other

provinces in the South and East. Table 2 below shows a list of the provinces under Uruzgan

with the lowest changes in completion rates from 2008 to 2009. Ghazni for example had 1%

lower completion rate in 2009 than in 2008.

Province Completion Rate

Uruzgan -36%

Ghazni -1%

Khost 0%

Paktika 4%

Logar 5%

Kunar 6%

Hirat 10%

Kandahar 11%

Nangarhar 11%

Kapisa 11%

Hilmand 12% Table 2 – Provinces with the lowest changes in completion rates of NSP projects from 2008 to 2009.

However, in terms of completion rates not all is bad. Leaving aside Uruzgan and

Ghazni provinces, the completion rate for NSP subprojects has increased in all other

province. Once the NSP is more stabilized, the MRRD should look at how projects are

approved more systematically. For example there are several provinces such as Daikundi,

Herat and Nuristan which are over appreciated by the MRRD and there are provinces such

as Jawzjan, Bamiyan and Nimroz that are under appreciated. When ranking the provinces

by their approval rates and completion rates, Daikundi is ranked 1st in approval rates in 2009

but 19th in completion rate in 2008. Herat is ranked 2nd in approval rates but 15th in

completion rates, Nuristan is ranked 4th in approval rates but 30th in completion rates. This is

a disturbing trend that shows Wardak, Balkh, Parwan, Zabul and Takhar in the top 10

provinces with the highest approval rate but all of these provinces have very low completion

rates. Conversely, Jawzjan, Bamiyan and Nimroz had very high completion rates until

January 2008 but were not rewarded with high approval rates for new subprojects in 2009. In

the early stages of the NSP, expansion of the program to all provinces was the primary

purpose which is understandable. However, once the NSP becomes more established, the

MRRD should pursue a meritocratic approach for program expansion. The MRRD should

consider the long term sustainability of the NSP program being hinged on results on the

ground and pursue projects based on either completion rates, impacts of the project or

simply reaching out to the poorest of the poor. However, this overarching strategy is not

visible from the current provincial expansions of the NSP. In the future, donors will be

Page 28: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 6

seeking results from the NSP as a condition of additional funding and meritocracy in MRRD

approval for subprojects will be important.

When comparing the NSP expansion across provinces, it is also useful to understand

the CDC expansions over the last few years. One conclusion that can be drawn from the

CDC expansions is that CDC expansion has been greatest in volatile provinces. In addition,

the expansion in volatile provinces means that the NSP is trying to be a truly national project

by first laying the initial governance structures in all areas. Of the top nine provinces with the

highest increases in CDCs, seven have security issues as demonstrated in Table 3 below.

Only Takhar and Nangarhar on the list can be considered safe provinces.

Province Percent increase in CDC from 2008 to 2009

Uruzgan 232.84%

Kunar 144.06%

Kandahar 138.72%

Day Kundi 136.73%

Khost 135.11%

Nangarhar 131.15%

Ghazni 129.37%

Takhar 122.62%

Hirat 121.14% Table 3 – Provinces with the highest percentage increases in CDCs between 2008 and 2009.

The second conclusion which can be drawn from the CDC expansion results is that

provinces which have a high number of members per CDC are getting the majority of new

CDCs. The figure for members per CDC is derived by dividing the population of the province

by the number of CDCs in that province. The expectation is that provinces where the

members per CDC are high, these are the same provinces where enough CDCs have been

instituted. Uruzgan, Herat, Kandahar, Nangarhar, Daikundi, Ghazni and Balkh had the

highest members per CDC and the greatest increases in CDC proving that the MRRD has

been concentrating its efforts on getting all of Afghanistan onto the NSP. The first step to

making the NSP a national project is getting CDCs in all communities and Table 4 shows

that the MRRD has concentrated its efforts in the right direction by increasing CDCs in

provinces with highest number of members per CDC.

Province Ranking of highest members per CDC Ranking of greatest increases in CDC

Kabul 1 22

Hilmand 2 23

Uruzgan 3 1

Herat 4 9

Kandahar 5 3

Nangarhar 6 6

Daikundi 7 4

Page 29: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 7

Ghazni 8 7

Balkh 9 17

Khost 10 5 Table 4 – Provinces with the highest members per CDC and the greatest increases in CDC.

LOCAL SUSTAINABILITY

The local sustainability analysis is derived from the primary data retrieved from

surveys of facilitating partners across Afghanistan. Each of the 60 respondents was asked to

complete a 16 question survey to assess the sustainability of several factors with respect to

the local implementation of the National Solidarity Program in communities. The data is used

as an aggregate to draw conclusions about the whole of the programme and the surveys

were not disaggregated by provinces or regions because there are not enough data points to

draw valid conclusions.

