1
FIGURE anderson perry associates, i nc. & 4-4A T. 13 S., R. 31 E. W.M. John Day River U.S. HWY. 395/26 To Mt. Vernon Job# 592-25-020 Jun. 7, 2018 lbauer CITY OF JOHN DAY, OREGON WASTEWATER FACILITIES PLAN UPDATE ALTERNATIVE B - MECHANICAL WASTEWATER TREATMENT FACILITIES To Prairie City 0 300 300 SCALE IN FEET EXISTING WASTEWATER TREATMENT FACILITIES STRUCTURES IN THIS AREA TO BE DEMOLISHED SEE PROCESS SCHEMATIC FIGURE 4-4B AEROBIC DIGESTERS MECHANICAL WASTEWATER TREATMENT FACILITY TREATED EFFLUENT TO DISPOSAL DEWATERED SLUDGE TO LAND APPLICATION SITE OR LANDFILL SLUDGE THICKENING AND DEWATERING BUILDING HEADWORKS BUILDING - FINE SCREEN, GRIT REMOVAL, FLOWMETER, INFLUENT LIFT STATION 18-INCH GRAVITY SEWER MANHOLE, TYP. EXISTING INFLUENT

anderson perry 4-4A - John Day, Oregon€¦ · anderson perry & associates, inc. 4-4a t. 13 s., r. 31 e. w.m. john day river. 395/26 to mt. vernon job# 592-25-020 jun. 7, 2018 lbauer

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: anderson perry 4-4A - John Day, Oregon€¦ · anderson perry & associates, inc. 4-4a t. 13 s., r. 31 e. w.m. john day river. 395/26 to mt. vernon job# 592-25-020 jun. 7, 2018 lbauer

FIGUREandersonperry

associates, inc.& 4-4AT. 13 S., R. 31 E. W.M.

John

Day

River

U.S. HWY. 395/26

To

Mt.

Ve

rno

n

Job#

592

-25-

020

Jun

. 7, 2

018

lbau

er

CITY OFJOHN DAY, OREGON

WASTEWATER FACILITIES PLAN UPDATE

ALTERNATIVE B - MECHANICAL WASTEWATER TREATMENT FACILITIES

To Prairie City

0 300 300 SCALE IN FEET

EXISTING WASTEWATER TREATMENT FACILITIES STRUCTURES IN THIS AREA TO BE DEMOLISHED

SEE PROCESS SCHEMATIC FIGURE 4-4B

AEROBIC DIGESTERS

MECHANICAL WASTEWATER TREATMENT FACILITY

TREATED EFFLUENT TO DISPOSAL

DEWATERED SLUDGE TO LAND APPLICATION SITE OR LANDFILL

SLUDGE THICKENING AND DEWATERING BUILDING

HEADWORKS BUILDING - FINE SCREEN, GRIT REMOVAL, FLOWMETER, INFLUENT LIFT STATION

18-INCH GRAVITY SEWER

MANHOLE, TYP.

EXISTING INFLUENT