Cost and Funding – The cost of implementing the NSP in communities across Afghanistan

has been researched quite extensively. The general conclusion is that the NSP has

achieved concrete successes at a price tag considerably lower than having Western NGO

implementing traditional initiatives (Nagl, 2009). Human Rights Watch has observed that

NSP projects are on average 30 percent cheaper than those built by foreign

nongovernmental organizations. The NSP has been funded through two phases and was

recently approved for phase 3 with the $40 million approved by the World Bank. In the

survey conducted for this research the facilitating partners were asked to compare the

overall costs of implementing NSP projects and traditional NGO led projects. Of the 60

responses, 85% have noticed the costs to be lower in NSP projects, 3% expected similar

costs between NSP and traditional NGO projects and 12% have noticed higher costs in

implementing NSP projects in Afghanistan. Moreover, the respondents were also asked to

compare whether the final costs of the project implementations have been under or over

their initial approved budgets. 13% of facilitating partners were under their initial budget,

78% had matched their budgets and 9% of facilitating partners went over budget. The

facilitating partner ZOA Refugee Care for Afghanistan (ZOA) has established that ―too many

parties were involved providing for delays and consequently more costs‖. Hence, co-

ordination of activities between several actors is a definite cause for increased costs;

however, in the long run as the implementation of subprojects becomes second nature to the

CDC it should be able to include the additional cost of engaging more parties. However, this

diversity of groups also provides a diversity of resources. Although ZOA experienced a

higher cost for including additional actors, these additional parties actually provided more

Page 30: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 8

resources. Of the 80 projects implemented by ZOA only 1 was over budget, the majority

were just below budget.

Although including additional parties in the consultation process can be costly,

natural disasters can be another factor that increases the costs for NSP implementations.

The Aga Khan Development Network (AKDN) has found that ―due to the unpredictability of

the climate, floods, earthquakes, etc. there can be unforeseen costs‖ resulting in some

projects being over budget. However, the AKDN has also noted that under such

circumstances communities will find ways to save and volunteer more along the way

resulting in most projects being completed within the allocated budget. The facilitating

partner Bangladesh Rural Advancement Committee (BRAC) in Nangarhar has also

observed similar instances of CDCs increasing their contribution above 10% of required

costs when they observe costs going over the initial budget.

Several anecdotes were provided by the facilitating partners to compare the costs of

NSP and traditional NGO projects. CONCERN in Takhar province noted that an 11 km road

constructed by an NGO cost $1,000,000 USD, however, the local CDC completed a similar

road for less than $60,000 USD. The facilitating partner Danish Committee for Aid to Afghan

Refugees (DACAAR) in Laghman province has observed that ―the cost of NSP subprojects

are cheaper compared to other similar traditional NGOs based projects. For example, an

eight classroom school will cost around $100,000 USD under the NSP program but if it is to

be built by a construction company it will cost around $150,000.‖ The facilitating partner

Norwegian Project Office /Rural Rehabilitation Association for Afghanistan (NPO/RRAA) has

explained why the NSP projects are able to complete projects for so much cheaper.

NPO/RRAA states that ―NSP projects are able to implement the projects without a significant

administration cost; however, traditional NGOs have to account for administration, program

and operational costs‖.

The other significant expense in implementing subprojects is the cost of materials.

The facilitating partner Ghazni Rural Support Program (GRSP) has found that projects run

over initial budget because of the increasing cost of materials. However, GRSP also noted

that locals were also able to negotiate much better prices for materials than traditional

NGOs. BRAC has also remarked that ―CDCs bargain a lot during procuring‖. This brings up

an interesting point about the block grants provided by the MRRD for subproject

implementation. Although it is equitable for the MRRD to provide the same funding for similar

subprojects across Afghanistan, the funding does not vary based on local situations. The

facilitating partner Swedish Committee for Afghanistan (SCA) has stated that one of the

Page 31: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 9

major problems with the NSP is that block grant funding does not change with different

locations, road accessibilities, security situations and availability of professional staff. In

several cases the SCA has noticed that with the allocated budget one community can

implement a subproject in one location but with the same budget the same subproject

cannot be implemented in another location. The expectation is that for a sustainable long

term implementation the MRRD should make implementation costs more variable. However,

the globalized nature of contracts will mean that contractors will expand to other parts of

Afghanistan if a demand for their services exists from CDCs. It is expected that in future

subproject implementations, CDCs will experience a greater competition amongst

contractors and eventually a lower cost of implementing projects. Until this becomes reality,

the MRRD could ensure that those communities which are not as easily accessible and

those experiencing security concerns are provided with additional resources to complete

NSP subprojects.

However, it would be naïve to assume that the NSP subproject costs are the only

costs associated with the NSP implementation. The facilitating partner is contracted by the

MRRD, the facilitating partner expends resources to engage and empower the community

and the facilitating partner disburses funds to ensure a CDC is elected. By ignoring these

additional costs and only tabulating the subproject implementation costs, the NSP

subprojects are much cheaper. Although the initial setup costs of electing CDCs are onetime

costs, to provide long term sustainability, these costs cannot be ignored. In the future, newer

CDC members will be elected and additional committees will be instituted to ensure

transparency of procurement, the maintenance of infrastructure and the monitoring and

evaluation of subprojects. The facilitating partner Afghan Development Association (ADA) in

Uruzgan has stated that these costs should be included otherwise ―the NSP projects will

always look cheaper if we do not calculate the costs of FP, PMU, RRD and others‖.

Moreover, additional research should be undertaken to understand the real cost of NSP

subprojects by including the overhead costs of contracting facilitating partners and

empowering communities.

Lastly, for sustainable development to occur, meritocracy of CDCs should be a driving force

in block grant disbursement. Although the NSP is a national programme which aims to

integrate the rural population of Afghanistan with the state, the MRRD must seek to reward

those CDCs which have completed projects on time, under budget and with all requirements

met. The MRRD could start by removing the cap on budget allocations regardless of the

number of beneficiaries of the project and incentivize CDCs which are able to produce

results. In addition, the MRRD must seek to streamline the funding approval process by

Page 32: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 10

reducing the number of block grant installments and providing greater transparency of

subproject funding across districts.

Completion Time – The time it takes to complete NSP projects is by far the biggest concern

amongst facilitating partners in Afghanistan. The AKDN has stated that ―community-based

consensus and prioritization can often be a longer process than top-down descison-making‖.

This long lead time is apparent from the results of the survey conducted. Only 10% of

respondents believe that NSP projects take less time to implement than traditional NGO

based projects, 22% believe it takes the same amount of time and 68% of facilitating

partners stated that NSP projects take longer to complete than NGO led initiatives.

Generally, CDD projects do take longer to complete. There is a primary tradeoff between

short term impacts and the need for impacts to be sustained, which requires a slower and

more costly setup so that capacities can be developed. In Nangarhar province, GAA has

experienced that ―learning is always more time consuming‖. In Kandahar province, SDO

states two main reasons for the lengthy implementation. ―Firstly, proposals have to be

approved by the PMU which takes a long time, and it takes even longer to get the physical

transfer to the CDC account. In these projects, the second installment can also take a long

time to be transferred. Secondly, as NSP projects are technical and implemented by non

technical people (CDCs and ordinary people of a community) it is a bit difficult compare to

other NGOs work. Though, facilitating partners on the ground do assist in the whole process

and provide assistance for the smooth implementation of the projects proposed by

communities.‖

For the long term sustainability of NSP projects the fixed time required to elect CDCs

are deadweight costs, however, these are onetime costs. Although normal project cycles for

first implementation can take approximately 2 years several NGOs have reported that

additional subprojects in a community take less time, this decrease in completion time is

expected and should continue as CDCs become familiar with the MRRD requirements. Of all

the NGOs who completed the survey only NPO/RRAA and GAA have reported that NSP

implementations take less time. In addition, for the facilitating partners that did report longer

completion times, every single facilitating partner reported significantly longer time to

complete subprojects instead of slightly longer time to complete subprojects. Further

research is required to understand the completion time of subprojects for communities in

their second implementations. The MRRD should consider facilitating the sharing of best

practices amongst communities to reduce the time required to complete newly approved

Page 33: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 11

subprojects. Moreover, the MRRD should seek to reduce the block grant funding bottlenecks

which are a consistent concern in completing projects in a timely manner.

Infrastructure maintenance and lifespan – The facilitating partner International Rescue

Committee (IRC) has stated that in the medium term additional support is provided for

project sustainability and self reliance. Moreover, the IRC has reported that this has resulted

in people ―caring for maintenance of projects more than with other NGO‖ initiatives.

However, in Indonesia‘s Kecamatan Development Project communities have postponed

maintenance until it is unavoidable —for example, the road is about to become impassable,

or the bridge is about to collapse, and then to do the minimum that will get it back into usable

shape. In Mali, similar infrastructure projects were constructed but very few arrangements

were made for its maintenance. Hence, even though infrastructure may be standing

in a village or community, it is often underused or not being used for the purpose that was

originally intended. In Benin, although the schools were constructed there was no steady

flow of available teachers to maintain the standard of teaching in the schools. In Eritrea, the

same was true for doctors in hospitals. However, the World Bank did find that water supply

schemes in the villages of Eritrea were maintained well and concluded that if the village was

not dependent on resources from outside the village maintenance increased and with it the

lifespan of the infrastructure.

The surveys conducted with the facilitating partners in Afghanistan‘s NSP show that

82% believe that NSP subprojects are better maintained that NGO led initiatives and 18%

considered the maintenance regime to be similar. However, the surprising aspect was that

not a single facilitating partner observed maintenance to be worse in NSP subprojects

compared to traditional NGO based projects. In Sarepol, the facilitating partners still believe

that the results are not conclusive with respect to lifespan. AKDN believes that although it is

still too early to answer the question on infrastructure lifespan, there is a clear trend that

NSP projects are of better quality. With respect to infrastructure lifespan, 70% of

respondents stated that the lifespan was longer for NSP projects, 25% mentioned that the

lifespan was similar and only 5% believed that infrastructure projects had a longer life when

built with a traditional NGO based approach. Using the historical context of other countries,

the expectation it that maintenance regimes should falter over time with CDD

implementations and many facilitating partners in Afghanistan cannot conclusively state

whether the maintenance and lifespan of NSP subprojects is actually better. As the majority

of the NSP subprojects are less than 5 years old, it is crucial that future studies are able to

investigate this question in more detail.

Page 34: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 12

Community skills development – The CDD mechanism has been interpreted differently by

officials at the central and local levels and the World Bank. The local level officials view the

NSP as a means of increasing the skills of communities but World Bank practitioners often

view it as a means of doing more with less, rather than actually putting communities in

control. The AKDN has remarked that if the ―community members participate in other NGO

projects, it is only through manual labour, rather than financial management, procurement,

and decision-making‖. Therefore the NSP has been able to diversify the skill set of

individuals in local villages. Approximately 36% of the respondents believe that communities

provide more time and labour for NSP subprojects than other NGO efforts, 59% consider

communities provide equal efforts for NSP and NGO initatives, and 5% believe that

communities spend more of their own time and resources for NGO led initiatives than NSP

subprojects. In addition to the additional time invested by the communities, more than 67%

of facilitating partners agree that community pride in infrastructure subprojects is sustained

well after project completion. Therefore, not only are communities investing more time, but

they are happy with the results of investing this additional time in NSP subprojects.

In terms of skills development, 82% of facilitating partners agree that the

communities gain more skills by implementing NSP projects rather than implementing a

similar NGO led project, 17% believe that the skills gained between NSP and NGO projects

are similar and a mere 2% believe that communities gain more skills by implementing

projects using the traditional NGO led approach. Although, the community has gained many

additional skills from their NSP projects, ZOA has found that ―some do not like to be laid off

as the project comes to an end‖. This means that to continue to maintain the skills gained

and provide useful employment the NSP must seek to engage these community members

with additional training and work. The skills gains should be sustained by providing additional

funding for these communities. Moreover, civil society associations should be encouraged to

harness the skills gained and leverage them for more work. In India, it was common for field

drains and connecting drains to not be repaired. The local CDCs should encourage and hire

these community members with technical skills to maintain the infrastructure projects which

they have built.

Disaster resiliency and mitigation – It is already known that CDD has been useful in the initial

response and mitigation of natural disasters. As community members are usually the first

responders in disasters, their active participation is crucial in many World Bank financed

disaster management projects. After the 2005 tsunami, for instance, CDD approaches in

countries such as Indonesia, India, and Sri Lanka had initiated a front line response to

Page 35: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 13

ensure that resources were used effectively so that the communities themselves were

involved in assessing the needs and recovery programmes. The Second Pakistan Poverty

Alleviation Fund too was quick to respond after the earthquakes of 2005. The communities

were quick to responds and were instrumental in the facilitation of the disaster response

efforts.

There are two parts to the disaster mitigation efforts with respect to the NSP. The first

as mentioned above is the training of local community members to respond to disasters as

first responders. The AKDN and several other NGOs have reported that training is being

planned and implementation would occur soon in the communities already implementing

infrastructure projects. The second is in regards to the structural resiliency of the subprojects

already implemented. The ADA in Zabul has reported that ―the people don't know about the

disaster and its relation with the subprojects, they only wants the quick benefits.‖ However,

CONCERN in Takhar has noted that the project feasibility study is undertaken with

―engineers which is a factor on selection of project location. however in some places,

resilience of projects to natural disaster is useless because the disaster is too powerful.‖

Hence, the resiliency of projects depends on the communities implementing the projects.

The NSP Operation Manual or MRRD do not automatically disqualify approval of projects

because the resiliency of projects is not considered in the design process. However, the

MRRD might consider the benefits of this in future approvals of the infrastructure projects in

the NSP Phase 3 implementation, as the sustainability of projects is a key concern in the

phase 3 based on the World Bank funding. In Paktika province, AREP has found that the

resiliency of materials are considered which indirectly improves the stability of subprojects in

the case of natural disasters. Only 17% of facilitating partners believe that disaster resiliency

is always considered in the design and implementation of NSP projects, 51% believe that it

is not usually considered and more than 32% believe that it is never considered in NSP

subproject implementations. A recommendation should be made to the MRRD that block

grant funding should be made available for mitigation of disaster and terrorist attacks that

destroy NSP projects. The Wall Street Journal has also requested the implementation of a

Disaster Mitigation Fund for these purposes.

Insurgency attacks and security – Human Rights Watch had conducted a survey of schools

which were built by the NSP and noted that they had a lower chance of being destroyed by

insurgents than schools built by other aid programmes. The reason was simply local

ownership. "If you're the Taliban, you feel some comfort in attacking things built by

foreigners," de Tray says. "But you don't want to create animosity among citizens you're

trying to recruit to your side." Sarah Chayes, author of The Punishment of Virtue: Inside

Page 36: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 14

Afghanistan After the Taliban and now a resident of the southern city of Kandahar.

Moreover, since the NSP subprojects are less, villagers are more willing to maintain and

defend them. "If people feel invested in a project, they'll protect it, at least within reason." Not

only are the subproject less likely to be destroyed, but they are also less likely to be

vandalized. ―The Afghans have this great saying — ‗If you sweat for it, you protect it‘ — and

so getting highly localized development in the hands of communities is critical, Of the

40,000 projects built through the NSP only about 5-10% have been vandalized by local

insurgents or criminals. Community ownership is crucial and other aid programmes have not

done as well.

Although NSP infrastructure projects have been safe, the same cannot be said for

council members on the CDCs. There is evidence that the Taliban are fighting the councils

much as they have resisted other government initiatives. The Taliban have killed more than

five councilors and wounded one since the four councils were formed in Helmand Province.

In the survey conducted for this research, the results of the Human Rights Watch

survey were validated. 57% of facilitating partners have noticed that NSP projects are less

likely to be attacked than other aid initiatives, 37% of facilitating partners claim both projects

are equally likely targets and only 6% believed that NSP projects were a more likely target

than other aid initiatives. According to facilitating partners, the majority of NSP projects

therefore are less likely to be attacked by insurgents. The facilitating partners were also

asked a follow up question of who they believed provided the greatest security for NSP

infrastructure projects and CDC members: 64% believed the Afghan National Police (ANP)

provided the best protection and 36% believed that the ANP reduced the security situation in

comunities implementing the NSP. With respect to the Afghan National Army (ANA), only

about 56% believed the army provided the required security for CDCs and infrastructure

projects. As the results are not conclusive, additional research should investigate whether

the ANP, ANA or Afghan National Auxiliary Police (ANAP) were best suited to provide the

required security to civil society development. For the long term sustainability of community

members, it is crucial to understand whether the ANA or ANP actually provide the best

support for the development of the NSP. Although it is known that the army is less corrupt,

the police force provides the required day to day security in communities and support for the

local long term development of districts. Fundamentally, no foreign military force can

guarantee a sustainable and peaceful solution, therefore Afghanistan will require a robust

and well trained security force to safeguard the successes and achievements of the NSP.

However, the NSP should continue in its central focus of promoting peace and not fighting

Page 37: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 15

terrorism because fighting terrorism, is based in fear. However the promotion of peace, is

based in hope.

Community project management – One perspective of future CDCs has been to see if they

can be leveraged as civil society organizations that are able to work with external

organizations for the benefit of the community. This research asked facilitating partner

organizations about the long term sustainability of CDC collaborating with external

organizations and other neighbouring CDCs. Exactly 80% of the facilitating partners believe

that CDCs are able to play such a role in the future and only 20% believe that the current

organizational structure of the CDCs does not make conducive for the CDC to manage

additional responsibilities. In Wardak province for example, SCA believes that by using

CDCs politically to coordinate with other CDCs and the national governments in other

matters can actually ―kill the CDCs and NSP as a whole‖.

Some of the expected broader range of responsibilities proposed will provide CDCs

with a significant role in community development planning and community governance. The

new responsbilities could include: resolving internal community disputes (e.g. land, water

rights); bargaining with traders; sharing lending risk; bargaining for better share cropping

arrangements; bargaining between CDCs and developing district plans and projects, thus

achieving economies of scale; and the registration of births, marriages and deaths. A more

ambitious and longer term task, which is nonetheless worthy of consideration, is to use

CDCs to collect local taxes on the basis that they would retain the large part of the levy for

community development activities, while transferring the remaining part to government. The

collection of some form of taxes is an increasingly contentious issue. It is already known that

many civil society organizations have risen and fallen as the agencies have come and gone

and have been dependent on external funding to keep them in business. The CDC formation

and activity has been driven by considerable funding, the level of which cannot be expected

to last into the future. Without that funding, CDCs will not necessarily continue to function,

even if they exist formally. The CDCs will be critical in initiating this process from donor

funded development to community funded development. To help with this transition process

the CDCs should play a greater role in empowering communities and providing top up grants

and matching funds, hence, increasing the onus on villagers to provide the funding for CDC

led projects. Although communities already pay 10% of labour and material for infrastructure

development, the top up grants and matching funds could provide a transition to

communities providing 50% of the funds and eventually 100% of the funds, making the NSP

a self sustaining initiative.

Page 38: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 16

In terms of community skills development, the results of this research have been

overly positive. More than 82% of facilitating partners believe that NSP projects are better

able to increase community skills in trades, building and back office activities that traditional

NGO led initiatives. The task now will be for CDCs to utilize these existing skills and

leverage the abilities of community members for infrastructure repair and maintenance.

The critical aspect that threatens community development councils will be its

inactiveness. In Rio Grande do Norte in Brazil, once community association mobilized to get

the water system the people stopped mobilizing and the community did not benefit with any

other projects. Once the target of getting water was achieved the people stopped mobilizing

(World Bank, 2005). This is not a remote scenario for Afghanistan and to prevent its

occurence, the community development councils will need to continuous engage with the

community to refine CDPs and proposals so that the community does not lose interest in its

CDC but more importantly in future civil society organizations that seek to improve the lives

of the community.

It has also been common practice for community development councils to be

compared to each other, however, the circumstances of CDCs working in difficult areas

should be accounted for. The interviews with facilitating partners has revealed that the

management of CDCs in problematic areas of the countries is much more difficult.

Ideally, for the long term availability of competent CDC members, remuneration of

some form should be considered. It is clear that many CDC members are simply seeking to

improve the living conditions of their communities by engaging with civil society

organizations such as CDCs and not for supplemental income. However, the CDC cannot

effectively increase its currently responsibilities without continous access to competent

members of the community for extended periods of time. For this reason, CDC members

who are directly involved in either the administrative or project management tasks should be

adequately rewarded. There are some indications that the World Bank believes that only

those CDC members with project and site management responsibilities and in enabling roles

should be paid and those CDC members in empowerment roles should not be rewarded

(World Bank, 2005). However, many of the empowerment roles required literate members of

society who are at a premium in Afghanistan and the CDCs should compensate these

individuals for the educational backgrounds. The independence of CDCs are the only way

that facilitating partners can be eventually relieved of their tasks in empowering and enabling

the communities of Afghanistan.

Page 39: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 17

Dependency and Approval from the MRRD – It is almost unreasonable to assume that the

community development councils can be a viable solution by completely ignoring the

government structures in Afghanistan. Moreover, there has been signficant hostility of other

ministeries to allow the creation of legitimate councils through the MRRD as the MRRD

already already receives a dispropotinately large portion of international support compared

to other ministeries. The long term sustainability of these councils could be jeopardized by

the failure to expand the current efforts to the subnational governance and rmore generally,

risk the development of the NSP. This research has found that more that 57% of facilitating

partners believe that the current approval process of the MRRD is a significant drawback to

the NSP. Moreover, this research has found that 68% of facilitating partners believe that the

NSP is not sustainable by depending solely on the MRRD and 83% believe that cooperation

needs to be improved for long term viability.

The three recommendations to improve this process are to improve the disbursement

process, including the provincial administration in the process and improving the cooperation

with government departments. Firstly, to improve the disbursement process the number of

installments needs to be reduced and the CDCs should be provided with a fixed date for

when the funding will arrive so that contractors and materials can be planned accordingly.

Secondly, in the provincial administration a strategic plan must be devised to understand

what role the provincial authorities can play in improving the infrastructure development.

Thirdly, the varying ministries should be provided with concrete roles and responsibilities to

improve their co-ordination across departments for and effective and efficient delivery of the

NSP.

Transparency – Already ranked one of the five most corrupt nations in the world by

Transparency International, the MRRD has improved the image of the NSP by conducting

social audits with the help of shuras and the CDCs. The facilitating partner BRAC in

Nangarhar has reported that CDCs have regular meetings with community members and

present their activities for the last month. Some CDCs have also lost their credibility in this

process and have been voted out in subsequent elections.

This research has found that in terms of transparency the NSP has performed better

than traditional NGO led initiatives. The surveys conducted by this research found that more

than 85% of facilitating partners believe that the NSP approach implemented by CDCs is

more transparent than NGO initiatives, 10% believe it is similar and only 5% believe that the

NSP performs worse in terms of transparency. Both the cyclical elections and the public

Page 40: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 18

notice boards have acted as crucial instruments for social audits and must be enhanced in

the future to promote transparency.

Social Cohesion – In Takhar, the facilitating partner CONCERN has noted that one of the

biggest differences between NSP and NGO projects is the targeted population. NGOs are

normally mandated with more specific objective such as to help with poorest of the poor

whereas the NSP is targeting the entire community. This allows the community to build

social cohesion as they have collectively identified common needs. The facilitating partner

UN Habitat has also noticed that this collective includes many different tribes. The facilitating

partner CHA in Herat has noted that as the elections are conducted in community clusters,

each member is selected from a different cluster and as ―the members come together to

select a project for their village this can bring cohesion among the groups and tribes and can

create harmony amongst different individuals.‖ This research has confirmed that the NSP is

much more successful at building social cohesion in the community than NGO led initiatives.

83% of facilitating partners believe that the NSP does a better job than traditional NGO

projects at building social cohesion and 17% believe that both forms of development perform

equally. More importantly, not a single facilitating partner believed that NSP did a worse job

than NGO projects at building social cohesion.

Conclusions

Tim Kessler in the World Bank‘s 2004 World Development Report noted that only

about 24% of CDD water projects were sustainable. Hence, sustainability has a long way to

go in community driven development initiatives. The Aga Khan has noted that three essential

conditions must be achieved for human development initiatives to be sustainable. First, an

environment that invests in, rather than seeks to stifle, pluralism and diversity should be a

requirement. Second, an extensive and engaged civil society must be present. Thirdly,

stable and competent democratic governance should be encouraged. These three

conditions are mutually reinforcing. Taken together, they allow developing societies

gradually to become masters of the process and make that process self sustainable. These

are all three notions that the NSP seeks to achieve by encouraging social cohesion within

communities, building community development council with supporting committees and

encouraging local governance in villages across Afghanistan.

The research has provided several recommendations for aspects of the NSP which

are currently not sustainable in the above analysis. The academic question still outstanding

is whether development programmes should be initiated even if they are not considered

Page 41: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 19

sustainable. For example, should the World Bank have considered other programmes for

implementation if they knew at the initial launch of the NSP that it was not sustainable?

Should the World Bank have ensured the sustainability of the NSP before launching it in

2003? Should development programmes be implemented if they are not sustainable? These

are all important questions that the World Bank and other governments will be considering

before launching community driven development initiatives in the future.

Although sustainability is quite important with the NSP and other CDD programmes

the important question should be whether the NSP is meeting the objectives that were set

out for it. By nature, development programmes are not sustainable and CDD is just

scaffolding. Food rations in the United States for example are not sustainable but it is an

acceptable part of doing business. Even some CDD programmes that have been set up in

the past have been either unsustainable or major failures such as in East Timor where the

CDD failed miserably. CDD is nothing more than a mechanism to get money out quickly and

be effective in setting up a local government so that when the scaffolding is pulled away the

government structure stays in that form. Afghanistan is not like Pakistan where the army can

be used to setup these structures. The objectives of the NSP have been to develop

infrastructure and instill local governance. If this was the criteria that the NSP was measured

against, then it can be considered successful. Sustainability and scalability will have to be

worked into the programme. Even the MRRD considers the biggest hurdle in the future of

the programme to be its sustainability of funding. In the first 3 phases of the NSP less than

$1 billion USD been required to implement the programme. The recent announcement that

over $1 trillion USD of mineral wealth exists in the southern and eastern regions of

Afghanistan provides another major source of funding for the long term sustainability of the

NSP. Although it will take decades for Afghanistan to exploit its mineral wealth fully, the

untapped wealth will likely provide more incentives for Afghans to work together.

Lastly, this research asked facilitating partners what percent of facilitating partner

employees and community members were happy with the results of the NSP. Overall 85% or

facilitating partner employees and 84% of community members have reported being happy

with the results of the programme. These results are significantly positive and only reinforce

the fact that the programme should be expanded to newer communities but also supported

strongly where it is already in existence.

Page 42: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 20

Bibliography

African Development Bank. 2003. Summary of the Environmental and Social Impact Assessment Study of the Second National Fadama Development Project. African Development Bank. Accessed on the World Wide Web from: http://www.afdb.org/fileadmin/uploads/afdb/Documents/Environmental-and-Social-Assessments/ADF-BD-IF-2003-99-EN-NIGERIA-FADAMA.PDF Ana María Ibáñez, 2002. The Social Impact of Social Funds in Jamaica: A Mixed-Methods Analysis. Ariana, 2010. Tougher Taliban in western Uruzgan. Accessed on the World Wide Web from: http://web.e-ariana.com/ariana/eariana.nsf/7eca40d3d348841987256b79007d1cb8/e8fd3e978e5f54698725736400342a23!OpenDocument Ashley, C. and Carney, D. (1999), ―Sustainable Livelihoods: Lessons From Early Experience‖ (DfID), p.1 Asian Development Bank. 2008. Community-Driven Development and Strategy 2020. Accessed on the World Wide Web from: http://www.adb.org/Documents/Participation/Brochure-CDD.pdf Asim Ijaz, K. 2001. ―Can Good Projects succeed in Bad Communities? Collective Action in the Himalayas.‖ Harvard University. Department of Economics, Cambridge, Mass. Binswanger, H., and S. Aiyar. 2003. Scaling up community driven development: Theoretical underpinnings and program design implications. Draft. World Bank, Washington, D.C. Brick, J. 2008. ―Investigating the Sustainability of Community Development Councils in Afghanistan,‖. Accessed on the World Wide Web from: http://polisci.wisc.edu/users/brick/files/brick-cv.pdf, 10 (accessed 15 November 2008). This section draws heavily on the material in this report. CARE Workshop in Atlanta, August 2002, ―A Rights-Based Approach to Achieving Household Livelihoods Security‖ from Drinkwater, M. (2001), ―Programming Principles for a Rights-Based Approach‖ Centre for Policy and Human Development. 2007. Annual Report. Accessed on the World Wide Web from: http://planipolis.iiep.unesco.org/upload/Afghanistan/Afghanistan_hdr2007.pdf CIDA. 2007. Review of the Afghanistan Program Final Version. Accessed on the World Wide Web from: http://www.acdi-cida.gc.ca/inet/images.nsf/vLUImages/Afghanistan/$file/RapportAfghanistanSept07-e.pdfhttp://www.acdi-cida.gc.ca/inet/images.nsf/vLUImages/Afghanistan/$file/RapportAfghanistanSept07-e.pdf Dixon, J., Gulliver, A., Gibbon, D. (2001), ―Farming Systems and Poverty‖, FAO Dongier, P., Domelen, J. V., Ostrom, E., Rizvi, A., Wakeman, W., Bebbington, A, Alkire, S., Esmail, T., and Polski, M. 2002. Chapter 9: Community Driven Devlopment. World Bank. Accessed on the World Whttp://siteresources.worldbank.org/INTPRS1/Resources/383606-1205334112622/5805_chap9.pdf

Page 43: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 21

El-Gammal, Y. 2004. Yemen: Social Fund for Development III Project. MfDR Principles in Action: Sourcebook on Emerging Good Practices. Accessed on the World Wide Web from: http://www.mfdr.org/sourcebook/1stEdition/6-6Yemen-SocialFund.pdf Ellis and Biggs 2001. Evolving themes in rural development. Development Policy Review 19 (4), pp. 437-448 FAO. 2010. Annex 1: Profile of the Main Development Approaches in the Study. Accessed on the World Wide Web from: http://www.fao.org/docrep/007/j3137e/j3137e0c.htm Frances, C. 1999. ―Paradoxes of Participation: Questioning Participation Approaches to Development.‖ Journal of International Development 11(4):597-612 Ghani, C. and Lockart, C. 2008. Fixing Failed States (New York: Oxford University Press, 2008), 205 Gall, C. 2010. In Afghanistan's North, Ex-Warlord Offers Security. Accessed on the World Wide Web from: http://www.nytimes.com/2010/05/18/world/asia/18mazar.htm Gillespie, S. 2004. SCALING UP COMMUNITY-DRIVEN DEVELOPMENT: A SYNTHESIS OF EXPERIENCE. The World Bank. Accessed on the World Wide Web from: http://www.expandnet.net/PDFs/Gillespie.pdf Guggenheim, S. 2004. Indonesia’ s Kecamatan Development Program: A Large-Scale Use of Community Development to Reduce Poverty. Accessed on the World Wide Web from: http://info.worldbank.org/etools/docs/reducingpoverty/case/88/fullcase/Indonesia%20KDP%20Full%20Case.pdf International Development Association. 2009. Community-Driven Development: Delivering the Results People Need. World Bank. Accessed on the World Wide Web from: http://siteresources.worldbank.org/IDA/Resources/IDA-CDD.pdf International Fund for Agriculture Development. 2010. Community Driven Development: IFAD's engagement in community-driven development. Accessed on the World Wide Web from: http://www.ifad.org/english/cdd/index.htm Katz, Travis and Jennifer Sara. 1997. ―Making Rural Water Supply Sustainable: Recommendations from a Global Study.‖ Water and Sanitation Program , Washington, D.C. Kleemier, E. 2000. ―The impact of Participation on Sustainability: An Analysis of the Malawi Rural Piped Scheme Program.‖ World Development 28(5):929-44 Mansuri, G., and Vijeyendra Rao. 2004. Community-Based and -Driven Development: A Critical Review. Policy Research Working Paper No. 3209. Washington, DC: World Bank. February. McNiel, M., and K. Keuhnast, with Anna O‘Donnel. 2004. Assessing Capacity for Community Based Development – A Pilot Study in Tajikistan. Washington, DC: World Bank Institute. December. Nagl, John A., Exum, A., Humayun, A. 2009. ―A Pathway to Success in Afghanistan: The National Solidarity Program‖. Center for New American Security. March 2009.

Page 44: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 22

Naidoo, K. and Finn, V. 2001. From Impossibility to Reality: A reflection and position paper on the civicus index of civil society project 1999-2001. CIVICUS World Alliance for citizenship Participation. Accessed on the World Wide Web from: http://www.civicus.org/new/media/CIVICUSPositionPaper1.pdf Perez de Castillo, C. 1998. Economic Analysis of Social Investment Fund Projects. Accessed on the World Wide Web from: http://siteresources.worldbank.org/INTCDD/Resources/EA.pdf Rawlings, L.B., L. Sherburne-Benze, and J. Van Domelen. 2004. Evaluating Social Funds – A Cross-Country Analysis of Community Investments. Regional and Sector Studies. Washington, DC: World Bank. Sandstrom, E. 2003. Afghanistan and Central Asia after September 11 – the Security-Political Development. Accessed on the World Wide Web from: http://www.asia.foi.se/pdf/afghanistan-and-central-asia-2003-03-18.pdf Tanaka, S. 2006. A review of community-driven development and its applications to the Asian Development Bank. Asian Development Bank. Accessed on the World Wide Web from: http://www.adb.org/Documents/Participation/Review-CDD-Application-ADB.pdf Toulmin, C. (1994) Gestion de Terroirs: Concept and Development World Bank. 2003. PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT IN THE AMOUNT OF SDR 114 MILLION (US$150 MILLION EQUIVALENT) TO INDIA FOR THE ANDHRA PRADESH RURAL POVERTY REDUCTION PROJECT. The World Bank. Accessed on the World Wide Web from: http://www.rd.ap.gov.in/velugu/pdf/velugupad.pdf World Bank OED (World Bank Operations Evaluation Department). 2005. The Effectiveness of World Bank Support for Community-Based and -Driven Development, An OED Evaluation. Washington, DC. Accessed on the World Wide Web from: http://siteresources.worldbank.org/EXTEFFWBSUPCOMDRIDEV/Resources/cbdcdd_complete_report.pdf World Bank. 2006. Institutional Enhancement and Sustainability. Accessed on the World Wide Web from: http://siteresources.worldbank.org/EXTEFFWBSUPCOMDRIDEV/Resources/cbdcdd_chapter4.pdf World Bank Annual Report. 2009. Accessed from the World Wide Web from: http://issuu.com/world.bank.publications/docs/9780821379462 WCED (World Commission on Environment and Development) (1987). Our common future. New York: Oxford University Press. Zakaria, F. 1999. Beyond Money: Development as Freedom. The New York Times. Accessed on the World Wide Web from : http://www.nytimes.com/1999/11/28/books/beyond-money.html Zoellick, R. ―The Key to Rebuilding Afghanistan‖ Washington Post (22 August 2008)

Page 45: Analyzing the sustainability of community driven development in Afghanistan using the National Solidarity Program case study

Page 23

Annex

The population and geographical area of the 34 provinces in Afghanistan sourced from the

Ministry of Rural Rehabilitation and Development.

Province Population Area (km²)

Badakhshan 819,396 44,059

Badghis 499,393 20,591

Baghlan 741,690 21,118

Balkh 1,123,948 17,249

Bamiyan 343,892 14,175

Daykundi 477,544 8,088

Farah 493,007 48,471

Faryab 833,724 20,293

Ghazni 1,080,843 22,915

Ghor 635,302 36,479

Helmand 1,441,769 58,584

Herat 1,762,157 54,778

Jowzjan 426,987 11,798

Kabul 3,314,000 4,462

Kandahar 913,000 54,022

Kapisa 358,268 1,842

Khost 638,849 4,152

Kunar 413,008 4,942

Kunduz 820,000 8,040

Laghman 382,280 3,843

Logar 322,704 3,880

Nangarhar 1,342,514 7,727

Nimruz 117,991 41,005

Nurestan 130,964 9,225

Orūzgān 320,589 22,696

Paktia 415,000 6,432

Paktika 809,772 19,482

Panjshir 128,620 3,610

Parwan 491,870 5,974

Samangan 378,000 11,262

Sar-e Pol 442,261 15,999

Takhar 830,319 12,333

Wardak 529,343 9,934

Zabul 244,899 17,343